5.2.5 Method of Construction
Dump stability and the development of conditions which could lead to failure are also related
to how the dump is constructed (Singhal, 1988; Golder Associates, 1987; Claridge et aI, 1986;
Gold, 1986; Campbell, 1981). Dumps are usually constructed in a series of lifts or platforms in
either a descending or ascending sequence. Upslope (ascending) construction is advantageous,
as the toe of each lift is supported on the preceding lift. The method of construction selected is
based on a combination of factors including: minimizing haulage distance, accessibility,
available capacity and dump stability (which is usually critical during and shortly after
construction). Stability can be enhanced by the judicious use of wrap-arounds, terracing,
restricting lift heights to limit shear stresses on the foundations and the length of potential
runout, dumping generally in the direction of valley contours, rather than downslope, and other
techniques. Construction methods and techniques for improving dump stability are described
in Section 7.3.
5.2.5 Méthode de construction
La stabilité de la décharge et le développement de conditions qui pourraient conduire à une
défaillance sont également liés à la façon dont la décharge est construite (Singhal, 1988 ;
Golder Associates, 1987 ; Claridge et al, 1986 ; Gold, 1986 ; Campbell, 1981). Les décharges
sont généralement construites dans une série d'ascenseurs ou de plates-formes dans une
séquence descendante ou ascendante. La construction en pente ascendante (ascendante) est
avantageuse, car le pied de chaque ascenseur est soutenu sur l'ascenseur précédent. La méthode
de construction choisie est basée sur une combinaison de facteurs, notamment : minimiser la
distance de transport, l'accessibilité, la capacité disponible et la stabilité de la décharge (ce qui
est généralement critique pendant et peu de temps après la construction). La stabilité peut être
améliorée par l'utilisation judicieuse des enveloppements, des terrasses, des hauteurs de levage
restrictives pour limiter les contraintes de cisaillement sur les fondations et la longueur du faux-
rond potentiel, le déversement généralement dans la direction des contours de la vallée, plutôt
que vers le bas, et d'autres techniques. Les méthodes et techniques de construction pour
améliorer la stabilité de la décharge sont décrites à la section 7.3.

Contenu connexe

PDF
Optimisation of Truck and Shovel for haulage system in the Cao Son Mine-1 fr ...
PDF
Optimisation of Truck and Shovel for haulage system in the Cao Son Mine-2 fr.pdf
PDF
Optimisation of Truck and Shovel for haulage system in the Cao Son Mine-1 fr ...
PDF
Combinaison.pdf
PDF
May_MA_T_2013-2 fr.pdf
PDF
May_MA_T_2013-1 fr.pdf
PDF
TYPES OF WASTE PILES.pdf
DOCX
Translate.docx
Optimisation of Truck and Shovel for haulage system in the Cao Son Mine-1 fr ...
Optimisation of Truck and Shovel for haulage system in the Cao Son Mine-2 fr.pdf
Optimisation of Truck and Shovel for haulage system in the Cao Son Mine-1 fr ...
Combinaison.pdf
May_MA_T_2013-2 fr.pdf
May_MA_T_2013-1 fr.pdf
TYPES OF WASTE PILES.pdf
Translate.docx

Dernier (12)

PDF
Processus-Elaboration-Projet-de-Construction.pdf
PDF
Rapport_PFE_Seifeddine_ABIDI_ESPRIT_24/25
PDF
DASY : Détection Automatisée des Symptômes de jaunisse de la vigne
PDF
Algorithmique et programmation Algorithmique et programmation
PPTX
PRÉSENTATION MEMOIRE DE FIN DE FORMATION
PPTX
Amélioration des propriétés mécanique_pdf.pptx
PDF
L’impression 3D dans le chaussant en 2019
PDF
formation en fibre optique le support le plus .pdf
PPTX
automobile3456768376363534ccessoire.pptx
PPTX
Amélioration des propriétés mécanique_pdf.pptx
PPTX
DASY : Détection Automatisée des Symptômes de jaunisse de la vigne
PPTX
Mechanical system design used to design dental implants
Processus-Elaboration-Projet-de-Construction.pdf
Rapport_PFE_Seifeddine_ABIDI_ESPRIT_24/25
DASY : Détection Automatisée des Symptômes de jaunisse de la vigne
Algorithmique et programmation Algorithmique et programmation
PRÉSENTATION MEMOIRE DE FIN DE FORMATION
Amélioration des propriétés mécanique_pdf.pptx
L’impression 3D dans le chaussant en 2019
formation en fibre optique le support le plus .pdf
automobile3456768376363534ccessoire.pptx
Amélioration des propriétés mécanique_pdf.pptx
DASY : Détection Automatisée des Symptômes de jaunisse de la vigne
Mechanical system design used to design dental implants

Translate 1.docx

  • 1. 5.2.5 Method of Construction Dump stability and the development of conditions which could lead to failure are also related to how the dump is constructed (Singhal, 1988; Golder Associates, 1987; Claridge et aI, 1986; Gold, 1986; Campbell, 1981). Dumps are usually constructed in a series of lifts or platforms in either a descending or ascending sequence. Upslope (ascending) construction is advantageous, as the toe of each lift is supported on the preceding lift. The method of construction selected is based on a combination of factors including: minimizing haulage distance, accessibility, available capacity and dump stability (which is usually critical during and shortly after construction). Stability can be enhanced by the judicious use of wrap-arounds, terracing, restricting lift heights to limit shear stresses on the foundations and the length of potential runout, dumping generally in the direction of valley contours, rather than downslope, and other techniques. Construction methods and techniques for improving dump stability are described in Section 7.3. 5.2.5 Méthode de construction La stabilité de la décharge et le développement de conditions qui pourraient conduire à une défaillance sont également liés à la façon dont la décharge est construite (Singhal, 1988 ; Golder Associates, 1987 ; Claridge et al, 1986 ; Gold, 1986 ; Campbell, 1981). Les décharges sont généralement construites dans une série d'ascenseurs ou de plates-formes dans une séquence descendante ou ascendante. La construction en pente ascendante (ascendante) est avantageuse, car le pied de chaque ascenseur est soutenu sur l'ascenseur précédent. La méthode de construction choisie est basée sur une combinaison de facteurs, notamment : minimiser la distance de transport, l'accessibilité, la capacité disponible et la stabilité de la décharge (ce qui est généralement critique pendant et peu de temps après la construction). La stabilité peut être améliorée par l'utilisation judicieuse des enveloppements, des terrasses, des hauteurs de levage restrictives pour limiter les contraintes de cisaillement sur les fondations et la longueur du faux- rond potentiel, le déversement généralement dans la direction des contours de la vallée, plutôt que vers le bas, et d'autres techniques. Les méthodes et techniques de construction pour améliorer la stabilité de la décharge sont décrites à la section 7.3.