Walter M. Johnson
johnsonwalt.0229@gmail.com
P.O. Box 1161
Valliant, OK
Cell- (918) 635-0229
Position of Industrial Millwright/Turbine Mechanic
Industrial Millwright/Turbine Mechanic with 10 years of heavy industrial experience primarily in the
power industry. Adept in performing expansions, maintenance, and modifications on boiler feed pumps and
75 mw up to 950 mw steam turbines. Also, experienced in performing maintenance and overhauling 6B-
7FA turbines and 9H gas turbine, steam cooled. Has strong experience in performing major overhauls
and/or maintenance on GE, Westinghouse, Toshiba, Siemens and Brown Bovarion and all other machinery
in fossil fuel power plants, pipeline, chemical plants, refineries and paper mills.
Key Skills
 Metric and standard measurements with
inside and outside micrometers,
calipers, dials, levels, depth gauges
 Blueprints
 Rigging
 Able to operate overhead crane and
knowledge of crane Hand signals
 Able to operate lull, JLG, fork lift and
scissor lift.
 Trained in confined space, heat stress,
FME, air monitoring.
 Alignments
 Inspections
 Fabrication using torch, plasma and
stick welding
 Using laser levels or dial calipers and
perils.
 Disassembly and reassembly of steam
and gas turbines and valves
 Overhauling, repairing and aligning
steam and combustion
turbines/generators
Professional Experience
Gemma July 2015-Nov2015
Journeyman Millwright
 Building two 400 MW single shaft power trains on Siemens SGT6-8000h gas turbines, Siemens
SST-5000 steam turbines, and Siemens SGEN6-2000H hydrogen cooled generators.
 Installing sole plates, bearing pedestals, turbine and generator setting the elevation and prepping
them to be grouted in.
 Doing horn loads to calculate the weight of the insulation to have the keys machined to the thickness
that is needed.
 Checking the clearness of the blade tips of the LP and gas turbines with filler gauges and doing a
run out with dial indicators and also the oil boar the thrust and turning gear and Exciter.
 Helping to assist the General Forman and Forman with problem solving and with the crew on job
tasks keeping a daily log book of the work and readings that was done for the day.
 Rigging equipment to be moved or installed with the Crain.
 Installing new motors and pumps checking for pipe stress and alignments to be sold off to the QC
and Siemens.
Pan Pacific August 2013-July2015
Journeyman Millwright
 Fabricate, installation and coming up with ideas on new and exciting equipment for better
performance.
 Changing bearings, motors, belts, rebuilding pumps, valves, hydraulic cylinders, replacing piping,
airlines and also changing out conveyer belts and realigning them.
 Doing daily and weekly maintenance on the sanders, saw line and hydraulic system. Working with
my superintendent and engineer on scheduling and planning of shut downs on ordering parts for
the equipment that I wasover.
TurboCare Apr 2013 –August 2013
Journeyman Millwright
 Replacement of the HP/LP shell on a 125 megawatt steam turbine.
 Rebuilding of the Stop, Control, and Intercept Valves. Changed out all the packing on the upper
and lower cases and performed wire alignment and step checks to verify and set the location of
diaphragms and packing boxes. Scraped all the seals to get within acceptable tolerances. Checked
bearings and all clearances before final installation. Performed final alignment from HP to LP to
Generator.
MD&A Oct 2012 – Apr 2013
Journeyman Millwright
 Reassembly of a 750 megawatt steam turbine. Completion of bearing changes and alignments.
 Completion of valve work and pulled generator on 150 megawatt steam turbine.
 Frame 5 gas turbine major overhaul and rebuild.
 Changed out bearings on 950 megawatt steam turbine and completed machining to the journals.
Used an ERAG machine to verify and set clearances.
Jacobs Jan 2011 – Aug 2012
Journeyman Millwright
 Performed the setting of sole plates and various equipment to elevations and centerline per
blueprint specifications. Used Rotalign Ultra for the various alignment, also used dial indicators
where laser was not feasible.
 Performed checks for pipe stress and coordinated with the pipe department for the solutions.
 Member of the Safety Committee, dedicated to the entire work force and myself working safely.
Shaw July 2010-Sep 2011
Journeyman Millwright
 Repaired and changed out pump and motors.
 Changed out piping and filters.
 Member of the Haz-Mat team and received all training involved in rescue of all personnel on site.
 Member of Safety Committee, dedicated to working safely.
QCI Feb 2008-June 2010
*Ongoing employment on various projects starting in 2004
Journeyman Millwright
 Inspection of valves and repaired all the various valves involved with steam and gas turbines.
Completed combustion inspection of various sizes of gas turbines.
 Replacement of bearings and piping.
 Set new sole plates along with pumps and motors.
 Completed alignment/realignments on several different motors and gas and steam turbines to
generators or compressors.
 Installation of panels and disconnects for motors, field instruments and devices.
War Fab May 2007-Aug 2007
Journeyman Millwright
 50K press rigging and hoisting out the cylinders.
 Installation of new equipment.
 Removal and reinstall new bushings and columns.
 Operation of Broderson crane to install new piping.
 Working with QC on torqueing flanges to specs with the use of hytorc.
TCI 2004-2005
Journeyman Millwright
 Maintenance in paper mill.
 Installation of new machinery and new piping to and from tanks to machines.
 Setting and leveling of pumps and motors.
 Changing out valves, dryers and rollers on paper machines.
All Seas 2003-2004
Journeyman Millwright
 Installation of new pipe lines on lay barge.
 Use of the overhead crane to move pipe around prepare pipe for welders.
 Performed all rigging.
More references available upon request
Certifications and Education
TWIC
OSHA 10 Card
Valliant High School
Eastern Oklahoma State, Wilburton OK
First aid/CPR certification

More Related Content

DOCX
Steven Lync1
DOCX
SENTHIL.BIODATA.1 - Copy
DOCX
Will's Resume[1]
DOC
Oberto Scotts resume 1
DOCX
M.Iqbal sarwer
DOCX
jahangir new
DOC
Resume
PDF
Anandakrishnan-resume s
Steven Lync1
SENTHIL.BIODATA.1 - Copy
Will's Resume[1]
Oberto Scotts resume 1
M.Iqbal sarwer
jahangir new
Resume
Anandakrishnan-resume s

What's hot (20)

DOC
P.V. Hari Prasad resume photo
DOCX
Trvl Tech
DOC
Frank-ProfessionalResume[1]
DOCX
ResumeKevinNoiaFinal
DOC
Resume
PDF
MYRESUME7
DOCX
Resume-Roger Stocksiek 1
PDF
aly afifi CV.
DOC
Najeeullah CV
DOC
MatthewMV3.Resume
DOC
SAID SAAD ALY CV
DOCX
vmg resume 2
DOCX
Victor Manuel Guilamo Resume
DOCX
Brandon Resume (1)
DOCX
David Seslar resume 2015
DOC
DVR CV NEW12
DOCX
WINSTON RESUME
DOCX
Keith_Magee_Resume_Production_2015 (1)
DOCX
chris's CV
DOCX
Abram_Clark_Resume_1
P.V. Hari Prasad resume photo
Trvl Tech
Frank-ProfessionalResume[1]
ResumeKevinNoiaFinal
Resume
MYRESUME7
Resume-Roger Stocksiek 1
aly afifi CV.
Najeeullah CV
MatthewMV3.Resume
SAID SAAD ALY CV
vmg resume 2
Victor Manuel Guilamo Resume
Brandon Resume (1)
David Seslar resume 2015
DVR CV NEW12
WINSTON RESUME
Keith_Magee_Resume_Production_2015 (1)
chris's CV
Abram_Clark_Resume_1
Ad

Similar to WaltJohnson (20)

DOCX
David's resume'
DOC
2014 Resume for James Rabon Jr
PDF
Mark McCroy resume
DOC
pzresume
ODT
William D. Brantley
DOCX
Greg's Resume NL
DOC
Mikes updated Resume-3
PDF
Jeffrey L. Mowery - 2015 Resume
PDF
Martin Walker GE style CV
PDF
Lynn's Resume 1
DOC
Josh Squyres Resume 3
DOCX
Adalberto2014resume
DOCX
Gordon_Murray updated cv
DOC
Shawn Schram Resume Revised
PDF
BGilbertResume1
PDF
Colin coleman
PDF
Colin-Coleman
RTF
Josh Rowe US Steel Resume
ODT
Chad Knight Resume April 2016 (1) (1)
DOCX
Schmidt, Ben Resume
David's resume'
2014 Resume for James Rabon Jr
Mark McCroy resume
pzresume
William D. Brantley
Greg's Resume NL
Mikes updated Resume-3
Jeffrey L. Mowery - 2015 Resume
Martin Walker GE style CV
Lynn's Resume 1
Josh Squyres Resume 3
Adalberto2014resume
Gordon_Murray updated cv
Shawn Schram Resume Revised
BGilbertResume1
Colin coleman
Colin-Coleman
Josh Rowe US Steel Resume
Chad Knight Resume April 2016 (1) (1)
Schmidt, Ben Resume
Ad

WaltJohnson

  • 1. Walter M. Johnson johnsonwalt.0229@gmail.com P.O. Box 1161 Valliant, OK Cell- (918) 635-0229 Position of Industrial Millwright/Turbine Mechanic Industrial Millwright/Turbine Mechanic with 10 years of heavy industrial experience primarily in the power industry. Adept in performing expansions, maintenance, and modifications on boiler feed pumps and 75 mw up to 950 mw steam turbines. Also, experienced in performing maintenance and overhauling 6B- 7FA turbines and 9H gas turbine, steam cooled. Has strong experience in performing major overhauls and/or maintenance on GE, Westinghouse, Toshiba, Siemens and Brown Bovarion and all other machinery in fossil fuel power plants, pipeline, chemical plants, refineries and paper mills. Key Skills  Metric and standard measurements with inside and outside micrometers, calipers, dials, levels, depth gauges  Blueprints  Rigging  Able to operate overhead crane and knowledge of crane Hand signals  Able to operate lull, JLG, fork lift and scissor lift.  Trained in confined space, heat stress, FME, air monitoring.  Alignments  Inspections  Fabrication using torch, plasma and stick welding  Using laser levels or dial calipers and perils.  Disassembly and reassembly of steam and gas turbines and valves  Overhauling, repairing and aligning steam and combustion turbines/generators Professional Experience Gemma July 2015-Nov2015 Journeyman Millwright  Building two 400 MW single shaft power trains on Siemens SGT6-8000h gas turbines, Siemens SST-5000 steam turbines, and Siemens SGEN6-2000H hydrogen cooled generators.  Installing sole plates, bearing pedestals, turbine and generator setting the elevation and prepping them to be grouted in.  Doing horn loads to calculate the weight of the insulation to have the keys machined to the thickness that is needed.  Checking the clearness of the blade tips of the LP and gas turbines with filler gauges and doing a run out with dial indicators and also the oil boar the thrust and turning gear and Exciter.  Helping to assist the General Forman and Forman with problem solving and with the crew on job tasks keeping a daily log book of the work and readings that was done for the day.  Rigging equipment to be moved or installed with the Crain.  Installing new motors and pumps checking for pipe stress and alignments to be sold off to the QC and Siemens.
  • 2. Pan Pacific August 2013-July2015 Journeyman Millwright  Fabricate, installation and coming up with ideas on new and exciting equipment for better performance.  Changing bearings, motors, belts, rebuilding pumps, valves, hydraulic cylinders, replacing piping, airlines and also changing out conveyer belts and realigning them.  Doing daily and weekly maintenance on the sanders, saw line and hydraulic system. Working with my superintendent and engineer on scheduling and planning of shut downs on ordering parts for the equipment that I wasover. TurboCare Apr 2013 –August 2013 Journeyman Millwright  Replacement of the HP/LP shell on a 125 megawatt steam turbine.  Rebuilding of the Stop, Control, and Intercept Valves. Changed out all the packing on the upper and lower cases and performed wire alignment and step checks to verify and set the location of diaphragms and packing boxes. Scraped all the seals to get within acceptable tolerances. Checked bearings and all clearances before final installation. Performed final alignment from HP to LP to Generator. MD&A Oct 2012 – Apr 2013 Journeyman Millwright  Reassembly of a 750 megawatt steam turbine. Completion of bearing changes and alignments.  Completion of valve work and pulled generator on 150 megawatt steam turbine.  Frame 5 gas turbine major overhaul and rebuild.  Changed out bearings on 950 megawatt steam turbine and completed machining to the journals. Used an ERAG machine to verify and set clearances. Jacobs Jan 2011 – Aug 2012 Journeyman Millwright  Performed the setting of sole plates and various equipment to elevations and centerline per blueprint specifications. Used Rotalign Ultra for the various alignment, also used dial indicators where laser was not feasible.  Performed checks for pipe stress and coordinated with the pipe department for the solutions.  Member of the Safety Committee, dedicated to the entire work force and myself working safely. Shaw July 2010-Sep 2011 Journeyman Millwright  Repaired and changed out pump and motors.  Changed out piping and filters.  Member of the Haz-Mat team and received all training involved in rescue of all personnel on site.  Member of Safety Committee, dedicated to working safely. QCI Feb 2008-June 2010 *Ongoing employment on various projects starting in 2004 Journeyman Millwright  Inspection of valves and repaired all the various valves involved with steam and gas turbines. Completed combustion inspection of various sizes of gas turbines.  Replacement of bearings and piping.  Set new sole plates along with pumps and motors.  Completed alignment/realignments on several different motors and gas and steam turbines to generators or compressors.  Installation of panels and disconnects for motors, field instruments and devices.
  • 3. War Fab May 2007-Aug 2007 Journeyman Millwright  50K press rigging and hoisting out the cylinders.  Installation of new equipment.  Removal and reinstall new bushings and columns.  Operation of Broderson crane to install new piping.  Working with QC on torqueing flanges to specs with the use of hytorc. TCI 2004-2005 Journeyman Millwright  Maintenance in paper mill.  Installation of new machinery and new piping to and from tanks to machines.  Setting and leveling of pumps and motors.  Changing out valves, dryers and rollers on paper machines. All Seas 2003-2004 Journeyman Millwright  Installation of new pipe lines on lay barge.  Use of the overhead crane to move pipe around prepare pipe for welders.  Performed all rigging. More references available upon request Certifications and Education TWIC OSHA 10 Card Valliant High School Eastern Oklahoma State, Wilburton OK First aid/CPR certification