VALUE ENGINEERING
GNA UNIVERSITY2
 Value, as defined, is the ratio of function to cost.
 Value engineering (VE) is systematic method to
improve the "value" of goods or products and
services by using an examination of function.
VALUE ENGINEERING
GNA UNIVERSITY3
 Value Engineering is an organizational creative
approach for the purpose of identifying of
unnecessary cost.
 Unnecessary cost are that which provides neither
quality, nor use, not appearance, not life and
customer features.
VALUE ENGINEERING
GNA UNIVERSITY4
It includes –
1. Cost Cutting
2. Design Review
3. Project Elimination
4. Scope Reduction
5. Quality Reduction
6. Detailed Cost Estimating
7. Redesign
VALUE ENGINEERING
GNA UNIVERSITY5
 Value is always increased by decreasing costs while
maintaining essential performance.
 Value may also be increased if the customer needs,
wants, and is willing to pay for greater performance.
 Most people who design a product are quite often
because designer is not sure real needs of user
 Over designed product by providing it that features
that are not useful to customer is useless.
VALUE ENGINEERING
GNA UNIVERSITY6
 The value of a function is defined as the relationship
of cost to performance
Performance max
Cost min
Value max =
VALUE ENGINEERING
GNA UNIVERSITY7
 VE applies to everything because every project or
process has a function
 VE can be applied at any point of the design or
process
 VE is a problem solving technique
 VE can be used as a technique for developing
design criteria
VALUE ENGINEERING
GNA UNIVERSITY8
Value engineering is often done by systematically
following a multi-stage job plan. It has the following
eight steps:
1. Preparation
2. Information
3. Analysis
4. Creation
5. Evaluation
6. Development
7. Presentation
8. Verification phase
VALUE ENGINEERING
GNA UNIVERSITY9
Preparation-
 It is the most important phase of value
engineering that creates that right and successful
environment.
 In this phase there is interaction of customer
before manufacturing.
 Work done on specifics rather than on
generalities.
VALUE ENGINEERING
GNA UNIVERSITY10
Information phase-
 To determine user needs
 To build team knowledge and understanding of
the project
 To completely understand the specific use of
function requirements of the item
 To visit the site (preferable)
 Process continues throughout remainder of the
study
VALUE ENGINEERING
GNA UNIVERSITY11
Analysis phase-
 The evaluation should be done after each idea
after brainstorming.
 Analyzing of each ideas without thinking that idea
would not work, idea not possible and all that.
 Identification of barriers and their elimination
tactfully.
VALUE ENGINEERING
GNA UNIVERSITY12
Creation-
 In this stage value engineers ask; What are the
various alternative ways of meeting
requirements? What else will perform the desired
function?
 Brainstorming with positive thinking.
 Creative ideas can be developed by number of
check lists.
VALUE ENGINEERING
GNA UNIVERSITY13
Evaluation phase-
 Study of ideas that results in cost saving
and their implementation.
 In this stage all the alternatives are assessed by
evaluating how well they meet the required
functions and how great the cost savings will be.
VALUE ENGINEERING
GNA UNIVERSITY14
Development phase-
 This phase attempts a further development of the
two to four ideas selected earlier.
 A real effort to develop the ideas of lowest cost
that do the main function is attempted.
 Ask yourself: would I spent my own money on
this solution? If not modify it.
VALUE ENGINEERING
GNA UNIVERSITY15
Presentation –
 In the final stage, the best alternative will be
chosen and presented to the client for final
decision
 To present value engineering study proposals to
the decision makers/stake holders
 To obtain approval/support
 Present final solution in writing in concise format
stating the savings cost and detailed plan for
implementation the idea.
VALUE ENGINEERING
GNA UNIVERSITY16
Verification phase-
 Every step of the process is geared towards
obtaining a result that increases the rate on
investment.
 It is necessary to ensure that the group that
implements the idea inform of savings produced
and other benefits.
VALUE ENGINEERING
GNA UNIVERSITY17
Conclusion-
Value Engineering helps us to learn how to :
 Improve our career skills
 Separate "Symptoms" from "problems"
 Solve "root cause" problems and capture
opportunities
 Become more competitive by improving
"benchmarking" process
 Take command of a powerful problem solving
methodology to use in any situation
 Reduction in cost of existing products or systems.
 Prevention of unnecessary cost in new products .
GNA UNIVERSITY18
THANKYOU

More Related Content

PPTX
Value Engineering
PPTX
Value engineering and Analysis
PPT
Production Planning and Control
PPT
Safety Instrumentation
PPTX
Value engineering
PPT
122 value engineering
PPTX
Value Engineering and Value Analysis.pptx
PPTX
Value engineering seminar presentation
Value Engineering
Value engineering and Analysis
Production Planning and Control
Safety Instrumentation
Value engineering
122 value engineering
Value Engineering and Value Analysis.pptx
Value engineering seminar presentation

What's hot (20)

PPTX
Value analysis and Value Engineering
PDF
Practical Application of Value Engineering in Capital Projects
PDF
Value Engineering
PDF
A Study Report on Value Analysis and Value Engineering (VAVE)
PDF
Fundamentals of value engineering
PPTX
VALUE ENGINEERING CONCEPT-A BRIEF IN CONSTRUCTION INDUSTRY
PPT
Value Engineering And Value Analysis
PPTX
Value Engineering
PPTX
Value engineering Short Over view ppt
PPTX
Value analysis and value engineering
PPTX
Fast diagram, Work Design and Measurement
PDF
Value engineering practical
PPTX
VA/VE Presentation
PPTX
Value engineering case study ppt
PPTX
PPTX
Value Analysis & Value Engineering
PPTX
Value engineering pom
PPTX
Value Management
PPSX
Value Engineering And Value Analysis
PPTX
Value Analysis Value Engineering & Business Process Reengineering
Value analysis and Value Engineering
Practical Application of Value Engineering in Capital Projects
Value Engineering
A Study Report on Value Analysis and Value Engineering (VAVE)
Fundamentals of value engineering
VALUE ENGINEERING CONCEPT-A BRIEF IN CONSTRUCTION INDUSTRY
Value Engineering And Value Analysis
Value Engineering
Value engineering Short Over view ppt
Value analysis and value engineering
Fast diagram, Work Design and Measurement
Value engineering practical
VA/VE Presentation
Value engineering case study ppt
Value Analysis & Value Engineering
Value engineering pom
Value Management
Value Engineering And Value Analysis
Value Analysis Value Engineering & Business Process Reengineering
Ad

Viewers also liked (20)

PPT
Value Engineering
PPTX
Value analysis
PPTX
Value engineering
PPTX
What is VAVE
PDF
Cost Reduction of a product through Value Analysis & Value Engineering
PDF
Value_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_G
PPTX
VALUE ANALYSIS
DOCX
INDUSTRIAL VISIT
DOCX
CURRICULUM VITAE
PPTX
Massaundum
PPTX
AUTO CADD PPT
PPTX
Value chain analysis and value engineering
PPTX
Value Analysis and Value Engineering in Material Management
DOCX
Value analysis and value engineering
PPTX
Risk Management at Wellfleet Bank: Deciding about Megadeals
DOC
Value Analysis and Value Engineering in Material Management
PPTX
Suspension system
PPTX
Product Diversity
PDF
Risk management-case-study-at-wellfleet-bank
PPT
Suspension system
Value Engineering
Value analysis
Value engineering
What is VAVE
Cost Reduction of a product through Value Analysis & Value Engineering
Value_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_G
VALUE ANALYSIS
INDUSTRIAL VISIT
CURRICULUM VITAE
Massaundum
AUTO CADD PPT
Value chain analysis and value engineering
Value Analysis and Value Engineering in Material Management
Value analysis and value engineering
Risk Management at Wellfleet Bank: Deciding about Megadeals
Value Analysis and Value Engineering in Material Management
Suspension system
Product Diversity
Risk management-case-study-at-wellfleet-bank
Suspension system
Ad

Similar to VALUE ENGINEERING ANALYSIS PPT (20)

PDF
Value engineering significance
PDF
Value engineering in residential house construction
PDF
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTION
PDF
IRJET- Overview of Value Engineering and Value Analysis
PDF
Value engineering
PPTX
572021116-WINSEM2021-22-ECE3502-ETH-VL2021220501486-Reference-Material-I-15-0...
PPTX
Building & launching mobile & digital products
PDF
IRJET- A Case Study Analysis through the Implementation of Value Engineering
PPTX
PDF
PRODUCT DESIGN AND DEVELOPMENT PPT IV B.TECH
PPTX
VALUE ENGINNERING.pptx
PPSX
Majestic MRSS Usability Engineering
PDF
Value analysis -2
PPTX
Value analysis
PPTX
Value analysis
PPT
MMRSS Usability Engineering
PDF
VALUE ENGINNERING.pdf
PPTX
Getting value out of design sprints
PDF
Product Development Demystified: Launching Faster with Confidence through Hum...
PPTX
Mba om 02_product_andprocessdesign
Value engineering significance
Value engineering in residential house construction
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTION
IRJET- Overview of Value Engineering and Value Analysis
Value engineering
572021116-WINSEM2021-22-ECE3502-ETH-VL2021220501486-Reference-Material-I-15-0...
Building & launching mobile & digital products
IRJET- A Case Study Analysis through the Implementation of Value Engineering
PRODUCT DESIGN AND DEVELOPMENT PPT IV B.TECH
VALUE ENGINNERING.pptx
Majestic MRSS Usability Engineering
Value analysis -2
Value analysis
Value analysis
MMRSS Usability Engineering
VALUE ENGINNERING.pdf
Getting value out of design sprints
Product Development Demystified: Launching Faster with Confidence through Hum...
Mba om 02_product_andprocessdesign

VALUE ENGINEERING ANALYSIS PPT

  • 2. VALUE ENGINEERING GNA UNIVERSITY2  Value, as defined, is the ratio of function to cost.  Value engineering (VE) is systematic method to improve the "value" of goods or products and services by using an examination of function.
  • 3. VALUE ENGINEERING GNA UNIVERSITY3  Value Engineering is an organizational creative approach for the purpose of identifying of unnecessary cost.  Unnecessary cost are that which provides neither quality, nor use, not appearance, not life and customer features.
  • 4. VALUE ENGINEERING GNA UNIVERSITY4 It includes – 1. Cost Cutting 2. Design Review 3. Project Elimination 4. Scope Reduction 5. Quality Reduction 6. Detailed Cost Estimating 7. Redesign
  • 5. VALUE ENGINEERING GNA UNIVERSITY5  Value is always increased by decreasing costs while maintaining essential performance.  Value may also be increased if the customer needs, wants, and is willing to pay for greater performance.  Most people who design a product are quite often because designer is not sure real needs of user  Over designed product by providing it that features that are not useful to customer is useless.
  • 6. VALUE ENGINEERING GNA UNIVERSITY6  The value of a function is defined as the relationship of cost to performance Performance max Cost min Value max =
  • 7. VALUE ENGINEERING GNA UNIVERSITY7  VE applies to everything because every project or process has a function  VE can be applied at any point of the design or process  VE is a problem solving technique  VE can be used as a technique for developing design criteria
  • 8. VALUE ENGINEERING GNA UNIVERSITY8 Value engineering is often done by systematically following a multi-stage job plan. It has the following eight steps: 1. Preparation 2. Information 3. Analysis 4. Creation 5. Evaluation 6. Development 7. Presentation 8. Verification phase
  • 9. VALUE ENGINEERING GNA UNIVERSITY9 Preparation-  It is the most important phase of value engineering that creates that right and successful environment.  In this phase there is interaction of customer before manufacturing.  Work done on specifics rather than on generalities.
  • 10. VALUE ENGINEERING GNA UNIVERSITY10 Information phase-  To determine user needs  To build team knowledge and understanding of the project  To completely understand the specific use of function requirements of the item  To visit the site (preferable)  Process continues throughout remainder of the study
  • 11. VALUE ENGINEERING GNA UNIVERSITY11 Analysis phase-  The evaluation should be done after each idea after brainstorming.  Analyzing of each ideas without thinking that idea would not work, idea not possible and all that.  Identification of barriers and their elimination tactfully.
  • 12. VALUE ENGINEERING GNA UNIVERSITY12 Creation-  In this stage value engineers ask; What are the various alternative ways of meeting requirements? What else will perform the desired function?  Brainstorming with positive thinking.  Creative ideas can be developed by number of check lists.
  • 13. VALUE ENGINEERING GNA UNIVERSITY13 Evaluation phase-  Study of ideas that results in cost saving and their implementation.  In this stage all the alternatives are assessed by evaluating how well they meet the required functions and how great the cost savings will be.
  • 14. VALUE ENGINEERING GNA UNIVERSITY14 Development phase-  This phase attempts a further development of the two to four ideas selected earlier.  A real effort to develop the ideas of lowest cost that do the main function is attempted.  Ask yourself: would I spent my own money on this solution? If not modify it.
  • 15. VALUE ENGINEERING GNA UNIVERSITY15 Presentation –  In the final stage, the best alternative will be chosen and presented to the client for final decision  To present value engineering study proposals to the decision makers/stake holders  To obtain approval/support  Present final solution in writing in concise format stating the savings cost and detailed plan for implementation the idea.
  • 16. VALUE ENGINEERING GNA UNIVERSITY16 Verification phase-  Every step of the process is geared towards obtaining a result that increases the rate on investment.  It is necessary to ensure that the group that implements the idea inform of savings produced and other benefits.
  • 17. VALUE ENGINEERING GNA UNIVERSITY17 Conclusion- Value Engineering helps us to learn how to :  Improve our career skills  Separate "Symptoms" from "problems"  Solve "root cause" problems and capture opportunities  Become more competitive by improving "benchmarking" process  Take command of a powerful problem solving methodology to use in any situation  Reduction in cost of existing products or systems.  Prevention of unnecessary cost in new products .