      The following is a brief Review highlighting The
        development and use of an Audit Checklist.

A fictitious procedure is used to demonstrate the process of
developing checklists that give the auditor a strong starting
point. This goes a long way to ensure a through audit.

       This skill is invaluable to an effective and comprehensive internal audit program.
       Mastery of this skill by the internal auditor adds greatly to the overall audit
       program within an organization. This skill applies to the internal audit for any of
       the international standards.
                  wwwMBCIncorp.com - Martin Business Consulting, Inc.                    1
Audit Checklist Development
           Set-up Procedure – SOP 101

5.1 The “Utility” person will do machine set-ups
    per the production schedule.
5.2 The “Utility” person runs 3 parts for set-up
    verification.                                                   Let’s Breakdown
5.3 “Utility” person takes the set-up parts to the                  the process of
     Lab for measurement.                                           developing and
5.4 All material produced after set-up is contained
    until the verification of the set-up.                           using a checksheet.
5.5 After verification the normal sampling plan is
    followed.




                   wwwMBCIncorp.com - Martin Business Consulting, Inc.               2
Audit Checklist Development
Set-up Procedure – SOP 101
                                                1. The auditor in the development of
5.1 The “Utility” person will do
     machine set-ups per                           the checksheet must account for
     the production schedule.                      each requirement of the
5.2 The “Utility” person runs 3                    procedure.
     parts for set-up verification.
5.3 “Utility” person takes the set-             2. Some items are accounted for by
    up parts to the Lab                            questions to the responsible
    for measurement.
5.4 All material produced after set-
                                                   person.
    up is contained
    until the verification of the               3. Other items are accounted for by
    set-up.                                        direct observation of the auditor
5.5 After verification the normal
    sampling plan is followed.


                      wwwMBCIncorp.com - Martin Business Consulting, Inc.              3
Audit Checklist Development
Set-up Procedure – SOP 101                                        Checklist – SOP 101

5.1 The “Utility” person will do
 1. Who does the machine
    machine set-ups per
    the production schedule.                                1. Who does the machine
     set-up? (5.1)
5.2 When are set-ups runs 3
 2. The “Utility” person                                       set-up? (5.1)
    parts for set-up verification.                          2. When are set-ups
     conducted? (5.1)
5.3 “Utility” person takes the set-                            conducted? (5.1)
 3. How manythe Labare run
    up parts to parts                                       3. How many parts are run
   for set-up verification? (5.2)
    for measurement.                                          for set-up verification? (5.2)
5.4 All material produced after set-
    up is contained
 4. Where are the parts the
    until the verification of
    set-up.                                                 4. Where are the parts
     transferred to? (5.3)
5.5 After verification the normal                              transferred to? (5.3)
 4A. Transfer by Who? (5.3)
    sampling plan is followed.                              4A. Transfer by Who? (5.3)


                      wwwMBCIncorp.com - Martin Business Consulting, Inc.                      4
Audit Checklist Development
Set-up Procedure – SOP 101                                        Checklist – SOP 101

5.1 The “Utility” person will do
    machine set-ups per
    the production schedule.
5.2 The “Utility” person runs 3
    parts for set-up verification.
5.3 “Utility” person takes the set-
5. How is production material
    up parts to the Lab                                    5. How is production material
   handled while awaiting
    for measurement.                                          handled while awaiting
5.4verification of set-up parts?
    All material produced after set-                          verification of set-up parts?
    (5.4) contained
    up is
                                                               (5.4)
6. How is the process of the
    until the verification
    set-up.                                                6. How is the process
   controlled after part normal
5.5 After verification the                                    controlled after part
   verification? (5.5)
    sampling plan is followed.                                verification? (5.5)


                      wwwMBCIncorp.com - Martin Business Consulting, Inc.                     5
Audit Checklist Development

•    Once the questions are developed, the
     auditor must transfer them to a checksheet
•    The format of the checksheet isn’t
     important and may vary by auditor.
•    Each auditor will develop a format that they
     are comfortable with.
•    The format development comes from
     auditor experience.
             wwwMBCIncorp.com - Martin Business Consulting, Inc.   6
Audit Checklist Development



                    lide
                 ts
               ex t!
              n
             e rma
           th fo
         ut le
        o b
 he pock ssi
C a
 f or
        wwwMBCIncorp.com - Martin Business Consulting, Inc.   7
Audit Checklist Development

Procedure Number   SOP 101 Rev A                       Issue Date   2/14/08

Audit date     May 12, 2008


CHECKLIST FOR AUDIT REPORT NO:           Page _____ of _____
  Item                                                     ACTIVITY
  No:         REQUIREMENT                 Interview      COMPLIANCE             COMMENTS/REMARKS


                                                                                        t
                                                                                fo rm a
                                                                          s heet ul this
                                                                    c heck helpf
                                                            gh  this t how
                                                       throu see jus itor!
                                                 ’s go tem to he aud
                                             Let by i            t
                                              item ecome    s to
                                                     b
                                               tool
                          wwwMBCIncorp.com - Martin Business Consulting, Inc.                      8
Audit Checklist Development

Procedure Number   SOP 101 Rev A                          Issue Date   2/14/08

Audit date     May 12, 2008
                                                                                              a   nd
                                                                                  s   ue date
                                                                             is
CHECKLIST FOR AUDIT REPORT NO:              Page _____ of _____
                                                                      ce dure the
  Item                                                           , Pro ment to
                                                              ACTIVITY
                                                              er
  No:         REQUIREMENT                    Interview numb         o cu
                                                            COMPLIANCE          dit.
                                                                              COMMENTS/REMARKS
                                                                                   u
                                              e dure ks this d of the a                         ve
                                      e Proc ate lin              da  te                ob jecti
                              1 . Th audit d               et ime/               o m es
                                   the            e at t h             ee  t bec
                                           ed u r                cksh s.                        of th
                                                                                                      e
                                     proc                  d ch e       it                  on
                                                m   plete ture aud                   m pleti
                                         h e co e fo r f u                   p er co
                                  2. T idenc                      th e p ro
                                        ev                n  as to ess.
                                                fi catio it proc
                                     3.   Veri al aud
                                                  n
                                           inter
                          wwwMBCIncorp.com - Martin Business Consulting, Inc.                             9
Audit Checklist Development

Procedure Number   SOP 101 Rev A                       Issue Date   2/14/08

Audit date     May 12, 2008


CHECKLIST FOR AUDIT REPORT NO:           Page _____ of _____
  Item                                                     ACTIVITY
  No:         REQUIREMENT                 Interview      COMPLIANCE             COMMENTS/REMARKS



     1. The “item No.”, “Requirement”, and “Interview” field give the
        auditor a place to itemize the questions to be ask and the person to
        be interviewed.
     2. In most cases the interviewee is identified by job title.
     3. There may be some exceptions where a proper name is utilized.

                          wwwMBCIncorp.com - Martin Business Consulting, Inc.                      10
Audit Checklist Development

Procedure Number   SOP 101 Rev A                       Issue Date   2/14/08

Audit date     May 12, 2008


CHECKLIST FOR AUDIT REPORT NO:           Page _____ of _____
  Item                                                     ACTIVITY
  No:         REQUIREMENT                 Interview      COMPLIANCE             COMMENTS/REMARKS




     The “Activity Compliance.” and “Comments/Remarks” fields give the
     auditor a place to document compliance and to record information
     about the answers given the auditor, or observation of the auditor.


                          wwwMBCIncorp.com - Martin Business Consulting, Inc.                      11
Audit Checklist Development
Procedure Number         SOP 101 Rev A                          Issue Date   2/14/08

                                                                                                     ”
                                                                                              rview on to
Audit date          May 12, 2008

                                                                Issue Date 2/14/08 e “In
                                                                                           te         rs
                                                                               n th            he pe
Procedure Number SOP 101 Rev A
   Item                                                                   1. I umn is t d.
                                                                     ACTIVITY
                                                                   COMPLIANCE lco COMMENTS/REMARKSe
                                                                                          rview
   No:           REQUIREMENT                    Interview
                                                                                       te
     1    Who does the machine set-up?
          (5.1)
                                            Set-up Tech
                                                                                 be in
                                                                                                 e
                                                                                          ve th ome our
     2    When are set-ups conducted? (5.1) Set-up Tech
                                                                                       ha
                                                                              r e we that bec r
    3        How many parts are run for set-up Set-up Tech
                                                                      1 . He stions             fo r o
                                                                                                       u
                                                                            que g point
             verification? (5.2)
    4        Where are the parts transferred to? Set-up Tech                      in
             (5.3) 4A. Transfer by Who? (5.3)                                start process.
                                                                                    t
                                                                              audi                  n
    5        How is production material            Supervisor                              m  ber i cates the
             handled while awaiting                                               T he nu ses indi being
                                                                           2.               e            nt
             verification of set-up parts? (5.4)
                                                                                 pa  renth re eleme
                                                                                          du
    6        How is the process controlled after Machine                          p roce ated.
                                                                                           tig
             part verification? (5.5)            Operator
                                                                                   i nves
                                 wwwMBCIncorp.com - Martin Business Consulting, Inc.                        12
Audit Checklist Use
Procedure Number         SOP 101 Rev A                          Issue Date   2/14/08

Audit date          May 12, 2008

Procedure Number SOP 101 Rev A                                  Issue Date 2/14/08
   Item                                                              ACTIVITY
   No:           REQUIREMENT                    Interview          COMPLIANCE          COMMENTS/REMARKS
     1    Who does the machine set-up?      Set-up Tech                                 Check training records for
          (5.1)
                                                                     Yes                set-up man “John Allen”
     2    When are set-ups conducted? (5.1) Set-up Tech
                                                                 1. The first question is confirmed
    3        How many parts are run for set-up Set-up Tech
             verification? (5.2)
                                                                    as OK and the name of the
    4        Where are the parts transferred to? Set-up Tech        person being interviewed is
             (5.3) 4A. Transfer by Who? (5.3)
                                                                    noted.
    5        How is production material            Supervisor
             handled while awaiting                              2. This allows the auditor to
             verification of set-up parts? (5.4)                    confirm training at a later
    6        How is the process controlled after Machine
                                                                    interview, perhaps in the HR
             part verification? (5.5)            Operator           department.
                                 wwwMBCIncorp.com - Martin Business Consulting, Inc.                                 13
Audit Checklist Use
Procedure Number         SOP 101 Rev A                          Issue Date    2/14/08

Audit date          May 12, 2008

Procedure Number SOP 101 Rev A                                  Issue Date 2/14/08
   Item                                                              ACTIVITY
   No:           REQUIREMENT                    Interview          COMPLIANCE              COMMENTS/REMARKS
     1    Who does the machine set-up?      Set-up Tech                                     Check training records for
          (5.1)
                                                                     Yes                    set-up man “John Allen”
     2    When are set-ups conducted? (5.1) Set-up Tech                      Yes        Confirmed by lab inspection records and the
                                                                                        production schedule for the past 4 set-ups
    3        How many parts are run for set-up Set-up Tech
             verification? (5.2)
    4        Where are the parts transferred to? Set-up Tech          1. The second question is
             (5.3) 4A. Transfer by Who? (5.3)
                                                                         confirmed by the set-up
    5        How is production material            Supervisor            person.
             handled while awaiting
             verification of set-up parts? (5.4)                      2. Note the follow-up comment
    6        How is the process controlled after Machine
                                                                         to confirm this important set-
             part verification? (5.5)            Operator                up step.
                                 wwwMBCIncorp.com - Martin Business Consulting, Inc.                                       14
Audit Checklist Use
Procedure Number         SOP 101 Rev A                          Issue Date    2/14/08

Audit date          May 12, 2008

Procedure Number SOP 101 Rev A                                  Issue Date 2/14/08
   Item                                                              ACTIVITY
   No:           REQUIREMENT                    Interview          COMPLIANCE              COMMENTS/REMARKS
     1    Who does the machine set-up?      Set-up Tech                                     Check training records for
          (5.1)
                                                                     Yes                    set-up man “John Allen”
     2    When are set-ups conducted? (5.1) Set-up Tech                      Yes        Confirmed by lab inspection records and the
                                                                                        production schedule for the past 4 set-ups
    3        How many parts are run for set-up Set-up Tech
                                                                   No                     Per the set-up person only two (2)
             verification? (5.2)                                                          parts are being taken to the lab to
    4        Where are the parts transferred to? Set-up Tech                              verify set-up. Inspection records in
             (5.3) 4A. Transfer by Who? (5.3)                                             the lab confirm this statement

    5        How is production material            Supervisor   1. The third question is confirmed by
             handled while awaiting
             verification of set-up parts? (5.4)                   the set-up person.
    6        How is the process controlled after Machine        2. Note the noncompliance is also
             part verification? (5.5)            Operator
                                                                   confirmed by lab records.
                                 wwwMBCIncorp.com - Martin Business Consulting, Inc.                                       15
Audit Checklist Use
Procedure Number         SOP 101 Rev A                          Issue Date    2/14/08

Audit date          May 12, 2008

Procedure Number SOP 101 Rev A                                  Issue Date 2/14/08
   Item                                                              ACTIVITY
   No:           REQUIREMENT                    Interview          COMPLIANCE          COMMENTS/REMARKS
     1    Who does the machine set-up?
          (5.1)
                                            Set-up Tech
                                                                     Yes The
                                                                      1.            fourth question isfor
                                                                                        Check training records
                                                                                        set-up man “John Allen”
     2    When are set-ups conducted? (5.1) Set-up Tech                      confirmed by lab inspection records and the
                                                                             Yes   Confirmed by
                                                                                                 the set-up
                                                                             person, as well asfor the past 4 set-ups
                                                                                   production schedule observation

                                                                             of the auditor. beingperson to thetwo (2)
                                                                                      Per the set-up         only
    3        How many parts are run for set-up Set-up Tech
             verification? (5.2)
                                                                   No
                                                                                      parts are        taken      lab to
    4        Where are the parts transferred to? Set-up Tech                            verify set-up. Inspection records in
             (5.3) 4A. Transfer by Who? (5.3)                                           the lab confirm this statement
                                                                4, Yes/4A Yes
    5        How is production material            Supervisor
             handled while awaiting
             verification of set-up parts? (5.4)

    6        How is the process controlled after Machine
             part verification? (5.5)            Operator

                                 wwwMBCIncorp.com - Martin Business Consulting, Inc.                                16
Audit Checklist Use
Procedure Number         SOP 101 Rev A                          Issue Date    2/14/08

Audit date          May 12, 2008

Procedure Number SOP 101 Rev A                                  Issue Date The fifth question is confirmed
                                                                       1. 2/14/08
   Item                                                              ACTIVITY
   No:           REQUIREMENT                    Interview
                                                                           by the supervisor.
                                                                   COMPLIANCE       COMMENTS/REMARKS
     1    Who does the machine set-up?      Set-up Tech                              Check training records for
          (5.1)
                                                                      Yes The auditor records the
                                                                       2.            set-up man “John Allen”
     2    When are set-ups conducted? (5.1) Set-up Tech                      supervisors name to confirm
                                                                             Yes Confirmed by lab inspection records and the
                                                                             properproduction schedule for the past 4 set-ups
                                                                                    training.
    3        How many parts are run for set-up Set-up Tech
                                                                   No                 Per the set-up person only two (2)
             verification? (5.2)
    4        Where are the parts transferred to? Set-up Tech          3.     This trainingare beingInspection records in
                                                                                      parts           taken to the lab to
                                                                                              is confirmed later
                                                                                      verify set-up.
             (5.3) 4A. Transfer by Who? (5.3)                                in HR. the lab confirm this statement
                                                                4, Yes/4A Yes
    5        How is production material            Supervisor
             handled while awaiting
             verification of set-up parts? (5.4)                      Yes               Check training records for
                                                                                        supervisor “Kathy Connor”
    6        How is the process controlled after Machine
             part verification? (5.5)            Operator

                                 wwwMBCIncorp.com - Martin Business Consulting, Inc.                                   17
Audit Checklist Use
Procedure Number         SOP 101 Rev A                          Issue Date   2/14/08

Audit date          May 12, 2008

Procedure Number SOP 101 Rev A                                  Issue Date 2/14/08
   Item                                                              ACTIVITY
   No:           REQUIREMENT                    Interview          COMPLIANCE            COMMENTS/REMARKS
     1    Who does the machine set-up?      Set-up Tech                                   Check training records for
          (5.1)
                                                                     Yes
                                                                      1. The last        question is confirmed
                                                                                          set-up man “John Allen”
     2    When are set-ups conducted? (5.1) Set-up Tech                  Yes the Confirmed by lab inspection records and the
                                                                         by       line operator.
                                                                                 production schedule for the past 4 set-ups
    3        How many parts are run for set-up Set-up Tech
                                                                   No The auditorthe set-up person only two (2)
                                                                    2.
                                                                              Per
             verification? (5.2)                                              partsconfirms proper to
                                                                                   are being taken to the lab
    4        Where are the parts transferred to? Set-up Tech
             (5.3) 4A. Transfer by Who? (5.3)
                                                                          process control by Inspection records in
                                                                                    verify set-up. verifying
                                                                                    the lab confirm this statement
                                                                          inspection records correspond
                                                                4, Yes/4A Yes
    5        How is production material            Supervisor             to job instructions for the
             handled while awaiting
             verification of set-up parts? (5.4)                      Yesoperator. training records for
                                                                                  Check
                                                                                       supervisor “Kathy Connor”
    6        How is the process controlled after Machine                               Confirmed by Job instructions and
             part verification? (5.5)            Operator               Yes            corresponding inspection records

                                 wwwMBCIncorp.com - Martin Business Consulting, Inc.                                       18
Audit Checklist Use
  Procedure Number         SOP 101 Rev A                        Issue Date    2/14/08

          1
  Audit date
            . T May 12, 2008
                  hi
  Procedure Numbers c SOP 101 Rev A                             Issue Date 2/14/08
              bec omp
     Item          o me         le                                   ACTIVITY
      2.
     No:                  s pa ted ch
                      REQUIREMENT                  Interview
           Thi does the machine set-up? ck Set-up Tech
                                                                   COMPLIANCE              COMMENTS/REMARKS
                s               rt o       e
       1     Who
                                     f th     s                                             Check training records for
         for(5.1) is val
                           u
              sur are set-ups             e au h eet n o             Yes                    set-up man “John Allen”
       2inte Whenveill abconducted? (5.1) iSet-up Tech
                                 le o         dt
                                                  reco w                     Yes        Confirmed by lab inspection records and the
            rn a          an c        b
                               e u je set-up
3. 3 Howl many parts arearun for ctive Set-up Tech.
                    au d                                rd                              production schedule for the past 4 set-ups
    Giv                  i s.        dits       e                  No                      Per the set-up person only two (2)
          ingverification?t(5.2)           and videnc                                      parts are being taken to the lab to
  pro Wherej are the parts transferred to? fu Teche
               o e
 thor
       4c
          edu b4A.cTransfer by Who? (5.3) Set-up e
                        tive                      tur                                      verify set-up. Inspection records in
       oug re in q
             (5.3)                                                                         the lab confirm this statement
                               e
            hly         ues videnc                               4, Yes/4A Yes
       5           is        tion
             Howauproduction material e th Supervisor
                      dite awaiting a
             handled while d . w s at t h e                           Yes
               verification of set-up parts? (5.4)                                       Check training records for
                                                                                         supervisor “Kathy Connor”
      6        How is the process controlled after Machine                               Confirmed by Job instructions and
               part verification? (5.5)            Operator             Yes              corresponding inspection records

                                   wwwMBCIncorp.com - Martin Business Consulting, Inc.                                       19
Thank you
• If you need additional information, training or direction
  about “Internal Audit”. Visit our web-site
                   www.MBCIncorp.com
• Select the menu tab “Course List & Services”, or “Public
  Seminars”
• Or just contact National Quality Services,
   – E-mail – BMartin@MBCIncorp.com
   – Phone – 931-637-1446
• Check the web site often for new PowerPoint
  presentation on many topics of interest

               wwwMBCIncorp.com - Martin Business Consulting, Inc.   20

More Related Content

PDF
Multiple regression in spss
PPTX
Discreet and continuous probability
PPTX
T distribution
PDF
Analysis of Variance (ANOVA)
PPTX
4.1-4.2 Sample Spaces and Probability
PPT
MANAGING RISK IN INTERNATIONAL BUSINESS
PDF
Variance And Standard Deviation
Multiple regression in spss
Discreet and continuous probability
T distribution
Analysis of Variance (ANOVA)
4.1-4.2 Sample Spaces and Probability
MANAGING RISK IN INTERNATIONAL BUSINESS
Variance And Standard Deviation

What's hot (9)

PDF
Probability Distributions
PPTX
Normal Distribution, Binomial Distribution, Poisson Distribution
PDF
Simple linear regression
PPTX
The written curriculum ppp
PDF
Measures of Relative Position GEC-MMW 1Y
PPTX
Statistics an introduction (1)
PDF
Regression
PPTX
Risk governance framework
PPT
Z score presnetation
Probability Distributions
Normal Distribution, Binomial Distribution, Poisson Distribution
Simple linear regression
The written curriculum ppp
Measures of Relative Position GEC-MMW 1Y
Statistics an introduction (1)
Regression
Risk governance framework
Z score presnetation
Ad

Viewers also liked (20)

PPTX
Computer networking
PDF
13 information system audit of banks
PDF
101 Free Online Marketing Resources For Entrepreneurs
PDF
Technical Marketing is the Price of Admission
DOCX
Iso 9001 2015 audit checklist
DOC
Capex audit checklist
PPT
Ch12 - Organisation theory design and change gareth jones
PPTX
Predictive Analytics: Context and Use Cases
PPTX
Summer Training Presentation On HMT Machine Tools Ltd
PPTX
How to Audit Your Incident Response Plan
PDF
Program management audit checklist
PDF
security-checklist-database
PPTX
IS Audit Checklist- by Software development company in india
PDF
Website Audit Checklist
PPSX
Landforms 60 - PowerPoint - Version 2
PPTX
Information System audit
PPT
Iso Process Audit Training
PPT
Integrated treasury management in banks
DOCX
Audit Checklist for Information Systems
PPT
Entrepreneurship And Business Management
Computer networking
13 information system audit of banks
101 Free Online Marketing Resources For Entrepreneurs
Technical Marketing is the Price of Admission
Iso 9001 2015 audit checklist
Capex audit checklist
Ch12 - Organisation theory design and change gareth jones
Predictive Analytics: Context and Use Cases
Summer Training Presentation On HMT Machine Tools Ltd
How to Audit Your Incident Response Plan
Program management audit checklist
security-checklist-database
IS Audit Checklist- by Software development company in india
Website Audit Checklist
Landforms 60 - PowerPoint - Version 2
Information System audit
Iso Process Audit Training
Integrated treasury management in banks
Audit Checklist for Information Systems
Entrepreneurship And Business Management
Ad

Similar to Web site int audit checklist intent (20)

PDF
INTERNAL AUDIT ISO 13485:2016 Medical Device
PPT
Smed smpl 1
PPT
Smed smpl 1
PDF
Project Pluto Will Adopt The Incremental Build Model Essay
PDF
Piano triennaleauditmultisito
PPT
lean & agile
PDF
Quality Inspection.pdf
PDF
How to improve machine performance
PDF
operator -self inspection.pdf
PDF
How to manage your testing automation project ttm methodology
PPTX
Pharmaceutical Qualification & Validation
PPTX
00.+Refresh+Quiz,+QMS (1).pptx ISO 9001:2015
PDF
Cmsc 1215 ensuring a quality order management (3)
PDF
Ensuring a Quality Order Management Implementation
PDF
CMRP PPT ABOUT THE INDUSTRY NAMASTE AND ALL ASSETS
PDF
Ewm erp qm_basic_inspection_process
PPTX
Manufacturing cells
PDF
Tool Box Training-Operator Care
INTERNAL AUDIT ISO 13485:2016 Medical Device
Smed smpl 1
Smed smpl 1
Project Pluto Will Adopt The Incremental Build Model Essay
Piano triennaleauditmultisito
lean & agile
Quality Inspection.pdf
How to improve machine performance
operator -self inspection.pdf
How to manage your testing automation project ttm methodology
Pharmaceutical Qualification & Validation
00.+Refresh+Quiz,+QMS (1).pptx ISO 9001:2015
Cmsc 1215 ensuring a quality order management (3)
Ensuring a Quality Order Management Implementation
CMRP PPT ABOUT THE INDUSTRY NAMASTE AND ALL ASSETS
Ewm erp qm_basic_inspection_process
Manufacturing cells
Tool Box Training-Operator Care

Recently uploaded (20)

PPTX
ACSFv1EN-58255 AWS Academy Cloud Security Foundations.pptx
PPTX
Programs and apps: productivity, graphics, security and other tools
PPTX
MYSQL Presentation for SQL database connectivity
PPTX
Cloud computing and distributed systems.
PPTX
Digital-Transformation-Roadmap-for-Companies.pptx
PDF
Encapsulation theory and applications.pdf
PDF
Dropbox Q2 2025 Financial Results & Investor Presentation
PDF
Peak of Data & AI Encore- AI for Metadata and Smarter Workflows
PDF
Spectral efficient network and resource selection model in 5G networks
PDF
Diabetes mellitus diagnosis method based random forest with bat algorithm
PDF
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
PDF
Reach Out and Touch Someone: Haptics and Empathic Computing
PDF
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
PPTX
Spectroscopy.pptx food analysis technology
PDF
Network Security Unit 5.pdf for BCA BBA.
PDF
Mobile App Security Testing_ A Comprehensive Guide.pdf
PPTX
Big Data Technologies - Introduction.pptx
PPT
“AI and Expert System Decision Support & Business Intelligence Systems”
PDF
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
PPTX
A Presentation on Artificial Intelligence
ACSFv1EN-58255 AWS Academy Cloud Security Foundations.pptx
Programs and apps: productivity, graphics, security and other tools
MYSQL Presentation for SQL database connectivity
Cloud computing and distributed systems.
Digital-Transformation-Roadmap-for-Companies.pptx
Encapsulation theory and applications.pdf
Dropbox Q2 2025 Financial Results & Investor Presentation
Peak of Data & AI Encore- AI for Metadata and Smarter Workflows
Spectral efficient network and resource selection model in 5G networks
Diabetes mellitus diagnosis method based random forest with bat algorithm
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
Reach Out and Touch Someone: Haptics and Empathic Computing
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
Spectroscopy.pptx food analysis technology
Network Security Unit 5.pdf for BCA BBA.
Mobile App Security Testing_ A Comprehensive Guide.pdf
Big Data Technologies - Introduction.pptx
“AI and Expert System Decision Support & Business Intelligence Systems”
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
A Presentation on Artificial Intelligence

Web site int audit checklist intent

  • 1. Each ‘click’ of your mouse will take you through this free presentation in only a few minutes. You may save this file for future use or return to this web-site at any time to utilize these free presentations. The following is a brief Review highlighting The development and use of an Audit Checklist. A fictitious procedure is used to demonstrate the process of developing checklists that give the auditor a strong starting point. This goes a long way to ensure a through audit. This skill is invaluable to an effective and comprehensive internal audit program. Mastery of this skill by the internal auditor adds greatly to the overall audit program within an organization. This skill applies to the internal audit for any of the international standards. wwwMBCIncorp.com - Martin Business Consulting, Inc. 1
  • 2. Audit Checklist Development Set-up Procedure – SOP 101 5.1 The “Utility” person will do machine set-ups per the production schedule. 5.2 The “Utility” person runs 3 parts for set-up verification. Let’s Breakdown 5.3 “Utility” person takes the set-up parts to the the process of Lab for measurement. developing and 5.4 All material produced after set-up is contained until the verification of the set-up. using a checksheet. 5.5 After verification the normal sampling plan is followed. wwwMBCIncorp.com - Martin Business Consulting, Inc. 2
  • 3. Audit Checklist Development Set-up Procedure – SOP 101 1. The auditor in the development of 5.1 The “Utility” person will do machine set-ups per the checksheet must account for the production schedule. each requirement of the 5.2 The “Utility” person runs 3 procedure. parts for set-up verification. 5.3 “Utility” person takes the set- 2. Some items are accounted for by up parts to the Lab questions to the responsible for measurement. 5.4 All material produced after set- person. up is contained until the verification of the 3. Other items are accounted for by set-up. direct observation of the auditor 5.5 After verification the normal sampling plan is followed. wwwMBCIncorp.com - Martin Business Consulting, Inc. 3
  • 4. Audit Checklist Development Set-up Procedure – SOP 101 Checklist – SOP 101 5.1 The “Utility” person will do 1. Who does the machine machine set-ups per the production schedule. 1. Who does the machine set-up? (5.1) 5.2 When are set-ups runs 3 2. The “Utility” person set-up? (5.1) parts for set-up verification. 2. When are set-ups conducted? (5.1) 5.3 “Utility” person takes the set- conducted? (5.1) 3. How manythe Labare run up parts to parts 3. How many parts are run for set-up verification? (5.2) for measurement. for set-up verification? (5.2) 5.4 All material produced after set- up is contained 4. Where are the parts the until the verification of set-up. 4. Where are the parts transferred to? (5.3) 5.5 After verification the normal transferred to? (5.3) 4A. Transfer by Who? (5.3) sampling plan is followed. 4A. Transfer by Who? (5.3) wwwMBCIncorp.com - Martin Business Consulting, Inc. 4
  • 5. Audit Checklist Development Set-up Procedure – SOP 101 Checklist – SOP 101 5.1 The “Utility” person will do machine set-ups per the production schedule. 5.2 The “Utility” person runs 3 parts for set-up verification. 5.3 “Utility” person takes the set- 5. How is production material up parts to the Lab 5. How is production material handled while awaiting for measurement. handled while awaiting 5.4verification of set-up parts? All material produced after set- verification of set-up parts? (5.4) contained up is (5.4) 6. How is the process of the until the verification set-up. 6. How is the process controlled after part normal 5.5 After verification the controlled after part verification? (5.5) sampling plan is followed. verification? (5.5) wwwMBCIncorp.com - Martin Business Consulting, Inc. 5
  • 6. Audit Checklist Development • Once the questions are developed, the auditor must transfer them to a checksheet • The format of the checksheet isn’t important and may vary by auditor. • Each auditor will develop a format that they are comfortable with. • The format development comes from auditor experience. wwwMBCIncorp.com - Martin Business Consulting, Inc. 6
  • 7. Audit Checklist Development lide ts ex t! n e rma th fo ut le o b he pock ssi C a f or wwwMBCIncorp.com - Martin Business Consulting, Inc. 7
  • 8. Audit Checklist Development Procedure Number SOP 101 Rev A Issue Date 2/14/08 Audit date May 12, 2008 CHECKLIST FOR AUDIT REPORT NO: Page _____ of _____ Item ACTIVITY No: REQUIREMENT Interview COMPLIANCE COMMENTS/REMARKS t fo rm a s heet ul this c heck helpf gh this t how throu see jus itor! ’s go tem to he aud Let by i t item ecome s to b tool wwwMBCIncorp.com - Martin Business Consulting, Inc. 8
  • 9. Audit Checklist Development Procedure Number SOP 101 Rev A Issue Date 2/14/08 Audit date May 12, 2008 a nd s ue date is CHECKLIST FOR AUDIT REPORT NO: Page _____ of _____ ce dure the Item , Pro ment to ACTIVITY er No: REQUIREMENT Interview numb o cu COMPLIANCE dit. COMMENTS/REMARKS u e dure ks this d of the a ve e Proc ate lin da te ob jecti 1 . Th audit d et ime/ o m es the e at t h ee t bec ed u r cksh s. of th e proc d ch e it on m plete ture aud m pleti h e co e fo r f u p er co 2. T idenc th e p ro ev n as to ess. fi catio it proc 3. Veri al aud n inter wwwMBCIncorp.com - Martin Business Consulting, Inc. 9
  • 10. Audit Checklist Development Procedure Number SOP 101 Rev A Issue Date 2/14/08 Audit date May 12, 2008 CHECKLIST FOR AUDIT REPORT NO: Page _____ of _____ Item ACTIVITY No: REQUIREMENT Interview COMPLIANCE COMMENTS/REMARKS 1. The “item No.”, “Requirement”, and “Interview” field give the auditor a place to itemize the questions to be ask and the person to be interviewed. 2. In most cases the interviewee is identified by job title. 3. There may be some exceptions where a proper name is utilized. wwwMBCIncorp.com - Martin Business Consulting, Inc. 10
  • 11. Audit Checklist Development Procedure Number SOP 101 Rev A Issue Date 2/14/08 Audit date May 12, 2008 CHECKLIST FOR AUDIT REPORT NO: Page _____ of _____ Item ACTIVITY No: REQUIREMENT Interview COMPLIANCE COMMENTS/REMARKS The “Activity Compliance.” and “Comments/Remarks” fields give the auditor a place to document compliance and to record information about the answers given the auditor, or observation of the auditor. wwwMBCIncorp.com - Martin Business Consulting, Inc. 11
  • 12. Audit Checklist Development Procedure Number SOP 101 Rev A Issue Date 2/14/08 ” rview on to Audit date May 12, 2008 Issue Date 2/14/08 e “In te rs n th he pe Procedure Number SOP 101 Rev A Item 1. I umn is t d. ACTIVITY COMPLIANCE lco COMMENTS/REMARKSe rview No: REQUIREMENT Interview te 1 Who does the machine set-up? (5.1) Set-up Tech be in e ve th ome our 2 When are set-ups conducted? (5.1) Set-up Tech ha r e we that bec r 3 How many parts are run for set-up Set-up Tech 1 . He stions fo r o u que g point verification? (5.2) 4 Where are the parts transferred to? Set-up Tech in (5.3) 4A. Transfer by Who? (5.3) start process. t audi n 5 How is production material Supervisor m ber i cates the handled while awaiting T he nu ses indi being 2. e nt verification of set-up parts? (5.4) pa renth re eleme du 6 How is the process controlled after Machine p roce ated. tig part verification? (5.5) Operator i nves wwwMBCIncorp.com - Martin Business Consulting, Inc. 12
  • 13. Audit Checklist Use Procedure Number SOP 101 Rev A Issue Date 2/14/08 Audit date May 12, 2008 Procedure Number SOP 101 Rev A Issue Date 2/14/08 Item ACTIVITY No: REQUIREMENT Interview COMPLIANCE COMMENTS/REMARKS 1 Who does the machine set-up? Set-up Tech Check training records for (5.1) Yes set-up man “John Allen” 2 When are set-ups conducted? (5.1) Set-up Tech 1. The first question is confirmed 3 How many parts are run for set-up Set-up Tech verification? (5.2) as OK and the name of the 4 Where are the parts transferred to? Set-up Tech person being interviewed is (5.3) 4A. Transfer by Who? (5.3) noted. 5 How is production material Supervisor handled while awaiting 2. This allows the auditor to verification of set-up parts? (5.4) confirm training at a later 6 How is the process controlled after Machine interview, perhaps in the HR part verification? (5.5) Operator department. wwwMBCIncorp.com - Martin Business Consulting, Inc. 13
  • 14. Audit Checklist Use Procedure Number SOP 101 Rev A Issue Date 2/14/08 Audit date May 12, 2008 Procedure Number SOP 101 Rev A Issue Date 2/14/08 Item ACTIVITY No: REQUIREMENT Interview COMPLIANCE COMMENTS/REMARKS 1 Who does the machine set-up? Set-up Tech Check training records for (5.1) Yes set-up man “John Allen” 2 When are set-ups conducted? (5.1) Set-up Tech Yes Confirmed by lab inspection records and the production schedule for the past 4 set-ups 3 How many parts are run for set-up Set-up Tech verification? (5.2) 4 Where are the parts transferred to? Set-up Tech 1. The second question is (5.3) 4A. Transfer by Who? (5.3) confirmed by the set-up 5 How is production material Supervisor person. handled while awaiting verification of set-up parts? (5.4) 2. Note the follow-up comment 6 How is the process controlled after Machine to confirm this important set- part verification? (5.5) Operator up step. wwwMBCIncorp.com - Martin Business Consulting, Inc. 14
  • 15. Audit Checklist Use Procedure Number SOP 101 Rev A Issue Date 2/14/08 Audit date May 12, 2008 Procedure Number SOP 101 Rev A Issue Date 2/14/08 Item ACTIVITY No: REQUIREMENT Interview COMPLIANCE COMMENTS/REMARKS 1 Who does the machine set-up? Set-up Tech Check training records for (5.1) Yes set-up man “John Allen” 2 When are set-ups conducted? (5.1) Set-up Tech Yes Confirmed by lab inspection records and the production schedule for the past 4 set-ups 3 How many parts are run for set-up Set-up Tech No Per the set-up person only two (2) verification? (5.2) parts are being taken to the lab to 4 Where are the parts transferred to? Set-up Tech verify set-up. Inspection records in (5.3) 4A. Transfer by Who? (5.3) the lab confirm this statement 5 How is production material Supervisor 1. The third question is confirmed by handled while awaiting verification of set-up parts? (5.4) the set-up person. 6 How is the process controlled after Machine 2. Note the noncompliance is also part verification? (5.5) Operator confirmed by lab records. wwwMBCIncorp.com - Martin Business Consulting, Inc. 15
  • 16. Audit Checklist Use Procedure Number SOP 101 Rev A Issue Date 2/14/08 Audit date May 12, 2008 Procedure Number SOP 101 Rev A Issue Date 2/14/08 Item ACTIVITY No: REQUIREMENT Interview COMPLIANCE COMMENTS/REMARKS 1 Who does the machine set-up? (5.1) Set-up Tech Yes The 1. fourth question isfor Check training records set-up man “John Allen” 2 When are set-ups conducted? (5.1) Set-up Tech confirmed by lab inspection records and the Yes Confirmed by the set-up person, as well asfor the past 4 set-ups production schedule observation of the auditor. beingperson to thetwo (2) Per the set-up only 3 How many parts are run for set-up Set-up Tech verification? (5.2) No parts are taken lab to 4 Where are the parts transferred to? Set-up Tech verify set-up. Inspection records in (5.3) 4A. Transfer by Who? (5.3) the lab confirm this statement 4, Yes/4A Yes 5 How is production material Supervisor handled while awaiting verification of set-up parts? (5.4) 6 How is the process controlled after Machine part verification? (5.5) Operator wwwMBCIncorp.com - Martin Business Consulting, Inc. 16
  • 17. Audit Checklist Use Procedure Number SOP 101 Rev A Issue Date 2/14/08 Audit date May 12, 2008 Procedure Number SOP 101 Rev A Issue Date The fifth question is confirmed 1. 2/14/08 Item ACTIVITY No: REQUIREMENT Interview by the supervisor. COMPLIANCE COMMENTS/REMARKS 1 Who does the machine set-up? Set-up Tech Check training records for (5.1) Yes The auditor records the 2. set-up man “John Allen” 2 When are set-ups conducted? (5.1) Set-up Tech supervisors name to confirm Yes Confirmed by lab inspection records and the properproduction schedule for the past 4 set-ups training. 3 How many parts are run for set-up Set-up Tech No Per the set-up person only two (2) verification? (5.2) 4 Where are the parts transferred to? Set-up Tech 3. This trainingare beingInspection records in parts taken to the lab to is confirmed later verify set-up. (5.3) 4A. Transfer by Who? (5.3) in HR. the lab confirm this statement 4, Yes/4A Yes 5 How is production material Supervisor handled while awaiting verification of set-up parts? (5.4) Yes Check training records for supervisor “Kathy Connor” 6 How is the process controlled after Machine part verification? (5.5) Operator wwwMBCIncorp.com - Martin Business Consulting, Inc. 17
  • 18. Audit Checklist Use Procedure Number SOP 101 Rev A Issue Date 2/14/08 Audit date May 12, 2008 Procedure Number SOP 101 Rev A Issue Date 2/14/08 Item ACTIVITY No: REQUIREMENT Interview COMPLIANCE COMMENTS/REMARKS 1 Who does the machine set-up? Set-up Tech Check training records for (5.1) Yes 1. The last question is confirmed set-up man “John Allen” 2 When are set-ups conducted? (5.1) Set-up Tech Yes the Confirmed by lab inspection records and the by line operator. production schedule for the past 4 set-ups 3 How many parts are run for set-up Set-up Tech No The auditorthe set-up person only two (2) 2. Per verification? (5.2) partsconfirms proper to are being taken to the lab 4 Where are the parts transferred to? Set-up Tech (5.3) 4A. Transfer by Who? (5.3) process control by Inspection records in verify set-up. verifying the lab confirm this statement inspection records correspond 4, Yes/4A Yes 5 How is production material Supervisor to job instructions for the handled while awaiting verification of set-up parts? (5.4) Yesoperator. training records for Check supervisor “Kathy Connor” 6 How is the process controlled after Machine Confirmed by Job instructions and part verification? (5.5) Operator Yes corresponding inspection records wwwMBCIncorp.com - Martin Business Consulting, Inc. 18
  • 19. Audit Checklist Use Procedure Number SOP 101 Rev A Issue Date 2/14/08 1 Audit date . T May 12, 2008 hi Procedure Numbers c SOP 101 Rev A Issue Date 2/14/08 bec omp Item o me le ACTIVITY 2. No: s pa ted ch REQUIREMENT Interview Thi does the machine set-up? ck Set-up Tech COMPLIANCE COMMENTS/REMARKS s rt o e 1 Who f th s Check training records for for(5.1) is val u sur are set-ups e au h eet n o Yes set-up man “John Allen” 2inte Whenveill abconducted? (5.1) iSet-up Tech le o dt reco w Yes Confirmed by lab inspection records and the rn a an c b e u je set-up 3. 3 Howl many parts arearun for ctive Set-up Tech. au d rd production schedule for the past 4 set-ups Giv i s. dits e No Per the set-up person only two (2) ingverification?t(5.2) and videnc parts are being taken to the lab to pro Wherej are the parts transferred to? fu Teche o e thor 4c edu b4A.cTransfer by Who? (5.3) Set-up e tive tur verify set-up. Inspection records in oug re in q (5.3) the lab confirm this statement e hly ues videnc 4, Yes/4A Yes 5 is tion Howauproduction material e th Supervisor dite awaiting a handled while d . w s at t h e Yes verification of set-up parts? (5.4) Check training records for supervisor “Kathy Connor” 6 How is the process controlled after Machine Confirmed by Job instructions and part verification? (5.5) Operator Yes corresponding inspection records wwwMBCIncorp.com - Martin Business Consulting, Inc. 19
  • 20. Thank you • If you need additional information, training or direction about “Internal Audit”. Visit our web-site www.MBCIncorp.com • Select the menu tab “Course List & Services”, or “Public Seminars” • Or just contact National Quality Services, – E-mail – BMartin@MBCIncorp.com – Phone – 931-637-1446 • Check the web site often for new PowerPoint presentation on many topics of interest wwwMBCIncorp.com - Martin Business Consulting, Inc. 20