UNIT –II
INTRODUCTION TO WATER SUPPLY SCHEME
a) Introduction to water supply scheme:
b) Water intake structures:
c) Quantity:
WATER IS THE BASIC NEED OF ALL LIVING BEING
 NECESSITY OF WATER
 Drinking, cooking, washing, bathing, sanitary purpose.
 Industrial Processes, Steam generation.
 Swimming pools, water games(parks).
 Ornamental displays like fountains.
 Watering lawns, gardens and roads.
 For modern applications such as air conditioners, dish
washers, washing machines etc.
 For extinguishing fires
 Irrigation purposes.
WATER SUPPLY SCHEME : VARIOUS PHASES
 Selection of source
 Collection and conveyance of raw water
 Treatment of water
 Pumping and storage of water in ESR
 Distribution of water
DATA TO BE COLLECTED FOR WATER SUPPLY SCHEME
1. Source of water
2. Quantity of water required
- - Population to served
- - Water demands- domestic, public, industrial
- - Design period
3.Quality of water 4. Survey data
5. Map or plan of town or city and
6. Acquisition of land & compensations
COMPONENTS OF WATER SUPPLY SCHEME
Water Source
Intake
Structure
Pumping
Unit
Rising/
falling main
Treatment
Units
ESR
Distribution
System
LAYOUT OF WATER SUPPLY SCHEME
Source Intake Well Jack Well Aeration
Clarifier
Sand
filter
Disinfection
Distribution
Storage
Tank
ESR
DESIGN PERIOD
 Future estimated period of number of years for which
provision is made in designing the capacities of various
components/units of water supply scheme is called as
design period.
DESIGN PERIOD FOR VARIOS COMPONENTS OF WTP
Sr.
No
Components Suggested design
Period
1. Dam, Weir, Intake Structure,
Reservoir, penstock pipe
30 – 35 Years
2. Treatment units- aerator,
clarifier, filter
20 – 30 Years
3. Distribution System
a) Pipe less than 300 mm Dia. 30 Years
b) Pipe More than 300 mm Dia. 20 – 25 Years
CONVEYANCE OF WATER
Selection of material for Pipe
 Carrying capacity of the pipe
 Durability of the pipe
 Type of water to be conveyed
 Availability of funds
 Repair and maintenance cost
Types of Pipes
1.Cast iron: Available in length of 3-6m
Advantages: Moderate cost
highly resistant to corrosion,
Strong,, easy jointing,
withstanding high internal pressure
long life (100 Yrs.)
Service connections easy
 Disadvantages :Very heavy and difficult to transport,
brittle easily cracks, cannot used for pressure more than
7 kg/cm2. they are fragile (delicate ).
2. Steel pipe: Made from steel bars, by hot or cold process.
mostly used for main lines where pressure is high and
diameter requirement is more.
Advantages: strong, light weight and withstand higher
pressure than cast iron pipes, cheap, easy to construct and
can be easily transported.
Disadvantages: Cannot withstand external loads,
affected by corrosion,
difficult to make connections,
and maintenance are costly.
3. Cement lined Cast Iron Pipes: Mortar lining of 1:1
proportion is applied . Thickness of lining 5 – 6 mm.
Advantages: more life, Easily constructed on site and
factories, least coefficient of expansion, not affected by
force of buoyancy.
Disadvantages : Repairs are very difficult, difficult to
make connection, due to heavy weight transportation and
laying costs are high.
4. Plastic Pipes: Made from synthetic resins of high
molecular weight. Polymerized from simple compounds by
heat, pressure and catalysis. Plastic pipes and tubes are
manufactured from a number of polymerization products
such as polythene, polypropylene,, poly vinyl chloride and
cellulose acetate butyrate.
Advantages - corrosion resistant , light weight and
economical, Cheaper, easy to handle and transport, good
electrical insulators, adequate strength, durable and
unaffected by weather.
Disadvantages :
Coefficient of
expansion is high,
low resistance to heat.
5.Wrought iron and galvanized iron pipes: Manufactured
by rolling flat plates of wrought iron to the proper
diameter and welding the edges. These pipes are
usually protected by coating them with a thin film of
molten zinc. Easily cut, threated, lighter in weight. More
costly , less durable.
6. Cement concrete pipes: PCC up to heads of 7m.
RCC up to head of 60m. For higher heads prestressed
concrete pipes are sed.
NP1,NP2,NP3 – non-reinforced or non-pressure pipes.
used for drainage lines, irrigation etc.
P1,P2,P3 – Reinforced concrete pipes. Pressure they
withstand may be 2.0 kg/cm2(20 m), 4.0 kg/cm2 (40m)
and 6.0 kg/cm2(60m).
Advantages: resists the external loads and backfill
loads, maintenance cost is less, no corrosion, pipe can be
cast at site, no transportation cost. No expansion joints.
Disadvantages: Tensile cracks, leakage problem ,
repair is difficult, handling is difficult.
7. Copper and lead pipes: made from copper and lead,
costly, soft and bend easily
 VALVES: various appurtenances are use to isolate and drain pipe
sections for test, installation, cleaning and repair.
 Valves are one of the important device provided to stop and regulate
the flow of water in the course of ordinary operations and in an
emergency.
VALVES ARE USED TO SERVE THE FOLLOWING PURPOSES:
 To control the rate of flow of water
 Release or admit air into the pipeline
 Prevent or detect the leakage
 Meet the demand during emergencies
 Make the distribution system more efficient.
FACTORS CONSIDERED IN THE SELECTION OF VALVES:
 purpose and operation,
 capacity required,
 head loss and rate of flow,
 cost,
 availability, etc.
TYPES OF VALVES
 Sluice or gate valve
 Air relief Valve
 Reflux valve
 Relief valve
 Altitude
 Score Valve
SLUICE VALVE: These are also known as gate for stop
valve. They are used in distribution system. Spacing of
these valves may be between 150 to 300 meters. Also
placed at street corners or where two pipelines intersects.
 AIR RELIEF VALVE: Air relief valves are installed at
high points of distribution piping to provide an exit for
entrapped air. They are also used to discharge air when
a main is being filled and to admit air when it is being
emptied.
REFLUX VALVE: It is also known as check valve or Non-
return valve. This valve allows the water to flow in one
direction only. They are placed in water pipes which
obtain water directly from the pump. when the pump is
stopped ,they the in the pipe dose not rush back and
damage the pump. It consists of flat disc, pivoted so that it
is forced open when flow of water is in one direction and
forced shut against a seating when flow tries to reverse.
PRESSURE RELIEF VALVE: also known as automatic
cutoff valve or safety valve. They are located at those
points where pressure is likely to be maximum. When
pressure in line increases above preset value, the valve
operates automatically, and the pressure is reduced.
 ALTITUDE VALVES : These valves are mainly used
on those lines which supply water to elevated tanks
or stand pipes, to automatically control the flow into
and out of an elevated storage tank or standpipe to
maintain desired water level elevations. These valves
close automatically when the tank is full and open
when the pressure on pump side is less than on the
tank side of the valve.
 SCORE VALVE: Also known as blow off or washout
valve. Located either at dead ends or at lowest points
in the mains. Provided to remove the sand and grit
deposited in the pipelines.
Unit  ii introduction to water supply scheme
Unit  ii introduction to water supply scheme
INTAKE STRUCTURES
 Intake structures are the structures used for admitting
water from the surface sources and conveying it further
to the treatment plant. It is masonry or concrete
structure with an aim of providing relatively clean
water, free from pollution, sand, grit and objectionable
material.
Factors Governing Location of Intake
 As far as possible, the site should be near the treatment
plant so that the cost of conveying water to the city is
less.
 The intake must be located in the purer zone of the
source to draw best quality water from the source,
thereby reducing load on the treatment plant.
 The intake must never be located at the downstream or
in the vicinity of the point of disposal of wastewater.
 The site should be such as to permit greater
withdrawal of water, if required at a future date.
 The intake must be located at a place from where it
can draw water even during the driest period of the
year.
 The intake site should remain easily accessible
during floods and should not get flooded. Moreover,
the flood waters should not be concentrated in the
vicinity of the intake.
 It should have good foundation, further expansion can
be possible, river flow should not get obstructed.
TYPES OF INTAKE
Submerged Exposed Wet Dry
Constructed
entirely
under water.
Such intake
are used to
get supply
from lake.
It is in the form of
tower or well
constructed near
bank of river or
away from bank.
These are very
common due to
ease in its
operation.
A wet intake is
that type of
intake tower in
which the
water level is
practically the
same as the
water level of
the sources of
supply.
There is no
water in the
water tower.
Water enters
through port
directly into the
conveying
pipes. The dry
tower is simply
used for the
operation of
valves.
 River Intake
 Reservoir Intake
 Lake Intake
 Canal Intake
Unit  ii introduction to water supply scheme
Unit  ii introduction to water supply scheme
Unit  ii introduction to water supply scheme
Unit  ii introduction to water supply scheme
Unit  ii introduction to water supply scheme
INTAKE STRUCTURES
Unit  ii introduction to water supply scheme
Unit  ii introduction to water supply scheme
VARIOUS TYPES OF CONSUMPTION/DEMANDS
 Domestic consumption
 Industrial and commercial demand
 Public demand
 Fire fighting demand.
 Domestic consumption: the water required for
actual household activities is known as domestic
demand. It includes water required for drinking,
cooking, bathing, washing flushing of toilets etc.
Details of Domestic consumption
Purpose Water consumption
( lit/capita/day)
Drinking
Cooking
Cleaning of utensils and
house
Washing of clothes
Flushing of water
closets(W.C.)
Bathing
TOTAL
5
5
20
20
30
55
135
 Industrial and Commercial Demand: Industry requires large
quantity of water for manufacturing, cooling operation, steam
generation, for processing and sanitation. This is known as
industrial demand. Commercial demand includes water required
for private offices, restaurants, cinema halls motor garages and
small scale industries. This demand can be expressed per capita
demand ,by dividing the industrial demand by the population of
the area.
Details of Industrial and commercial Demand
ACTIVITY DEMAND(lit/capita/day)
Factories
Offices
Restaurants/seat
Hotels/person
Cinema/seat
30-45
45
70
180
15
 Public Demands: It includes water required for
washing of roads, cleaning of public sewers, watering
of parks, gardens water fountains, swimming pools,
flushing of water closets and urinals, hospitals, hotels,
schools and colleges. This demand is about 5
percentage of total demand.
Details of Public Demands
ACTIVITY DEMAND
Public gardens
Street washing
Sewer cleaning
Hospitals
Hotels
Schools(without boarding)
Schools(with boarding)
1.4 lit/m2/day
1.0 lit/m2/day
4.5 lit/head/day
340 - 450 lit/bed/day
135 lit/head/day
45 lit/head/day
135 lit/head/day
FIRE FIGHTING DEMAND
FACTORS AFFECTING PER CAPITA DEMAND
IN A COMMUNITY
 People's habits
 Industrialization
 Public Services
 Climatic conditions
 Systems of water supply
 Meter system
 System of drainage
 Availability of supplementary sources
 Distribution pressure
 Cost of water
POPULATION FORECASTING
1. Arithmetic Increase Method:
 This method is generally applicable to large and old
cities.
 In this method average increase of population per
decade is calculated from the past records and added to
the present population to find out population of next
decade.
 This method gives a low value and is suitable for well
settled and established cities.
Pn = P + n x i
Pn = Population after n decade
P = Present population, n = Nos of decades
i = Average increase in population
2. GEOMETRIC INCREASE METHOD
 In this method percentage increase in population from
decade to decade remains constant.
 Therefore, the average value of percentage increase in
population is calculated and the future population are
calculated at this rate.
 This method gives much higher value and mostly
applicable for growing towns and cities having vast scope
for expansion.
Pn = P( 1 + r/100)n
Where r = Average percentage rate of population increase
P = Present population
Pn = Population after n decade
3. INCREMENTAL INCREASE METHOD
 This method is the combination of arithmetic increase
method and geometric increase method.
 Hence ,combines the advantages of both methods and
gives satisfactory results.
 In this method, average increase per decade is first
calculated and to this average of net incremental
increase once for every future decade is added.
Pn = P + n x i + n(n + 1)/2 x I
Where I = Average incremental increase
i = Average increase per decade
n = Nos of decades
 Decreasing rate of increase method
 Graphical comparison method
 Graphical extension method

More Related Content

PPT
Intake structures-Introduction
PPTX
Sources of water supply
PPTX
Water demand
PPTX
Collection and estimation of sewage
PPTX
Collection of sewage & estimation of its discharge
PPTX
Water distribution System In Water Supply Schemes
PPTX
Spillways components and types
PPTX
Water demand
Intake structures-Introduction
Sources of water supply
Water demand
Collection and estimation of sewage
Collection of sewage & estimation of its discharge
Water distribution System In Water Supply Schemes
Spillways components and types
Water demand

What's hot (20)

PPTX
Sewer appurtenances
PPT
Introduction to water supply engg. by Prof. D S.Shah
PPTX
Sewer Design
PPTX
Water distribution system
PPTX
SEWERAGE SYSTEMS ppt by mayank oza
PPTX
P.P.T on water distribution system by Manish Pandey
PDF
L 3 collection and conveyance
PPTX
Storm water drainage
PPTX
PPTX
Sewer Appurtenances
PPTX
Collection and Distribution of Water: Intakes
PPTX
Sewer appurtenances
PPTX
Storage and distribution reservoirs
PPTX
Interceptors and manholes
PPTX
Pipe lines in sewage system
PPTX
Small bore system: Wastewater Engineering
PPT
Spillway
PPT
Intake structures in wwwe
PPTX
Pumping Stations
PPT
Railway Gauge
Sewer appurtenances
Introduction to water supply engg. by Prof. D S.Shah
Sewer Design
Water distribution system
SEWERAGE SYSTEMS ppt by mayank oza
P.P.T on water distribution system by Manish Pandey
L 3 collection and conveyance
Storm water drainage
Sewer Appurtenances
Collection and Distribution of Water: Intakes
Sewer appurtenances
Storage and distribution reservoirs
Interceptors and manholes
Pipe lines in sewage system
Small bore system: Wastewater Engineering
Spillway
Intake structures in wwwe
Pumping Stations
Railway Gauge
Ad

Similar to Unit ii introduction to water supply scheme (20)

PPT
Storm water rain water harvesting
PPTX
Water conveyance and distribution
PPT
Hydropower water conveyance systam
PPT
hydro power energy water conveyance system
PPTX
Water distribution system
PPT
Conveyence and distribution
DOCX
intakes and transportation of water
PPTX
Introduction to Sewerage and Wastewater .pptx
PPTX
APPERANTANCES in water sypply system for towns and city
PDF
Planning and design of building services in multi Story
PPTX
Malay nces ppt
PPTX
Water distribution system by kalpesh solanki
PPTX
waterdistributionsystem-.pptx
PPTX
Water supply final
PPTX
L16- Distribution Systems.pptx
PPTX
Water Resources Engineering (CVE 728)--Slide 5.pptx
PDF
Unit I Water Distribution System.pdf
PDF
Summary_Utilities.pdf
PPTX
Lesson 6 ppt
PDF
Unit 4.pdf kerth qwrd qwwe09wejokqe awedwoi
Storm water rain water harvesting
Water conveyance and distribution
Hydropower water conveyance systam
hydro power energy water conveyance system
Water distribution system
Conveyence and distribution
intakes and transportation of water
Introduction to Sewerage and Wastewater .pptx
APPERANTANCES in water sypply system for towns and city
Planning and design of building services in multi Story
Malay nces ppt
Water distribution system by kalpesh solanki
waterdistributionsystem-.pptx
Water supply final
L16- Distribution Systems.pptx
Water Resources Engineering (CVE 728)--Slide 5.pptx
Unit I Water Distribution System.pdf
Summary_Utilities.pdf
Lesson 6 ppt
Unit 4.pdf kerth qwrd qwwe09wejokqe awedwoi
Ad

Recently uploaded (20)

PDF
Basic Mud Logging Guide for educational purpose
PPTX
Lesson notes of climatology university.
PDF
102 student loan defaulters named and shamed – Is someone you know on the list?
PDF
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
PPTX
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
PDF
TR - Agricultural Crops Production NC III.pdf
PDF
Pre independence Education in Inndia.pdf
PPTX
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
PPTX
Introduction_to_Human_Anatomy_and_Physiology_for_B.Pharm.pptx
PPTX
GDM (1) (1).pptx small presentation for students
PDF
RMMM.pdf make it easy to upload and study
PDF
Sports Quiz easy sports quiz sports quiz
PDF
STATICS OF THE RIGID BODIES Hibbelers.pdf
PDF
Insiders guide to clinical Medicine.pdf
PPTX
PPH.pptx obstetrics and gynecology in nursing
PDF
Anesthesia in Laparoscopic Surgery in India
PPTX
Renaissance Architecture: A Journey from Faith to Humanism
PDF
Module 4: Burden of Disease Tutorial Slides S2 2025
PDF
VCE English Exam - Section C Student Revision Booklet
PDF
Complications of Minimal Access Surgery at WLH
Basic Mud Logging Guide for educational purpose
Lesson notes of climatology university.
102 student loan defaulters named and shamed – Is someone you know on the list?
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
TR - Agricultural Crops Production NC III.pdf
Pre independence Education in Inndia.pdf
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
Introduction_to_Human_Anatomy_and_Physiology_for_B.Pharm.pptx
GDM (1) (1).pptx small presentation for students
RMMM.pdf make it easy to upload and study
Sports Quiz easy sports quiz sports quiz
STATICS OF THE RIGID BODIES Hibbelers.pdf
Insiders guide to clinical Medicine.pdf
PPH.pptx obstetrics and gynecology in nursing
Anesthesia in Laparoscopic Surgery in India
Renaissance Architecture: A Journey from Faith to Humanism
Module 4: Burden of Disease Tutorial Slides S2 2025
VCE English Exam - Section C Student Revision Booklet
Complications of Minimal Access Surgery at WLH

Unit ii introduction to water supply scheme

  • 1. UNIT –II INTRODUCTION TO WATER SUPPLY SCHEME a) Introduction to water supply scheme: b) Water intake structures: c) Quantity:
  • 2. WATER IS THE BASIC NEED OF ALL LIVING BEING  NECESSITY OF WATER  Drinking, cooking, washing, bathing, sanitary purpose.  Industrial Processes, Steam generation.  Swimming pools, water games(parks).  Ornamental displays like fountains.  Watering lawns, gardens and roads.  For modern applications such as air conditioners, dish washers, washing machines etc.  For extinguishing fires  Irrigation purposes.
  • 3. WATER SUPPLY SCHEME : VARIOUS PHASES  Selection of source  Collection and conveyance of raw water  Treatment of water  Pumping and storage of water in ESR  Distribution of water DATA TO BE COLLECTED FOR WATER SUPPLY SCHEME 1. Source of water 2. Quantity of water required - - Population to served - - Water demands- domestic, public, industrial - - Design period 3.Quality of water 4. Survey data 5. Map or plan of town or city and 6. Acquisition of land & compensations
  • 4. COMPONENTS OF WATER SUPPLY SCHEME Water Source Intake Structure Pumping Unit Rising/ falling main Treatment Units ESR Distribution System
  • 5. LAYOUT OF WATER SUPPLY SCHEME Source Intake Well Jack Well Aeration Clarifier Sand filter Disinfection Distribution Storage Tank ESR
  • 6. DESIGN PERIOD  Future estimated period of number of years for which provision is made in designing the capacities of various components/units of water supply scheme is called as design period. DESIGN PERIOD FOR VARIOS COMPONENTS OF WTP Sr. No Components Suggested design Period 1. Dam, Weir, Intake Structure, Reservoir, penstock pipe 30 – 35 Years 2. Treatment units- aerator, clarifier, filter 20 – 30 Years 3. Distribution System a) Pipe less than 300 mm Dia. 30 Years b) Pipe More than 300 mm Dia. 20 – 25 Years
  • 7. CONVEYANCE OF WATER Selection of material for Pipe  Carrying capacity of the pipe  Durability of the pipe  Type of water to be conveyed  Availability of funds  Repair and maintenance cost Types of Pipes 1.Cast iron: Available in length of 3-6m Advantages: Moderate cost highly resistant to corrosion, Strong,, easy jointing, withstanding high internal pressure long life (100 Yrs.) Service connections easy
  • 8.  Disadvantages :Very heavy and difficult to transport, brittle easily cracks, cannot used for pressure more than 7 kg/cm2. they are fragile (delicate ). 2. Steel pipe: Made from steel bars, by hot or cold process. mostly used for main lines where pressure is high and diameter requirement is more. Advantages: strong, light weight and withstand higher pressure than cast iron pipes, cheap, easy to construct and can be easily transported. Disadvantages: Cannot withstand external loads, affected by corrosion, difficult to make connections, and maintenance are costly.
  • 9. 3. Cement lined Cast Iron Pipes: Mortar lining of 1:1 proportion is applied . Thickness of lining 5 – 6 mm. Advantages: more life, Easily constructed on site and factories, least coefficient of expansion, not affected by force of buoyancy. Disadvantages : Repairs are very difficult, difficult to make connection, due to heavy weight transportation and laying costs are high.
  • 10. 4. Plastic Pipes: Made from synthetic resins of high molecular weight. Polymerized from simple compounds by heat, pressure and catalysis. Plastic pipes and tubes are manufactured from a number of polymerization products such as polythene, polypropylene,, poly vinyl chloride and cellulose acetate butyrate. Advantages - corrosion resistant , light weight and economical, Cheaper, easy to handle and transport, good electrical insulators, adequate strength, durable and unaffected by weather. Disadvantages : Coefficient of expansion is high, low resistance to heat.
  • 11. 5.Wrought iron and galvanized iron pipes: Manufactured by rolling flat plates of wrought iron to the proper diameter and welding the edges. These pipes are usually protected by coating them with a thin film of molten zinc. Easily cut, threated, lighter in weight. More costly , less durable. 6. Cement concrete pipes: PCC up to heads of 7m. RCC up to head of 60m. For higher heads prestressed concrete pipes are sed. NP1,NP2,NP3 – non-reinforced or non-pressure pipes. used for drainage lines, irrigation etc. P1,P2,P3 – Reinforced concrete pipes. Pressure they withstand may be 2.0 kg/cm2(20 m), 4.0 kg/cm2 (40m) and 6.0 kg/cm2(60m).
  • 12. Advantages: resists the external loads and backfill loads, maintenance cost is less, no corrosion, pipe can be cast at site, no transportation cost. No expansion joints. Disadvantages: Tensile cracks, leakage problem , repair is difficult, handling is difficult. 7. Copper and lead pipes: made from copper and lead, costly, soft and bend easily
  • 13.  VALVES: various appurtenances are use to isolate and drain pipe sections for test, installation, cleaning and repair.  Valves are one of the important device provided to stop and regulate the flow of water in the course of ordinary operations and in an emergency. VALVES ARE USED TO SERVE THE FOLLOWING PURPOSES:  To control the rate of flow of water  Release or admit air into the pipeline  Prevent or detect the leakage  Meet the demand during emergencies  Make the distribution system more efficient. FACTORS CONSIDERED IN THE SELECTION OF VALVES:  purpose and operation,  capacity required,  head loss and rate of flow,  cost,  availability, etc.
  • 14. TYPES OF VALVES  Sluice or gate valve  Air relief Valve  Reflux valve  Relief valve  Altitude  Score Valve SLUICE VALVE: These are also known as gate for stop valve. They are used in distribution system. Spacing of these valves may be between 150 to 300 meters. Also placed at street corners or where two pipelines intersects.  AIR RELIEF VALVE: Air relief valves are installed at high points of distribution piping to provide an exit for entrapped air. They are also used to discharge air when a main is being filled and to admit air when it is being emptied.
  • 15. REFLUX VALVE: It is also known as check valve or Non- return valve. This valve allows the water to flow in one direction only. They are placed in water pipes which obtain water directly from the pump. when the pump is stopped ,they the in the pipe dose not rush back and damage the pump. It consists of flat disc, pivoted so that it is forced open when flow of water is in one direction and forced shut against a seating when flow tries to reverse. PRESSURE RELIEF VALVE: also known as automatic cutoff valve or safety valve. They are located at those points where pressure is likely to be maximum. When pressure in line increases above preset value, the valve operates automatically, and the pressure is reduced.
  • 16.  ALTITUDE VALVES : These valves are mainly used on those lines which supply water to elevated tanks or stand pipes, to automatically control the flow into and out of an elevated storage tank or standpipe to maintain desired water level elevations. These valves close automatically when the tank is full and open when the pressure on pump side is less than on the tank side of the valve.  SCORE VALVE: Also known as blow off or washout valve. Located either at dead ends or at lowest points in the mains. Provided to remove the sand and grit deposited in the pipelines.
  • 19. INTAKE STRUCTURES  Intake structures are the structures used for admitting water from the surface sources and conveying it further to the treatment plant. It is masonry or concrete structure with an aim of providing relatively clean water, free from pollution, sand, grit and objectionable material. Factors Governing Location of Intake  As far as possible, the site should be near the treatment plant so that the cost of conveying water to the city is less.  The intake must be located in the purer zone of the source to draw best quality water from the source, thereby reducing load on the treatment plant.  The intake must never be located at the downstream or in the vicinity of the point of disposal of wastewater.
  • 20.  The site should be such as to permit greater withdrawal of water, if required at a future date.  The intake must be located at a place from where it can draw water even during the driest period of the year.  The intake site should remain easily accessible during floods and should not get flooded. Moreover, the flood waters should not be concentrated in the vicinity of the intake.  It should have good foundation, further expansion can be possible, river flow should not get obstructed.
  • 21. TYPES OF INTAKE Submerged Exposed Wet Dry Constructed entirely under water. Such intake are used to get supply from lake. It is in the form of tower or well constructed near bank of river or away from bank. These are very common due to ease in its operation. A wet intake is that type of intake tower in which the water level is practically the same as the water level of the sources of supply. There is no water in the water tower. Water enters through port directly into the conveying pipes. The dry tower is simply used for the operation of valves.
  • 22.  River Intake  Reservoir Intake  Lake Intake  Canal Intake
  • 31. VARIOUS TYPES OF CONSUMPTION/DEMANDS  Domestic consumption  Industrial and commercial demand  Public demand  Fire fighting demand.
  • 32.  Domestic consumption: the water required for actual household activities is known as domestic demand. It includes water required for drinking, cooking, bathing, washing flushing of toilets etc. Details of Domestic consumption Purpose Water consumption ( lit/capita/day) Drinking Cooking Cleaning of utensils and house Washing of clothes Flushing of water closets(W.C.) Bathing TOTAL 5 5 20 20 30 55 135
  • 33.  Industrial and Commercial Demand: Industry requires large quantity of water for manufacturing, cooling operation, steam generation, for processing and sanitation. This is known as industrial demand. Commercial demand includes water required for private offices, restaurants, cinema halls motor garages and small scale industries. This demand can be expressed per capita demand ,by dividing the industrial demand by the population of the area. Details of Industrial and commercial Demand ACTIVITY DEMAND(lit/capita/day) Factories Offices Restaurants/seat Hotels/person Cinema/seat 30-45 45 70 180 15
  • 34.  Public Demands: It includes water required for washing of roads, cleaning of public sewers, watering of parks, gardens water fountains, swimming pools, flushing of water closets and urinals, hospitals, hotels, schools and colleges. This demand is about 5 percentage of total demand. Details of Public Demands ACTIVITY DEMAND Public gardens Street washing Sewer cleaning Hospitals Hotels Schools(without boarding) Schools(with boarding) 1.4 lit/m2/day 1.0 lit/m2/day 4.5 lit/head/day 340 - 450 lit/bed/day 135 lit/head/day 45 lit/head/day 135 lit/head/day
  • 36. FACTORS AFFECTING PER CAPITA DEMAND IN A COMMUNITY  People's habits  Industrialization  Public Services  Climatic conditions  Systems of water supply  Meter system  System of drainage  Availability of supplementary sources  Distribution pressure  Cost of water
  • 37. POPULATION FORECASTING 1. Arithmetic Increase Method:  This method is generally applicable to large and old cities.  In this method average increase of population per decade is calculated from the past records and added to the present population to find out population of next decade.  This method gives a low value and is suitable for well settled and established cities. Pn = P + n x i Pn = Population after n decade P = Present population, n = Nos of decades i = Average increase in population
  • 38. 2. GEOMETRIC INCREASE METHOD  In this method percentage increase in population from decade to decade remains constant.  Therefore, the average value of percentage increase in population is calculated and the future population are calculated at this rate.  This method gives much higher value and mostly applicable for growing towns and cities having vast scope for expansion. Pn = P( 1 + r/100)n Where r = Average percentage rate of population increase P = Present population Pn = Population after n decade
  • 39. 3. INCREMENTAL INCREASE METHOD  This method is the combination of arithmetic increase method and geometric increase method.  Hence ,combines the advantages of both methods and gives satisfactory results.  In this method, average increase per decade is first calculated and to this average of net incremental increase once for every future decade is added. Pn = P + n x i + n(n + 1)/2 x I Where I = Average incremental increase i = Average increase per decade n = Nos of decades
  • 40.  Decreasing rate of increase method  Graphical comparison method  Graphical extension method