Outline
     Motivation
     Background
     Objectives
     Methodology
     Evaluation Approach
     Boston Case Study
     Next Steps




3
Why TSP?
     A technique to provide priority to public transport services
      through traffic lights
     A means to improve performance of public transportation
      systems at the operational level
     A strategy aiming at reducing travel times and improving bus
      service reliability
     When properly designed for BRTs it can complement their
      other features such as exclusive bus lanes, off-vehicle fare
      collection, all-door boarding, etc., and potentially contribute
      to improved system performance

4
Types of Priority
     Unconditional – priority is always provided
     Conditional – priority is provided only when certain
      conditions are met (schedule adherence, vehicle load, etc.)

     TSP Actions
     With traditional signal controllers, the actions that can be used
     when a vehicle is detected are:
      Extension of the current green interval
      Early start of the green interval
      Skipping a phase
      Inserting an extra phase
5
Previous Studies in TSP
     The majority of studies in TSP are through simulation experiments
     It has been found that it can accomplish travel time reductions of
      0-42% (Chang et al, 1995)
     But, as the buses benefit from this, cross-traffic and traffic light
      synchronization can be negatively affected
     Studies have shown that providing priority to all buses can
      significantly affect the overall traffic, therefore, providing priority
      to express routes -or select buses conditionally- could result in higher
      benefits (Dion and Rakha, 2005)
     Studies indicate that it may work well in arterial intersections in
      urban areas if properly planned and designed

6
Background Research
     Work to date has focused mainly on conventional bus
      systems; the study of TSP for BRT corridors is limited
       A recent simulation study of schedule-based TSP for a BRT
        line in Beijing
       Another study of TSP using speed guidance and advanced
        detection for a BRT line in Yingtan City
     But BRT corridors present a number of challenges and
      operating characteristics, which are different from
      conventional corridors and are worth considering (high
      frequencies of service, great levels of demand, etc.)

7
Research Objectives
    The objective of the proposed research activity is to study how
    TSP can benefit BRT systems and can best be incorporated into
    their operations both in the U.S. and in developing countries.
    The main tasks include the following:
     review literature and experience with TSP with both
      conventional and BRT systems, and document the main
      conclusions and lessons learned;
     determine how TSP can best be implemented in BRT
      corridors with different characteristics in terms of demand
      levels, frequency of service, etc.;
     evaluate TSP strategies that consider different conditions
      (schedule, headways, loading, etc.) in a BRT context; and
     develop guidelines for implementation of signal priority
      strategies in BRT corridors, based on their characteristics.
8
Data Sources
     Automated Passenger Counting Records (APC)
     Automatic Vehicle Location Records (AVL)
     Signal Timing Plans
     Traffic count studies/O-D Matrix from Planning Model
     Vehicle Specifications




9
Data Preparation
      Traffic Data
        Road network – coded or from a geographic file
        Traffic Flows – turning movements inputted from traffic counts
         or O/D matrix generated with Cube Analyst
        Signal Timing Plans




10
Data Preparation
      Transit Data
        Transit Routes delineated with defined route physical stop
        Average Departing headways and standard deviation calculated
         from AVL Records
        Average Arrival rates and Alighting Percentages per stop
         calculated from APC Records
        Vehicle type defined with capacity and dwell time parameters
        Average Initial load calculated for the segment of the route to
         be simulated, if necessary




11
Dwell Time Model
      Passengers are not really modeled in the simulation, but rather
       their effect on dwell times, which will be a function of the number
       of passenger boardings and alightings, using parameters that
       account for crowding and boarding and alighting times per
       passenger.
      Dwell time model:
        T=ɣ + αA + βB if there is no crowding
        T=ɣ + αA + βB’’ + (β +CF) B’’’ if there is crowding
      These parameters are defined by vehicle class to define the dead
       time component and the service time component of the dwell
       time. Therefore, the vehicle class will have a defined seating
       capacity, total capacity, dead time, alighting time, boarding time,
       and crowding factor.

12
Actions Evaluated
      Green Extension




      Red Truncation




      Phase Skipping (only if it is not a major cross-street)
13
Conditional Priorities Evaluated
      Schedule deviation (a bus must be running late) on all
       intersections
         -Headway limitation: 2 cycles & Lateness Treshold: 1min
      Combined schedule deviation and minimum passenger load on all
       intersections (a bus must be late and have the requisite number of
       passengers to be eligible for priority)
      Schedule deviation on all intersections with the minimum
       passenger load constraint only on critical intersections (cross-
       streets with high volumes or high-frequency bus routes)
      Schedule deviation on all intersections except on critical
       intersections (no priority will be provided in cross-streets with
       high volumes or high-frequency bus routes)

     *Will be evaluated in current conditions and other projections
14
Evaluation Metrics
      Impact on average and variability of bus travel times
      Impact on average bus speeds
      Impact on general traffic speed
      Headway variability
      Intersection delays
      Crowding
      Vehicle Emissions (in the long run)




15
The cities
      Case Studies
        Boston
          Silver Line 5 – Washington Street
             Limited bus-only lanes, 6 min headways during peaks, +15,000 weekday
               boardings
        Minneapolis
          Route 10 – Central Avenue
             Limited bus-only lanes, 12 min headways during peaks, +7,300 weekday
               boardings
        Santiago
          Routes 204 and 204 e – Carmen Avenue
             Limited bus-only lanes, 4 min headways during peaks ,+15,000 weekday
               boardings
             Many assumptions were made (fleet, frequencies, lanes, etc)


16
Boston
     • Silver Line 5 - Washington Street




17
Boston Case Study – SL5
      Applied Conditional TSP (schedule-based) at “major” signalized
       intersections:
          Melnea Cass Boulevard
          Mass Ave – outbound
          East Berkeley St.
          Herald St.
      Operating Scheme:
        Bus computer sends location to MBTA’s Bus Control Center
        Bus Control Center checks if it is behind schedule and sends signal to
         hardware in kiosk on the side of the intersection
        Hardware in kiosk sends contact closure signal to the intersection
         signal controller which passes the signal to the BTD computer system
        BTD decides to grant priority (green extension or early green)

18
Boston Case Study – SL5
      OTP Without TSP




19
Boston Case Study – SL5
      OTP with TSP




20
Next Steps
      Finish gathering then inputs for the corridors
      Evaluate the effects of the different strategies on each
       corridor
      Project the scenarios to higher levels of demand and
       frequency (and visualize the effects of having more than one
       request per cycle)
      Generate conclusions depending on corridor characteristics




21
Thank you!
Questions? Suggestions?

More Related Content

PPTX
MetroRapid Transit Signal Priority—Using Technology to Improve Service Quality
PPTX
Transit Signal Priority
 
PPTX
Calibration and Validation of Micro-Simulation Models
 
PPTX
Transit Signalisation Priority (TSP) - A New Approach to Calculate Gains
 
PPTX
Updated Traffic Analysis Tools for Complete Streets
 
PPTX
Traffic Conditions - From Now Until Forever
 
PDF
Transit Signal Priority System - All you need to know about
PDF
Transit Signal Priority
MetroRapid Transit Signal Priority—Using Technology to Improve Service Quality
Transit Signal Priority
 
Calibration and Validation of Micro-Simulation Models
 
Transit Signalisation Priority (TSP) - A New Approach to Calculate Gains
 
Updated Traffic Analysis Tools for Complete Streets
 
Traffic Conditions - From Now Until Forever
 
Transit Signal Priority System - All you need to know about
Transit Signal Priority

What's hot (20)

PPT
KAI - Arterial Performance Measures 02-03-10
PPT
Transperth buses its 28102014 (final)
PDF
Ieeepro techno solutions 2013 ieee embedded project person-based traffic re...
PPTX
Transportation planning 1
PPTX
Traffic studies volume study
PPTX
Session 38 Oded Cats
PDF
Traffic Access and Impact Study Guidelines & Procedures
PPTX
Presentation on Spot Speed Study Analysis for the course CE 454
PPT
2010 APTA Rail Conference: MetroRail Successful Launch and Lessons Learned
PPTX
ITS presentation final
PDF
Spot speed study, transport planning
PPTX
Traffic & transportation – ii
PPTX
Disruptions on Road Networks: Impact on traffic characteristics
DOCX
Traffic Speed Analysis
PPTX
GreenSwirl: Combining Traffic Signal Control and Route Guidance for Reducing ...
PDF
Spot speed studies and speed delay time survey
PPT
Planning of a field operational test on navigation systems: Implementation an...
PDF
05 Traffic Data Collection (Traffic Engineering هندسة المرور & Prof. Saad AlG...
PDF
Measurement of spot speed
KAI - Arterial Performance Measures 02-03-10
Transperth buses its 28102014 (final)
Ieeepro techno solutions 2013 ieee embedded project person-based traffic re...
Transportation planning 1
Traffic studies volume study
Session 38 Oded Cats
Traffic Access and Impact Study Guidelines & Procedures
Presentation on Spot Speed Study Analysis for the course CE 454
2010 APTA Rail Conference: MetroRail Successful Launch and Lessons Learned
ITS presentation final
Spot speed study, transport planning
Traffic & transportation – ii
Disruptions on Road Networks: Impact on traffic characteristics
Traffic Speed Analysis
GreenSwirl: Combining Traffic Signal Control and Route Guidance for Reducing ...
Spot speed studies and speed delay time survey
Planning of a field operational test on navigation systems: Implementation an...
05 Traffic Data Collection (Traffic Engineering هندسة المرور & Prof. Saad AlG...
Measurement of spot speed
Ad

Similar to LO5: Simulation of transit signal priority strategies for brt operations (20)

PPTX
Presentation1 (1).pptx
PPTX
Robust Sensing and Analytics in Urban Environment
PDF
MasterThesis_MarcMartinezGomez
PPTX
Deven Barth Urban Transport Term Project.pptx
PPTX
Poska_PTV_UGM_2013_BRT Stn Configs and TSP using ASC3 093013
PPTX
Transit Signal Priority: When to use this Strategy (Full Description)?
PDF
Webinar: Using smart card and GPS data for policy and planning: the case of T...
PDF
IRJET- Intelligent Traffic Management System
PPTX
ESCC2018, Mykonos, Greece, June 4-8, 2018, presentation by Rizopoulos D, Saha...
PPTX
4 Major Active Traffic Signal Priority Systems.pptx
PDF
Urban Traffic Estimation & Optimization: An Overview
PDF
Theme 4 Flexible capacity operations
PDF
RTPI 2013 David Hytch
PDF
Webinar: Bus rapid transit system: metro on surface or high performance bus s...
PDF
LT4: A comparison of ridership response to incremental BRT upgrades consideri...
PPTX
Timetable synchronization
PDF
TSP for Public Transport & Buses
PPTX
COTA NE AA Public Meeting Presentation
PDF
Public Transport _Project1_Presentation .pdf
PPTX
ThesisPresentation
Presentation1 (1).pptx
Robust Sensing and Analytics in Urban Environment
MasterThesis_MarcMartinezGomez
Deven Barth Urban Transport Term Project.pptx
Poska_PTV_UGM_2013_BRT Stn Configs and TSP using ASC3 093013
Transit Signal Priority: When to use this Strategy (Full Description)?
Webinar: Using smart card and GPS data for policy and planning: the case of T...
IRJET- Intelligent Traffic Management System
ESCC2018, Mykonos, Greece, June 4-8, 2018, presentation by Rizopoulos D, Saha...
4 Major Active Traffic Signal Priority Systems.pptx
Urban Traffic Estimation & Optimization: An Overview
Theme 4 Flexible capacity operations
RTPI 2013 David Hytch
Webinar: Bus rapid transit system: metro on surface or high performance bus s...
LT4: A comparison of ridership response to incremental BRT upgrades consideri...
Timetable synchronization
TSP for Public Transport & Buses
COTA NE AA Public Meeting Presentation
Public Transport _Project1_Presentation .pdf
ThesisPresentation
Ad

More from BRTCoE (20)

PDF
BRT+ Workshop
PDF
MaaS Trial in Sydney
PDF
Full cost reliability by Juan Carlos Muñoz
PPTX
Congreso nacional chileno 2019 DITL
PDF
Gabriel Oliveira - BRT in Brazil: state of the practice as from the BRT Stand...
PDF
Heather Allen - Why do we need to consider how women move in urban transport ...
PPTX
Workshop Innovation in Africa - Manifesto for BRT Lite
PPTX
Workshop Innovation in Africa - BRT Lessons from Nigeria by Dr. Dayo Mobereola
PPTX
Workshop Innovation in Africa - Context, challenges & opportunities for urban...
PPTX
Workshop Innovation in Africa - Mobilize
PPTX
Workshop Innovation in Africa - Day one of operations by Cristina Albuquerque
PPTX
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
PPTX
Workshop Innovation in Africa - BRT, Minibus System and Innovation in African...
PPTX
Workshop Innovation in Africa - BRT in South Africa by Christo Venter
PPTX
Workshop Innovation in Africa - BRT+ Centre of Excellence Presentation
PPTX
Camila Balbontin - Do preferences for BRT and LRT change as a voter, citizen,...
PPTX
Cristian Navas - Testing collaborative accessibility-based engagement tools: ...
PPTX
Juan Carlos Muñoz - Connected and automated buses. An opportunity to bring re...
PPTX
BRT Station Design in the Urban Context
PDF
Zhao emotional travel 20160920 p
BRT+ Workshop
MaaS Trial in Sydney
Full cost reliability by Juan Carlos Muñoz
Congreso nacional chileno 2019 DITL
Gabriel Oliveira - BRT in Brazil: state of the practice as from the BRT Stand...
Heather Allen - Why do we need to consider how women move in urban transport ...
Workshop Innovation in Africa - Manifesto for BRT Lite
Workshop Innovation in Africa - BRT Lessons from Nigeria by Dr. Dayo Mobereola
Workshop Innovation in Africa - Context, challenges & opportunities for urban...
Workshop Innovation in Africa - Mobilize
Workshop Innovation in Africa - Day one of operations by Cristina Albuquerque
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
Workshop Innovation in Africa - BRT, Minibus System and Innovation in African...
Workshop Innovation in Africa - BRT in South Africa by Christo Venter
Workshop Innovation in Africa - BRT+ Centre of Excellence Presentation
Camila Balbontin - Do preferences for BRT and LRT change as a voter, citizen,...
Cristian Navas - Testing collaborative accessibility-based engagement tools: ...
Juan Carlos Muñoz - Connected and automated buses. An opportunity to bring re...
BRT Station Design in the Urban Context
Zhao emotional travel 20160920 p

LO5: Simulation of transit signal priority strategies for brt operations

  • 1. Simulation of Transit Signal Priority Strategies for BRT Operations Anna Matías Alemán January 15, 2013
  • 2. Outline  Motivation  Background  Objectives  Methodology  Evaluation Approach  Boston Case Study  Next Steps 3
  • 3. Why TSP?  A technique to provide priority to public transport services through traffic lights  A means to improve performance of public transportation systems at the operational level  A strategy aiming at reducing travel times and improving bus service reliability  When properly designed for BRTs it can complement their other features such as exclusive bus lanes, off-vehicle fare collection, all-door boarding, etc., and potentially contribute to improved system performance 4
  • 4. Types of Priority  Unconditional – priority is always provided  Conditional – priority is provided only when certain conditions are met (schedule adherence, vehicle load, etc.) TSP Actions With traditional signal controllers, the actions that can be used when a vehicle is detected are:  Extension of the current green interval  Early start of the green interval  Skipping a phase  Inserting an extra phase 5
  • 5. Previous Studies in TSP  The majority of studies in TSP are through simulation experiments  It has been found that it can accomplish travel time reductions of 0-42% (Chang et al, 1995)  But, as the buses benefit from this, cross-traffic and traffic light synchronization can be negatively affected  Studies have shown that providing priority to all buses can significantly affect the overall traffic, therefore, providing priority to express routes -or select buses conditionally- could result in higher benefits (Dion and Rakha, 2005)  Studies indicate that it may work well in arterial intersections in urban areas if properly planned and designed 6
  • 6. Background Research  Work to date has focused mainly on conventional bus systems; the study of TSP for BRT corridors is limited  A recent simulation study of schedule-based TSP for a BRT line in Beijing  Another study of TSP using speed guidance and advanced detection for a BRT line in Yingtan City  But BRT corridors present a number of challenges and operating characteristics, which are different from conventional corridors and are worth considering (high frequencies of service, great levels of demand, etc.) 7
  • 7. Research Objectives The objective of the proposed research activity is to study how TSP can benefit BRT systems and can best be incorporated into their operations both in the U.S. and in developing countries. The main tasks include the following:  review literature and experience with TSP with both conventional and BRT systems, and document the main conclusions and lessons learned;  determine how TSP can best be implemented in BRT corridors with different characteristics in terms of demand levels, frequency of service, etc.;  evaluate TSP strategies that consider different conditions (schedule, headways, loading, etc.) in a BRT context; and  develop guidelines for implementation of signal priority strategies in BRT corridors, based on their characteristics. 8
  • 8. Data Sources  Automated Passenger Counting Records (APC)  Automatic Vehicle Location Records (AVL)  Signal Timing Plans  Traffic count studies/O-D Matrix from Planning Model  Vehicle Specifications 9
  • 9. Data Preparation  Traffic Data  Road network – coded or from a geographic file  Traffic Flows – turning movements inputted from traffic counts or O/D matrix generated with Cube Analyst  Signal Timing Plans 10
  • 10. Data Preparation  Transit Data  Transit Routes delineated with defined route physical stop  Average Departing headways and standard deviation calculated from AVL Records  Average Arrival rates and Alighting Percentages per stop calculated from APC Records  Vehicle type defined with capacity and dwell time parameters  Average Initial load calculated for the segment of the route to be simulated, if necessary 11
  • 11. Dwell Time Model  Passengers are not really modeled in the simulation, but rather their effect on dwell times, which will be a function of the number of passenger boardings and alightings, using parameters that account for crowding and boarding and alighting times per passenger.  Dwell time model:  T=ɣ + αA + βB if there is no crowding  T=ɣ + αA + βB’’ + (β +CF) B’’’ if there is crowding  These parameters are defined by vehicle class to define the dead time component and the service time component of the dwell time. Therefore, the vehicle class will have a defined seating capacity, total capacity, dead time, alighting time, boarding time, and crowding factor. 12
  • 12. Actions Evaluated  Green Extension  Red Truncation  Phase Skipping (only if it is not a major cross-street) 13
  • 13. Conditional Priorities Evaluated  Schedule deviation (a bus must be running late) on all intersections  -Headway limitation: 2 cycles & Lateness Treshold: 1min  Combined schedule deviation and minimum passenger load on all intersections (a bus must be late and have the requisite number of passengers to be eligible for priority)  Schedule deviation on all intersections with the minimum passenger load constraint only on critical intersections (cross- streets with high volumes or high-frequency bus routes)  Schedule deviation on all intersections except on critical intersections (no priority will be provided in cross-streets with high volumes or high-frequency bus routes) *Will be evaluated in current conditions and other projections 14
  • 14. Evaluation Metrics  Impact on average and variability of bus travel times  Impact on average bus speeds  Impact on general traffic speed  Headway variability  Intersection delays  Crowding  Vehicle Emissions (in the long run) 15
  • 15. The cities  Case Studies  Boston  Silver Line 5 – Washington Street  Limited bus-only lanes, 6 min headways during peaks, +15,000 weekday boardings  Minneapolis  Route 10 – Central Avenue  Limited bus-only lanes, 12 min headways during peaks, +7,300 weekday boardings  Santiago  Routes 204 and 204 e – Carmen Avenue  Limited bus-only lanes, 4 min headways during peaks ,+15,000 weekday boardings  Many assumptions were made (fleet, frequencies, lanes, etc) 16
  • 16. Boston • Silver Line 5 - Washington Street 17
  • 17. Boston Case Study – SL5  Applied Conditional TSP (schedule-based) at “major” signalized intersections:  Melnea Cass Boulevard  Mass Ave – outbound  East Berkeley St.  Herald St.  Operating Scheme:  Bus computer sends location to MBTA’s Bus Control Center  Bus Control Center checks if it is behind schedule and sends signal to hardware in kiosk on the side of the intersection  Hardware in kiosk sends contact closure signal to the intersection signal controller which passes the signal to the BTD computer system  BTD decides to grant priority (green extension or early green) 18
  • 18. Boston Case Study – SL5  OTP Without TSP 19
  • 19. Boston Case Study – SL5  OTP with TSP 20
  • 20. Next Steps  Finish gathering then inputs for the corridors  Evaluate the effects of the different strategies on each corridor  Project the scenarios to higher levels of demand and frequency (and visualize the effects of having more than one request per cycle)  Generate conclusions depending on corridor characteristics 21