Time and sync requirements
in railway networks
Mario Arnold, synchronization network engineering at DB Netz AG
Jörg Urban, AVP BD at Oscilloquartz, ADTRAN SE
• Deutsche Bahn Netz
2023 © ADTRAN, INC
Confidential
The future of mobility is rail
• Digitalization, automation and artificial
intelligence (AI) are key to a higher capacity and
optimal utilization of the rail network. Our goal is
clear: more attractive rail transport with more
trains, of higher quality. And all without adding a
single meter of new track.
Modernizing
Faster, greener, smoother: thanks to Digitale
Schiene Deutschland
European Train Control System (ETCS)
2023 © ADTRAN, INC
Confidential
Rail sector in transition
• Modernization
• Old SSUs replaced with new sync technology
• SDH to packet network, support for E1 and SyncE
• NTP and PTP …
• New 5G comm technology for rail operation
• Future Railway Mobile Communication System / Europe
• https://uic.org/projects/future-railways-mobile-communications-systems-solutions
• Needed to replace obsoleted GSM-R / ETCS
• Digitalization/Big Data
• Positioning enables efficiency rail track operation
• IoT
• Predictive maintenance
• Smart power grid
• Renewable and decentralized energy supply/production
MODERNIZATION OF THE IT/TELECOM INFRASTRUCTURE INCL. SYNCHRONIZATION
2023 © ADTRAN, INC
Confidential
SLA enabling sync architecture for mission-critical communication networks
The new timing and sync solution
Highly accurate and redundant timekeeping, distribution and assurance
Core network
Ensemble of highly precise and
accurate ePRTCs
< +/-30ns to UTC ePRTC
Aggregation/access network
COs enabled to provide time information
to variety of consumers
Better +/- 100ns (PRTC-A), 40ns (PRTC-B)
4G / 5G
Versatile
edgeSync
Versatile
edgeSync
Enterprises/wholesale
Applications
Better +/- 1000ns to UTC
Sync
network
and
service
management
Smart grid
Time over optical transport
Secure and highly accurate time distribution
MEC / DC
L2/TSN/L3
Fiber/WDM/MW
Access network
ePRTC
ePRTC
Time/phase
Peering
2023 © ADTRAN, INC
Confidential
Modernization of sync network
(High-level sync design)
Objective:
Highly resilient sync architecture at any Deutsche
Bahn ‘Netz’ site,
GNSS jamming and spoofing agnostic
2023 © ADTRAN, INC
Confidential
• SDH, still in use for the next 15 years
• > 5.000 SDH nodes
• Rail track operation (monitoring and control)
• GSM-R, voice and data services
• DWDM & IP/MPLS for each
• ITC services
• Enable 5G rollout replacing GSM-R
• Migration of SDH/PDH-based rail track operation
The network – points of presence (PoPs)
6
2023 © ADTRAN, INC
Confidential
7
The SDH sync structure
7
‘Clusters’ add redundancy (3 – 4 areas)
52 PRC areas 15 PRC clusters
2023 © ADTRAN, INC
Confidential
• PRC/SSU for E1/SyncE, PTP and NTP application
• PRTC-B capable device
• Performance management capabilities
• T-BC Class C/D support
• High E1 and Ethernet fan-out
• Highly redundant – clock module, PSU & port
• Future-proof with (cn/e)PRTC
• Less power consumption
• High system uptime
• Design approach – simplified architecture and device config.
Versatile edgeSync requirements
2023 © ADTRAN, INC
Confidential
• PTP G8275.1 and SyncE over 1G OTN links
• Max 2 OTN hops, typical measurements, maxTE of 5ns
• For monitoring use the internal measuring function
• A link outage on DWDM/OTN causes phase hits!
• DWDM network to transport phase/time via OTN
edgeSync device monitoring and backup
9
2023 © ADTRAN, INC
Confidential
• Typical measured maxTE 60ns on monitored PRTC (configuration: GNSS vs PTP input from cnPRTC)
Measurement results
10
• PRTC monitoring – 2
2023 © ADTRAN, INC
Confidential
11
Introducing ePRTC at core sites
2023 © ADTRAN, INC
Confidential
• (cn)ePRTC cluster at each core site
• 2x ePRTCs each connected to 2x Cs clocks
• Interconnection with 10MHz over optical fiber
• 2x dedicated T-BC / Class D devices
• PTP G8275.1 and SyncE input over optical fiber
• Distribution of PTP G8275.1 & SyncE over 1G-OTN
• Interconnect UTC(DT) and UTC(PTB) for research
purposes
• At 2 core sites in each location (Frankfurt and Berlin)
(cn)ePRTC setup
2023 © ADTRAN, INC
Confidential
• edgeGM & T-BC at 5G switch hub (grooming of 5G RRU)
• OTN being used to transport PTP/SyncE, G8275.1
• Plan to build own time scale
• Time sync of 5G radio and application
Next …
13
The intended timeline for the introduction of FRMCS by DB
and an overview of the various steps taken, (03 / 2022)
2023 © ADTRAN, INC
Confidential
• We can’t know what we don’t measure
• Synchronization networks require accurate planning
• Internal knowledge transfer about synchronization is necessary
• Keep it simple and stupid (KISS) principle – Perfect is when you can't leave
anything out
Takeaways
14
2023 © ADTRAN, INC
Confidential
Thank you
For questions please contact:
mario.arnold@deutschebahn.com or joerg.urban@adtran.com

More Related Content

PDF
Network Automation Journey, A systems engineer NetOps perspective
PDF
AI in Telecom: How artificial intelligence is reshaping the vision of telco i...
PDF
#BainWebinar Next Generation Industrial Performance Post COVID-19
PPTX
5 Great Examples of CEO Thought Leadership Through Social Media
PDF
Mckinsey trends 2021
PDF
Digital Transformation Case Study
PPTX
Mergers and Acquisitions Toolkit
PDF
The State of Global AI Adoption in 2023
Network Automation Journey, A systems engineer NetOps perspective
AI in Telecom: How artificial intelligence is reshaping the vision of telco i...
#BainWebinar Next Generation Industrial Performance Post COVID-19
5 Great Examples of CEO Thought Leadership Through Social Media
Mckinsey trends 2021
Digital Transformation Case Study
Mergers and Acquisitions Toolkit
The State of Global AI Adoption in 2023

What's hot (6)

PDF
Smart Cities – how to master the world's biggest growth challenge
PPTX
Cloud-native Enterprise Data Science Teams
PDF
Apostila de treinamento_sigapco_1
PDF
Turning diligence insights into actionable integration steps
PDF
Mind the-(ai)-gap : BCG study
PDF
SmartCity : La transformation digitale de la ville
Smart Cities – how to master the world's biggest growth challenge
Cloud-native Enterprise Data Science Teams
Apostila de treinamento_sigapco_1
Turning diligence insights into actionable integration steps
Mind the-(ai)-gap : BCG study
SmartCity : La transformation digitale de la ville
Ad

Similar to Timing and sync requirements in railway networks (20)

PDF
Time as a service for the IoT world of tomorrow
PDF
NECOS Industrial Workshop lightning talk by Luis Contreras (Telefonica)
PDF
Get your timing right for 5G OpenRAN!
PDF
Time sync: Existing mobile networks need to be ready for 5G and time-sensitiv...
PDF
New connectivity in 5G: Avoiding dead-ends in the road to mobile growth
PDF
Recent growth in timing
PDF
Nb 430 ts
PPTX
The Optical Reboot: Radical Changes in Service Provider Transport Networks
PPTX
Light Reading Webinar: Defining the 5G Network Connectivity Challenge
PDF
5G for Internet of Things & Patents
PDF
Sharing is caring: Real-life shared infrastructure experience
PDF
GNSS Optimization for Urban Canyon and Indoor Synchronization
PDF
Syncing the cloud - from T1 to TAP
PDF
Yangzhou cnc
PPT
Seminar_1vvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvv.ppt
PDF
IP-optical convergence: a complete solution
PDF
Orchestration of Ethernet Services in Software-Defined and Flexible Heterogen...
PDF
Improving time accuracy at the network edge
PDF
Accelerating 5G enterprise networks with edge computing and latency assurance
PDF
Inject precise synchronization into open compute servers
Time as a service for the IoT world of tomorrow
NECOS Industrial Workshop lightning talk by Luis Contreras (Telefonica)
Get your timing right for 5G OpenRAN!
Time sync: Existing mobile networks need to be ready for 5G and time-sensitiv...
New connectivity in 5G: Avoiding dead-ends in the road to mobile growth
Recent growth in timing
Nb 430 ts
The Optical Reboot: Radical Changes in Service Provider Transport Networks
Light Reading Webinar: Defining the 5G Network Connectivity Challenge
5G for Internet of Things & Patents
Sharing is caring: Real-life shared infrastructure experience
GNSS Optimization for Urban Canyon and Indoor Synchronization
Syncing the cloud - from T1 to TAP
Yangzhou cnc
Seminar_1vvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvv.ppt
IP-optical convergence: a complete solution
Orchestration of Ethernet Services in Software-Defined and Flexible Heterogen...
Improving time accuracy at the network edge
Accelerating 5G enterprise networks with edge computing and latency assurance
Inject precise synchronization into open compute servers
Ad

More from Adtran (20)

PDF
Introducing the OSA 3200 SP and OSA 3250 ePRC
PDF
SDG 9000 Series: Unleashing multigigabit everywhere
PDF
Introducing Ensemble Cloudlet vRouter
PDF
Enhanced Short-Term Unit (ESTU) for OSA 3300 HP/SHP optical cesium clocks
PDF
Strengthening resilience and integrity in timing
PDF
PNT alternatives for multi-source timing deployments
PPTX
Pushing the limits of ePRTC - timing the future in the face of increasing GNS...
PDF
Central office consolidation: A practical guide
PDF
Assured PNT for data centers: All you need to know
PDF
Pushing the limits of ePRTC: 100ns holdover for 100 days
PDF
Meet the new FSP 3000 M-Flex800™
PDF
National plan for distribution of time and frequency
PDF
Assured timing for power networks
PDF
Deep PON assurance with Adtran ALM
PDF
Addressing GPS vulnerabilities with Satellite Time and Location technology
PDF
A new era of in-home Wi-Fi has arrived
PDF
Introducing the industry's smallest Combo PON OLT
PDF
A new era of Wi-Fi has arrived
PDF
Deep PON assurance with Adtran ALM
PDF
Transforming DCI connectivity with the FSP 3000 S-Flex
Introducing the OSA 3200 SP and OSA 3250 ePRC
SDG 9000 Series: Unleashing multigigabit everywhere
Introducing Ensemble Cloudlet vRouter
Enhanced Short-Term Unit (ESTU) for OSA 3300 HP/SHP optical cesium clocks
Strengthening resilience and integrity in timing
PNT alternatives for multi-source timing deployments
Pushing the limits of ePRTC - timing the future in the face of increasing GNS...
Central office consolidation: A practical guide
Assured PNT for data centers: All you need to know
Pushing the limits of ePRTC: 100ns holdover for 100 days
Meet the new FSP 3000 M-Flex800™
National plan for distribution of time and frequency
Assured timing for power networks
Deep PON assurance with Adtran ALM
Addressing GPS vulnerabilities with Satellite Time and Location technology
A new era of in-home Wi-Fi has arrived
Introducing the industry's smallest Combo PON OLT
A new era of Wi-Fi has arrived
Deep PON assurance with Adtran ALM
Transforming DCI connectivity with the FSP 3000 S-Flex

Recently uploaded (20)

PDF
Electronic commerce courselecture one. Pdf
PDF
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
PDF
Building Integrated photovoltaic BIPV_UPV.pdf
PPTX
20250228 LYD VKU AI Blended-Learning.pptx
PPTX
sap open course for s4hana steps from ECC to s4
PDF
The Rise and Fall of 3GPP – Time for a Sabbatical?
PDF
Peak of Data & AI Encore- AI for Metadata and Smarter Workflows
PDF
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
PPTX
Cloud computing and distributed systems.
PPT
Teaching material agriculture food technology
PPT
“AI and Expert System Decision Support & Business Intelligence Systems”
PDF
Reach Out and Touch Someone: Haptics and Empathic Computing
PDF
Machine learning based COVID-19 study performance prediction
PDF
Network Security Unit 5.pdf for BCA BBA.
PDF
Advanced methodologies resolving dimensionality complications for autism neur...
PDF
Per capita expenditure prediction using model stacking based on satellite ima...
PDF
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
PPTX
MYSQL Presentation for SQL database connectivity
PPTX
VMware vSphere Foundation How to Sell Presentation-Ver1.4-2-14-2024.pptx
PPTX
Understanding_Digital_Forensics_Presentation.pptx
Electronic commerce courselecture one. Pdf
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
Building Integrated photovoltaic BIPV_UPV.pdf
20250228 LYD VKU AI Blended-Learning.pptx
sap open course for s4hana steps from ECC to s4
The Rise and Fall of 3GPP – Time for a Sabbatical?
Peak of Data & AI Encore- AI for Metadata and Smarter Workflows
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
Cloud computing and distributed systems.
Teaching material agriculture food technology
“AI and Expert System Decision Support & Business Intelligence Systems”
Reach Out and Touch Someone: Haptics and Empathic Computing
Machine learning based COVID-19 study performance prediction
Network Security Unit 5.pdf for BCA BBA.
Advanced methodologies resolving dimensionality complications for autism neur...
Per capita expenditure prediction using model stacking based on satellite ima...
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
MYSQL Presentation for SQL database connectivity
VMware vSphere Foundation How to Sell Presentation-Ver1.4-2-14-2024.pptx
Understanding_Digital_Forensics_Presentation.pptx

Timing and sync requirements in railway networks

  • 1. Time and sync requirements in railway networks Mario Arnold, synchronization network engineering at DB Netz AG Jörg Urban, AVP BD at Oscilloquartz, ADTRAN SE • Deutsche Bahn Netz
  • 2. 2023 © ADTRAN, INC Confidential The future of mobility is rail • Digitalization, automation and artificial intelligence (AI) are key to a higher capacity and optimal utilization of the rail network. Our goal is clear: more attractive rail transport with more trains, of higher quality. And all without adding a single meter of new track. Modernizing Faster, greener, smoother: thanks to Digitale Schiene Deutschland European Train Control System (ETCS)
  • 3. 2023 © ADTRAN, INC Confidential Rail sector in transition • Modernization • Old SSUs replaced with new sync technology • SDH to packet network, support for E1 and SyncE • NTP and PTP … • New 5G comm technology for rail operation • Future Railway Mobile Communication System / Europe • https://uic.org/projects/future-railways-mobile-communications-systems-solutions • Needed to replace obsoleted GSM-R / ETCS • Digitalization/Big Data • Positioning enables efficiency rail track operation • IoT • Predictive maintenance • Smart power grid • Renewable and decentralized energy supply/production MODERNIZATION OF THE IT/TELECOM INFRASTRUCTURE INCL. SYNCHRONIZATION
  • 4. 2023 © ADTRAN, INC Confidential SLA enabling sync architecture for mission-critical communication networks The new timing and sync solution Highly accurate and redundant timekeeping, distribution and assurance Core network Ensemble of highly precise and accurate ePRTCs < +/-30ns to UTC ePRTC Aggregation/access network COs enabled to provide time information to variety of consumers Better +/- 100ns (PRTC-A), 40ns (PRTC-B) 4G / 5G Versatile edgeSync Versatile edgeSync Enterprises/wholesale Applications Better +/- 1000ns to UTC Sync network and service management Smart grid Time over optical transport Secure and highly accurate time distribution MEC / DC L2/TSN/L3 Fiber/WDM/MW Access network ePRTC ePRTC Time/phase Peering
  • 5. 2023 © ADTRAN, INC Confidential Modernization of sync network (High-level sync design) Objective: Highly resilient sync architecture at any Deutsche Bahn ‘Netz’ site, GNSS jamming and spoofing agnostic
  • 6. 2023 © ADTRAN, INC Confidential • SDH, still in use for the next 15 years • > 5.000 SDH nodes • Rail track operation (monitoring and control) • GSM-R, voice and data services • DWDM & IP/MPLS for each • ITC services • Enable 5G rollout replacing GSM-R • Migration of SDH/PDH-based rail track operation The network – points of presence (PoPs) 6
  • 7. 2023 © ADTRAN, INC Confidential 7 The SDH sync structure 7 ‘Clusters’ add redundancy (3 – 4 areas) 52 PRC areas 15 PRC clusters
  • 8. 2023 © ADTRAN, INC Confidential • PRC/SSU for E1/SyncE, PTP and NTP application • PRTC-B capable device • Performance management capabilities • T-BC Class C/D support • High E1 and Ethernet fan-out • Highly redundant – clock module, PSU & port • Future-proof with (cn/e)PRTC • Less power consumption • High system uptime • Design approach – simplified architecture and device config. Versatile edgeSync requirements
  • 9. 2023 © ADTRAN, INC Confidential • PTP G8275.1 and SyncE over 1G OTN links • Max 2 OTN hops, typical measurements, maxTE of 5ns • For monitoring use the internal measuring function • A link outage on DWDM/OTN causes phase hits! • DWDM network to transport phase/time via OTN edgeSync device monitoring and backup 9
  • 10. 2023 © ADTRAN, INC Confidential • Typical measured maxTE 60ns on monitored PRTC (configuration: GNSS vs PTP input from cnPRTC) Measurement results 10 • PRTC monitoring – 2
  • 11. 2023 © ADTRAN, INC Confidential 11 Introducing ePRTC at core sites
  • 12. 2023 © ADTRAN, INC Confidential • (cn)ePRTC cluster at each core site • 2x ePRTCs each connected to 2x Cs clocks • Interconnection with 10MHz over optical fiber • 2x dedicated T-BC / Class D devices • PTP G8275.1 and SyncE input over optical fiber • Distribution of PTP G8275.1 & SyncE over 1G-OTN • Interconnect UTC(DT) and UTC(PTB) for research purposes • At 2 core sites in each location (Frankfurt and Berlin) (cn)ePRTC setup
  • 13. 2023 © ADTRAN, INC Confidential • edgeGM & T-BC at 5G switch hub (grooming of 5G RRU) • OTN being used to transport PTP/SyncE, G8275.1 • Plan to build own time scale • Time sync of 5G radio and application Next … 13 The intended timeline for the introduction of FRMCS by DB and an overview of the various steps taken, (03 / 2022)
  • 14. 2023 © ADTRAN, INC Confidential • We can’t know what we don’t measure • Synchronization networks require accurate planning • Internal knowledge transfer about synchronization is necessary • Keep it simple and stupid (KISS) principle – Perfect is when you can't leave anything out Takeaways 14
  • 15. 2023 © ADTRAN, INC Confidential Thank you For questions please contact: mario.arnold@deutschebahn.com or joerg.urban@adtran.com