PROJECTS LIST: Below, I have listed several highlight projects that I was instrumental in the successful
completion thereof. I served in a variety of roles throughout the procurement, design and construction
management.
Reata Wash Flood Control Study, Scottsdale, AZ
I served as the Water Resource Engineer on behalf of ASLD, providing project review and technical
assistance during the project study phase. I provided technical knowledge of existing drainage,
public utilities, mitigation monitoring and permitting requirements. This purpose of this project is to
identify and recommend flood control measures that will reduce flood risks to residents, property and
public infrastructure within the Reata Wash floodplain. Utilized MS Project and Hec-RAS and Hec-
HMS
Construction Cost: N/A
Duration: N/A
Client: ASLD
Title/Role: Water Resource Engineer (ASLD)
Desert Ridge Development, Phoenix, AZ
I served as the Water Resource Engineer for this vacant tract of land located in North Phoenix/North
Scottsdale. This land is a master-planned community comprised of 5,700 acres, currently managed
by ASLD. I provided technical knowledge of existing drainage, public utilities, mitigation monitoring
and permitting requirements. Utilized MS Project and Hec-RAS and Hec-HMS
Construction Cost: N/A
Duration: N/A
Client: ASLD
Title/Role: Water Resource Engineer (ASLD)
Chemehuevi Wastewater Expansion Project, Lake Havasu City, AZ
Recently, I served as the Resident Engineer and Project Manager for a multi-million dollar sanitary
sewer expansion district in Lake Havasu City, Arizona. This required overall project management
and administration, engineering and inspection staff coordination and management, site construction
management and administration, construction pay quantities, resident interaction, federal and state
wage program administration and sanitary sewer testing / permitting through ADEQ. Utilized MS
Project.
Construction Cost: $10.5M
Duration: 365 days
Client: City of Lake Havasu, AZ
Title/Role: Resident Engineer (Atkins Global)
Hankinson Ethanol Plant Site Improvements, Hankinson, ND
A recent assignment provided the opportunity for me to design, assemble and complete plans for the
grading/drainage (Phase I) and the utilities/roadways (Phase II) for a proposed ethanol plant located
in SE North Dakota. The successful plans and subsequent construction management solidified
possibilities that future sites would be granted to MEI. Utilized MS Project and Microstation V8.
Construction Cost: $3.5M
Duration: 185 days
Client: Fagen Engineering, Inc.
Title/Role: Design Engineer / Construction Manager (Municipal Engineering)
PAGE 2
City of Newfolden Wastewater Improvements, Newfolden, MN
I served a Lead Design Engineer and Construction Manager for the total replacement and expansion
of the entire wastewater piping system for the City of Newfolden. This further involved the
replacement of several outdated pumping stations and pressure piping. The pumping system was
with remote SCADA controls for ease of operation and monitoring. Utilized Microstation V8 and MS
Project.
Construction Cost: $1.75M
Duration:185 days
Client: City of Newfolden, MN
Title/Role: Design Engineer / Construction Manager (Floan-Sanders)
City of Warren Wastewater Pump Stations, Warren, MN
The entire wastewater pumping system was replaced, along with the necessary pressure piping
system. All pump stations were equipped with remote SCADA controls and monitoring stations. I
served a lead design engineer and construction manager during the entire construction phase and
startup. Utilized Microstation V8 and MS Project.
Construction Cost: $10.5M
Duration: 365 days
Client: City of Warren, MN
Title/Role: Design Engineer / Construction Manager (Floan-Sanders)
City of Minot Conference Center, Minot, ND
I served as project superintendent for this project, working with the contractor. This was the first
opportunity to work on the construction side of a project, versus the design and engineering side.
This project provided valuable construction experience, working directly with the contractor and
construction team. Utilized MS Project and Microstation V8.
Construction Cost: $4.75M
Duration: 160 days
Client: Minot, ND Park District
Title/Role: Construction Superintendent (Floan-Sanders)
Maricopa County Storm Water Diversion Project, Maricopa County, AZ
I have served as the Design Engineer for numerous public projects that involved environmental
hydrology issues in order to resolve the repeated overflow of a drain way that flowed through an
established residential neighborhood utilizing a series of retention and detention ponds. This was
completed utilizing a storm sewer design program named Hec-RAS as developed by the US Army
Corp of Engineers. We were able to provide the necessary combination of retention and detention for
the given storm water flows to prevent flooding of the downstream floodway or drain way that was in
direct contact with the residential homes. Utilized Hec-RAS, MS Project and AutoCAD throughout
project duration.
Construction Cost: $850K
Duration: 120 days
Client: Maricopa County, AZ
Title/Role: Design Engineer (Civiltec)
PAGE 3
Buckeye Residential Development, Buckeye, AZ
In 2007, a large scale residential land development project provided an excellent opportunity to work
with the design standards and governing agencies of Maricopa County and the State of Arizona. I
served as the Project Manager and Designer for this project, providing many design solutions and
calculations for drainage and storm sewer retention, drainage pipe capacity, sanitary sewer piping,
water main pipe capacity, fire flow coverage, roadway capacity and structural pavement designs.
Utilized MS Project as project management software.
Construction Cost: $8.25M
Duration: 285 days
Client: City of Buckeye, AZ
Title/Role: Design Engineer (Pentacor)
Argyle Wastewater Treatment Plant, Argyle, MN
I served as a design engineer with a team of technical personnel in the design and construction
management of this facility. This facility provided treatment for turbidity, phosphorous removal and
disinfection. The design capacity of the facility was approximately 1.5 Mgpd. Utilized Microstation
V8 for plan design.
Construction Cost: N/A
Duration: 185 days
Client: City of Argyle, MN
Title/Role: Design Engineer (Floan-Sanders)

More Related Content

PDF
Walden Center-Revised 050716
PDF
Linkeden files
DOC
CV-Goutam Sen
PPTX
Ongoing & Suspended Projects as of September 2011
DOCX
SaifMogriResume (2)
PDF
David Beck Resume
DOCX
Derek Dhonau resume
DOC
Jeff Jvancich Resume 2016
Walden Center-Revised 050716
Linkeden files
CV-Goutam Sen
Ongoing & Suspended Projects as of September 2011
SaifMogriResume (2)
David Beck Resume
Derek Dhonau resume
Jeff Jvancich Resume 2016

What's hot (20)

PPTX
Completed projects july 2010 sept 2011
PPTX
Basebuilt Examples
DOCX
PDF
Sunil Kumar Final
PDF
I-635 Specifications
DOCX
MRITYUNJOY_MAJUMDAR-_CV
PDF
M.s. resume 290817
PPT
Presentation-Nilantha
DOCX
Long Resume
PDF
Building Relationships on the Double - Design/Build Mechanical Systems Projects
DOC
Eschenburg Resume 1
PDF
Silicon Valley/San Jose Contractor of the Year Award
PDF
A Better Outcome by Design
PPTX
Linked In Presentation
DOC
AAMIR - PROFILE
PDF
City of Salina-9th Street Curb & Gutter Project
PDF
M.s. resume 150316
DOC
Scott M Tidwell Resume word document 030415
PPT
Completed projects july 2010 sept 2011
Basebuilt Examples
Sunil Kumar Final
I-635 Specifications
MRITYUNJOY_MAJUMDAR-_CV
M.s. resume 290817
Presentation-Nilantha
Long Resume
Building Relationships on the Double - Design/Build Mechanical Systems Projects
Eschenburg Resume 1
Silicon Valley/San Jose Contractor of the Year Award
A Better Outcome by Design
Linked In Presentation
AAMIR - PROFILE
City of Salina-9th Street Curb & Gutter Project
M.s. resume 150316
Scott M Tidwell Resume word document 030415
Ad

Viewers also liked (14)

PDF
V3 sherry stern resume [11316]
PDF
Chris Weipert Resume 2016
DOCX
TREVOR HANKINS Resume 4-19-16
DOC
Merrill resume Word
PDF
Adam Santoro Resume
DOCX
Shane Resume
PDF
Resume_Kylie Stiens
PDF
Resume-Regnier Updated 4-13-16
DOCX
Sherry Mattingly Summer 2016 resume
PDF
Jennifer Kaman Pharmaceutical Resume 12-16
DOCX
Sean Resume #2
DOCX
Patricia A Vamos - 2016 Resume - General
ODT
Nita's Resume #1
DOCX
PJ Lizotte Resume 11.2016
V3 sherry stern resume [11316]
Chris Weipert Resume 2016
TREVOR HANKINS Resume 4-19-16
Merrill resume Word
Adam Santoro Resume
Shane Resume
Resume_Kylie Stiens
Resume-Regnier Updated 4-13-16
Sherry Mattingly Summer 2016 resume
Jennifer Kaman Pharmaceutical Resume 12-16
Sean Resume #2
Patricia A Vamos - 2016 Resume - General
Nita's Resume #1
PJ Lizotte Resume 11.2016
Ad

Similar to Project list (20)

PDF
Scott_Molstad 8
PDF
CLARK PE RESUME
DOCX
AMIR PIA_Resume_7-16
PDF
K Horner_RESUME_20161103
DOC
Resume pe civil
DOC
Resume.Brian Murphree
PDF
Resume_Koziol_Environmental Civil Engr
PDF
Projects(Nov 17 2010)
PDF
Resume-Vrsalovich 2015
PDF
Cover Letter & Resume
PDF
Michael Barbera Resume 1.6-na
DOCX
Scott resume
DOCX
resume_2015
DOCX
Donald J resume Word 2 copy
PDF
Portfolio
DOCX
Resume of Eng.Ali
PDF
7 2016 l-janney_la_resume
PDF
Bokath Resume
DOC
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Scott_Molstad 8
CLARK PE RESUME
AMIR PIA_Resume_7-16
K Horner_RESUME_20161103
Resume pe civil
Resume.Brian Murphree
Resume_Koziol_Environmental Civil Engr
Projects(Nov 17 2010)
Resume-Vrsalovich 2015
Cover Letter & Resume
Michael Barbera Resume 1.6-na
Scott resume
resume_2015
Donald J resume Word 2 copy
Portfolio
Resume of Eng.Ali
7 2016 l-janney_la_resume
Bokath Resume
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...

Project list

  • 1. PAGE 1 SSccootttt RR.. MMoollssttaadd,, PPEE 3295 S. Tatum Lane Phone: 218.230.8108 (M) Gilbert, Arizona 85297 Email: smolstad@earthlink.net PROJECTS LIST: Below, I have listed several highlight projects that I was instrumental in the successful completion thereof. I served in a variety of roles throughout the procurement, design and construction management. Reata Wash Flood Control Study, Scottsdale, AZ I served as the Water Resource Engineer on behalf of ASLD, providing project review and technical assistance during the project study phase. I provided technical knowledge of existing drainage, public utilities, mitigation monitoring and permitting requirements. This purpose of this project is to identify and recommend flood control measures that will reduce flood risks to residents, property and public infrastructure within the Reata Wash floodplain. Utilized MS Project and Hec-RAS and Hec- HMS Construction Cost: N/A Duration: N/A Client: ASLD Title/Role: Water Resource Engineer (ASLD) Desert Ridge Development, Phoenix, AZ I served as the Water Resource Engineer for this vacant tract of land located in North Phoenix/North Scottsdale. This land is a master-planned community comprised of 5,700 acres, currently managed by ASLD. I provided technical knowledge of existing drainage, public utilities, mitigation monitoring and permitting requirements. Utilized MS Project and Hec-RAS and Hec-HMS Construction Cost: N/A Duration: N/A Client: ASLD Title/Role: Water Resource Engineer (ASLD) Chemehuevi Wastewater Expansion Project, Lake Havasu City, AZ Recently, I served as the Resident Engineer and Project Manager for a multi-million dollar sanitary sewer expansion district in Lake Havasu City, Arizona. This required overall project management and administration, engineering and inspection staff coordination and management, site construction management and administration, construction pay quantities, resident interaction, federal and state wage program administration and sanitary sewer testing / permitting through ADEQ. Utilized MS Project. Construction Cost: $10.5M Duration: 365 days Client: City of Lake Havasu, AZ Title/Role: Resident Engineer (Atkins Global) Hankinson Ethanol Plant Site Improvements, Hankinson, ND A recent assignment provided the opportunity for me to design, assemble and complete plans for the grading/drainage (Phase I) and the utilities/roadways (Phase II) for a proposed ethanol plant located in SE North Dakota. The successful plans and subsequent construction management solidified possibilities that future sites would be granted to MEI. Utilized MS Project and Microstation V8. Construction Cost: $3.5M Duration: 185 days Client: Fagen Engineering, Inc. Title/Role: Design Engineer / Construction Manager (Municipal Engineering)
  • 2. PAGE 2 City of Newfolden Wastewater Improvements, Newfolden, MN I served a Lead Design Engineer and Construction Manager for the total replacement and expansion of the entire wastewater piping system for the City of Newfolden. This further involved the replacement of several outdated pumping stations and pressure piping. The pumping system was with remote SCADA controls for ease of operation and monitoring. Utilized Microstation V8 and MS Project. Construction Cost: $1.75M Duration:185 days Client: City of Newfolden, MN Title/Role: Design Engineer / Construction Manager (Floan-Sanders) City of Warren Wastewater Pump Stations, Warren, MN The entire wastewater pumping system was replaced, along with the necessary pressure piping system. All pump stations were equipped with remote SCADA controls and monitoring stations. I served a lead design engineer and construction manager during the entire construction phase and startup. Utilized Microstation V8 and MS Project. Construction Cost: $10.5M Duration: 365 days Client: City of Warren, MN Title/Role: Design Engineer / Construction Manager (Floan-Sanders) City of Minot Conference Center, Minot, ND I served as project superintendent for this project, working with the contractor. This was the first opportunity to work on the construction side of a project, versus the design and engineering side. This project provided valuable construction experience, working directly with the contractor and construction team. Utilized MS Project and Microstation V8. Construction Cost: $4.75M Duration: 160 days Client: Minot, ND Park District Title/Role: Construction Superintendent (Floan-Sanders) Maricopa County Storm Water Diversion Project, Maricopa County, AZ I have served as the Design Engineer for numerous public projects that involved environmental hydrology issues in order to resolve the repeated overflow of a drain way that flowed through an established residential neighborhood utilizing a series of retention and detention ponds. This was completed utilizing a storm sewer design program named Hec-RAS as developed by the US Army Corp of Engineers. We were able to provide the necessary combination of retention and detention for the given storm water flows to prevent flooding of the downstream floodway or drain way that was in direct contact with the residential homes. Utilized Hec-RAS, MS Project and AutoCAD throughout project duration. Construction Cost: $850K Duration: 120 days Client: Maricopa County, AZ Title/Role: Design Engineer (Civiltec)
  • 3. PAGE 3 Buckeye Residential Development, Buckeye, AZ In 2007, a large scale residential land development project provided an excellent opportunity to work with the design standards and governing agencies of Maricopa County and the State of Arizona. I served as the Project Manager and Designer for this project, providing many design solutions and calculations for drainage and storm sewer retention, drainage pipe capacity, sanitary sewer piping, water main pipe capacity, fire flow coverage, roadway capacity and structural pavement designs. Utilized MS Project as project management software. Construction Cost: $8.25M Duration: 285 days Client: City of Buckeye, AZ Title/Role: Design Engineer (Pentacor) Argyle Wastewater Treatment Plant, Argyle, MN I served as a design engineer with a team of technical personnel in the design and construction management of this facility. This facility provided treatment for turbidity, phosphorous removal and disinfection. The design capacity of the facility was approximately 1.5 Mgpd. Utilized Microstation V8 for plan design. Construction Cost: N/A Duration: 185 days Client: City of Argyle, MN Title/Role: Design Engineer (Floan-Sanders)