SlideShare a Scribd company logo
What can we do to Create more Efficient
Model Based Collaboration on Projects
?
What can we do to create more Efficient Model Based Collaboration on Projects?
1. Cooperation and Early Engagement:
What can we do to create more Efficient Model Based Collaboration on Projects?
1. Cooperation and Early Engagement:
2. Discipline:
What can we do to create more Efficient Model Based Collaboration on Projects?
1. Cooperation and Early Engagement:
2. Discipline:
3. Technology:
PDC Workflow for Model Based Collaboration
PDC Job Management System
iConstruct BimFlow Tool Suite
BimFlow Model Processing Workflow
What can we do to create more Efficient Model Based Collaboration
• Demo External Use Model Compiler
PDC Internal Model Compiler
What can we do to create more Efficient Model Based Collaboration
Review Track Commenting Panel
Review Track Database Comment Viewer

More Related Content

PDF
What is user experience(ux) & ux designer
PPT
Nuxeo Studio, a new way to configure content-centric applications
PPT
MPS, MVC Framework
PPTX
Agile Software Development
PDF
Brilliant Software Architecture or How to Build Good Software
DOCX
Fusionops sr ux designer 2 2017
PPT
Chen's second test slides again
PPT
Chen's second test slides
What is user experience(ux) & ux designer
Nuxeo Studio, a new way to configure content-centric applications
MPS, MVC Framework
Agile Software Development
Brilliant Software Architecture or How to Build Good Software
Fusionops sr ux designer 2 2017
Chen's second test slides again
Chen's second test slides

What's hot (17)

PPTX
Work agile with VS2010
PDF
Consistency vs Flexibility in Design Systems : A GE Case Study
PPTX
Theming and Branding in App Builder
ODP
IT@C What If?
PDF
How to Use No-Code/Low-Code Tools for Growth
PPTX
Web based system
PPTX
Agile software development methodology & Rapid E-Learning
PPTX
Bains Slides Brokenpeg
PPTX
Building with Visual Studio Online
PDF
How to drive more value from Innovation Initiatives
PPTX
XPM & GeneXus Framework
DOCX
Top 10 custom software development methodologies
PDF
DevOps Implementation for Applications Solution - Datasheet
PPT
Satama SUP (SIGCHI.NL Synergy Unlimited)
PDF
DevOps vs Agile — Understand The Difference!
PDF
Fast Track PM Success with Project Online
ODP
Agile + Benefits + Transition Nov 2009
Work agile with VS2010
Consistency vs Flexibility in Design Systems : A GE Case Study
Theming and Branding in App Builder
IT@C What If?
How to Use No-Code/Low-Code Tools for Growth
Web based system
Agile software development methodology & Rapid E-Learning
Bains Slides Brokenpeg
Building with Visual Studio Online
How to drive more value from Innovation Initiatives
XPM & GeneXus Framework
Top 10 custom software development methodologies
DevOps Implementation for Applications Solution - Datasheet
Satama SUP (SIGCHI.NL Synergy Unlimited)
DevOps vs Agile — Understand The Difference!
Fast Track PM Success with Project Online
Agile + Benefits + Transition Nov 2009
Ad

What can we do to create more Efficient Model Based Collaboration

Editor's Notes

  • #2:     Big advantage thinking about this stuff at PDC where we have the opportunity of taking Multi-Discipline, Multi Software projects, through Concept, Design, Detail design, Construction, and into Asset Management.   Our challenge now is to take this approach and extend the opportunities to include all the project stake holders and participants.   First pre-requisite:
  • #3: Establish the workflows and controls as early as possible, preferably driven by the client (With a little advice of course!!). Obvious but rarely done. We arrive on a project to manage the BIM deliverables yet we are sometimes 2 years late with the input we would have liked at the beginning.
  • #4: Model Database and Controls, File Naming Conventions, File Structures, Layer Control, External Model Data, separate from Model Geometry Data. E.g. Without this how can we know if the Ducting from the Architects Revit Model has been substituted with the Contractors Detailed Model and how can we control this process (Discuss). Native File Layers etc etc are are very useful for exception exporting yet never considered in the native files themselves with a view to future benefits in the BIM process. Stop the over laps!!!   Development of our own JMS system.
  • #5: Show Workflow image. Discuss.   Show BIM flow image. Discuss History. Microsoft Workflow Engine replacing code, a big breakthrough. (Civil Structural Model Relationships)…….
  • #10: AFTER HERE GO TO NAVIS MODEL