Bridge Engineering Dept.
• Bridge Dept. is responsible for upkeep and maintenance of all
type of Girder Bridges of 12.2 m and above spans.
• Includes Technical inspection of steel structure, oiling &
greasing of bearing, painting of structure etc.
TRAINING
@ CENTRAL ENGINEERING
WORKSHOP
DRAWING SECTION
As per work order, Drawing are received from RDSO (Research
Design & Standard Organization), Lucknow.
Drawing Comprises of these many Sheets.
1.General Arrangement.
2.Stress sheet.
3.Camber diagram.
4.Details of Bearing.
5.Details of Top & Bottom Chord.
6.Details of End Raker & Portal Bracing.
7.Details of vertical & Diagonal.
8.Details of bottom & top chord joint.
9.Details of cross Girder & Stringer/Rail Bearer.
10.Details of Sway Bracing , bottom and Top lateral Bracing.
11.Erection Drawing.
12.Shipping list.
General Arrangement
Stress sheet
Camber diagram
Details of Bearing
Work done by Drawing Section.
• To study updated Drawings Received from
RDSO.
• To Calculate Its Weight and Cost.
• To calculate its Painting Area.
• To prepare Estimates & Technical Check of
Bills.
TEMPLATE SHOP
• Templating means Setting out Drawing to the
Scale on Floor.
• Layout is Plotted for Nominal
Dim. As well as Camber Dim.
• Material List: Means material
required for fabrication of bridge.
• Working Drawing: Drawing
that fabrication unit understands.
Note: Templating can be done on
Autocad Software instead of Floor also. Template Floor
Duties of Template Shop.
• Layout plotting on Template Floor.
• Preparing Material/Cutting List.
• To calculate Weight each Member.
• To find Painting Area.
• Provide working drawing to fabricators.
CUTTING SECTION
• MARKING.
• CUTTING TOLERANCE: While Marking, Cutting
Allowance as per IS 1852.
• GAS REQUIRED: Oxy- Acetylene.
• PRESSURE: 1.5 Kg/ sq. cm for Acetylene.
for Oxygen it may vary with Thickness.
• NOTE: Undercutting & Overcutting shall both be avoided.
Thickness (mm) Tolerance (mm)
Below 16 3
16-32 4
32-50 5
50 above 6
Top Flange Cutting by PUG machine
Angle Section Cut
Stiffeners Cutting by GAS Cutter.
JIG SECTION
• What is JIG?
It’s a custom made tool, used to control the Location of Drill
holes.
Drilling with the Help of JIG. 30.5 m Top Flange JIG.
-Master Piece: Component of Bridge to its Actual
Dimension as per Drawing.
- Jig: An Assembly used for Precise Drilling as to
obtained Symmetric Pieces.
• Note: Each & every time Bushes are checked with Plug
Gauge.
• Master & JIGs are verified by PCO & RDSO Seperately.
Fabricating JIG for Diagonal
Member.
PLUG GAUGE
• Simply GO-NOGO Gauge.
• Go End should go inside ferrule,
that shows diameter of jig hole is ok.
• If No-Go End plug gauge goes inside
bush hole, bush has to be replaced
with new one. Ferrule or Bush
Plug Gauge
Work done by Jig Section
• To fabricate Master Piece.
• To fabricate New Jigs.
• Repair & Maintenance of Old Jig.
• Bent Plate of 30.5,45.7,61.0 & 76.2 m Span.
Bottom Gusset at Lo
WELDING SHOP
• To Join various Structural members
• Types of Joint such as Butt, Tee, Lap and
Corner joint are as follows.
Fillet Welds
Members Depicting welded portions.
Flaws Introduced during Welding.
• Incomplete Fusion.
• Porosities.
• Blow holes.
• Undercuts.
• Hot & Cold cracks.
RIVETTING SHOP
• Riveted connection are used for connecting various
Structural Members.
• Rivets are superior to bolts as they are hammered up,
while Hot and they contract on cooling thereby
causing frictional resistance b/w connected metal
surface.
• Rivets are heated uniformly to a light Cherry Red
Color.(temp. b/w 550-1000 Celsius).
• For snap head,Lenth of Grip is calculated
L=G+G/8+1.5D
Types of Rivet Heads
Riveting
Defects in Rivets.
• Cracked Head.
• Over burnt Rivet.
• Loose Rivet.
• Variable Shank Length.
Note:110 gm Hammer is used to detect loose
Rivets on site.
SAW SECTION
• Submerged Arc Welding as arc is Submerged
Under Flux.
• Flux: Granulated flux shields and
protects molten weld from atmospheric
contamination.
• Electrode Wire: SAW filler material usually
a standard wire, Electrodes are generally
copper coated to prevent rusting and to increase
their electrical conductivity.
Advantages of SAW
• Deep weld penetration.
• Minimal welding fume or arc light is emitted.
• Welds produced are sound, uniform, ductile, corrosion resistant.
• Arc is always covered under a blanket of flux, thus there is no chance of
spatter of weld.
Pieces of slag from
Submerged arc welding
SAW Undergoing
PAINTING SHOP
Procedure for Painting.
1) First Coat: Zinc Chrome.
2) Second Coat: Zinc Chrome / Red Oxide (Primer).
3) Third Coat: Red Oxide.
Procedure for Metalizing.
1) On metalized Surface apply etch Primer.
2) Second Coat: Zinc Chrome Primer.
3) Third Coat: Aluminum Paint as per IS 2339.
Note: Surface should be cleaned by sand blasting, wire
brush or sand paper before Painting or Metalizing.
FABRICATION OF PLATE GIRDER
• Templating.
• Master Jig.
• Material List.
• Material Cutting.
• Edge Grinding.
• Tack Assembly.
• Full SAW.
• Drilling.
• Final Finishing.
• PCO Inspection
• Rectification.
• RDSO Inspection
• Painting.
• Dispatch.
WPG Ready For Dispatch
WPG Ready For Dispatch
Site visit @ Bhima Bridge.
• Bridge No & Name: 301/1 Bhima Bridge.
• Span: 18.3 m @ 23 spans.
Purpose:
• During Inspection of bridge it was found that
cracks were developed at top flange.
Solution:
• It was suggested to provide cover plate where
excessive cracks are visible for time being,
after that going to change the whole Top
Flange.
Site Visit @ Godavari Bridge
• Bridge No & Name: 193/1 Godavari Bridge.
• Span: 22.66 @ 5 Spans.
Purpose:
• During Inspection of bridge it was found that
Bearing Plate 3 in No's got some crack on its
surface.
Solution:
• Old Bearing Plates were Removed and
replaced by a New one.
• Total 2 hours of block was taken.
REFERENCE
• Bridge Manual.
• B1 Specification.
• Steel Structure Fabrication for Railways by
N.L.Nadgouda.
• Inspection & Maintenance of steel girders by
IRICEN,Pune.
• Bridge inspector's handbook by Northern Publication
1987.
Workshop Practices

More Related Content

PPT
Maintenance & repair of steel bridges
PPTX
Inspection and maintenance of bridges In India
PPTX
Inspection and maintenance of bridge
PPTX
Brief Study about Prestressed Steel Concrete Composite Girder
PDF
Pilework
PDF
Auber_Steel fiber reinforcement concrete_Slab on ground-Design Note
PPTX
Final Presentation
PPTX
Munger rail cum road bridge
Maintenance & repair of steel bridges
Inspection and maintenance of bridges In India
Inspection and maintenance of bridge
Brief Study about Prestressed Steel Concrete Composite Girder
Pilework
Auber_Steel fiber reinforcement concrete_Slab on ground-Design Note
Final Presentation
Munger rail cum road bridge

What's hot (20)

PPTX
Stress ribbon bridge
PPTX
Tony
PPT
1.1 box jacking
PPTX
RESTORATION OF EXISTING MAJOR BRIDGE ACROSS RIVER BHADAR ON NATIONAL HIGHWAY ...
PPTX
Underwater construction
PPT
Mihalis presentation final 10092011
PPTX
Stress ribbon-bridges
PPTX
Types of construction
PPTX
Segmental bridge construction
PPTX
Box culverts
PPTX
Tunnel engineering
PPT
Rubber Products Presentation on Bridges
PDF
Concrete pavement design
PPT
Shaft and resistance of bored piles
PPTX
stress ribbon bridge by kaiser malik
PDF
Building structure project 1 report
PDF
Lyapichev. Analysis, design & behavior of CFRDs
PDF
Lyapichev, Landau. Modern structural & technological solutions for new dams (...
PDF
Tremie
PDF
Site visit presentation: Kwun Tong line extension
Stress ribbon bridge
Tony
1.1 box jacking
RESTORATION OF EXISTING MAJOR BRIDGE ACROSS RIVER BHADAR ON NATIONAL HIGHWAY ...
Underwater construction
Mihalis presentation final 10092011
Stress ribbon-bridges
Types of construction
Segmental bridge construction
Box culverts
Tunnel engineering
Rubber Products Presentation on Bridges
Concrete pavement design
Shaft and resistance of bored piles
stress ribbon bridge by kaiser malik
Building structure project 1 report
Lyapichev. Analysis, design & behavior of CFRDs
Lyapichev, Landau. Modern structural & technological solutions for new dams (...
Tremie
Site visit presentation: Kwun Tong line extension
Ad

Similar to Workshop Practices (20)

PPT
Presentation on steel, fabrication & erection Munger Ganga Bridge
PPT
TOFD PPT FOR WELDING SKILLS AND PRACTICE
PPT
lap joint .ppt
PPTX
FABRICATION OF BRIDGE GRIDER ,GLUED JOINT AT STRUCTURAL YARD AND CASTING OF ...
PPTX
Forging presentation for b.tech metallurgical engineering
PPT
Piping welding notes for beginners
PPTX
Basic Mechanical Engineering bcm-MID-I.pptx
PPTX
Unit 3 (1).pptx bndtujlhifdytshfuchiojgh
DOCX
report of open web girder (railway)
PPT
UNIT3-Special casting processmechanical.ppt
PPT
UNIT3-Special casting processmechanica.ppt
PPT
UNIT3-Special casting processcasting.ppt
PPT
UNIT3-Special casting processmechanical.ppt
PPTX
Welding Joint Design and Welding Symbols.pptx
PPTX
Design Consideration For Casting
PPT
Kalp Chap 15 Extrusion and Drawing.ppt
PPTX
Introduction to mp prathik
PPT
Introduction to Casting and Solidification techniques
DOC
Cswip welding-inspection-notes-and-questions-1
PPT
UNIT3-Special casting process mechanical.ppt
Presentation on steel, fabrication & erection Munger Ganga Bridge
TOFD PPT FOR WELDING SKILLS AND PRACTICE
lap joint .ppt
FABRICATION OF BRIDGE GRIDER ,GLUED JOINT AT STRUCTURAL YARD AND CASTING OF ...
Forging presentation for b.tech metallurgical engineering
Piping welding notes for beginners
Basic Mechanical Engineering bcm-MID-I.pptx
Unit 3 (1).pptx bndtujlhifdytshfuchiojgh
report of open web girder (railway)
UNIT3-Special casting processmechanical.ppt
UNIT3-Special casting processmechanica.ppt
UNIT3-Special casting processcasting.ppt
UNIT3-Special casting processmechanical.ppt
Welding Joint Design and Welding Symbols.pptx
Design Consideration For Casting
Kalp Chap 15 Extrusion and Drawing.ppt
Introduction to mp prathik
Introduction to Casting and Solidification techniques
Cswip welding-inspection-notes-and-questions-1
UNIT3-Special casting process mechanical.ppt
Ad

Recently uploaded (20)

PPTX
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
DOCX
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
PPTX
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
PDF
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
PDF
Automation-in-Manufacturing-Chapter-Introduction.pdf
PPTX
Foundation to blockchain - A guide to Blockchain Tech
PPT
Project quality management in manufacturing
PDF
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
PPTX
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
PPTX
OOP with Java - Java Introduction (Basics)
PDF
Model Code of Practice - Construction Work - 21102022 .pdf
PPT
Mechanical Engineering MATERIALS Selection
PPTX
UNIT-1 - COAL BASED THERMAL POWER PLANTS
DOCX
573137875-Attendance-Management-System-original
PPTX
Internet of Things (IOT) - A guide to understanding
PDF
Operating System & Kernel Study Guide-1 - converted.pdf
PPTX
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
PPTX
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
PDF
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
PPTX
Construction Project Organization Group 2.pptx
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
Automation-in-Manufacturing-Chapter-Introduction.pdf
Foundation to blockchain - A guide to Blockchain Tech
Project quality management in manufacturing
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
OOP with Java - Java Introduction (Basics)
Model Code of Practice - Construction Work - 21102022 .pdf
Mechanical Engineering MATERIALS Selection
UNIT-1 - COAL BASED THERMAL POWER PLANTS
573137875-Attendance-Management-System-original
Internet of Things (IOT) - A guide to understanding
Operating System & Kernel Study Guide-1 - converted.pdf
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
Construction Project Organization Group 2.pptx

Workshop Practices

  • 1. Presentation on First Phase of Training By: MOHD FURQAN J.E (BRIDGE) Presented To: MOHAMMAD FAIZ XEN(B & F),Manmad
  • 2. Bridge Engineering Dept. • Bridge Dept. is responsible for upkeep and maintenance of all type of Girder Bridges of 12.2 m and above spans. • Includes Technical inspection of steel structure, oiling & greasing of bearing, painting of structure etc.
  • 4. DRAWING SECTION As per work order, Drawing are received from RDSO (Research Design & Standard Organization), Lucknow. Drawing Comprises of these many Sheets. 1.General Arrangement. 2.Stress sheet. 3.Camber diagram. 4.Details of Bearing. 5.Details of Top & Bottom Chord. 6.Details of End Raker & Portal Bracing. 7.Details of vertical & Diagonal. 8.Details of bottom & top chord joint. 9.Details of cross Girder & Stringer/Rail Bearer. 10.Details of Sway Bracing , bottom and Top lateral Bracing. 11.Erection Drawing. 12.Shipping list.
  • 9. Work done by Drawing Section. • To study updated Drawings Received from RDSO. • To Calculate Its Weight and Cost. • To calculate its Painting Area. • To prepare Estimates & Technical Check of Bills.
  • 10. TEMPLATE SHOP • Templating means Setting out Drawing to the Scale on Floor. • Layout is Plotted for Nominal Dim. As well as Camber Dim. • Material List: Means material required for fabrication of bridge. • Working Drawing: Drawing that fabrication unit understands. Note: Templating can be done on Autocad Software instead of Floor also. Template Floor
  • 11. Duties of Template Shop. • Layout plotting on Template Floor. • Preparing Material/Cutting List. • To calculate Weight each Member. • To find Painting Area. • Provide working drawing to fabricators.
  • 12. CUTTING SECTION • MARKING. • CUTTING TOLERANCE: While Marking, Cutting Allowance as per IS 1852. • GAS REQUIRED: Oxy- Acetylene. • PRESSURE: 1.5 Kg/ sq. cm for Acetylene. for Oxygen it may vary with Thickness. • NOTE: Undercutting & Overcutting shall both be avoided. Thickness (mm) Tolerance (mm) Below 16 3 16-32 4 32-50 5 50 above 6
  • 13. Top Flange Cutting by PUG machine Angle Section Cut Stiffeners Cutting by GAS Cutter.
  • 14. JIG SECTION • What is JIG? It’s a custom made tool, used to control the Location of Drill holes. Drilling with the Help of JIG. 30.5 m Top Flange JIG.
  • 15. -Master Piece: Component of Bridge to its Actual Dimension as per Drawing. - Jig: An Assembly used for Precise Drilling as to obtained Symmetric Pieces. • Note: Each & every time Bushes are checked with Plug Gauge. • Master & JIGs are verified by PCO & RDSO Seperately. Fabricating JIG for Diagonal Member.
  • 16. PLUG GAUGE • Simply GO-NOGO Gauge. • Go End should go inside ferrule, that shows diameter of jig hole is ok. • If No-Go End plug gauge goes inside bush hole, bush has to be replaced with new one. Ferrule or Bush Plug Gauge
  • 17. Work done by Jig Section • To fabricate Master Piece. • To fabricate New Jigs. • Repair & Maintenance of Old Jig. • Bent Plate of 30.5,45.7,61.0 & 76.2 m Span. Bottom Gusset at Lo
  • 18. WELDING SHOP • To Join various Structural members • Types of Joint such as Butt, Tee, Lap and Corner joint are as follows. Fillet Welds
  • 20. Flaws Introduced during Welding. • Incomplete Fusion. • Porosities. • Blow holes. • Undercuts. • Hot & Cold cracks.
  • 21. RIVETTING SHOP • Riveted connection are used for connecting various Structural Members. • Rivets are superior to bolts as they are hammered up, while Hot and they contract on cooling thereby causing frictional resistance b/w connected metal surface. • Rivets are heated uniformly to a light Cherry Red Color.(temp. b/w 550-1000 Celsius). • For snap head,Lenth of Grip is calculated L=G+G/8+1.5D
  • 22. Types of Rivet Heads
  • 24. Defects in Rivets. • Cracked Head. • Over burnt Rivet. • Loose Rivet. • Variable Shank Length. Note:110 gm Hammer is used to detect loose Rivets on site.
  • 25. SAW SECTION • Submerged Arc Welding as arc is Submerged Under Flux. • Flux: Granulated flux shields and protects molten weld from atmospheric contamination. • Electrode Wire: SAW filler material usually a standard wire, Electrodes are generally copper coated to prevent rusting and to increase their electrical conductivity.
  • 26. Advantages of SAW • Deep weld penetration. • Minimal welding fume or arc light is emitted. • Welds produced are sound, uniform, ductile, corrosion resistant. • Arc is always covered under a blanket of flux, thus there is no chance of spatter of weld. Pieces of slag from Submerged arc welding SAW Undergoing
  • 27. PAINTING SHOP Procedure for Painting. 1) First Coat: Zinc Chrome. 2) Second Coat: Zinc Chrome / Red Oxide (Primer). 3) Third Coat: Red Oxide. Procedure for Metalizing. 1) On metalized Surface apply etch Primer. 2) Second Coat: Zinc Chrome Primer. 3) Third Coat: Aluminum Paint as per IS 2339. Note: Surface should be cleaned by sand blasting, wire brush or sand paper before Painting or Metalizing.
  • 28. FABRICATION OF PLATE GIRDER • Templating. • Master Jig. • Material List. • Material Cutting. • Edge Grinding. • Tack Assembly. • Full SAW. • Drilling. • Final Finishing. • PCO Inspection • Rectification. • RDSO Inspection • Painting. • Dispatch. WPG Ready For Dispatch WPG Ready For Dispatch
  • 29. Site visit @ Bhima Bridge. • Bridge No & Name: 301/1 Bhima Bridge. • Span: 18.3 m @ 23 spans. Purpose: • During Inspection of bridge it was found that cracks were developed at top flange. Solution: • It was suggested to provide cover plate where excessive cracks are visible for time being, after that going to change the whole Top Flange.
  • 30. Site Visit @ Godavari Bridge • Bridge No & Name: 193/1 Godavari Bridge. • Span: 22.66 @ 5 Spans. Purpose: • During Inspection of bridge it was found that Bearing Plate 3 in No's got some crack on its surface. Solution: • Old Bearing Plates were Removed and replaced by a New one. • Total 2 hours of block was taken.
  • 31. REFERENCE • Bridge Manual. • B1 Specification. • Steel Structure Fabrication for Railways by N.L.Nadgouda. • Inspection & Maintenance of steel girders by IRICEN,Pune. • Bridge inspector's handbook by Northern Publication 1987.