• Ventilation Plan
Ventilation plan
Q-What is ventilation plan and what is its
objectives-
Ventilation plans have to be maintained by all
belowground mines. Regulation 65(1)(d) of
Coal Mines Regulations 2017 stipulates that
the owners, Agents or Managers shall keep a
ventilation plan and section where necessary,
showing the system of ventilation in the mine ,
and in particular –
Ventilation plan…contd
(i) The general direction of air current
(ii) Every point where the quantity of air is
measured
(iii)Every air-crossing, ventilation door, stopping
and every other principal device for the
regulation of distribution of air.
(iv)Every fire-stopping and its serial number
(v) Every room used for storing inflammable
material
Ventilation plan…contd
(vi)The position of every fire fighting equipment
(vii)Every water-dam with dimensions and other
particulars of construction
(viii)Every pumping, telephone and ambulance
station
(ix)Every haulage and travelling roadway
(x) Every auxiliary and booster fan
(xi)Every stone dust barrier
Ventilation plan…contd
(xii) Surface contour lines drawn at vertical
intervals not exceeding five meters (or ten
meters in the case of a mine where there are
no working belowground or in cases of mines
situated in hilly terrain, such other interval as
the Regional Inspector may permit by an
order in writing and subject to such
conditions as he may specify) over the whole
area lying within 200m of any part of the
workings.
Ventilation plan…contd
Regulation 163 of CMR 2017 stipulates that
the manager shall ensure that as soon as any
alteration is made in the ventilation of a mine
involving erection or removal of an air-
crossing or stopping or alteration in the
position or installation of a ventilator or fan
belowground, the erection, removal,
Ventilation plan…contd
alteration or installation, as the case may be,
is notified to the surveyor who shall
forthwith make necessary alterations on the
ventilation plan maintained under
Regulation 65.
Regulation 64(2) stipulatesthat while preparing
the ventilation plan, the convention shown in
the schedule shall be used.
Ventilation plan…contd
Regulation 64(1) stipulates that the ventilation
plan should
(i) Specify the name of the mine and of the
owner and purpose for which it is prepared
(ii) Show the true north or the magnetic
meridian and the date of the later
(iii)Specify a scale of the plan at least
25centimeters long and suitably subdivided.
Ventilation plan…contd
(iv) Be on a scale having a representative factor
of 2000:1 or 1000:1.
(v) Be properly inked in on a durable paper,
tracing cloth or on a polyester film and be
kept in good condition
(vi) The plans and sections required shall be
maintained corrected up-to-date which is not
earlier than three months.
Ventilation Plan.pdf& mining methods in mining
Ventilation Plan.pdf& mining methods in mining
Ventilation Plan.pdf& mining methods in mining
Ventilation Plan.pdf& mining methods in mining

More Related Content

PPT
Refuge_Station_Design_Don_Peake.ppt
PPT
Central Electrical Authority Regulation 2010
DOCX
Draft Rule Changes by ODNR for Construction of Well Pads in Ohio (Document 1)
PDF
kl1672014-140729101429-phpapp01.pdf
PPSX
OCCUPATIONAL SAFETY AND HEALTH
PDF
Petroleum Safety Measures Act 1984 Malaysia
PDF
Wasa guidelines for design and construction -boett-2003
Refuge_Station_Design_Don_Peake.ppt
Central Electrical Authority Regulation 2010
Draft Rule Changes by ODNR for Construction of Well Pads in Ohio (Document 1)
kl1672014-140729101429-phpapp01.pdf
OCCUPATIONAL SAFETY AND HEALTH
Petroleum Safety Measures Act 1984 Malaysia
Wasa guidelines for design and construction -boett-2003

Similar to Ventilation Plan.pdf& mining methods in mining (20)

PPTX
Factory Act 1948 with provisions related to health safety welfare.pptx
PPTX
Factories act 1948 health, safety and welfare of workers
PPTX
factories act Unit IV in industrial engineering
PDF
Metalliferous Mines Regulation, 1961.pdf
PDF
FCC 2021 Question FMR.pdf
PDF
Special Rules for Regulating the Construction & Maintenance in the Vicinity o...
PDF
Capalli Botha - Sheet - Pg_01 - Construction Plans03
PPT
Salient features of mines act, rules and regulation
PPTX
Health_Welfare_Provisions (1).pptx
PPT
Safety and health laws in pakistan
PPTX
Factories Act, 1948
PPTX
Sea NG - Small Market Gas Project Development
PDF
Building regualations-for-noida 0
PDF
Working plan guidance_wwtp
PDF
Working plan guidance_wwtp
PDF
Wasa guidelines for design of water and wastewater systems
PPTX
Standards of ventilation & Natural Ventilation
PDF
The coal mines regulation, 1957
Factory Act 1948 with provisions related to health safety welfare.pptx
Factories act 1948 health, safety and welfare of workers
factories act Unit IV in industrial engineering
Metalliferous Mines Regulation, 1961.pdf
FCC 2021 Question FMR.pdf
Special Rules for Regulating the Construction & Maintenance in the Vicinity o...
Capalli Botha - Sheet - Pg_01 - Construction Plans03
Salient features of mines act, rules and regulation
Health_Welfare_Provisions (1).pptx
Safety and health laws in pakistan
Factories Act, 1948
Sea NG - Small Market Gas Project Development
Building regualations-for-noida 0
Working plan guidance_wwtp
Working plan guidance_wwtp
Wasa guidelines for design of water and wastewater systems
Standards of ventilation & Natural Ventilation
The coal mines regulation, 1957
Ad

Recently uploaded (20)

PDF
Computing-Curriculum for Schools in Ghana
PDF
AI-driven educational solutions for real-life interventions in the Philippine...
PPTX
History, Philosophy and sociology of education (1).pptx
PDF
IGGE1 Understanding the Self1234567891011
PDF
advance database management system book.pdf
PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
PDF
Trump Administration's workforce development strategy
PPTX
Virtual and Augmented Reality in Current Scenario
PDF
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
PDF
Paper A Mock Exam 9_ Attempt review.pdf.
PDF
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
PDF
FORM 1 BIOLOGY MIND MAPS and their schemes
DOC
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
PDF
Weekly quiz Compilation Jan -July 25.pdf
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PDF
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
PDF
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
PDF
Practical Manual AGRO-233 Principles and Practices of Natural Farming
PDF
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
PDF
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
Computing-Curriculum for Schools in Ghana
AI-driven educational solutions for real-life interventions in the Philippine...
History, Philosophy and sociology of education (1).pptx
IGGE1 Understanding the Self1234567891011
advance database management system book.pdf
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
Trump Administration's workforce development strategy
Virtual and Augmented Reality in Current Scenario
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
Paper A Mock Exam 9_ Attempt review.pdf.
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
FORM 1 BIOLOGY MIND MAPS and their schemes
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
Weekly quiz Compilation Jan -July 25.pdf
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
Practical Manual AGRO-233 Principles and Practices of Natural Farming
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
Ad

Ventilation Plan.pdf& mining methods in mining

  • 2. Ventilation plan Q-What is ventilation plan and what is its objectives- Ventilation plans have to be maintained by all belowground mines. Regulation 65(1)(d) of Coal Mines Regulations 2017 stipulates that the owners, Agents or Managers shall keep a ventilation plan and section where necessary, showing the system of ventilation in the mine , and in particular –
  • 3. Ventilation plan…contd (i) The general direction of air current (ii) Every point where the quantity of air is measured (iii)Every air-crossing, ventilation door, stopping and every other principal device for the regulation of distribution of air. (iv)Every fire-stopping and its serial number (v) Every room used for storing inflammable material
  • 4. Ventilation plan…contd (vi)The position of every fire fighting equipment (vii)Every water-dam with dimensions and other particulars of construction (viii)Every pumping, telephone and ambulance station (ix)Every haulage and travelling roadway (x) Every auxiliary and booster fan (xi)Every stone dust barrier
  • 5. Ventilation plan…contd (xii) Surface contour lines drawn at vertical intervals not exceeding five meters (or ten meters in the case of a mine where there are no working belowground or in cases of mines situated in hilly terrain, such other interval as the Regional Inspector may permit by an order in writing and subject to such conditions as he may specify) over the whole area lying within 200m of any part of the workings.
  • 6. Ventilation plan…contd Regulation 163 of CMR 2017 stipulates that the manager shall ensure that as soon as any alteration is made in the ventilation of a mine involving erection or removal of an air- crossing or stopping or alteration in the position or installation of a ventilator or fan belowground, the erection, removal,
  • 7. Ventilation plan…contd alteration or installation, as the case may be, is notified to the surveyor who shall forthwith make necessary alterations on the ventilation plan maintained under Regulation 65. Regulation 64(2) stipulatesthat while preparing the ventilation plan, the convention shown in the schedule shall be used.
  • 8. Ventilation plan…contd Regulation 64(1) stipulates that the ventilation plan should (i) Specify the name of the mine and of the owner and purpose for which it is prepared (ii) Show the true north or the magnetic meridian and the date of the later (iii)Specify a scale of the plan at least 25centimeters long and suitably subdivided.
  • 9. Ventilation plan…contd (iv) Be on a scale having a representative factor of 2000:1 or 1000:1. (v) Be properly inked in on a durable paper, tracing cloth or on a polyester film and be kept in good condition (vi) The plans and sections required shall be maintained corrected up-to-date which is not earlier than three months.