SlideShare a Scribd company logo
Akeem Olawale BASHIRU (B.Sc, PMP)
13 Abeokuta Street,
Ilaje Bariga Lagos,
Lagos State
Nigeria.
Phone :+2348055114096
:+2348060725703
E-mail: bashir_olawale@yahoo.co.uk
CAREER SUMMARY
I have about 8years mechanical, piping, systems & project engineering/management experience. I possess good problem
solving skills, good verbal communication and writing skills required to work in multi-cultural engineering and management
teams involved in management, planning/execution, design, installation, construction, testing, commissioning of complex
facilities.
I possess multi-talented skills and competencies required for project conception to commissioning and handover of complex
fibre optic links, cement plant and power facilities. I can follow-up with project (scope, budgets and schedules) to achieve
management's objective for assigned project. Software used includes FLARENET, AutoCAD, Solid-Works (3D Models),
Maximo 7.5, Lotus note Microsoft Packages.
I’m Familiar with relevant DNV, ABS, API, ASME, BS, NACE codes such as - BS PD5500, EN13445, DNV E403. DNV
C201, API610, API617, API 616, API614, API613, API560, API676, API 14C, API 650/620, API653, API682, API510, ASME
B31.1, ASME B31.3, ASME B31.4, ASME B31.6. ASME VIII-1&2 and relevant International Oil Company's (IOC) Codes.
PERSONAL INFORMATION
Sex/Marital Status/DoB Male/Married/1ST
April, 1979
EDUCATION
2000 - 2006 University of Ibadan, Ibadan Nigeria (Degree).
1992 - 1998 St Luke‘s, Grammar School, Bariga, Lagos Nigeria (W.A.S.S.C.E).
1986 - 1982 Idowu Primary School, Bariga, Lagos.
SUMMARY OF QUALIFICATIONS
GCE (Senior Secondary School Certificate), Dec., 1999 (5A's and 3C's).
BSC (Mechanical Engineering), University of Ibadan, Ibadan, Feb., 2006{Second Class Honors, (Upper Div.)} 2-1.
Certificate (National Youth Service Corps), Jos Plateau PL/WB/06/353546 Certificate Number: A001094846, Sept. 2007.
Certificate (Modeling Flare System with Aspen FLARENET) – Weam & Company Limited July, 2008
Aspen Technologies Inc. Massachusetts, USA
Certificate (Optical Fiber training and Workshop) – BT Technologies Limited, Lagos Nigeria July, 2009
Certificate (Precision Laser Alignment for rotating mechanical equipment training {SKF WE240}) SKF Sub-Sahara
Africa, Certificate License No: SSA2159 January, 2011
Certificate (Project Management Professional Training) – Piston & Fusion Limited, Lagos Nigeria July, 2012
Certificate (Bearing Specification Installation and Maintenance) – O-Secul Nigeria Limited, Certificate Number: OSNL
NO: WAP1212-02 Dec., 2012.
OTHER CAREER TRAINING
• Scaffolding Training, Harrison Inspection & Training, Port-Harcourt Nigeria (July 2014).
• Safe Operation of Cherry Picker & Tele-handler - National Industrial Safety Council of Nigeria with Tofunpe Venture
(March 2014).
• Level 1 First Aid Course for First Respondent – Wetland Rescue Consult Academy, Certificate Number
WRCA/MR/08/283 (August 2013).
• Mechanical Execution Professionalise Training – Lichtenburg, South Africa (May, 2013).
• Apollo Root Cause Analysis, ARMS reliability (January, 2013).
• 35 hours Training on Project Management for Project Management Professional (PMP), Piston & Fusion Limited,
Lagos Nigeria (July 2012)
• Scaffold (Safety) Inspection Training Workshop, Ogun State National Industrial Safety Council of Nigeria (July, 2012)
• Mechanical Equipment Installation Specialist Training (Bearings, Hydraulic, Pneumatic & Conveyors) -Lichtenburg,
South Africa (February, 2011).
• Practical Operation and Maintenance of Industrial Fans, Blowers and Compressors – IDC Technologies, South Africa
(February, 2011).
• 40 hours Comprehensive Safety training-WAH, Hot Work, Confine Safe, Risk assessment (July, 2010).
• Visible felt Leadership training - E.I du Pont de Nemours and Company Wilmington, DE 19898 (July 2010)
• Precision Shaft Alignment (WE240)-SKF Laser Alignment-Certificate NO: (Sub-Saharan Africa) SSA2160(Jan. 2010)
EMPLOYMENT HISTORY
June 2010 -Date (4 Year, 8months)
Lafarge Cement WAPCO Nigeria PLC (27B, Gerrard Road, Ikoyi, Lagos.)
Position: Mechanical Engineer-(Commissioning/Startup & Head Sectional Engineer Quarry-Raw mill-Kiln-Packing)
Responsibilities Includes (but not limited to):
Commissioning/Startup:
 Installation of mechanical equipment such as pumps, fans, compressor, valves for gas train, filters, gas pipeline.
 Alignment and balancing of rotating equipment such as fans, pump, compressor to correct abnormal vibration.
 Installation of piping systems for gas, compressed air, process and cooling water, drainage, gas valve trains, valves,
strainers,
 Construction support, hydro testing, Purging, inspection, commissioning process and procedures, rotational test. Full
Speed No-load/load test, individual test, sequence test, 8/24hours test, vibration measurements.
 Preparation of Standard Operating procedures for mechanical equipments,
 Correction of installation deficiency of installed equipment such as pumps, compressors, heat exchanger, hydraulic
systems, lubrication systems, coolers, drives, gear box.
 Clearing punch-list items to prepare for commissioning work and participation in the commissioning of equipment.
 MTO's, Material Management, fabrication, Construction Supervision, maintenance planning.
 Material control and spares part management.
 Good knowledge of oil and gas production processes and technologies, familiar with maintenance systems.
 Welding inspection and procedure specification, supervision, interpretation of mechanical installation drawings.
Plant maintenance:
 Responsible for the maintenance and well-being of the relevant equipment
 Record some possible anomalies observed on the equipment during maintenance or inspection.
 Monitor the time requirements for each job and the optimal manpower and skills necessary for executing jobs.
 Supervise the trial of equipment after maintenance.
 Ensure that proper safety measures are being adhered to at all times by all personnel.
 Responsible for scheduled inspection of tools and tackles (including safety tools and tackles) and ensuring that these
are in optimal condition of safe use.
 Responsible for recording of daily job activities.
 Manage people working under him.
 Monitor job duration, cost and performance of crew.
 Recommend improvements for cost reductions.
 Respond to emergency repair needs.
 Work with the planning in the development of job planning.
 Ensure productive use of the crew.
 Specify work procedures if required.
 Monitor and controls overtime.
 Ensure safe storage and disposal of replaced spares.
Team Management:
 Defining Tasks and Objectives and annually carry out their Performance Reviews.
 Ensuring good quality of works carried out in the area of coverage without re-work.
 Ensuring good working relationship within the team.
 Motivating the team and ensuring good level of discipline.
 Implement Training Plan for Improving Personnel Skills.
 Contribute to Preparation of the Departmental Budget.
 Facilitate communications.
PROJECT: Lakatabu Expansion Project + 90MegaWatts Wartsila Power Plant
Project cost: >300 Million Euros. -Over 10Million Man-hours of work
(Lafarge S.A France, Wartsila Power Solution, CBMI,).
Nov., 2008 – May, 2010 (1 Year, 6months)
BT Technologies Limited (50/52, Broad Street, Marina, Lagos.)
Position: System Engineer II - (Commissioning, Installation & Maintenance of Optic fiber)
Responsibilities Includes (but not limited to):
 Maintenance of Multilinks-Telkom and Huawei/MTNN FOB network in S/West Nigeria
 Maintain site documentation on Fibre optic links, equipment and network layout.
 Provide project support to implementation on projects execution.
 Supervise civil works (Excavation of trenches, Construction of Manhole and joint box) preparatory to cable
installation.
 Supervise the upgrade and expansion of both OFC and ELP networks.
 Training and support of internal/external personnel on fiber optics technology
PROJECTS:
1. Re-installation of 10km OFC backbone Multilinks – MTN Nigeria Interconnectivity Dugbe Zone
Project Duration: (2 months) May, 2010.
2. Installation of fresh 20km OFC on Ibadan – Ikire segment Multilinks – Telkom Backbone Link
Project Duration: (1 months) Nov., 2009.
3. DWDM interconnectivity: Lagos – Ibadan Multilinks – Telkom EVDO High data Link
Project Duration: (3months) Aug., 2009.
4. Expansion of the FOB along Shagamu – Ibadan Segment Multilinks – Telkom: External Line Plant (ELP) Project
Duration: (6months) Apr., 2009.
5. Installation and testing of OFC inter-shelter at Ibadan switch MTN Nigeria Interconnectivity
Project duration: (2 months) Dec., 2008.
Nov., 2002 – April, 2005 (1 Year)
Automobile Workshop (Bodija Ibadan), Engineering Section (Ministry of Works and Transport Secretariat Ibadan
Oyo State) and Gabimo holding Company (CMD Road Ketu Lagos, Nigeria)
Position: Industrial trainee Engineer
Responsibilities Includes (but not limited to):
 Repair and maintenance of automobile.
 Repair and maintenance of air conditioning.
 Repair and maintenance of generating set.
 Installation and commissioning of heavy duty generating get.
INTERESTS
Teaching, Driving, Traveling, Football, Watching television.
REFERENCES
Dr. T.A.O Salau Senior Lecture Phone number:+234 8028644815
Mechanical Engineering Department Email: tao.salau@mail.ui.edu.ng
University of Ibadan, Ibadan, Nigeria
Dr. O.S Ismail Senior Lecturer Phone number: +234 8023371570
Mechanical Engineering Department Email: osismail@yahoo.com
University of Ibadan, Ibadan, Nigeria

More Related Content

DOC
Evan CV RSTC
PDF
TATIRA TATIRA CV Current 1
DOCX
Anoop Kumar M S_CV
DOC
Totie Laurel CV
PDF
DOCX
EMEM ENO JAMES CURRENT CV 2016
DOCX
Cv tapan kumar prusty updated
Evan CV RSTC
TATIRA TATIRA CV Current 1
Anoop Kumar M S_CV
Totie Laurel CV
EMEM ENO JAMES CURRENT CV 2016
Cv tapan kumar prusty updated

What's hot (20)

DOC
mpita20_CV_Amec
PDF
Profile Details (CV)
PDF
Marlon Maisog CV GE 1
PDF
Raisey-Skeats S April 2015 Personal[2]
DOC
CV_E&I QC
DOC
sanjay sharan CV2015
PDF
Saifulrizan Annuar CV UPDATED.
DOC
Amos dennis cv new
PDF
CV Amine Halimi Oilfield Senior Cementing Supervisor
DOCX
Rod Ivan Yumol Resume 16
PDF
Deepwater Completions Operations
DOC
matthew adekunle abioye cv uae
DOC
Rajandran Thaiman CV(2015)
PDF
MUHAMMAD AMIN CV
DOCX
jameen new senior instrument cv
DOCX
Ejike's CV
DOC
SABER CV
PDF
Challenor-paul 13-01-16
DOCX
DOC
Abdalla Ghanem CV.. rotating, reliability and mechanical engineering, and pl...
mpita20_CV_Amec
Profile Details (CV)
Marlon Maisog CV GE 1
Raisey-Skeats S April 2015 Personal[2]
CV_E&I QC
sanjay sharan CV2015
Saifulrizan Annuar CV UPDATED.
Amos dennis cv new
CV Amine Halimi Oilfield Senior Cementing Supervisor
Rod Ivan Yumol Resume 16
Deepwater Completions Operations
matthew adekunle abioye cv uae
Rajandran Thaiman CV(2015)
MUHAMMAD AMIN CV
jameen new senior instrument cv
Ejike's CV
SABER CV
Challenor-paul 13-01-16
Abdalla Ghanem CV.. rotating, reliability and mechanical engineering, and pl...
Ad

Viewers also liked (13)

PDF
wps qualification metho
PDF
Inspection services
PDF
Points-to-recall-api653
PPT
Asme sec. ix bkr - 051010
PDF
Duplex welding guidelines
PPTX
XLSX
WPS-PQR (welding-pengelasan)
PPT
Procedure qualification
PDF
Api 653 study guide
PPTX
Guide to understanding welding procedure specification (wps
PDF
Introduction to Storage Tanks
PDF
cswip-3-1-new-book
PDF
Cswip welding inspection notes and questions
wps qualification metho
Inspection services
Points-to-recall-api653
Asme sec. ix bkr - 051010
Duplex welding guidelines
WPS-PQR (welding-pengelasan)
Procedure qualification
Api 653 study guide
Guide to understanding welding procedure specification (wps
Introduction to Storage Tanks
cswip-3-1-new-book
Cswip welding inspection notes and questions
Ad

Similar to Bashiru_Akeem CV_2015 (20)

DOC
Lawanson Oluwasanmi Resume (2)
DOC
Lawanson Oluwasanmi Resume..
DOCX
ERHINYOJARE O. FIDELIS
DOCX
Eberri Kennedy CV
DOC
ENGINEERING PROJECTS 1
DOCX
Ogbonnaya Okoro CV
DOC
lasisi kehinde cv
DOCX
OGUNLANA JOSEPH CV-1 MODIFIED
DOC
OKOROAFOR ,CV (Autosaved) 2
DOC
RAPHAEL_AKANUOH_CV_UNO_setup[1]
DOC
LAWAL ABIODUN M
PDF
CV - Asikpata Emmanuel
DOC
Electrical Supervisor, Technician, Electrician
DOC
bede_cv_updated[1]
DOC
OJUGO DAVID1
PDF
Engr Nuhu Solomon Updated CV v1
DOC
ADEBAYO SOLOMON NEW CV
DOC
Olanrewaju Bolaji Cv2
DOC
JOHNSON CV 2015
DOC
CURRICULUM VITAE - Copy
Lawanson Oluwasanmi Resume (2)
Lawanson Oluwasanmi Resume..
ERHINYOJARE O. FIDELIS
Eberri Kennedy CV
ENGINEERING PROJECTS 1
Ogbonnaya Okoro CV
lasisi kehinde cv
OGUNLANA JOSEPH CV-1 MODIFIED
OKOROAFOR ,CV (Autosaved) 2
RAPHAEL_AKANUOH_CV_UNO_setup[1]
LAWAL ABIODUN M
CV - Asikpata Emmanuel
Electrical Supervisor, Technician, Electrician
bede_cv_updated[1]
OJUGO DAVID1
Engr Nuhu Solomon Updated CV v1
ADEBAYO SOLOMON NEW CV
Olanrewaju Bolaji Cv2
JOHNSON CV 2015
CURRICULUM VITAE - Copy

Bashiru_Akeem CV_2015

  • 1. Akeem Olawale BASHIRU (B.Sc, PMP) 13 Abeokuta Street, Ilaje Bariga Lagos, Lagos State Nigeria. Phone :+2348055114096 :+2348060725703 E-mail: bashir_olawale@yahoo.co.uk CAREER SUMMARY I have about 8years mechanical, piping, systems & project engineering/management experience. I possess good problem solving skills, good verbal communication and writing skills required to work in multi-cultural engineering and management teams involved in management, planning/execution, design, installation, construction, testing, commissioning of complex facilities. I possess multi-talented skills and competencies required for project conception to commissioning and handover of complex fibre optic links, cement plant and power facilities. I can follow-up with project (scope, budgets and schedules) to achieve management's objective for assigned project. Software used includes FLARENET, AutoCAD, Solid-Works (3D Models), Maximo 7.5, Lotus note Microsoft Packages. I’m Familiar with relevant DNV, ABS, API, ASME, BS, NACE codes such as - BS PD5500, EN13445, DNV E403. DNV C201, API610, API617, API 616, API614, API613, API560, API676, API 14C, API 650/620, API653, API682, API510, ASME B31.1, ASME B31.3, ASME B31.4, ASME B31.6. ASME VIII-1&2 and relevant International Oil Company's (IOC) Codes. PERSONAL INFORMATION Sex/Marital Status/DoB Male/Married/1ST April, 1979 EDUCATION 2000 - 2006 University of Ibadan, Ibadan Nigeria (Degree). 1992 - 1998 St Luke‘s, Grammar School, Bariga, Lagos Nigeria (W.A.S.S.C.E). 1986 - 1982 Idowu Primary School, Bariga, Lagos. SUMMARY OF QUALIFICATIONS GCE (Senior Secondary School Certificate), Dec., 1999 (5A's and 3C's). BSC (Mechanical Engineering), University of Ibadan, Ibadan, Feb., 2006{Second Class Honors, (Upper Div.)} 2-1. Certificate (National Youth Service Corps), Jos Plateau PL/WB/06/353546 Certificate Number: A001094846, Sept. 2007. Certificate (Modeling Flare System with Aspen FLARENET) – Weam & Company Limited July, 2008 Aspen Technologies Inc. Massachusetts, USA Certificate (Optical Fiber training and Workshop) – BT Technologies Limited, Lagos Nigeria July, 2009 Certificate (Precision Laser Alignment for rotating mechanical equipment training {SKF WE240}) SKF Sub-Sahara Africa, Certificate License No: SSA2159 January, 2011 Certificate (Project Management Professional Training) – Piston & Fusion Limited, Lagos Nigeria July, 2012 Certificate (Bearing Specification Installation and Maintenance) – O-Secul Nigeria Limited, Certificate Number: OSNL NO: WAP1212-02 Dec., 2012. OTHER CAREER TRAINING • Scaffolding Training, Harrison Inspection & Training, Port-Harcourt Nigeria (July 2014). • Safe Operation of Cherry Picker & Tele-handler - National Industrial Safety Council of Nigeria with Tofunpe Venture (March 2014). • Level 1 First Aid Course for First Respondent – Wetland Rescue Consult Academy, Certificate Number WRCA/MR/08/283 (August 2013). • Mechanical Execution Professionalise Training – Lichtenburg, South Africa (May, 2013). • Apollo Root Cause Analysis, ARMS reliability (January, 2013).
  • 2. • 35 hours Training on Project Management for Project Management Professional (PMP), Piston & Fusion Limited, Lagos Nigeria (July 2012) • Scaffold (Safety) Inspection Training Workshop, Ogun State National Industrial Safety Council of Nigeria (July, 2012) • Mechanical Equipment Installation Specialist Training (Bearings, Hydraulic, Pneumatic & Conveyors) -Lichtenburg, South Africa (February, 2011). • Practical Operation and Maintenance of Industrial Fans, Blowers and Compressors – IDC Technologies, South Africa (February, 2011). • 40 hours Comprehensive Safety training-WAH, Hot Work, Confine Safe, Risk assessment (July, 2010). • Visible felt Leadership training - E.I du Pont de Nemours and Company Wilmington, DE 19898 (July 2010) • Precision Shaft Alignment (WE240)-SKF Laser Alignment-Certificate NO: (Sub-Saharan Africa) SSA2160(Jan. 2010) EMPLOYMENT HISTORY June 2010 -Date (4 Year, 8months) Lafarge Cement WAPCO Nigeria PLC (27B, Gerrard Road, Ikoyi, Lagos.) Position: Mechanical Engineer-(Commissioning/Startup & Head Sectional Engineer Quarry-Raw mill-Kiln-Packing) Responsibilities Includes (but not limited to): Commissioning/Startup:  Installation of mechanical equipment such as pumps, fans, compressor, valves for gas train, filters, gas pipeline.  Alignment and balancing of rotating equipment such as fans, pump, compressor to correct abnormal vibration.  Installation of piping systems for gas, compressed air, process and cooling water, drainage, gas valve trains, valves, strainers,  Construction support, hydro testing, Purging, inspection, commissioning process and procedures, rotational test. Full Speed No-load/load test, individual test, sequence test, 8/24hours test, vibration measurements.  Preparation of Standard Operating procedures for mechanical equipments,  Correction of installation deficiency of installed equipment such as pumps, compressors, heat exchanger, hydraulic systems, lubrication systems, coolers, drives, gear box.  Clearing punch-list items to prepare for commissioning work and participation in the commissioning of equipment.  MTO's, Material Management, fabrication, Construction Supervision, maintenance planning.  Material control and spares part management.  Good knowledge of oil and gas production processes and technologies, familiar with maintenance systems.  Welding inspection and procedure specification, supervision, interpretation of mechanical installation drawings. Plant maintenance:  Responsible for the maintenance and well-being of the relevant equipment  Record some possible anomalies observed on the equipment during maintenance or inspection.  Monitor the time requirements for each job and the optimal manpower and skills necessary for executing jobs.  Supervise the trial of equipment after maintenance.  Ensure that proper safety measures are being adhered to at all times by all personnel.  Responsible for scheduled inspection of tools and tackles (including safety tools and tackles) and ensuring that these are in optimal condition of safe use.  Responsible for recording of daily job activities.  Manage people working under him.  Monitor job duration, cost and performance of crew.  Recommend improvements for cost reductions.  Respond to emergency repair needs.  Work with the planning in the development of job planning.  Ensure productive use of the crew.  Specify work procedures if required.  Monitor and controls overtime.  Ensure safe storage and disposal of replaced spares. Team Management:  Defining Tasks and Objectives and annually carry out their Performance Reviews.  Ensuring good quality of works carried out in the area of coverage without re-work.  Ensuring good working relationship within the team.  Motivating the team and ensuring good level of discipline.  Implement Training Plan for Improving Personnel Skills.
  • 3.  Contribute to Preparation of the Departmental Budget.  Facilitate communications. PROJECT: Lakatabu Expansion Project + 90MegaWatts Wartsila Power Plant Project cost: >300 Million Euros. -Over 10Million Man-hours of work (Lafarge S.A France, Wartsila Power Solution, CBMI,). Nov., 2008 – May, 2010 (1 Year, 6months) BT Technologies Limited (50/52, Broad Street, Marina, Lagos.) Position: System Engineer II - (Commissioning, Installation & Maintenance of Optic fiber) Responsibilities Includes (but not limited to):  Maintenance of Multilinks-Telkom and Huawei/MTNN FOB network in S/West Nigeria  Maintain site documentation on Fibre optic links, equipment and network layout.  Provide project support to implementation on projects execution.  Supervise civil works (Excavation of trenches, Construction of Manhole and joint box) preparatory to cable installation.  Supervise the upgrade and expansion of both OFC and ELP networks.  Training and support of internal/external personnel on fiber optics technology PROJECTS: 1. Re-installation of 10km OFC backbone Multilinks – MTN Nigeria Interconnectivity Dugbe Zone Project Duration: (2 months) May, 2010. 2. Installation of fresh 20km OFC on Ibadan – Ikire segment Multilinks – Telkom Backbone Link Project Duration: (1 months) Nov., 2009. 3. DWDM interconnectivity: Lagos – Ibadan Multilinks – Telkom EVDO High data Link Project Duration: (3months) Aug., 2009. 4. Expansion of the FOB along Shagamu – Ibadan Segment Multilinks – Telkom: External Line Plant (ELP) Project Duration: (6months) Apr., 2009. 5. Installation and testing of OFC inter-shelter at Ibadan switch MTN Nigeria Interconnectivity Project duration: (2 months) Dec., 2008. Nov., 2002 – April, 2005 (1 Year) Automobile Workshop (Bodija Ibadan), Engineering Section (Ministry of Works and Transport Secretariat Ibadan Oyo State) and Gabimo holding Company (CMD Road Ketu Lagos, Nigeria) Position: Industrial trainee Engineer Responsibilities Includes (but not limited to):  Repair and maintenance of automobile.  Repair and maintenance of air conditioning.  Repair and maintenance of generating set.  Installation and commissioning of heavy duty generating get. INTERESTS Teaching, Driving, Traveling, Football, Watching television. REFERENCES Dr. T.A.O Salau Senior Lecture Phone number:+234 8028644815 Mechanical Engineering Department Email: tao.salau@mail.ui.edu.ng University of Ibadan, Ibadan, Nigeria Dr. O.S Ismail Senior Lecturer Phone number: +234 8023371570 Mechanical Engineering Department Email: osismail@yahoo.com University of Ibadan, Ibadan, Nigeria