Marion Environmental, Inc. (Three Major Projects)
• Construct a strapping chart for a jet fuel tank at an air force base
o Required to calculate the volume of a 20,000 gallon for every 1/16th
of an inch
o Involved researching existing construction plans, taking physical measurements,
producing three dimensional figures, performing calculus, and tabulating in Excel
• Dig and haul project after gasoline spill in Chattanooga, Tennessee and after diesel
spill in Oxford, Alabama
o Directed operators where to excavate, collected conformation soil samples, and
designed final figures of excavated area
o Calculated stock pile volumes and weights of contaminated material (Within 3%
in Oxford, Chattanooga Jury is still out)
Senior Design Project (Two Major Projects)
• Design a brine extraction well and associated structures near Carlsbad, New Mexico
after the moratorium (due to multiple catastrophic collapses) was lifted in the area:
o Responsible for analyzing subsurface lithology through the interpretation of
multiple geophysical logs, constructing cross-sections and other applicable
figures, and performed extensive calculations (pressure, volume, budget,
logistics, etc.) for the construction process, as well as life span of the well
• Phase I Environmental Assessment of a leaking underground storage tank:
o Project consisted of analyzing contamination levels in multiple monitoring wells to
delineate and calculate the volume of the contamination plume
Subsurface Site Characterization (Three Major Projects)
• Individual project involving the completion of boring description logs from a number
of boreholes at a site subject to contamination from a leaking underground pipe
• Individual project assessing potential for halite dissolution that involved the analysis
of geophysical logs from 78 wells near the Texas-New Mexico border
• Group project (Group Leader) that required the production of a conceptual model of
pesticide contamination of groundwater and surface water at the University of
Mississippi Field Station. As group leader, Paul Robinson, administered and
organized design project responsibilities to five other undergraduate engineering
students
Field Geology – Rapid City, South Dakota (Five Major Projects)
• Construction of two stratagraphic columns and a correlation of four stratagraphic
columns
• Geologic mapping of sedimentary lithologies near Lakota Peak in South Dakota
• Geologic mapping of Precambrian metamorphic rocks to determine the source
location and migration path of a contamination plume in the town of Nemo, South
Dakota
• Geologic mapping of igneous rocks and calculating the volume of a drainage basin
in order to determine if the site was suitable for the placement of an earthened dam
*All projects involved extensive research, calculations, writing a technical report, and advanced computer programs
(i.e. – Excel, Adobe Illustrator, AutoCAD, GIS, etc.)*
• Determine the geologic stability of a road cut using RockFall software
*All projects involved extensive research, calculations, writing a technical report, and advanced computer programs
(i.e. – Excel, Adobe Illustrator, AutoCAD, GIS, etc.)*

More Related Content

PDF
RAB NASA Update
PPTX
Introduction of three nuclear techniques integrated in order to strengthen i...
PDF
Contributions of Satellite Images in the Diachronic Study of the Stanley-Pool...
PPTX
Biondic n zrnovnica
PPT
Fluvial Sedementation from Mt. Rainier
PPTX
Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015
PPTX
A Fresh Look at Marine Magnetic Anomalies, One of the Key Datasets in the Dev...
PDF
Moffett RAB Site 25 Update
RAB NASA Update
Introduction of three nuclear techniques integrated in order to strengthen i...
Contributions of Satellite Images in the Diachronic Study of the Stanley-Pool...
Biondic n zrnovnica
Fluvial Sedementation from Mt. Rainier
Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015
A Fresh Look at Marine Magnetic Anomalies, One of the Key Datasets in the Dev...
Moffett RAB Site 25 Update

What's hot (20)

PDF
Espino et al. 1995
PPT
PALEOMAP Project Update by Christopher R. Scotese: 2013/Third Annual PaleoGIS...
PPT
The Costs and Benefits of Dam Removal in the Klamath
PPTX
Presentation of GIS Works by Adil Latif
PDF
Professional Geologist Work Experience
PDF
DSD-INT 2016 Effects of Extraction and Open Pit Mining on Rode Beek Saeffele...
PDF
Petroleum Site 14 Update
PDF
Delineation of Hydrocarbon Bearing Reservoirs from Surface Seismic and Well L...
PDF
TRANS-LARA
PDF
Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012
DOC
Karen Edelvang-list of projects
PDF
DSD-INT 2016 Groundwater model Visp - Christe
PDF
Hydrological modelling i5
PDF
Egu talk on EcoHydrology by Brenner et al.
PPT
Gude landfill remediation 161019
PDF
Field lab
PDF
AN INTEGRATED APPROACH TO THE COAL DEPOSITS IN THE MESOHELLENIC TROUGH, GREECE
PPTX
PNG Multi Client Study
PDF
GeoTool_2015_Coastal_Data_Application_BWang_Final
PDF
The Emerging Rogersville Shale Play: Hurry up and Wait
Espino et al. 1995
PALEOMAP Project Update by Christopher R. Scotese: 2013/Third Annual PaleoGIS...
The Costs and Benefits of Dam Removal in the Klamath
Presentation of GIS Works by Adil Latif
Professional Geologist Work Experience
DSD-INT 2016 Effects of Extraction and Open Pit Mining on Rode Beek Saeffele...
Petroleum Site 14 Update
Delineation of Hydrocarbon Bearing Reservoirs from Surface Seismic and Well L...
TRANS-LARA
Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012
Karen Edelvang-list of projects
DSD-INT 2016 Groundwater model Visp - Christe
Hydrological modelling i5
Egu talk on EcoHydrology by Brenner et al.
Gude landfill remediation 161019
Field lab
AN INTEGRATED APPROACH TO THE COAL DEPOSITS IN THE MESOHELLENIC TROUGH, GREECE
PNG Multi Client Study
GeoTool_2015_Coastal_Data_Application_BWang_Final
The Emerging Rogersville Shale Play: Hurry up and Wait
Ad

Similar to Project Summaries (20)

DOCX
blanco resume for civil
PDF
CLARK PE RESUME
DOCX
Experience Summary
PDF
Kate Barnhart Resume
PDF
Bokath Resume
PDF
Wilson_Brad_Master_01072016
DOC
Frank Del 0215
DOC
1. Melissa Fagan 2017 - Geosyntec
PDF
Lindsay Minck 2015
PPTX
August 31 - 1053 - Xinhua Jia
PDF
Tyler Hall - Project Experience
PDF
Resume Part A - Summary 7-19-16
PDF
Resume
DOCX
projects
PPTX
Engineering Power Point
PDF
PDF
Ahmad mousa project list
PDF
Answers to Problems – Geoenvironmental Engineering by Sharma & Reddy
PDF
Answers to Problems – Geoenvironmental Engineering by Sharma & Reddy
blanco resume for civil
CLARK PE RESUME
Experience Summary
Kate Barnhart Resume
Bokath Resume
Wilson_Brad_Master_01072016
Frank Del 0215
1. Melissa Fagan 2017 - Geosyntec
Lindsay Minck 2015
August 31 - 1053 - Xinhua Jia
Tyler Hall - Project Experience
Resume Part A - Summary 7-19-16
Resume
projects
Engineering Power Point
Ahmad mousa project list
Answers to Problems – Geoenvironmental Engineering by Sharma & Reddy
Answers to Problems – Geoenvironmental Engineering by Sharma & Reddy
Ad

Project Summaries

  • 1. Project Summaries Marion Environmental, Inc. (Three Major Projects) • Construct a strapping chart for a jet fuel tank at an air force base o Required to calculate the volume of a 20,000 gallon for every 1/16th of an inch o Involved researching existing construction plans, taking physical measurements, producing three dimensional figures, performing calculus, and tabulating in Excel • Dig and haul project after gasoline spill in Chattanooga, Tennessee and after diesel spill in Oxford, Alabama o Directed operators where to excavate, collected conformation soil samples, and designed final figures of excavated area o Calculated stock pile volumes and weights of contaminated material (Within 3% in Oxford, Chattanooga Jury is still out) Senior Design Project (Two Major Projects) • Design a brine extraction well and associated structures near Carlsbad, New Mexico after the moratorium (due to multiple catastrophic collapses) was lifted in the area: o Responsible for analyzing subsurface lithology through the interpretation of multiple geophysical logs, constructing cross-sections and other applicable figures, and performed extensive calculations (pressure, volume, budget, logistics, etc.) for the construction process, as well as life span of the well • Phase I Environmental Assessment of a leaking underground storage tank: o Project consisted of analyzing contamination levels in multiple monitoring wells to delineate and calculate the volume of the contamination plume Subsurface Site Characterization (Three Major Projects) • Individual project involving the completion of boring description logs from a number of boreholes at a site subject to contamination from a leaking underground pipe • Individual project assessing potential for halite dissolution that involved the analysis of geophysical logs from 78 wells near the Texas-New Mexico border • Group project (Group Leader) that required the production of a conceptual model of pesticide contamination of groundwater and surface water at the University of Mississippi Field Station. As group leader, Paul Robinson, administered and organized design project responsibilities to five other undergraduate engineering students Field Geology – Rapid City, South Dakota (Five Major Projects) • Construction of two stratagraphic columns and a correlation of four stratagraphic columns • Geologic mapping of sedimentary lithologies near Lakota Peak in South Dakota • Geologic mapping of Precambrian metamorphic rocks to determine the source location and migration path of a contamination plume in the town of Nemo, South Dakota • Geologic mapping of igneous rocks and calculating the volume of a drainage basin in order to determine if the site was suitable for the placement of an earthened dam *All projects involved extensive research, calculations, writing a technical report, and advanced computer programs (i.e. – Excel, Adobe Illustrator, AutoCAD, GIS, etc.)*
  • 2. • Determine the geologic stability of a road cut using RockFall software *All projects involved extensive research, calculations, writing a technical report, and advanced computer programs (i.e. – Excel, Adobe Illustrator, AutoCAD, GIS, etc.)*