To take advantage of the additional oil and gas reserves in the Valhall field, BP Norway have
invested in a new Production and Hotel (PH) platform. Atkins provided technical support to
address the Working Environment aspects of the PH during the Detailed Design Phase and
continues to provide support during the current Construction Phase.
Valhall Redevelopment (VRD)
Mustang Engineering, Houston, USA
Designed with a 40-year lifespan, the new Production
and Hotel (PH) platform will replace the existing
field Quarters Platform and the Production and
Compression Platform. The Valhall PH is one of BP’s
flagship ‘Field of the Future’ platforms, employing
minimal manning, low maintenance components and
a high degree of automation. The PH is based on a
Gulf of Mexico design philosophy, and will be installed
offshore as a single lift.
As with all Norwegian projects, there is a high focus
on user involvement and good design of the Working
Environment. Atkins staff provided expertise in this
area during the Detailed Design and Construction
phases of the project, in an integrated design and
assurance role.
Atkins’ client Mustang Engineering (part of the
Wood Group) is responsible for the platform topsides
(process area). Atkins staff carried out Working
Environment activities in accordance with NORSOK
standards to ensure compliance with the rigorous
Working Environment standards set by the customer,
BP Norway.
A Working Environment programme was developed
in accordance with NORSOK standard S-002, that
covered all required activities. These included:
• Chemical health risk assessment
• Control of noise and vibration
• Crisis intervention and operability analysis (this was
applied to the crane cabin)
• Operability and maintenance review
• Outdoor operations analysis
• Valves and instrument access and operability
review
• Working Environment design reviews and Job
Hazard Analysis
The primary focus of Atkins’ effort on Working
Environment was to review the entire topsides design,
ensuring operator involvement in the design of the
major in-house and vendor-designed equipment.
Given the scale of this task and level of detail
required, a pragmatic approach was developed. This
was based on the NORSOK coarse Job Hazard Analysis
method and involved conducting assessments on the
basis of task analyses. This ensured that assessments
were systematic, logical and focused on tasks that
were frequent, difficult or hazardous. Findings
of these meetings led to several hundred design
amendments that were remedied during the design
phase, saving money and avoiding costly deviations
from requirements.
A programme of inspections is now underway to
ensure that the agreed design is built, and a robust
audit trail is being constructed to facilitate auditing.
Plan Design Enable

More Related Content

DOC
Mohammed vasil k.
PPTX
Maintenance presentation 2015
PDF
DOC
KEY ATTRIBUTES FULL TEXT
DOC
Saqib Shahzad CV updated
PPTX
Glovebox design challenges with highly integrated equipment
DOCX
GW Amec Foster Wheeler
PDF
Perth metro
Mohammed vasil k.
Maintenance presentation 2015
KEY ATTRIBUTES FULL TEXT
Saqib Shahzad CV updated
Glovebox design challenges with highly integrated equipment
GW Amec Foster Wheeler
Perth metro

What's hot (18)

DOC
DOCX
Resume
PDF
RESUME - NAJMUL SAQIB MANIAR
PPT
Audiopack Overview
DOC
1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...
DOC
2015 Resume
PPTX
Intergrated Rice Plant Progress 2013
DOC
vijay cv
DOC
Ardeshir_Tolouei_CV modified
PDF
CAIRO METRO Project E14155 - presentation to JV 23 Dec 2014
DOC
PDF
Environmental Affairs Forum - 15 June
PDF
01 Monadelphous Marine Capability
PDF
Arun Goyle resume
DOC
dean resume (1)
PDF
TES_Brochure_Trifold_2015_back
DOCX
Atoosa Samiei-Resume
DOCX
Fritz Ansel resume word(12-14)
Resume
RESUME - NAJMUL SAQIB MANIAR
Audiopack Overview
1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...
2015 Resume
Intergrated Rice Plant Progress 2013
vijay cv
Ardeshir_Tolouei_CV modified
CAIRO METRO Project E14155 - presentation to JV 23 Dec 2014
Environmental Affairs Forum - 15 June
01 Monadelphous Marine Capability
Arun Goyle resume
dean resume (1)
TES_Brochure_Trifold_2015_back
Atoosa Samiei-Resume
Fritz Ansel resume word(12-14)
Ad

Similar to Valhall Working Environment Case Study (18)

PDF
India’s Offshore Integrity - Learn and Use Global Offshore Experience
PDF
Preventing accidents in-offshoreoil-and-gasoperations-mb-dhsg-jan2011
PDF
Integrated Oil Field Development Plan - FDP. Criteria, strategy and process f...
PDF
Roy Shilling
PDF
Major New Energy Investment In Uk
PDF
Managing resource abundance and wealth The Norwegian experience 1st Edition L...
PDF
magzine 02.pdf
PDF
magzine 02.pdf
PDF
Life extension of aging petroleum production facilities offshore
DOCX
Cv sigve hamilton aspelund 052019 v2
DOCX
byco report
PAGES
120420 Aph Cv
PDF
Subsea leak detection systems
PDF
Sevan Marine Q3 2012 results presentation
PDF
Statoil’s industrial response to the energy and climate challenges
PDF
Norsokr002
PDF
Multi-Criteria Decision Making for Oil Pollution Recovery Module for Swath Mu...
PDF
India’s Offshore Integrity - Learn and Use Global Offshore Experience
Preventing accidents in-offshoreoil-and-gasoperations-mb-dhsg-jan2011
Integrated Oil Field Development Plan - FDP. Criteria, strategy and process f...
Roy Shilling
Major New Energy Investment In Uk
Managing resource abundance and wealth The Norwegian experience 1st Edition L...
magzine 02.pdf
magzine 02.pdf
Life extension of aging petroleum production facilities offshore
Cv sigve hamilton aspelund 052019 v2
byco report
120420 Aph Cv
Subsea leak detection systems
Sevan Marine Q3 2012 results presentation
Statoil’s industrial response to the energy and climate challenges
Norsokr002
Multi-Criteria Decision Making for Oil Pollution Recovery Module for Swath Mu...
Ad

More from Martin Robb CPE (7)

PPTX
ORS Consulting: Summary of National Academies Safety Culture Report
PPTX
ORS Consulting Overview of Services
PPTX
ORS Consulting Overview of Services
PPTX
Opening Presentation
PDF
Valve Placement Guidelines
PDF
Activities Summary 2010
PDF
Activity Highlights
ORS Consulting: Summary of National Academies Safety Culture Report
ORS Consulting Overview of Services
ORS Consulting Overview of Services
Opening Presentation
Valve Placement Guidelines
Activities Summary 2010
Activity Highlights

Valhall Working Environment Case Study

  • 1. To take advantage of the additional oil and gas reserves in the Valhall field, BP Norway have invested in a new Production and Hotel (PH) platform. Atkins provided technical support to address the Working Environment aspects of the PH during the Detailed Design Phase and continues to provide support during the current Construction Phase. Valhall Redevelopment (VRD) Mustang Engineering, Houston, USA Designed with a 40-year lifespan, the new Production and Hotel (PH) platform will replace the existing field Quarters Platform and the Production and Compression Platform. The Valhall PH is one of BP’s flagship ‘Field of the Future’ platforms, employing minimal manning, low maintenance components and a high degree of automation. The PH is based on a Gulf of Mexico design philosophy, and will be installed offshore as a single lift. As with all Norwegian projects, there is a high focus on user involvement and good design of the Working Environment. Atkins staff provided expertise in this area during the Detailed Design and Construction phases of the project, in an integrated design and assurance role. Atkins’ client Mustang Engineering (part of the Wood Group) is responsible for the platform topsides (process area). Atkins staff carried out Working Environment activities in accordance with NORSOK standards to ensure compliance with the rigorous Working Environment standards set by the customer, BP Norway.
  • 2. A Working Environment programme was developed in accordance with NORSOK standard S-002, that covered all required activities. These included: • Chemical health risk assessment • Control of noise and vibration • Crisis intervention and operability analysis (this was applied to the crane cabin) • Operability and maintenance review • Outdoor operations analysis • Valves and instrument access and operability review • Working Environment design reviews and Job Hazard Analysis The primary focus of Atkins’ effort on Working Environment was to review the entire topsides design, ensuring operator involvement in the design of the major in-house and vendor-designed equipment. Given the scale of this task and level of detail required, a pragmatic approach was developed. This was based on the NORSOK coarse Job Hazard Analysis method and involved conducting assessments on the basis of task analyses. This ensured that assessments were systematic, logical and focused on tasks that were frequent, difficult or hazardous. Findings of these meetings led to several hundred design amendments that were remedied during the design phase, saving money and avoiding costly deviations from requirements. A programme of inspections is now underway to ensure that the agreed design is built, and a robust audit trail is being constructed to facilitate auditing. Plan Design Enable