• Essam Lotfi is ELV Projects Manager, Abu Dhabi, UAE, BSc. in
Electrical Engineering, Power Distribution through Zagazig
University, Egypt since 2001. Pursued and achieved his
certificates in Project Management (PMP®) from PMI-USA
since 2013, and certificate in Cost Management (CCP®) from
AACE International since june-2014.
• 16 years extensive hands on experience in various aspects of
projects and project management within maintenance, power
distribution networks monitoring and supervision and
construction projects as well.
• Authored, Co-Authored at PMWorld Library, PWLJ.
• Volunteered at PMI-Global Congress EMEA-2014 – Dubai, 5th
to 8th May 2014.
• Technical presentation at PMI-AGC 15th International
conference –Bahrain 19th to 21st January 2015.
• Technical presentation at 54th AACEi-SF Bay Annual Western
Winter Workshop, Lake Tahoe, Nevada, USA
• Technical presentation 55th AACEi-SF Bay Annual
Western Winter Workshop, Indian Wells, CA, USA
• Technical presentation 56th AACEi-SF Bay Annual
Western Winter Workshop, Indian Wells, CA, USA
• Independent Project Management and cost
engineering/Control Instructor.
Essam,Biography
3
Course
Objectives
• Understand the importance
of Project Management
• Understand the Project
management framework
defined by PMI
• Learn what are Project
Management Processes,
Process Groups and
Knowledge Areas which help
Project Managers
Ground Rules
We agree to:
• Respect others by:
– Actively listen to others
– Turning off electronic
devices
– Putting cell phones on
silent mode
– Promoting positive
feedback
– Watching your timing
4
Course Outlines
Project Management Framework
• What’s Project?
• What’s a Project Management?
• Operations/Projects/Programs/Portfolios
• The Project Management Office
• Progressive Elaboration vs. Scope Creep
• The Triple Constraint
• Ten Knowledge Areas & Five Process Groups.
• Project Life Cycle
What do you
have to know
before starting
your venture
with PMBoK6
PMBoK 6th Vs.
PMBoK 5th
in Numbers
Cited from Dr. Ahmed Al Senosy Publications
Item Description PMBoK 5th PMBoK 6th Difference %age
Total Pages 618 695 77 12.46%
No of Processes 47 49 2 4.26%
1st Sections pages 60 68 8 13.33%
Integration 42 60 18 42.86%
Scope 36 44 8 22.22%
Schedule 52 58 6 11.54%
Cost 34 40 6 17.65%
Quality 28 36 8 28.57%
Resource 35 52 17 48.57%
Communications 22 36 14 63.64%
Risk 46 64 18 39.13%
Procurement 36 44 8 22.22%
Stockholders 22 34 12 54.55%
SECTION 3—THE ROLE OF THE PROJECT MANAGER
This is a new section that outlines the project manager’s role on the team. It
includes information on the project manager’s sphere of influence and
competencies. PMI’s Talent Triangle® is discussed with its emphasis on
strategic and business management skills, technical project management skills,
and leadership skills. Leadership styles and personality are also discussed as
part of this section. The final part of this section focuses on the project manager
as an integrator.
AGILE
The Sixth Edition has included a subsection called Considerations for Adaptive
Environments at the beginning of Sections 4 through 13. Some agile-specific
tools and techniques have been introduced into the PMBOK® Guide, such as
sprint and iteration planning. Appendix X3 describes the use of agile, adaptive,
iterative, and hybrid approaches from the perspective of the Project
Management Process Groups.
KNOWLEDGE AREA FRONT MATERIAL
Key Concepts.
Collects key concepts associated with the specific knowledge area. This
information was presented in earlier editions; in this edition, it is consolidated
and presented for consistency between knowledge areas. These key concepts are
compiled in Appendix X4.
Trends and Emerging Practices.
This subsection identifies some of the trends or emerging practices that are
occurring, but that may not be practiced on most projects.
KNOWLEDGE AREA FRONT MATERIAL
Tailoring Considerations.
The Sixth Edition emphasizes the importance of tailoring all aspects of the
project to meet the needs of the organization, environment, stakeholders and
other variables. This subsection identifies areas the project manager can
consider when tailoring their project. These tailoring considerations are
compiled in Appendix X5.
Considérations for Agile/Adaptive Environnements.
This subsection identifies some of the areas where adaptive approaches may
differ from predictive approaches in the particular Knowledge Area.
KNOWLEDGE AREA AND PROCESS
CHANGES
 Manage Project Knowledge (Section 4.4)—Added.
 Estimate Activity Resources (Section 6.4)—Moved to Project Resource
Management.
 Control Resources (Section 9.6)—Added.
 Implement Risk Responses (Section 11.6)—Added.
 Close Procurements (Section 12.4)—Eliminated.
KNOWLEDGE AREA AND PROCESS
CHANGES
 Perform Quality Assurance (Section 8.2)—Changed to Manage Quality.
 Plan Human Resource Management (Section 9.1)—Changed to Plan
Resource Management.
 Acquire Project Team (Section 9.2)—Changed to Acquire Resources.
 Develop Project Team (Section 9.3)—Changed to Develop Team.
 Manage Project Team (Section 9.4)—Changed to Manage Team.
 Control Communications (Section 10.3)—Changed to Monitor
Communications
 Control Risks (Section 11.6)—Changed to Monitor Risks.
 Plan Stakeholder Management (Section 13.2)—Changed to Plan
Stakeholder Engagement.
 Control Stakeholder Engagement (Section 13.4)—Changed to Monitor
Stakeholder Engagement.
Is Project
management
new?
It has been used
for hundreds of
years.
The Great Pyramid at Giza was the greatest engineering
achievement since the dawn of ‘time. Completed around
2750BC. Ancient pharaohs had managed Scope,
Materials, Budget, and workmanship to create
deliverables on time.
History of Project
Management
Scope; the scope had been defined to One massive monument to be constructed
as a tomb with a square base and four triangular sides. The scope was decreased
to create the actual foundation into a quarry. Site preparation, Construction and
ramp removals were the core element of the scope that was being used to create
a work breakdown, to define the activities.
Time; A clear relation and sequence between the activities were defined and
used to develop the time schedule of completing the project works and deliver
the final product of the project.
Cost; The pyramids were built by thousands craftsmen and labors, paid with
food, clothes and tax breaks.
“Hemienue understood the three aspects of Scope, Time and Cost and
managed this to great effect”
History of Project Management
Quality; Quality was paramount in site preparation, in insuring a firm and flat
base. An imperfect level base out by even centimeter would mean meters at the
top. The Egyptians built with incredible accuracy and precision even by today’s
standards. The pyramid’s 4 sides are perpendicular to 58 millimeters over 230
meters in length
Human Resource; Craftsmen treated well, they had excellent medical care, and
a rich meat diet of the middle classes.
Communication; Vertical (Top-Down Communications) representing the
hierarchy.
Risk; The main source of risks was the workforce risks due to high quantities of
moved materials with simple equipments. Risks were monitored
History of Project Management
Procurement; The project supply-chain carried millions of tons of materials thousands
of kilometers. The supply-chain had to work in lockstep with the project schedule. The
delivery of copper and timbers was schedule showstoppers. Also the delivery of food to
project workforce was considered.
Stakeholder; All the entities that affected or being affected by the project and its
outcome were identified and communicate.
Integrated all the above; they had created a clear charter with completion date of the
project.
The Job of constructing the pyramids followed a method, with phase, requirements
design & Constrains. The stakeholders depended on communication, problem solving &
decision making. They combined team efforts into a singular output. Project
management has always been there, it did not just appear in the 20th century.
History of Project Management
That’s it?!!!
Obviously
No….
Let’s go with the following game…..
How customer explained it
How project leader understood it
How analyst designed it
How the programmer wrote it
How business consultant explained it
How the project was documented
What operations installed
How the customer was billed
How it was supported
What the customer really needed
What percentage of overall projects
succeed
• As per the study conducted by Standish Group, only
– 32 % of the projects succeed
– 44 % of the projects are either late, over budget or do
not deliver all the features
– 24% of the projects never finish or are cancelled
Why projects fail?
• Failure to align project with organizational
objectives
• Poor scope
• Unrealistic expectations
• Lack of executive sponsorship
• Lack of project management
• Inability to move beyond individual and personality
conflicts
• Politics
How projects succeed?
• Project Sponsorship at executive level
• Good project charter
• Strong project management
• The right mix of team players
• Good decision making structure
• Good communication
• Team members are working toward common goals
Why this matters to you?
• Most of us possess some technical or specific set of
skills
• If you want to get things done, you need a good
blend of
– Business knowledge
– People management
– Knowledge of organizational politics
– AND an area of technical expertise
Project Managers Role
• Leadership
• Organization
• Communication
• Finance
• Technical Knowledge
• Team building
• Praising
• Punishing
• Integrator
Take Rest & Sneak to
PMI…..
PMI Credentials Family
Certified
Associate in
Project
Management
Project
Management
Professional
Program
Management
Professional
PMI Risk
Management
Professional
PMI Agile
Certified
Practitioner
Designation CAPM® PMP® PgMP® PMI-RMP® PMI-ACP®
Target
Audience
Project Team
Members
Project
Managers who
Lead and Direct
Project Teams
Project
Managers who
Lead and Direct
Multiple
Projects on an
Organization-
Wide Basis
Project
Managers or
Team Members
who Assess and
Identify Risks,
Minimize
Threats, and
Maximize
Opportunities
Project
Managers
and Team
Members
who Work in
or Must
Transition to
an Agile
Environment
PMI Credential Process Flow
Ready, Steady, GO………
Project Management
Framework
What is Project?
Idea / Vision
PROJECT
Reality
Making Something Different / Unique
What is Project?
Project is a Temporary endeavor undertaken to create a unique
product, service or result, and has the following characteristics:
•Definite beginning and a definite end.
•Does not mean short duration.
•Produces a product or artifact, quantifiable, an end item or a
component item.
•Has a capability to perform a service, such as telesales.
•Has a result, such as research or document.
•Has a capability to make improvement in an existing product or
service.
Project Drives change
Project Initiation Context
Meet Regulatory, legal,
or social requirements
Satisfy stakeholder
requests or needs
Create, improve, or fix
products, services or
processes
Implement or change
business or
technological strategies
Project Management
• Project Management is the application of information, skills, tools,
and techniques to activities involved with a project in order to meet
project needs.
• It can include:
– developing requirements,
– determining realistic goals,
– managing the triple constraint (Scope, Cost & Time), and
– adapting the various plans as needed to achieve the goals of the
project and stakeholders.
• Project management can start with selection of the suitable
processes associated with completing the work of the project.
• In addition, it can involve using an established methodology to
align project and product requirements with the product
specifications.
PMBoK6Ed.lect1.introduction
Project Management Life Cycle
What you do to MANAGE the project
Planning Process
Group
Executing Process
Group
Monitoring & Controlling
Process Group
Initiating Process
Group
Closing Process
Group
I
P
EM&C
C
Project Life Cycle
Projects vary in size and complexity. All
projects can be mapped to the following
generic life cycle structure:
• Starting the project
• Organizing and preparing
• Carrying out the project work
• Closing the project
Starting the Project
Organizing and
Preparing
Carrying out the
Work
Ending the Project
PROJECT AND DEVELOPMENT LIFE CYCLES
10
Knowledge
Areas
Initiating
Processes
Planning
Processes
Executing
Processes
Monitoring &
Controlling
Processes
Closing
Processes
Project Life Cycle
Project Management Process for a large project
Research Design TestCode Transition
I P
E
M&C
C
I P
E
M&C
C
I P
E
M&C
C
I P
E
M&C
C
I P
E
M&C
C
Project Life Cycle
Project Management process for a small project
Research Design TestCode Transition
I P
E
M&C
C
Progressive Elaboration
• It means to work on a project for which you might not know all the details.
You plan based on what you know.
• You begin the work while learning about (and planning) the future details
of the unknown work. As you learn more about the work of the project,
the plan progresses, becoming more elaborate.
• Typically, you start out in small steps and make multiple increments in the
Planning and Executing of the project as work is completed.
Project
A Project:
• Has a specific purpose
• Creates specific results
• Has definite start and finish dates
• Is temporary
• Could be progressively elaborated as more is learned about the project details
• could occur as a result of a business opportunity or market need, which could
have a limited time window.
Program and Program
Management and
Project Management Office (PMO)
Project Management Office (PMO)
• It is a management organization with several possible
configurations:
• A centralized area for all project management
personnel to work and be assigned to projects as they
arise
• A centralized area for documentation and process
support for project management throughout the
organization
• A centralized area for project management support
and auditing of projects in the organization
• For a PMO to be successful, project goals must be
clearly defined and backed by strong executive
support.
Project vs. Operations Mgmt.
• Project management deals with the creation of
temporary specific initiatives.
• Operations management deals with the ongoing
repetitive day-to-day activities of running the business.
Triple Constraint
Enhanced Triple Constraint
Take Rest & Ask Your
Questions……..

More Related Content

PDF
Introduction to schedule management
PPT
project planning-estimation
PPT
Project planning-and-control
PPT
Project management
PPT
The Project Management Process - Week 9 Performance Management
PPT
Software Project Management Spm1176
PPT
07. Project Integration Management
PPTX
project management
Introduction to schedule management
project planning-estimation
Project planning-and-control
Project management
The Project Management Process - Week 9 Performance Management
Software Project Management Spm1176
07. Project Integration Management
project management

What's hot (20)

PPSX
Project management
PPT
Project planning and control
PPTX
Project Tracking and Scope Management
PPT
08. Project Time Management Upload
PDF
A brief on project cost management
PPTX
PMP Training - 07 project cost management
PDF
PMBoK V5 changes
PPT
Ch 9 project monitoring & control updated
PPTX
07 projectcostmanagement
PDF
A brief on project time management
PPTX
Project Time Management
PPT
Software Project Management
PPTX
Managingtripleconstraint aam
PPTX
Brief introduction to project management and project management tools
PPTX
Role of project engineering in project management
PPT
Top 3 Challenges in Managing Triple Constraint
PPT
Introduction to Software Project Management
PPTX
Project Cost Management - PMP preparation course
PPTX
Triple Constraints of Projects: Scope, Cost & Schedule
PPTX
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
Project management
Project planning and control
Project Tracking and Scope Management
08. Project Time Management Upload
A brief on project cost management
PMP Training - 07 project cost management
PMBoK V5 changes
Ch 9 project monitoring & control updated
07 projectcostmanagement
A brief on project time management
Project Time Management
Software Project Management
Managingtripleconstraint aam
Brief introduction to project management and project management tools
Role of project engineering in project management
Top 3 Challenges in Managing Triple Constraint
Introduction to Software Project Management
Project Cost Management - PMP preparation course
Triple Constraints of Projects: Scope, Cost & Schedule
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
Ad

Similar to PMBoK6Ed.lect1.introduction (20)

PPT
Ibm projectmgmt-1
PDF
Pmp introduction
PDF
Pmp introduction
PDF
01 02&03 introduction to pmp-mao
PPT
introduction to project management
PPT
01 introduction
PPTX
01 introductiontoframework
PDF
Topic 1 - Introduction of Project Management.pdf
PPTX
project management concepts
PPTX
Fundamentals of Project Management - Basics
PPTX
PM & PM LC.pptx
PPTX
What is a Project Management and how we can create a program in P6
PDF
What is a Project Management and how we can create a program in P6
PDF
Introduction to Project Management by Javid Hamdard
PPTX
Introduction to Project Management - PMP Workgroup
PPTX
An Introduction to Project Management
PPTX
Project Management basics PMBOK 6 (1).pptx
PPTX
PMP Training - 01 introduction to framework
PDF
Essentials of PM 1.pdf
PDF
Pmp study-notes
Ibm projectmgmt-1
Pmp introduction
Pmp introduction
01 02&03 introduction to pmp-mao
introduction to project management
01 introduction
01 introductiontoframework
Topic 1 - Introduction of Project Management.pdf
project management concepts
Fundamentals of Project Management - Basics
PM & PM LC.pptx
What is a Project Management and how we can create a program in P6
What is a Project Management and how we can create a program in P6
Introduction to Project Management by Javid Hamdard
Introduction to Project Management - PMP Workgroup
An Introduction to Project Management
Project Management basics PMBOK 6 (1).pptx
PMP Training - 01 introduction to framework
Essentials of PM 1.pdf
Pmp study-notes
Ad

More from Essam Lotffy, PMP®, CCP® (15)

PPS
Introduction to quality management
PPS
Common contract types
PPSX
Pmp selective process data flow
PPT
Sample cosntructability report Template
PDF
Introduction to cost management & control in construction projects
PDF
Essam lotffy this project is not in line with organizational strategic plans
PDF
Controling productivity in construction projects
PDF
Fidic contracts management introduction
PDF
Failure in construction due to ineffective project management information.final
PDF
Eot claims due to scope change under fidic contracts
PPT
Labor productivity improvement in construction projects using wbs obs integra...
PDF
Failures in construction due to ineffective project management information sy...
PDF
Evm.calculations.Summary sheet
PDF
Effect of organizational unwritten rules on pmo success
PDF
A simple example to calculate net present value and pay back period
Introduction to quality management
Common contract types
Pmp selective process data flow
Sample cosntructability report Template
Introduction to cost management & control in construction projects
Essam lotffy this project is not in line with organizational strategic plans
Controling productivity in construction projects
Fidic contracts management introduction
Failure in construction due to ineffective project management information.final
Eot claims due to scope change under fidic contracts
Labor productivity improvement in construction projects using wbs obs integra...
Failures in construction due to ineffective project management information sy...
Evm.calculations.Summary sheet
Effect of organizational unwritten rules on pmo success
A simple example to calculate net present value and pay back period

Recently uploaded (20)

PDF
Complications of Minimal Access Surgery at WLH
PPTX
Renaissance Architecture: A Journey from Faith to Humanism
PDF
RMMM.pdf make it easy to upload and study
PPTX
Lesson notes of climatology university.
PPTX
human mycosis Human fungal infections are called human mycosis..pptx
PDF
Module 4: Burden of Disease Tutorial Slides S2 2025
PDF
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
PDF
STATICS OF THE RIGID BODIES Hibbelers.pdf
PDF
Computing-Curriculum for Schools in Ghana
PPTX
Microbial diseases, their pathogenesis and prophylaxis
PDF
VCE English Exam - Section C Student Revision Booklet
PDF
Abdominal Access Techniques with Prof. Dr. R K Mishra
PDF
Pre independence Education in Inndia.pdf
PPTX
Introduction_to_Human_Anatomy_and_Physiology_for_B.Pharm.pptx
PDF
Sports Quiz easy sports quiz sports quiz
PDF
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
PDF
Insiders guide to clinical Medicine.pdf
PPTX
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
PDF
Basic Mud Logging Guide for educational purpose
PDF
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
Complications of Minimal Access Surgery at WLH
Renaissance Architecture: A Journey from Faith to Humanism
RMMM.pdf make it easy to upload and study
Lesson notes of climatology university.
human mycosis Human fungal infections are called human mycosis..pptx
Module 4: Burden of Disease Tutorial Slides S2 2025
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
STATICS OF THE RIGID BODIES Hibbelers.pdf
Computing-Curriculum for Schools in Ghana
Microbial diseases, their pathogenesis and prophylaxis
VCE English Exam - Section C Student Revision Booklet
Abdominal Access Techniques with Prof. Dr. R K Mishra
Pre independence Education in Inndia.pdf
Introduction_to_Human_Anatomy_and_Physiology_for_B.Pharm.pptx
Sports Quiz easy sports quiz sports quiz
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
Insiders guide to clinical Medicine.pdf
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
Basic Mud Logging Guide for educational purpose
3rd Neelam Sanjeevareddy Memorial Lecture.pdf

PMBoK6Ed.lect1.introduction

  • 2. 2 • Essam Lotfi is ELV Projects Manager, Abu Dhabi, UAE, BSc. in Electrical Engineering, Power Distribution through Zagazig University, Egypt since 2001. Pursued and achieved his certificates in Project Management (PMP®) from PMI-USA since 2013, and certificate in Cost Management (CCP®) from AACE International since june-2014. • 16 years extensive hands on experience in various aspects of projects and project management within maintenance, power distribution networks monitoring and supervision and construction projects as well. • Authored, Co-Authored at PMWorld Library, PWLJ. • Volunteered at PMI-Global Congress EMEA-2014 – Dubai, 5th to 8th May 2014. • Technical presentation at PMI-AGC 15th International conference –Bahrain 19th to 21st January 2015. • Technical presentation at 54th AACEi-SF Bay Annual Western Winter Workshop, Lake Tahoe, Nevada, USA • Technical presentation 55th AACEi-SF Bay Annual Western Winter Workshop, Indian Wells, CA, USA • Technical presentation 56th AACEi-SF Bay Annual Western Winter Workshop, Indian Wells, CA, USA • Independent Project Management and cost engineering/Control Instructor. Essam,Biography
  • 3. 3 Course Objectives • Understand the importance of Project Management • Understand the Project management framework defined by PMI • Learn what are Project Management Processes, Process Groups and Knowledge Areas which help Project Managers
  • 4. Ground Rules We agree to: • Respect others by: – Actively listen to others – Turning off electronic devices – Putting cell phones on silent mode – Promoting positive feedback – Watching your timing 4
  • 5. Course Outlines Project Management Framework • What’s Project? • What’s a Project Management? • Operations/Projects/Programs/Portfolios • The Project Management Office • Progressive Elaboration vs. Scope Creep • The Triple Constraint • Ten Knowledge Areas & Five Process Groups. • Project Life Cycle
  • 6. What do you have to know before starting your venture with PMBoK6
  • 7. PMBoK 6th Vs. PMBoK 5th in Numbers Cited from Dr. Ahmed Al Senosy Publications
  • 8. Item Description PMBoK 5th PMBoK 6th Difference %age Total Pages 618 695 77 12.46% No of Processes 47 49 2 4.26% 1st Sections pages 60 68 8 13.33% Integration 42 60 18 42.86% Scope 36 44 8 22.22% Schedule 52 58 6 11.54% Cost 34 40 6 17.65% Quality 28 36 8 28.57% Resource 35 52 17 48.57% Communications 22 36 14 63.64% Risk 46 64 18 39.13% Procurement 36 44 8 22.22% Stockholders 22 34 12 54.55%
  • 9. SECTION 3—THE ROLE OF THE PROJECT MANAGER This is a new section that outlines the project manager’s role on the team. It includes information on the project manager’s sphere of influence and competencies. PMI’s Talent Triangle® is discussed with its emphasis on strategic and business management skills, technical project management skills, and leadership skills. Leadership styles and personality are also discussed as part of this section. The final part of this section focuses on the project manager as an integrator. AGILE The Sixth Edition has included a subsection called Considerations for Adaptive Environments at the beginning of Sections 4 through 13. Some agile-specific tools and techniques have been introduced into the PMBOK® Guide, such as sprint and iteration planning. Appendix X3 describes the use of agile, adaptive, iterative, and hybrid approaches from the perspective of the Project Management Process Groups.
  • 10. KNOWLEDGE AREA FRONT MATERIAL Key Concepts. Collects key concepts associated with the specific knowledge area. This information was presented in earlier editions; in this edition, it is consolidated and presented for consistency between knowledge areas. These key concepts are compiled in Appendix X4. Trends and Emerging Practices. This subsection identifies some of the trends or emerging practices that are occurring, but that may not be practiced on most projects.
  • 11. KNOWLEDGE AREA FRONT MATERIAL Tailoring Considerations. The Sixth Edition emphasizes the importance of tailoring all aspects of the project to meet the needs of the organization, environment, stakeholders and other variables. This subsection identifies areas the project manager can consider when tailoring their project. These tailoring considerations are compiled in Appendix X5. Considérations for Agile/Adaptive Environnements. This subsection identifies some of the areas where adaptive approaches may differ from predictive approaches in the particular Knowledge Area.
  • 12. KNOWLEDGE AREA AND PROCESS CHANGES  Manage Project Knowledge (Section 4.4)—Added.  Estimate Activity Resources (Section 6.4)—Moved to Project Resource Management.  Control Resources (Section 9.6)—Added.  Implement Risk Responses (Section 11.6)—Added.  Close Procurements (Section 12.4)—Eliminated.
  • 13. KNOWLEDGE AREA AND PROCESS CHANGES  Perform Quality Assurance (Section 8.2)—Changed to Manage Quality.  Plan Human Resource Management (Section 9.1)—Changed to Plan Resource Management.  Acquire Project Team (Section 9.2)—Changed to Acquire Resources.  Develop Project Team (Section 9.3)—Changed to Develop Team.  Manage Project Team (Section 9.4)—Changed to Manage Team.  Control Communications (Section 10.3)—Changed to Monitor Communications  Control Risks (Section 11.6)—Changed to Monitor Risks.  Plan Stakeholder Management (Section 13.2)—Changed to Plan Stakeholder Engagement.  Control Stakeholder Engagement (Section 13.4)—Changed to Monitor Stakeholder Engagement.
  • 14. Is Project management new? It has been used for hundreds of years.
  • 15. The Great Pyramid at Giza was the greatest engineering achievement since the dawn of ‘time. Completed around 2750BC. Ancient pharaohs had managed Scope, Materials, Budget, and workmanship to create deliverables on time. History of Project Management
  • 16. Scope; the scope had been defined to One massive monument to be constructed as a tomb with a square base and four triangular sides. The scope was decreased to create the actual foundation into a quarry. Site preparation, Construction and ramp removals were the core element of the scope that was being used to create a work breakdown, to define the activities. Time; A clear relation and sequence between the activities were defined and used to develop the time schedule of completing the project works and deliver the final product of the project. Cost; The pyramids were built by thousands craftsmen and labors, paid with food, clothes and tax breaks. “Hemienue understood the three aspects of Scope, Time and Cost and managed this to great effect” History of Project Management
  • 17. Quality; Quality was paramount in site preparation, in insuring a firm and flat base. An imperfect level base out by even centimeter would mean meters at the top. The Egyptians built with incredible accuracy and precision even by today’s standards. The pyramid’s 4 sides are perpendicular to 58 millimeters over 230 meters in length Human Resource; Craftsmen treated well, they had excellent medical care, and a rich meat diet of the middle classes. Communication; Vertical (Top-Down Communications) representing the hierarchy. Risk; The main source of risks was the workforce risks due to high quantities of moved materials with simple equipments. Risks were monitored History of Project Management
  • 18. Procurement; The project supply-chain carried millions of tons of materials thousands of kilometers. The supply-chain had to work in lockstep with the project schedule. The delivery of copper and timbers was schedule showstoppers. Also the delivery of food to project workforce was considered. Stakeholder; All the entities that affected or being affected by the project and its outcome were identified and communicate. Integrated all the above; they had created a clear charter with completion date of the project. The Job of constructing the pyramids followed a method, with phase, requirements design & Constrains. The stakeholders depended on communication, problem solving & decision making. They combined team efforts into a singular output. Project management has always been there, it did not just appear in the 20th century. History of Project Management
  • 19. That’s it?!!! Obviously No…. Let’s go with the following game…..
  • 21. How project leader understood it
  • 23. How the programmer wrote it
  • 24. How business consultant explained it
  • 25. How the project was documented
  • 27. How the customer was billed
  • 28. How it was supported
  • 29. What the customer really needed
  • 30. What percentage of overall projects succeed • As per the study conducted by Standish Group, only – 32 % of the projects succeed – 44 % of the projects are either late, over budget or do not deliver all the features – 24% of the projects never finish or are cancelled
  • 31. Why projects fail? • Failure to align project with organizational objectives • Poor scope • Unrealistic expectations • Lack of executive sponsorship • Lack of project management • Inability to move beyond individual and personality conflicts • Politics
  • 32. How projects succeed? • Project Sponsorship at executive level • Good project charter • Strong project management • The right mix of team players • Good decision making structure • Good communication • Team members are working toward common goals
  • 33. Why this matters to you? • Most of us possess some technical or specific set of skills • If you want to get things done, you need a good blend of – Business knowledge – People management – Knowledge of organizational politics – AND an area of technical expertise
  • 34. Project Managers Role • Leadership • Organization • Communication • Finance • Technical Knowledge • Team building • Praising • Punishing • Integrator
  • 35. Take Rest & Sneak to PMI…..
  • 36. PMI Credentials Family Certified Associate in Project Management Project Management Professional Program Management Professional PMI Risk Management Professional PMI Agile Certified Practitioner Designation CAPM® PMP® PgMP® PMI-RMP® PMI-ACP® Target Audience Project Team Members Project Managers who Lead and Direct Project Teams Project Managers who Lead and Direct Multiple Projects on an Organization- Wide Basis Project Managers or Team Members who Assess and Identify Risks, Minimize Threats, and Maximize Opportunities Project Managers and Team Members who Work in or Must Transition to an Agile Environment
  • 40. What is Project? Idea / Vision PROJECT Reality Making Something Different / Unique
  • 41. What is Project? Project is a Temporary endeavor undertaken to create a unique product, service or result, and has the following characteristics: •Definite beginning and a definite end. •Does not mean short duration. •Produces a product or artifact, quantifiable, an end item or a component item. •Has a capability to perform a service, such as telesales. •Has a result, such as research or document. •Has a capability to make improvement in an existing product or service.
  • 43. Project Initiation Context Meet Regulatory, legal, or social requirements Satisfy stakeholder requests or needs Create, improve, or fix products, services or processes Implement or change business or technological strategies
  • 44. Project Management • Project Management is the application of information, skills, tools, and techniques to activities involved with a project in order to meet project needs. • It can include: – developing requirements, – determining realistic goals, – managing the triple constraint (Scope, Cost & Time), and – adapting the various plans as needed to achieve the goals of the project and stakeholders. • Project management can start with selection of the suitable processes associated with completing the work of the project. • In addition, it can involve using an established methodology to align project and product requirements with the product specifications.
  • 46. Project Management Life Cycle What you do to MANAGE the project Planning Process Group Executing Process Group Monitoring & Controlling Process Group Initiating Process Group Closing Process Group I P EM&C C
  • 47. Project Life Cycle Projects vary in size and complexity. All projects can be mapped to the following generic life cycle structure: • Starting the project • Organizing and preparing • Carrying out the project work • Closing the project
  • 48. Starting the Project Organizing and Preparing Carrying out the Work Ending the Project PROJECT AND DEVELOPMENT LIFE CYCLES 10 Knowledge Areas Initiating Processes Planning Processes Executing Processes Monitoring & Controlling Processes Closing Processes
  • 49. Project Life Cycle Project Management Process for a large project Research Design TestCode Transition I P E M&C C I P E M&C C I P E M&C C I P E M&C C I P E M&C C
  • 50. Project Life Cycle Project Management process for a small project Research Design TestCode Transition I P E M&C C
  • 51. Progressive Elaboration • It means to work on a project for which you might not know all the details. You plan based on what you know. • You begin the work while learning about (and planning) the future details of the unknown work. As you learn more about the work of the project, the plan progresses, becoming more elaborate. • Typically, you start out in small steps and make multiple increments in the Planning and Executing of the project as work is completed.
  • 52. Project A Project: • Has a specific purpose • Creates specific results • Has definite start and finish dates • Is temporary • Could be progressively elaborated as more is learned about the project details • could occur as a result of a business opportunity or market need, which could have a limited time window.
  • 55. Project Management Office (PMO) • It is a management organization with several possible configurations: • A centralized area for all project management personnel to work and be assigned to projects as they arise • A centralized area for documentation and process support for project management throughout the organization • A centralized area for project management support and auditing of projects in the organization • For a PMO to be successful, project goals must be clearly defined and backed by strong executive support.
  • 56. Project vs. Operations Mgmt. • Project management deals with the creation of temporary specific initiatives. • Operations management deals with the ongoing repetitive day-to-day activities of running the business.
  • 59. Take Rest & Ask Your Questions……..