SlideShare a Scribd company logo
reading daTa CenTre /
550 RACK CAPACITY /
UP TO 8KW PER RACK /
3MW POWER AVAILABLE /
24-365 MANNED SECURITY /
HANDS & EYES SUPPORT /
PCI & ISO COMPLIANT /
CARRIER NEUTRAL /
FREE PARKING /
CHALLENGE US /
READING DATA CENTRE AT A GLANCE /




NEW NEXT GENERATION DATA CENTRE: READING /
InTechnology has always invested in leading edge technology and facilities. As one of the UK’s leading Managed
Service Providers, we hold a firm commitment to best-in-class innovation, and we’ve now added a next
generation, industry leading data centre facility to our portfolio.

It’s just one element of our high availability, highly resilient core network and forms part of our multi-million
pound rolling investment programme. As an energy efficient hosting facility, it represents an exciting opportunity
for customers looking to save money quickly and build agility over the long-term.




OUR NEXT GENERATION DATA CENTRE PROPOSITION /
                                                                                                AVAILABLE Q1

  DATA CENTRE SPEC:
  Secure facility with best-of-breed, energy efficient technology.
                                                                                                2012
  ADDRESS:
  Commensus House, Worton Drive, Reading, RG2 OTG.
  LOCATION:
  M4 Junction 11 (1 mile), London Heathrow Airport (30 miles),
  Central London (40 miles), Gatwick Airport (65 miles).
  PARKING:
  Free on-site parking available.
POWER                                                                         FIRE PROTECTION
Up to 3MW of power will be available, with between 1.5 and 8KW per cabinet.   The site will have an inert gas fire suppression system, in addition to a
The facility will also have N+1 backup generation, with an N+N UPS system.    network-monitored fire detection system to enable proactive prevention.


COOLING                                                                       CONNECTIVITY
An ultra efficient ‘Free Air’ cooling system, including cold aisle            Our Reading data centre will be embedded within InTechnology’s highly
containment, will reduce cooling costs and environmental impact.              resillient national network, with additional connectivity available to and
                                                                              from all other major network providers.
SECURITY
Security guards will man the Reading facility 24/365, while CCTV will         CERTIFICATION
monitor our data centre from the site itself, and also in our Harrogate HQ.   The data centre will be engineered for concurrent maintenance, within
Photo ID and access cards will be required as part of a ‘single person’       Tier 3 guidelines. From Q1 2012, the facility will be ISO and PCI compliant.
entry system, while an intruder alarm will be fitted for full reassurance.




   InTechnology will offer a 100% power availability guarantee, made possible through our strategic design and
   extensive infrastructure investment. Up to 8KW of power will always be available per cabinet via redundant feeds.




                                     CHALLENGE US /
                                     Data centre hosting is just one of the value-adding propositions within our managed services portfolio.
                                     To learn more about how our new facility could help you cut cost, build agility and increase productivity
                                     put us to the test and ask for a FREE Spend & Strategy Review.

                                     Call: 0800 983 2522
MIKE HEAPS /                         email: challenge@intechnology.com
DIVISIONAL DIRECTOR /
DATA CENTRES /                       Visit: www.intechnology.com
InTechnology Head Office                            InTechnology Reading                        InTechnology London
Central House                                       Commensus House                             17 St. Helen’s Place
Beckwith Knowle                                     3 – 5 Worton drive                          Bishopsgate
Harrogate                                           reading                                     London
Hg3 1Ug                                             rg2 0Tg                                     eC3a 6dg
Tel: +44 (0)1423 850 000                            Tel: +44 (0)870 777 7778                    Tel: +44 (0)20 30 40 50 00
Fax: +44 (0)1423 850 001                            Fax: +44 (0)870 777 7779                    Fax: +44 (0)20 30 40 50 01

challenge@intechnology.com                          challenge@intechnology.com                  challenge@intechnology.com
www.intechnology.com                                www.intechnology.com                        www.intechnology.com



                      N DR
                 WORTO
                                               READING
                                               DATA              B3033
                                               CENTRE
              WOR
               TON




                                         WO
                                         RT
                   DR




        A33
                                                              AY
                                           ON




                                                         IAL W

                                                                                                How to find us:
                                                    IMPER
                                              DR




                                                                                                exit the M4 at Junction 11.
                                    AY




                                                                                                Take the a33 towards reading.
                                   W
                                  AL
                              RI
                             PE
                             IM




                                                    33
                                                   B30




                                                                                                Follow the a33 for a quarter of a mile, turning
                        A33                                                                     right at the roundabout signposted Worton
                                                                                                grange Business Park onto imperial Way.

                                                                                                Follow imperial Way and take 1st left onto
   M4
                                                                                                Worton drive.
                                       A33
                                                                                                inTechnology data centre is approximately
                                                                         B3270                  half a mile along the road, on the right,
                                                                                                opposite Static Control Components Ltd.

                                                                                 M4             SATNAV ref:
                                  A33
                                                                                                rg2 0Tg




 Network               Data                                                            Data              Unified              Calls          Instant
                                                             IP Telephony
                    Management                                                        Centres            Comms               & Lines         Comms

More Related Content

PDF
SmartExposé Immobilien-Apps
PDF
PPT
An introduction and overview to Software as a Service
PPTX
PaySecure Connect: Introduction to PCI-certified payment routing infrastructure
PPT
Telehealth: InTechnology’s new patient monitoring services for the NHS
PPT
PPTX
SmartExposé Immobilien-Apps
An introduction and overview to Software as a Service
PaySecure Connect: Introduction to PCI-certified payment routing infrastructure
Telehealth: InTechnology’s new patient monitoring services for the NHS

More from InTechnology Managed Services (part of Redcentric) (20)

PPT
Key areas to consider when evaluating a Data Centre
PPT
Delivering services over the N3 Network
PPTX
Disaster Recover : 10 tips for disaster recovery planning
PPT
10 key questions to ask your managed network provider
PPT
Cloud Circle Forum (Cloud State Of Play)
PPTX
Cloud Circle Forum - Changing Landscape - 19 May 2011
PDF
InTechnology - Polycom VoIP Phone Handsets
PDF
Infrastructure-as-a-Service (IaaS)
PDF
PDF
PDF
InSpire Newsletter - Spring 2011
PPTX
Building the Business Case for Cloud Computing deployment
PDF
The business case for Managed IT and Communications
PDF
How will Cloud Computing change the way the world does business?
Key areas to consider when evaluating a Data Centre
Delivering services over the N3 Network
Disaster Recover : 10 tips for disaster recovery planning
10 key questions to ask your managed network provider
Cloud Circle Forum (Cloud State Of Play)
Cloud Circle Forum - Changing Landscape - 19 May 2011
InTechnology - Polycom VoIP Phone Handsets
Infrastructure-as-a-Service (IaaS)
InSpire Newsletter - Spring 2011
Building the Business Case for Cloud Computing deployment
The business case for Managed IT and Communications
How will Cloud Computing change the way the world does business?
Ad

Recently uploaded (20)

PDF
Reach Out and Touch Someone: Haptics and Empathic Computing
PPTX
Understanding_Digital_Forensics_Presentation.pptx
PDF
Advanced methodologies resolving dimensionality complications for autism neur...
PDF
Mobile App Security Testing_ A Comprehensive Guide.pdf
PPTX
Digital-Transformation-Roadmap-for-Companies.pptx
PDF
Encapsulation_ Review paper, used for researhc scholars
PPTX
A Presentation on Artificial Intelligence
PPTX
MYSQL Presentation for SQL database connectivity
PPTX
20250228 LYD VKU AI Blended-Learning.pptx
PPTX
PA Analog/Digital System: The Backbone of Modern Surveillance and Communication
PDF
Agricultural_Statistics_at_a_Glance_2022_0.pdf
PDF
Encapsulation theory and applications.pdf
PDF
Per capita expenditure prediction using model stacking based on satellite ima...
PPTX
VMware vSphere Foundation How to Sell Presentation-Ver1.4-2-14-2024.pptx
PDF
KodekX | Application Modernization Development
PDF
Bridging biosciences and deep learning for revolutionary discoveries: a compr...
PDF
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
PDF
Approach and Philosophy of On baking technology
PPT
Teaching material agriculture food technology
PDF
The Rise and Fall of 3GPP – Time for a Sabbatical?
Reach Out and Touch Someone: Haptics and Empathic Computing
Understanding_Digital_Forensics_Presentation.pptx
Advanced methodologies resolving dimensionality complications for autism neur...
Mobile App Security Testing_ A Comprehensive Guide.pdf
Digital-Transformation-Roadmap-for-Companies.pptx
Encapsulation_ Review paper, used for researhc scholars
A Presentation on Artificial Intelligence
MYSQL Presentation for SQL database connectivity
20250228 LYD VKU AI Blended-Learning.pptx
PA Analog/Digital System: The Backbone of Modern Surveillance and Communication
Agricultural_Statistics_at_a_Glance_2022_0.pdf
Encapsulation theory and applications.pdf
Per capita expenditure prediction using model stacking based on satellite ima...
VMware vSphere Foundation How to Sell Presentation-Ver1.4-2-14-2024.pptx
KodekX | Application Modernization Development
Bridging biosciences and deep learning for revolutionary discoveries: a compr...
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
Approach and Philosophy of On baking technology
Teaching material agriculture food technology
The Rise and Fall of 3GPP – Time for a Sabbatical?
Ad

InTechnology Reading Data Centre

  • 1. reading daTa CenTre / 550 RACK CAPACITY / UP TO 8KW PER RACK / 3MW POWER AVAILABLE / 24-365 MANNED SECURITY / HANDS & EYES SUPPORT / PCI & ISO COMPLIANT / CARRIER NEUTRAL / FREE PARKING / CHALLENGE US /
  • 2. READING DATA CENTRE AT A GLANCE / NEW NEXT GENERATION DATA CENTRE: READING / InTechnology has always invested in leading edge technology and facilities. As one of the UK’s leading Managed Service Providers, we hold a firm commitment to best-in-class innovation, and we’ve now added a next generation, industry leading data centre facility to our portfolio. It’s just one element of our high availability, highly resilient core network and forms part of our multi-million pound rolling investment programme. As an energy efficient hosting facility, it represents an exciting opportunity for customers looking to save money quickly and build agility over the long-term. OUR NEXT GENERATION DATA CENTRE PROPOSITION / AVAILABLE Q1 DATA CENTRE SPEC: Secure facility with best-of-breed, energy efficient technology. 2012 ADDRESS: Commensus House, Worton Drive, Reading, RG2 OTG. LOCATION: M4 Junction 11 (1 mile), London Heathrow Airport (30 miles), Central London (40 miles), Gatwick Airport (65 miles). PARKING: Free on-site parking available.
  • 3. POWER FIRE PROTECTION Up to 3MW of power will be available, with between 1.5 and 8KW per cabinet. The site will have an inert gas fire suppression system, in addition to a The facility will also have N+1 backup generation, with an N+N UPS system. network-monitored fire detection system to enable proactive prevention. COOLING CONNECTIVITY An ultra efficient ‘Free Air’ cooling system, including cold aisle Our Reading data centre will be embedded within InTechnology’s highly containment, will reduce cooling costs and environmental impact. resillient national network, with additional connectivity available to and from all other major network providers. SECURITY Security guards will man the Reading facility 24/365, while CCTV will CERTIFICATION monitor our data centre from the site itself, and also in our Harrogate HQ. The data centre will be engineered for concurrent maintenance, within Photo ID and access cards will be required as part of a ‘single person’ Tier 3 guidelines. From Q1 2012, the facility will be ISO and PCI compliant. entry system, while an intruder alarm will be fitted for full reassurance. InTechnology will offer a 100% power availability guarantee, made possible through our strategic design and extensive infrastructure investment. Up to 8KW of power will always be available per cabinet via redundant feeds. CHALLENGE US / Data centre hosting is just one of the value-adding propositions within our managed services portfolio. To learn more about how our new facility could help you cut cost, build agility and increase productivity put us to the test and ask for a FREE Spend & Strategy Review. Call: 0800 983 2522 MIKE HEAPS / email: challenge@intechnology.com DIVISIONAL DIRECTOR / DATA CENTRES / Visit: www.intechnology.com
  • 4. InTechnology Head Office InTechnology Reading InTechnology London Central House Commensus House 17 St. Helen’s Place Beckwith Knowle 3 – 5 Worton drive Bishopsgate Harrogate reading London Hg3 1Ug rg2 0Tg eC3a 6dg Tel: +44 (0)1423 850 000 Tel: +44 (0)870 777 7778 Tel: +44 (0)20 30 40 50 00 Fax: +44 (0)1423 850 001 Fax: +44 (0)870 777 7779 Fax: +44 (0)20 30 40 50 01 challenge@intechnology.com challenge@intechnology.com challenge@intechnology.com www.intechnology.com www.intechnology.com www.intechnology.com N DR WORTO READING DATA B3033 CENTRE WOR TON WO RT DR A33 AY ON IAL W How to find us: IMPER DR exit the M4 at Junction 11. AY Take the a33 towards reading. W AL RI PE IM 33 B30 Follow the a33 for a quarter of a mile, turning A33 right at the roundabout signposted Worton grange Business Park onto imperial Way. Follow imperial Way and take 1st left onto M4 Worton drive. A33 inTechnology data centre is approximately B3270 half a mile along the road, on the right, opposite Static Control Components Ltd. M4 SATNAV ref: A33 rg2 0Tg Network Data Data Unified Calls Instant IP Telephony Management Centres Comms & Lines Comms