Overview of Validation Requirements
                 in
      Pharmaceutical Industry



                                     Kaushik Desai
                                       Chairman,
                      Industrial Pharmacy Division
                Indian Pharmaceutical Association
                             www.ipapharma.org

                                                     1
   A definition
   Where did validation come from ?
   Why do it ?
   What are the benefits ?
   How far do we have to go ?




                                       2
“ Establishing the documented evidence which
  provides a high degree of assurance that a
  specific process will consistently produce a
  product of predetermined specifications and
  quality attributes.”

 (FDA Guidelines 1987)




                                                 3
“Process validation is defined as the collection
  & evaluation of data, from the process design
  stage through commercial production, which
  establishes scientific evidence that process is
  capable of consistently delivering quality
  product.”
(FDA Guidelines, 2011)




                                                 4
“Action of proving, in accordance with the
principles of Good Manufacturing Practice
(GMP), that any procedure, process,
equipment, material, activity or system
actually leads to expected results.”

(EU GMP 1997)




                                             5
   Began in 1970’s
   Originally sterilized based.
   Now evolved into all Product, Process and Facility
    matters.




                                                         6
   Assures Quality

   Regulatory Requirement

   Reduces Cost

   It’s the LAW !


                             7
Validation can reduce costs by reducing,
   Rejects
   Reworks
   Reliance on In-process controls
   Down time




                                           8
   Reliance on product testing

   Loss of confidence

   Possibility of adulterated products

   Inspection : Observations / 483’s


                                          9
   User Requirement Specification (URS)
   Design Qualification
   Impact Assessment
   Factory Acceptance Testing
   Installation Qualification

                                           10
   Calibration
   Site Acceptance Testing
   Operational Qualification
   Standard Operating Procedures
   Performance Qualification
   Process Validation
   Change Control


                                    11
User Requirement Specification (URS)

   A description of the requirements of the facility
    (project) in terms of product to be manufactured,
    required throughput and conditions in which the
    product should be manufactured.

   Approved statements prepared by the user which
    defines what is required by the project.


                                                        12
Design Qualification (DQ)

   Documented review of the design, at an
    appropriate stage in a project, for conformance
    to operational and regulatory expectations.

(Note : Not an obligation)


                                                  13
Impact Assessment

   The process of evaluating the impact of the
    operating, controlling, alarming and failure
    conditions of a system on the quality of a
    product




                                               14
Factory Acceptance Testing (FAT)

   Inspection and static and/or dynamic testing of
    systems or major system components to
    support the qualification of an equipment
    system conducted and documented at a
    supplier site.

(Note : Not an obligation)

                                                  15
   Documented verification that all aspects of a facility,
    utility or equipment that can affect the product
    quality adhere to approved specifications and are
    correctly installed.

   The process of checking/verifying the installation to
    ensure that the critical components meet the
    approved specifications and that they are installed
    correctly in accordance with design documentation.



                                                              16
   To establish that the critical components are installed
    correctly     and    in    accordance    with    design
    documentation requirements (i.e. PO’s, Contracts
    etc.), that supporting documentation is in place and of
    suitable quality.

   To record the checks and verifications for critical
    components in Direct Impact Systems.


                                                         17
   Approval Page
   Objectives
   System Description
   Responsibilities
   Acceptance Criteria
   Engineering Documentation Requirements
   Records of Signatures
   Qualification Test Equipment/Instrument List
   Product Contact Materials Review
   Utilities Verification
   Control System Verification




                                                   18
   Instrument/Control Devices Verification
   Equipment Verification
   Piping Installation Verification
   Discrepancy/Justification and corrective Action
   As built P&I Diagrams
   Specifications
   Conclusions
   References
   Modification/ Change Control
   Attachments / Appendices




                                                      19
Parameters

   Does the vessel meet the design specification?
   Does the agitator assembly meet the design specification?
   Is the motor housing earthed?
   Is the motor over current device set to correct setting?
   Is all the pipe work connected?
   Are all instruments installed as per P&I diagram?
   Have all the temperature indicators been calibrated?
   Is calibration procedure available?
   Are operation and maintenance manuals available?
   all electrical connections securely and safely fitted?
   Is insulation complete?
   Is vessel clean and free from dirt?




                                                                20
   After protocol execution is complete and
    deviations evaluated, post execution approval
    is required.

   Requires sign off by original signatories.

   IQ execution should be complete and approved
    prior to the start of OQ.

                                                    21
Calibration
   Demonstrating that a measuring device
    produces results within the specified limits of
    those produced by a reference standard over
    an appropriate range of measurements.

   The devices are normally tagged and
    supported by a maintenance procedures.


                                                      22
Site Acceptance Testing (SAT)
 Inspection and dynamic testing of systems or
  major system components to support the
  qualification of an equipment system
  conducted at a client site.

(Note : Not an obligation)


                                             23
   Documented verification that all aspects of
    a facility, utility or equipment that can affect
    product quality operate as intended
    throughout all anticipated ranges. It is the
    process of testing to ensure that individual
    components and systems operate as
    specified, and how that information is
    recorded.

                                                       24
   To establish through documented testing, that all
    critical components and direct impact systems are
    capable of operating within established limits and
    tolerances.

   To test parameters that regulate the process or
    product quality. To verify the proper operation of
    controllers, indicators, recorders, alarms and
    interlocks, is performed and documented during the
    operational qualification testing.

                                                         25
   Approval page
   Pre-requisites
   Objectives
   System Description
   Responsibilities
   Acceptance Criteria
   Records of signatures
   Qualification test Equipment/Instruments list
   Alarm and Interlocks test
   Operation testing
   Capacity testing
   Power failure testing



                                                    26
     Sequence testing
     Test data sheets
     SOP’s
     Conclusions
     Modification / change control
     Discrepancy/Justification and corrective action
     Operational Qualification Summary
     References
     Attachments/Appendices
    - Verification of test instruments
    - Chart recordings
    - P&I diagrams
    - Printouts



                                                        27
Parameters

   Have all Installation Qualification been completed for this system?
   Is the system clean and free from dirt?
   Is the direction of the rotation of agitator correct?
   Check the operation of the agitator emergency stop?
   Check the operation of all agitator controls, both on the main and local
    panels?
   Check that the agitator in the vessel free to turn?
   Pressurize the vessel and record the pressure drop for 10 min.
   Perform a vacuum test and record the vacuum drop.




                                                                               28
   Documented verification that all aspects of
    a facility, utility or equipment that can
    affect the product quality perform as
    intended in meeting the predetermined
    acceptance criteria.




                                                  29
   To integrate procedures, personnel, systems
    and materials to verify that the utility /
    environment / equipment / support systems
    produces the required output. This output
    may be a product contact utility, sterilization
    condition or environment.




                                                      30
   Approval page
   Pre-requisites
   Objectives
   System Description
   Responsibilities
   Acceptance Criteria
   PQ test plan
   Challenge test plan
   Records of signatures
   Test equipment/Instrument list
   Test data sheets
   SOP’s
   References
   Conclusions
   Attachments


                                     31
Process Validation
 The documented verification providing a high
  degree of assurance that a specific process will
  consistently produce a product meeting its
  predetermined specifications and quality
  attributes.
 The new guidelines aligns process validation
  activities with a product life cycle concept.


                                                 32
   211.42, 211.63, 211.68, 211.84

   211.100(a) ,   211.110(a),
    211.110(b)

   211.160(b), 211.165(c),
    211.165(d), 211.180(e)


                                     33
Life Cycle of the product & the process

   Stage 1 – Process Design

   Stage 2 – Process qualification

   Stage 3 - Continuous process verification


                                                34
   It is the activity of defining the commercial manufacturing
    process that will be reflected in planned master production
    and control records.

   The goal of this stage is to design a process suitable for
    routine commercial manufacturing that can consistently
    deliver a product that meets its quality attributes.

   It is based on the knowledge gained through development &
    scale-up activities.



                                                                  35
During this stage, the process design is evaluated to
    determine if the process is capable of reproducible
    commercial         manufacturing.       The     products
    manufactured during this stage, if acceptable , can be
    released for distribution.
    Two Aspects
   Design of facility and qualification of equipment and
    utilities.
   Process Performance Qualification ( PPQ).


                                                          36
Def.: “Releasing for distribution a lot of finished
  product, manufactured following a qualification
  protocol, that meets the standards established in
  the protocol, but before the entire study has been
  executed”.

   Orphan Drugs

   Specific drug for specific use

   Shor t Shelf-life radio pharmaceuticals


                                                   37
   The goal of this stage is continual assurance that the
    process remains in a state of control ( the validated state)
    during commercial manufacture.

   The cGMP requirements, specifically the collection &
    evaluation of information & data about the performance
    of the process will allow detection of undesired process
    variability.

   This stage is also applicable for legacy products.




                                                                   38
Change Control

   Formal evaluation of the potential impact of
    planned modifications on the validated status
    of a product, process or facility.




                                                    39
   Training personnel for IQ/OQ execution.
   The purpose of the equipment/ system.
   Use of test equipment
   Applicable SOP’s
   cGMP documentation of training
   Document all training
   Periodically review training requirements


                                                40
   A document that summarizes and analyses
    the test results at the end of PQ.

   Provides a conclusion about the ability of the
    system to consistently meet acceptance
    criteria.

   May be a stand alone document at each
    stage of IQ/OQ and PQ to summarize results.


                                                     41
Commissioning and Qualification

Project Phases                                  Validation Phases
Technology Transfer                              Collecting data
   Conceptual Design
    Basic Design                              Preliminary VMP
      Detailed Design                        Detailed VMP
        Procurement                         Detailed planning,DQ
         Construction                  IQ
          Pre commissioning
           Commissioning          OQ

               Process operation / Validation


                                                                    42
Preventive
Introduction   Qualification   Personnel          Schedule
                                                                 Maintenance




               Installation    Responsibilities              Change
                                                             Control


                Operation         Training                             Procedures
                                                                       Documents
                                                                       Appendices

                  Process



                                                                                    43
The company’s overall policy, intentions and
    approach to validation, including :

   Validation of production processes
   Cleaning procedures
   Analytical methods
   In-process control test procedures
   Computerized systems
   Persons responsible for design, review, approval
   Documentation of each validation phase


                                                       44
    Product validation is NOT ……
    - just 3 batches that meet specifications

    Product validation is ……
    - an ongoing process to build confidence into
      the manufacturing activities
    - an ability to demonstrate consistency at any
      time.


                                                     45
   Cleaning validation is establishing
    documented evidence that the equipment
    is consistently cleaned from product,
    microbial and cleaning agent residues to
    predetermined acceptable levels.




                                               46
A written procedure for cleaning validation
which includes :

    Responsibility for development, performance and
     approval of the validation study.
    Establishment of SOP’s
    Acceptance criteria
    - defined to prevent cross contamination
    - definition of residue limits

                                                   47
     Cleaning procedure for each piece of equipment
    - Flow charts and diagrams
    - Cleaning agents, concentration, volume
    - Frequency
    - time left ‘dirty’




                                                       48
   Sampling procedures
    - swabs, rinse, location

   Residue limits

   Analytical methods


                               49
   Validation report

    - Results Vs. acceptance criteria
    - Deviations and how handled
    - Conclusion that cleaning process is
      validated


                                            50
   Major change in cleaning procedure

   Change in cleaning agent

   New equipment




                                         51
   Knowledge of the materials
    - Potency of the drug
    - Pharmacological and toxic properties
    - Degradation products
    - Cleaning agents
    - Micro residues



                                             52
Residual Limits must be………….
 Practical
 Achievable
 Verifiable
 Safe



FDA does not set acceptance specifications
  (limits).


                                             53
MAC = TD x BS x SF / LDD
MAC = Maximum Allowable Carryover
TD = Single Therapeutic Dose
BS = Batch size of next product to be
       manufactured on the same equipment.
SF = Safety Factor
LDD = Largest Daily Dose of the next product
       in the same equipment.

                                               54
Ranitidine Tablets - Ibuprofen Tablets

TD = Single Therapeutic Dose = 150 mg Ranitidine-Tab
BS = Batch Size = 100 kg of Ibuprofen
SF      = Safety Factor = 1/1000
LDD     = Largest Daily Dose of the next product in the same
          equipment = 200 mg X 5 tablets of Ibuprofen
MAC     = Max Allowable Carryover = 150 X 100 X 1000 x
         1000 X 1/1000 X 1/1000
          i.e 15000 mg in 100 kg Batch size
         i.e 150 mg in 1 kg = 150 ppm



                                                               55
Validation ksd

More Related Content

PPTX
Validation
PPTX
Validation part 2
PPTX
Bioprocess Validation
PPTX
Process validation fof Pharmaceutical dosage forms (formulation)
DOCX
Basic concept of process validation
PPTX
Validation
PPT
concept of validation
Validation
Validation part 2
Bioprocess Validation
Process validation fof Pharmaceutical dosage forms (formulation)
Basic concept of process validation
Validation
concept of validation

What's hot (20)

PPTX
Pharmaceutical validation ppt Rahul Dalvi
PDF
Pharmaceutical process validation (PV)
PPTX
Process validation ppt.
PPTX
Processs validation
PPTX
Process validation and its types
PPT
Process valiadtion
PPTX
Validation of pharmaceutical dosage form
PPTX
introduction to validation
PPTX
Pharmaceutical validation & it's types
PDF
Validation of liquids
PPT
Validation Theory And Application 3
PDF
Pharmaceutical Process validation
PPTX
Process Validation
PPT
Validation Part7
PDF
Process validation of drug product
PPT
Validation Protocol
PPT
Process validation
PPTX
Process validation
PDF
Validation Master Plan
Pharmaceutical validation ppt Rahul Dalvi
Pharmaceutical process validation (PV)
Process validation ppt.
Processs validation
Process validation and its types
Process valiadtion
Validation of pharmaceutical dosage form
introduction to validation
Pharmaceutical validation & it's types
Validation of liquids
Validation Theory And Application 3
Pharmaceutical Process validation
Process Validation
Validation Part7
Process validation of drug product
Validation Protocol
Process validation
Process validation
Validation Master Plan
Ad

Similar to Validation ksd (20)

PDF
validationksd-140930004558-phpapp01 (1).pdf
PPT
Jatin validation
PPTX
validationqualification-200524131037.pptx
PPTX
Validation qualification
PPT
Principle of Validation and Qualification
PPTX
validation and verification of medical device.pptx
PDF
Cleanroom Qualification
PPTX
Facility Qualification & Consideration of Validation Aspects
PPTX
Process Validation of API
PPTX
Elements of validation (IQ, DQ, OQ, PQ) PPTx
PPTX
Validation and calibration of master plan
DOCX
Nguyên tắc Thẩm định theo Bộ tiêu chuẩn GMP Nhật Bản
PPTX
EQUIPMENT QUALIFICATION.pptx
PPTX
EQUIPMENT QUALIFICATION.pptx
PDF
Qualification for validation
PPTX
PROCESS VALIDATION
PPT
Validation
PPTX
validation ppt.pptx
PPTX
Urs,dq, iq,oq,pq
validationksd-140930004558-phpapp01 (1).pdf
Jatin validation
validationqualification-200524131037.pptx
Validation qualification
Principle of Validation and Qualification
validation and verification of medical device.pptx
Cleanroom Qualification
Facility Qualification & Consideration of Validation Aspects
Process Validation of API
Elements of validation (IQ, DQ, OQ, PQ) PPTx
Validation and calibration of master plan
Nguyên tắc Thẩm định theo Bộ tiêu chuẩn GMP Nhật Bản
EQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptx
Qualification for validation
PROCESS VALIDATION
Validation
validation ppt.pptx
Urs,dq, iq,oq,pq
Ad

Recently uploaded (20)

PPTX
CME 2 Acute Chest Pain preentation for education
PPT
MENTAL HEALTH - NOTES.ppt for nursing students
PPTX
POLYCYSTIC OVARIAN SYNDROME.pptx by Dr( med) Charles Amoateng
PPT
OPIOID ANALGESICS AND THEIR IMPLICATIONS
PDF
Intl J Gynecology Obste - 2021 - Melamed - FIGO International Federation o...
PDF
NEET PG 2025 | 200 High-Yield Recall Topics Across All Subjects
PPTX
History and examination of abdomen, & pelvis .pptx
PPT
ASRH Presentation for students and teachers 2770633.ppt
PPTX
CEREBROVASCULAR DISORDER.POWERPOINT PRESENTATIONx
PPTX
surgery guide for USMLE step 2-part 1.pptx
PPT
genitourinary-cancers_1.ppt Nursing care of clients with GU cancer
PPT
Obstructive sleep apnea in orthodontics treatment
PPTX
DENTAL CARIES FOR DENTISTRY STUDENT.pptx
PPTX
SKIN Anatomy and physiology and associated diseases
PDF
Handout_ NURS 220 Topic 10-Abnormal Pregnancy.pdf
PPT
Copy-Histopathology Practical by CMDA ESUTH CHAPTER(0) - Copy.ppt
PDF
Khadir.pdf Acacia catechu drug Ayurvedic medicine
PPTX
Imaging of parasitic D. Case Discussions.pptx
PPT
Management of Acute Kidney Injury at LAUTECH
PPT
CHAPTER FIVE. '' Association in epidemiological studies and potential errors
CME 2 Acute Chest Pain preentation for education
MENTAL HEALTH - NOTES.ppt for nursing students
POLYCYSTIC OVARIAN SYNDROME.pptx by Dr( med) Charles Amoateng
OPIOID ANALGESICS AND THEIR IMPLICATIONS
Intl J Gynecology Obste - 2021 - Melamed - FIGO International Federation o...
NEET PG 2025 | 200 High-Yield Recall Topics Across All Subjects
History and examination of abdomen, & pelvis .pptx
ASRH Presentation for students and teachers 2770633.ppt
CEREBROVASCULAR DISORDER.POWERPOINT PRESENTATIONx
surgery guide for USMLE step 2-part 1.pptx
genitourinary-cancers_1.ppt Nursing care of clients with GU cancer
Obstructive sleep apnea in orthodontics treatment
DENTAL CARIES FOR DENTISTRY STUDENT.pptx
SKIN Anatomy and physiology and associated diseases
Handout_ NURS 220 Topic 10-Abnormal Pregnancy.pdf
Copy-Histopathology Practical by CMDA ESUTH CHAPTER(0) - Copy.ppt
Khadir.pdf Acacia catechu drug Ayurvedic medicine
Imaging of parasitic D. Case Discussions.pptx
Management of Acute Kidney Injury at LAUTECH
CHAPTER FIVE. '' Association in epidemiological studies and potential errors

Validation ksd

  • 1. Overview of Validation Requirements in Pharmaceutical Industry Kaushik Desai Chairman, Industrial Pharmacy Division Indian Pharmaceutical Association www.ipapharma.org 1
  • 2. A definition  Where did validation come from ?  Why do it ?  What are the benefits ?  How far do we have to go ? 2
  • 3. “ Establishing the documented evidence which provides a high degree of assurance that a specific process will consistently produce a product of predetermined specifications and quality attributes.” (FDA Guidelines 1987) 3
  • 4. “Process validation is defined as the collection & evaluation of data, from the process design stage through commercial production, which establishes scientific evidence that process is capable of consistently delivering quality product.” (FDA Guidelines, 2011) 4
  • 5. “Action of proving, in accordance with the principles of Good Manufacturing Practice (GMP), that any procedure, process, equipment, material, activity or system actually leads to expected results.” (EU GMP 1997) 5
  • 6. Began in 1970’s  Originally sterilized based.  Now evolved into all Product, Process and Facility matters. 6
  • 7. Assures Quality  Regulatory Requirement  Reduces Cost  It’s the LAW ! 7
  • 8. Validation can reduce costs by reducing,  Rejects  Reworks  Reliance on In-process controls  Down time 8
  • 9. Reliance on product testing  Loss of confidence  Possibility of adulterated products  Inspection : Observations / 483’s 9
  • 10. User Requirement Specification (URS)  Design Qualification  Impact Assessment  Factory Acceptance Testing  Installation Qualification 10
  • 11. Calibration  Site Acceptance Testing  Operational Qualification  Standard Operating Procedures  Performance Qualification  Process Validation  Change Control 11
  • 12. User Requirement Specification (URS)  A description of the requirements of the facility (project) in terms of product to be manufactured, required throughput and conditions in which the product should be manufactured.  Approved statements prepared by the user which defines what is required by the project. 12
  • 13. Design Qualification (DQ)  Documented review of the design, at an appropriate stage in a project, for conformance to operational and regulatory expectations. (Note : Not an obligation) 13
  • 14. Impact Assessment  The process of evaluating the impact of the operating, controlling, alarming and failure conditions of a system on the quality of a product 14
  • 15. Factory Acceptance Testing (FAT)  Inspection and static and/or dynamic testing of systems or major system components to support the qualification of an equipment system conducted and documented at a supplier site. (Note : Not an obligation) 15
  • 16. Documented verification that all aspects of a facility, utility or equipment that can affect the product quality adhere to approved specifications and are correctly installed.  The process of checking/verifying the installation to ensure that the critical components meet the approved specifications and that they are installed correctly in accordance with design documentation. 16
  • 17. To establish that the critical components are installed correctly and in accordance with design documentation requirements (i.e. PO’s, Contracts etc.), that supporting documentation is in place and of suitable quality.  To record the checks and verifications for critical components in Direct Impact Systems. 17
  • 18. Approval Page  Objectives  System Description  Responsibilities  Acceptance Criteria  Engineering Documentation Requirements  Records of Signatures  Qualification Test Equipment/Instrument List  Product Contact Materials Review  Utilities Verification  Control System Verification 18
  • 19. Instrument/Control Devices Verification  Equipment Verification  Piping Installation Verification  Discrepancy/Justification and corrective Action  As built P&I Diagrams  Specifications  Conclusions  References  Modification/ Change Control  Attachments / Appendices 19
  • 20. Parameters  Does the vessel meet the design specification?  Does the agitator assembly meet the design specification?  Is the motor housing earthed?  Is the motor over current device set to correct setting?  Is all the pipe work connected?  Are all instruments installed as per P&I diagram?  Have all the temperature indicators been calibrated?  Is calibration procedure available?  Are operation and maintenance manuals available?  all electrical connections securely and safely fitted?  Is insulation complete?  Is vessel clean and free from dirt? 20
  • 21. After protocol execution is complete and deviations evaluated, post execution approval is required.  Requires sign off by original signatories.  IQ execution should be complete and approved prior to the start of OQ. 21
  • 22. Calibration  Demonstrating that a measuring device produces results within the specified limits of those produced by a reference standard over an appropriate range of measurements.  The devices are normally tagged and supported by a maintenance procedures. 22
  • 23. Site Acceptance Testing (SAT)  Inspection and dynamic testing of systems or major system components to support the qualification of an equipment system conducted at a client site. (Note : Not an obligation) 23
  • 24. Documented verification that all aspects of a facility, utility or equipment that can affect product quality operate as intended throughout all anticipated ranges. It is the process of testing to ensure that individual components and systems operate as specified, and how that information is recorded. 24
  • 25. To establish through documented testing, that all critical components and direct impact systems are capable of operating within established limits and tolerances.  To test parameters that regulate the process or product quality. To verify the proper operation of controllers, indicators, recorders, alarms and interlocks, is performed and documented during the operational qualification testing. 25
  • 26. Approval page  Pre-requisites  Objectives  System Description  Responsibilities  Acceptance Criteria  Records of signatures  Qualification test Equipment/Instruments list  Alarm and Interlocks test  Operation testing  Capacity testing  Power failure testing 26
  • 27. Sequence testing  Test data sheets  SOP’s  Conclusions  Modification / change control  Discrepancy/Justification and corrective action  Operational Qualification Summary  References  Attachments/Appendices - Verification of test instruments - Chart recordings - P&I diagrams - Printouts 27
  • 28. Parameters  Have all Installation Qualification been completed for this system?  Is the system clean and free from dirt?  Is the direction of the rotation of agitator correct?  Check the operation of the agitator emergency stop?  Check the operation of all agitator controls, both on the main and local panels?  Check that the agitator in the vessel free to turn?  Pressurize the vessel and record the pressure drop for 10 min.  Perform a vacuum test and record the vacuum drop. 28
  • 29. Documented verification that all aspects of a facility, utility or equipment that can affect the product quality perform as intended in meeting the predetermined acceptance criteria. 29
  • 30. To integrate procedures, personnel, systems and materials to verify that the utility / environment / equipment / support systems produces the required output. This output may be a product contact utility, sterilization condition or environment. 30
  • 31. Approval page  Pre-requisites  Objectives  System Description  Responsibilities  Acceptance Criteria  PQ test plan  Challenge test plan  Records of signatures  Test equipment/Instrument list  Test data sheets  SOP’s  References  Conclusions  Attachments 31
  • 32. Process Validation  The documented verification providing a high degree of assurance that a specific process will consistently produce a product meeting its predetermined specifications and quality attributes.  The new guidelines aligns process validation activities with a product life cycle concept. 32
  • 33. 211.42, 211.63, 211.68, 211.84  211.100(a) , 211.110(a), 211.110(b)  211.160(b), 211.165(c), 211.165(d), 211.180(e) 33
  • 34. Life Cycle of the product & the process  Stage 1 – Process Design  Stage 2 – Process qualification  Stage 3 - Continuous process verification 34
  • 35. It is the activity of defining the commercial manufacturing process that will be reflected in planned master production and control records.  The goal of this stage is to design a process suitable for routine commercial manufacturing that can consistently deliver a product that meets its quality attributes.  It is based on the knowledge gained through development & scale-up activities. 35
  • 36. During this stage, the process design is evaluated to determine if the process is capable of reproducible commercial manufacturing. The products manufactured during this stage, if acceptable , can be released for distribution. Two Aspects  Design of facility and qualification of equipment and utilities.  Process Performance Qualification ( PPQ). 36
  • 37. Def.: “Releasing for distribution a lot of finished product, manufactured following a qualification protocol, that meets the standards established in the protocol, but before the entire study has been executed”.  Orphan Drugs  Specific drug for specific use  Shor t Shelf-life radio pharmaceuticals 37
  • 38. The goal of this stage is continual assurance that the process remains in a state of control ( the validated state) during commercial manufacture.  The cGMP requirements, specifically the collection & evaluation of information & data about the performance of the process will allow detection of undesired process variability.  This stage is also applicable for legacy products. 38
  • 39. Change Control  Formal evaluation of the potential impact of planned modifications on the validated status of a product, process or facility. 39
  • 40. Training personnel for IQ/OQ execution.  The purpose of the equipment/ system.  Use of test equipment  Applicable SOP’s  cGMP documentation of training  Document all training  Periodically review training requirements 40
  • 41. A document that summarizes and analyses the test results at the end of PQ.  Provides a conclusion about the ability of the system to consistently meet acceptance criteria.  May be a stand alone document at each stage of IQ/OQ and PQ to summarize results. 41
  • 42. Commissioning and Qualification Project Phases Validation Phases Technology Transfer Collecting data Conceptual Design Basic Design Preliminary VMP Detailed Design Detailed VMP Procurement Detailed planning,DQ Construction IQ Pre commissioning Commissioning OQ Process operation / Validation 42
  • 43. Preventive Introduction Qualification Personnel Schedule Maintenance Installation Responsibilities Change Control Operation Training Procedures Documents Appendices Process 43
  • 44. The company’s overall policy, intentions and approach to validation, including :  Validation of production processes  Cleaning procedures  Analytical methods  In-process control test procedures  Computerized systems  Persons responsible for design, review, approval  Documentation of each validation phase 44
  • 45. Product validation is NOT …… - just 3 batches that meet specifications  Product validation is …… - an ongoing process to build confidence into the manufacturing activities - an ability to demonstrate consistency at any time. 45
  • 46. Cleaning validation is establishing documented evidence that the equipment is consistently cleaned from product, microbial and cleaning agent residues to predetermined acceptable levels. 46
  • 47. A written procedure for cleaning validation which includes :  Responsibility for development, performance and approval of the validation study.  Establishment of SOP’s  Acceptance criteria - defined to prevent cross contamination - definition of residue limits 47
  • 48. Cleaning procedure for each piece of equipment - Flow charts and diagrams - Cleaning agents, concentration, volume - Frequency - time left ‘dirty’ 48
  • 49. Sampling procedures - swabs, rinse, location  Residue limits  Analytical methods 49
  • 50. Validation report - Results Vs. acceptance criteria - Deviations and how handled - Conclusion that cleaning process is validated 50
  • 51. Major change in cleaning procedure  Change in cleaning agent  New equipment 51
  • 52. Knowledge of the materials - Potency of the drug - Pharmacological and toxic properties - Degradation products - Cleaning agents - Micro residues 52
  • 53. Residual Limits must be………….  Practical  Achievable  Verifiable  Safe FDA does not set acceptance specifications (limits). 53
  • 54. MAC = TD x BS x SF / LDD MAC = Maximum Allowable Carryover TD = Single Therapeutic Dose BS = Batch size of next product to be manufactured on the same equipment. SF = Safety Factor LDD = Largest Daily Dose of the next product in the same equipment. 54
  • 55. Ranitidine Tablets - Ibuprofen Tablets TD = Single Therapeutic Dose = 150 mg Ranitidine-Tab BS = Batch Size = 100 kg of Ibuprofen SF = Safety Factor = 1/1000 LDD = Largest Daily Dose of the next product in the same equipment = 200 mg X 5 tablets of Ibuprofen MAC = Max Allowable Carryover = 150 X 100 X 1000 x 1000 X 1/1000 X 1/1000 i.e 15000 mg in 100 kg Batch size i.e 150 mg in 1 kg = 150 ppm 55