create a website

The System Dynamics Analysis of Cost Overrun Causations in UK Rail Projects in a COVID-19 Epidemic Era. (2022). Ajayi, Saheed ; Osobajo, Oluyomi ; Obi, Lovelin Ifeoma ; Awuzie, Bankole ; Oke, Adekunle ; Omotayo, Temitope Seun.
In: SAGE Open.
RePEc:sae:sagope:v:12:y:2022:i:2:p:21582440221097923.

Full description at Econpapers || Download paper

Cited: 1

Citations received by this document

Cites: 42

References cited by this document

Cocites: 22

Documents which have cited the same bibliography

Coauthors: 0

Authors who have wrote about the same topic

Citations

Citations received by this document

  1. Systems Thinking Interplay Between Project Complexities, Stakeholder Engagement, and Social Dynamics Roles in Influencing Construction Project Outcomes. (2024). Omotayo, Temitope Seun ; Ross, Jonathan ; Udeaja, Chika ; Oyetunji, Abiodun.
    In: SAGE Open.
    RePEc:sae:sagope:v:14:y:2024:i:2:p:21582440241255872.

    Full description at Econpapers || Download paper

References

References cited by this document

  1. Aljohani A., Ahiaga-Dagbui D., Moore D., (2017). Construction projects cost overrun: What does the literature tell us? International Journal of Innovation, Management and Technology, 8(2), 137–143.
    Paper not yet in RePEc: Add citation now
  2. Amadi A. I., Omotayo T., (2017, September). Positioning cost overrun research in the philosophical debate: A case for critical realism [Conference session]. Strategic Realignment of the Post-Control Process in the Nigerian Construction Industry Using Kaizen, United Kingdom (pp. 1–7).
    Paper not yet in RePEc: Add citation now
  3. Araya F., (2021). Modeling the spread of COVID-19 on construction workers: An agent-based approach. Safety Science, 133, 105022. https://doi.org/10.1016/j.ssci.2020.105022.
    Paper not yet in RePEc: Add citation now
  4. Aziz A. A., Rahman I. A., Memon A. H., (2012). The cause factors of large project’s cost overrun: A survey in the southern part of Peninsular Malaysia. International Journal of Real Estate Studies, 7(2), 2–13.
    Paper not yet in RePEc: Add citation now
  5. Bahra A., (2019). What causes delays and cost overruns on major infrastructure projects? CPA. Retrieved November, 2019, from https://www.constructionproducts.org.uk/news-media-events/blog/2019/may/what-causes-delays-and-cost-overruns-on-major-infrastructure-projects/.
    Paper not yet in RePEc: Add citation now
  6. Boateng P., Chen Z., Ogunlana S., (2016). A dynamic framework for managing the complexities of risks in megaprojects. International Journal of Technology and Management Research, 1, 1–13.
    Paper not yet in RePEc: Add citation now
  7. Brunes F., Lind H., (2014). Explaining cost overruns in infrastructural projects: A new framework with applications to Sweden (Working Paper No. 01 Section for Building and Real Estate Economics, School of Architecture and the Built Environment). Royal Institute of Technology.

  8. Cantarelli C. C., van Wee B., Molin E. J. E., Flyvbjerg B., (2012). Different cost performance: Different determinants? The case of cost overruns in Dutch transport infrastructure projects. Transport Policy, 22, 88–95. https://doi.org/10.1016/j.tranpol.2012.04.002.
    Paper not yet in RePEc: Add citation now
  9. Crown. (2020). Government publishes coronavirus (COVID-19) R value and growth rates. Retrieved June 20, 2020, from https://www.gov.uk/government/news/government-publishes-coronavirus-covid-19-r-value-and-growth-rates.
    Paper not yet in RePEc: Add citation now
  10. Cunningham T., (2017). What causes cost overruns on building projects? – An overview. Review. Dublin Institute of Technology. Retrieved November 1, 2019, from https://arrow.dit.ie/cgi/viewcontent.cgi?article=1070&context=beschreoth.
    Paper not yet in RePEc: Add citation now
  11. Current Results. (2020). Average annual precipitation for the United Kingdom. Retrieved June 20, 2020, from https://www.currentresults.com/Weather/United-Kingdom/average-yearly-precipitation.php#:~:text=The%20annual%20amount%20of%20precipitation,885%20millimetres%20(33.7%20inches).
    Paper not yet in RePEc: Add citation now
  12. Doloi H., (2013). Cost overruns and failure in project management: Understanding the roles of key stakeholders in construction projects. Journal of Construction Engineering and Management, 3(139), 267–279.
    Paper not yet in RePEc: Add citation now
  13. Duff V., (2019). How can stakeholders negatively influence a project? Chron. Retrieved December, 2019, from https://smallbusiness.chron.com/can-stakeholdersnegatively-influence-project-36026.html.
    Paper not yet in RePEc: Add citation now
  14. Eden C., Williams T., Ackermann F., (2005). Analysing project cost overruns: Comparing the “measured mile†analysis and system dynamics modelling. International Journal of Project Management, 23(2), 135–139. https://doi.org/10.1016/j.ijproman.2004.07.006.
    Paper not yet in RePEc: Add citation now
  15. Flyvbjerg B., Ansar A., Budzier A., Buhl S., Cantarelli C., Garbuio M., Glenting C., Holm M. S., Lovallo D., Lunn D., Molin E., Rønnest A., Stewart A., van Wee B., (2018). Five things you should know about cost overrun ☆. Transportation Research Part A, 118, 174–190. https://doi.org/10.1016/j.tra.2018.07.013.

  16. Flyvbjerg B., Glenting C., Rønnest A., (2004). Procedures for dealing with optimism bias in transport planning. The British Department for Transport, Guidance Document.
    Paper not yet in RePEc: Add citation now
  17. Hewitt A., (2016). Construction claims and responses: Effective writing and presentation. John Wiley & Sons.
    Paper not yet in RePEc: Add citation now
  18. Insight Maker. (2021). System dynamics models. Retrieved May 12, 2021, from https://insightmaker.com/.
    Paper not yet in RePEc: Add citation now
  19. Institute for Government. (2020). Major projects. Retrieved December 12, 2020 from https://www.instituteforgovernment.org.uk/publication/whitehall-monitor-2020/major-projects.
    Paper not yet in RePEc: Add citation now
  20. Love P. E. D., Ahiaga-Dagbui D. D., Irani Z., (2016). Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation, Transportation Research Part A: Policy and Practice, 92, 184–194. https://doi.org/10.1016/j.tra.2016.08.007.

  21. Love P. E. D., Zhou J., Edwards D. J., Irani Z., Sing M. P., (2017). Off the rails: The cost performance of infrastructure rail projects. Transportation Research Part A: Policy and Practice, 99, 14–29. https://doi.org/10.1016/j.tra.2017.02.008.

  22. Narayanan S., Kure A. M., Palaniappan S., (2019). Study on time and cost overruns in mega infrastructure projects in India. Journal of The Institution of Engineers (India): Series A, 100(1), 139–145.
    Paper not yet in RePEc: Add citation now
  23. Nykamp D., (2020). An introduction to networks. Retrieved January 4, 2020, from https://mathinsight.org/network_introduction.
    Paper not yet in RePEc: Add citation now
  24. Obi L., Arif M., Kulonda D., (2017). Prioritising cost management system considerations for Nigerian housing projects. Journal of Financial Management of Property and Construction, 22, 135–153. https://doi.org/10.1108/JFMPC-06-2016-0025.
    Paper not yet in RePEc: Add citation now
  25. Ogunnusi M., Omotayo T., Hamma-Adama M., Awuzie B. O., Egbelakin T., (2021). Lessons learned from the impact of COVID-19 on the global construction industry. Journal of Engineering, Design and Technology, 20, 299–320. https://doi.org/10.1108/JEDT-05-2021-0286.
    Paper not yet in RePEc: Add citation now
  26. Olawale Y. A., Sun M., (2010). Cost and time control of construction projects: Inhibiting factors and mitigating measures in practice. Construction Management and Economics, 28(5), 509–526.

  27. Omotayo T. S., Boateng P., Osobajo O., Oke A., Obi L. I., (2019). Systems thinking and CMM for continuous improvement in the construction industry. International Journal of Productivity and Performance Management, 69(2), 271–296. https://doi.org/10.1108/IJPPM-11-2018-0417.

  28. Pagoni E. G., Patroklos G., (2019). A system dynamics model for the assessment of national public-private partnership programmes’ sustainable performance. Simulation Modelling Practice and Theory, 97, 101949. https://doi.org/10.1016/j.simpat.2019.101949.
    Paper not yet in RePEc: Add citation now
  29. Pallant J., (2020). SPSS survival manual: A step by step guide to data analysis using IBM SPSS. Routledge.
    Paper not yet in RePEc: Add citation now
  30. Pamidimukkala A., Kermanshachi S., (2021). Impact of Covid-19 on field and office workforce in construction industry. Project Leadership and Society, 2, 100018. https://doi.org/10.1016/j.plas.2021.100018.
    Paper not yet in RePEc: Add citation now
  31. Patil Y. K., Pankaj P., (2016). Investigation of factors influencing cost overrun in high-rise building constructions. International Journal of Latest Trends in Engineering and Technology, 6(3), 336.
    Paper not yet in RePEc: Add citation now
  32. PlanGrid. (2019). 5 Common causes of cost overruns in construction projects. Retrieved March 30, 2019 from https://blog.plangrid.com/2017/11/5-commoncauses-of-cost-overruns-in-construction-projects/.
    Paper not yet in RePEc: Add citation now
  33. Ramabhadran M., (2018). An investigation into cost overrun in construction projects in United Arab Emirates. International Journal of Construction Management, 7(1), 1–21.
    Paper not yet in RePEc: Add citation now
  34. Reichelt K., Lyneis J., (1999). The dynamics of project performance: Benchmarking the drivers of cost and schedule overrun. European Management Journal, 17(2), 135–150. https://doi.org/10.1016/S0263-2373(98)00073-5.

  35. Rode P., Terrefe B., da Cruz N. F., (2020). Cities and the governance of transport interfaces: Ethiopia’s new rail systems. Transport Policy, 91, 76–94. https://doi.org/10.1016/j.tranpol.2020.03.004.

  36. Rothengatter W., (2019). Megaprojects in transportation networks. Transport Policy, 75, A1–A15. https://doi.org/10.1016/j.tranpol.2018.08.002.

  37. Singh R., (2011). Determinants of cost overruns in public procurement of infrastructure: Roads and railways. India Policy Forum, 7(1), 97–158.

  38. Soudbakhsh D., Chakrabortty A., Annaswamy A. M., (2017). A delay-aware cyber-physical architecture for wide-area control of power systems. Control Engineering Practice, 60, 171–182. https://doi.org/10.1016/j.conengprac.2016.12.012.
    Paper not yet in RePEc: Add citation now
  39. Subramani T., Sruthi P. S., Kavitha M., (2014). Causes of cost overrun in construction. IOSR Journal of Engineering, 4(6), 1–7.
    Paper not yet in RePEc: Add citation now
  40. Uchehara I., Moore D., Jafarifar N., Omotayo T., (2022). Sustainability rating system for highway design:—A key focus for developing sustainable cities and societies in Nigeria. Sustainable Cities and Society, 78, 103620. https://doi.org/10.1016/j.scs.2021.103620.
    Paper not yet in RePEc: Add citation now
  41. Xu Y., Sun C., Skibniewski M. J., Chan A. P. C., Yeung J. F. Y., Cheng H., (2012). System dynamics (SD) -based concession pricing model for PPP highway projects. International Journal of Project Management, 30(2), 240–251. https://doi.org/10.1016/j.ijproman.2011.06.001.
    Paper not yet in RePEc: Add citation now
  42. Zinbarg R. E., Revelle W., Yovel I., Li W., (2005). Cronbach’s α, Revelle’s β, and McDonald’s ω H: Their relations with each other and two alternative conceptualisations of reliability. Psychometrika, 70, 123–133. https://doi.org/10.1007/s11336-003-0974-7.

Cocites

Documents in RePEc which have cited the same bibliography

  1. Determining Cost and Causes of Overruns in Infrastructure Projects in South Asia. (2024). Lin, Shuangyu ; Andri, Jelena M ; Sun, Bin ; Cheng, Yuan.
    In: Sustainability.
    RePEc:gam:jsusta:v:16:y:2024:i:24:p:11159-:d:1547768.

    Full description at Econpapers || Download paper

  2. The bright side of the planning fallacy in distribution channels. (2024). Kopel, Michael ; Ramani, Vinay.
    In: European Journal of Operational Research.
    RePEc:eee:ejores:v:314:y:2024:i:2:p:540-551.

    Full description at Econpapers || Download paper

  3. Expert Opinion on the Key Influencing Factors of Cost Control for Water Engineering Contractors. (2023). Xue, Zhiyuan ; Ding, Zhenhan ; Liu, Xun.
    In: Sustainability.
    RePEc:gam:jsusta:v:15:y:2023:i:8:p:6963-:d:1128669.

    Full description at Econpapers || Download paper

  4. Risks Caused by Information Asymmetry in Construction Projects: A Systematic Literature Review. (2023). Ivi, Ivona ; Ceri, Anita.
    In: Sustainability.
    RePEc:gam:jsusta:v:15:y:2023:i:13:p:9979-:d:1177502.

    Full description at Econpapers || Download paper

  5. Uncertainty in the Planning Phase of Public Projects—Its Scope, Consequences, and Possible Remedies. (2023). Capone, Vincenza ; Canonico, Paolo ; Capaldo, Guido ; Kuchta, Dorota.
    In: Administrative Sciences.
    RePEc:gam:jadmsc:v:13:y:2023:i:6:p:145-:d:1161848.

    Full description at Econpapers || Download paper

  6. The System Dynamics Analysis of Cost Overrun Causations in UK Rail Projects in a COVID-19 Epidemic Era. (2022). Ajayi, Saheed ; Osobajo, Oluyomi ; Obi, Lovelin Ifeoma ; Awuzie, Bankole ; Oke, Adekunle ; Omotayo, Temitope Seun.
    In: SAGE Open.
    RePEc:sae:sagope:v:12:y:2022:i:2:p:21582440221097923.

    Full description at Econpapers || Download paper

  7. When can lotteries improve public procurement processes?. (2022). Serebrisky, Tomas ; Foucart, Renaud ; Estache, Antonio.
    In: Working Papers.
    RePEc:lan:wpaper:359001116.

    Full description at Econpapers || Download paper

  8. Mapping Studies on Sustainability in the Performance Measurement of Public-Private Partnership Projects: A Systematic Review. (2022). Jin, Xiaohua ; Osei-Kyei, Robert ; Akomea-Frimpong, Isaac.
    In: Sustainability.
    RePEc:gam:jsusta:v:14:y:2022:i:12:p:7174-:d:836632.

    Full description at Econpapers || Download paper

  9. Is there a net economic loss from employing reference class forecasting in the appraisal of hydropower projects?. (2022). Olasehinde-Williams, Godwin ; Jenkins, Glenn ; Baurzhan, S.
    In: Renewable and Sustainable Energy Reviews.
    RePEc:eee:rensus:v:159:y:2022:i:c:s1364032122001411.

    Full description at Econpapers || Download paper

  10. When can Lotteries improve Public Procurement Processes?. (2022). Serebrisky, Tomas ; Foucart, Renaud ; Estache, Antonio.
    In: Working Papers ECARES.
    RePEc:eca:wpaper:2013/345092.

    Full description at Econpapers || Download paper

  11. The ‘context’ of transport project cost performance: Insights from contract award to final construction costs. (2021). , Peter ; Ika, Lavagnon A.
    In: Research in Transportation Economics.
    RePEc:eee:retrec:v:90:y:2021:i:c:s0739885921000342.

    Full description at Econpapers || Download paper

  12. The Cost-Benefit Fallacy: Why Cost-Benefit Analysis Is Broken and How to Fix It. (2021). Flyvbjerg, Bent ; Bester, Dirk W.
    In: Papers.
    RePEc:arx:papers:2112.03171.

    Full description at Econpapers || Download paper

  13. Who Risks and Wins?—Simulated Cost Variance in Sustainable Construction Projects. (2020). Górecki, Jarosław ; Diaz-Madroero, Manuel ; Gorecki, Jarosaw.
    In: Sustainability.
    RePEc:gam:jsusta:v:12:y:2020:i:8:p:3370-:d:348316.

    Full description at Econpapers || Download paper

  14. Evaluación Económica de Proyectos y Políticas de Transporte: Metodología y Aplicaciones. Parte 1: Metodología para el análisis coste-beneficio de proyectos y políticas de transporte. (2020). Socorro, M. Pilar ; de Rus, Ginés ; Campos, Javier ; Valido, Jorge ; Graham, Daniel.
    In: Working Papers.
    RePEc:fda:fdaddt:2020-11.

    Full description at Econpapers || Download paper

  15. Developing flexible management strategies in infrastructure: The sequential expansion problem for infrastructure analysis (SEPIA). (2020). Zuluaga, Santiago ; Snchez-Silva, Mauricio ; Lozano, Jorge-Mario.
    In: Reliability Engineering and System Safety.
    RePEc:eee:reensy:v:200:y:2020:i:c:s0951832019310695.

    Full description at Econpapers || Download paper

  16. Regression to the Tail: Why the Olympics Blow Up. (2020). Flyvbjerg, Bent ; Lunn, Daniel ; Budzier, Alexander.
    In: Papers.
    RePEc:arx:papers:2009.14682.

    Full description at Econpapers || Download paper

  17. Time Overrun in Public Works—Evidence from North-East Italy. (2019). Antoniucci, Valentina ; Marella, Giuliano.
    In: Sustainability.
    RePEc:gam:jsusta:v:11:y:2019:i:24:p:7057-:d:296168.

    Full description at Econpapers || Download paper

  18. On the magnitude of cost overruns throughout the project life-cycle: An assessment for the Italian transport infrastructure projects. (2019). Guccio, Calogero ; Cavalieri, Marina ; Cristaudo, Rossana.
    In: Transport Policy.
    RePEc:eee:trapol:v:79:y:2019:i:c:p:21-36.

    Full description at Econpapers || Download paper

  19. On de-bunking “Fake News” in the post-truth era: How to reduce statistical error in research. (2019). Flyvbjerg, Bent ; van Wee, Bert ; Ansar, Atif ; Ronnest, Arne ; Buhl, Soren ; Stewart, Allison ; Holm, Mette Skamris ; Budzier, Alexander ; Garbuio, Massimo ; Molin, Eric ; Lovallo, Dan ; Cantarelli, Chantal ; Glenting, Carsten.
    In: Transportation Research Part A: Policy and Practice.
    RePEc:eee:transa:v:126:y:2019:i:c:p:409-411.

    Full description at Econpapers || Download paper

  20. On de-bunking ‘fake news’ in a post truth era: Why does the Planning Fallacy explanation for cost overruns fall short?. (2019). Ahiaga-Dagbui, Dominic ; Ika, Lavagnon A.
    In: Transportation Research Part A: Policy and Practice.
    RePEc:eee:transa:v:126:y:2019:i:c:p:397-408.

    Full description at Econpapers || Download paper

  21. Measuring the value for money of transport infrastructure procurement; an intergenerational approach. (2019). Peñalver, Domingo ; Turro, Mateu ; Williamson, John B ; Penyalver, Domingo.
    In: Transportation Research Part A: Policy and Practice.
    RePEc:eee:transa:v:119:y:2019:i:c:p:238-254.

    Full description at Econpapers || Download paper

  22. Framework for Structuring Procurement Contracts. (2014). Borg, Lena ; Lind, Hans.
    In: Working Paper Series.
    RePEc:hhs:kthrec:2014_009.

    Full description at Econpapers || Download paper

Coauthors

Authors registered in RePEc who have wrote about the same topic

Report date: 2025-10-04 00:18:44 || Missing content? Let us know

CitEc is a RePEc service, providing citation data for Economics since 2001. Last updated August, 3 2024. Contact: Jose Manuel Barrueco.