HOT PROJECTS!
SKY TRAIN PEDESTRIAN BRIDGE"The installation of the 125'+ long girders required extensive logistical planning. Coreslab coordinated the operation including; special transports with steerable dollies, temporary transportation routes, special 500 ton cranes, and the passing of girders from one crane to another crane to set the girders over the SRP canal without incident."per Leslie A. Moat, Project ManagerHenselPhelps Construction Company Owner: City of Phoenix, Aviation DepartmentEngineer: Gannett Fleming, Inc.General Contractor: Hensel Phelps Construction CompanyCoreslab Structures (ARIZ) Inc. recently fabricated, delivered, and erected 125' long 'U' 54 precast beams for Hensel Phelps Construction Company, utilized in the City of Phoenix Sky Train Bridge Crossing into the 40th Street station.April 2011
FOUNTAINHEAD OFFICE PLAZA“On behalf of all of us at Sundt including Managers, Marty Hedlund, & Jeff Esgar , and our entire field staff, we would like to extend our appreciation to Coreslab, and to Jesse Steichen and the Coreslab field staff for superb execution of management, coordination and installation of the structural precast scope for the six story parking garage, six story office building and ten story office building on the Fountainhead project.”   per Brian Kleve, Project ManagerSundt ConstructionOwner: USAAArchitect: DAVISEngineer: TLCP Structural General Contractor: Sundt ConstructionCoreslab provided value engineering design ideas  and numerous pricing options for the Architect and Owner.
Coreslab provided a preliminary schedule which was exceeded by two weeks on the garage.March 2011
GRAND CANYON UNIVERSITY EVENT CENTER“The owner and the design team have commented that the precast is the best they have seen and have expressed their appreciation to Perini and Coreslab for performing above their expectations.”Per Tony Meyer, Project Manager       Perini Building CompanyOwner: Grand Canyon UniversityArchitect:: Architekton + Three Sixty ArchitectureEngineer: Paragon Structural Design, Inc.General Contractor: Perini Building CompanyCoreslab provided 16 precast raker beams and 144 stadia units for this 3,678 seat event center, in basketball mode.
Precast raker walls supported the corner precast stadia units and accommodated the mechanical plenum.
 Precast walls form the vomitory entrances.

More Related Content

PDF
Selected Projects Pg 2 PDF
DOC
Phillips Howard
DOC
CV TO DATE 25062015
DOCX
Donald J resume Word 2 copy
PDF
RRozek Project List 9 20 15
DOC
Eschenburg Resume 1
DOC
Rusty Adkins Resume
DOCX
Selected Projects Pg 2 PDF
Phillips Howard
CV TO DATE 25062015
Donald J resume Word 2 copy
RRozek Project List 9 20 15
Eschenburg Resume 1
Rusty Adkins Resume

What's hot (18)

PDF
1. MAQ CV-
DOCX
Long Resume
DOC
Construction Manager Resume
DOC
CV Mahmoud Farid PM
PPTX
i+iconUSA Corporate Presentation
DOC
AroResume(SK)
PDF
JUNDEE MAR TEJEDO
PPT
Cv Presentation
DOCX
GLASS, Ian (Mar15)
DOCX
CE1 - Final Reviewed - 10 Feb 2016
PDF
Epw Cv 2009
PPTX
CV Presentation May16
PPTX
Projects presentation1
PDF
DOC
Simon Murphy CV
DOC
CV - AGK LinkedIn
PDF
CV Updated 8-10-16
1. MAQ CV-
Long Resume
Construction Manager Resume
CV Mahmoud Farid PM
i+iconUSA Corporate Presentation
AroResume(SK)
JUNDEE MAR TEJEDO
Cv Presentation
GLASS, Ian (Mar15)
CE1 - Final Reviewed - 10 Feb 2016
Epw Cv 2009
CV Presentation May16
Projects presentation1
Simon Murphy CV
CV - AGK LinkedIn
CV Updated 8-10-16
Ad

Similar to Linked In Presentation (20)

PPTX
Pc Advantages Over Cip
PDF
IV Consulting - Architectural Projects
PDF
Pci dwp binder_ch2
PDF
Morris Group Resume
PDF
Lni Presentation
PDF
Cr and-vm-reduced
PDF
110623 pgi cv_hospitals_english
PDF
Accelerated Bridge Construction
PDF
Built -aia_southern_arizona_article_draft_v8_send
PDF
MTCcorp - Aerospace Capabilities
PDF
Richard beaumont bam
PPTX
Custom Components Company Sales Presentation
PDF
eBook-MicroStation-Civil-Engineering.pdf
PPTX
Simon Design Engineering
PPT
From the Shared Internet to Personal Light Waves: How the OptIPuter is Transf...
PPT
Lp Presentation
PDF
Ryan Davis-Selected Work
PDF
Capital Needs Assessment Provider - Statement of Qualifications
PPTX
Smith Engineering - Structural Highlights
Pc Advantages Over Cip
IV Consulting - Architectural Projects
Pci dwp binder_ch2
Morris Group Resume
Lni Presentation
Cr and-vm-reduced
110623 pgi cv_hospitals_english
Accelerated Bridge Construction
Built -aia_southern_arizona_article_draft_v8_send
MTCcorp - Aerospace Capabilities
Richard beaumont bam
Custom Components Company Sales Presentation
eBook-MicroStation-Civil-Engineering.pdf
Simon Design Engineering
From the Shared Internet to Personal Light Waves: How the OptIPuter is Transf...
Lp Presentation
Ryan Davis-Selected Work
Capital Needs Assessment Provider - Statement of Qualifications
Smith Engineering - Structural Highlights
Ad

Recently uploaded (20)

PDF
Nante Industrial Plug Factory: Engineering Quality for Modern Power Applications
PDF
NEW - FEES STRUCTURES (01-july-2024).pdf
PDF
Kishore Vora - Best CFO in India to watch in 2025.pdf
PPTX
operations management : demand supply ch
PDF
PMB 401-Identification-of-Potential-Biotechnological-Products.pdf
PDF
Tortilla Mexican Grill 发射点犯得上发射点发生发射点犯得上发生
PPTX
basic introduction to research chapter 1.pptx
DOCX
80 DE ÔN VÀO 10 NĂM 2023vhkkkjjhhhhjjjj
PPT
Lecture 3344;;,,(,(((((((((((((((((((((((
PDF
Daniels 2024 Inclusive, Sustainable Development
PPTX
chapter 2 entrepreneurship full lecture ppt
PDF
income tax laws notes important pakistan
PDF
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
PDF
Charisse Litchman: A Maverick Making Neurological Care More Accessible
PPTX
IITM - FINAL Option - 01 - 12.08.25.pptx
PPTX
BUSINESS CYCLE_INFLATION AND UNEMPLOYMENT.pptx
PPTX
TRAINNING, DEVELOPMENT AND APPRAISAL.pptx
PDF
1911 Gold Corporate Presentation Aug 2025.pdf
DOCX
Handbook of Entrepreneurship- Chapter 5: Identifying business opportunity.docx
PDF
Susan Semmelmann: Enriching the Lives of others through her Talents and Bless...
Nante Industrial Plug Factory: Engineering Quality for Modern Power Applications
NEW - FEES STRUCTURES (01-july-2024).pdf
Kishore Vora - Best CFO in India to watch in 2025.pdf
operations management : demand supply ch
PMB 401-Identification-of-Potential-Biotechnological-Products.pdf
Tortilla Mexican Grill 发射点犯得上发射点发生发射点犯得上发生
basic introduction to research chapter 1.pptx
80 DE ÔN VÀO 10 NĂM 2023vhkkkjjhhhhjjjj
Lecture 3344;;,,(,(((((((((((((((((((((((
Daniels 2024 Inclusive, Sustainable Development
chapter 2 entrepreneurship full lecture ppt
income tax laws notes important pakistan
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
Charisse Litchman: A Maverick Making Neurological Care More Accessible
IITM - FINAL Option - 01 - 12.08.25.pptx
BUSINESS CYCLE_INFLATION AND UNEMPLOYMENT.pptx
TRAINNING, DEVELOPMENT AND APPRAISAL.pptx
1911 Gold Corporate Presentation Aug 2025.pdf
Handbook of Entrepreneurship- Chapter 5: Identifying business opportunity.docx
Susan Semmelmann: Enriching the Lives of others through her Talents and Bless...

Linked In Presentation

  • 2. SKY TRAIN PEDESTRIAN BRIDGE"The installation of the 125'+ long girders required extensive logistical planning. Coreslab coordinated the operation including; special transports with steerable dollies, temporary transportation routes, special 500 ton cranes, and the passing of girders from one crane to another crane to set the girders over the SRP canal without incident."per Leslie A. Moat, Project ManagerHenselPhelps Construction Company Owner: City of Phoenix, Aviation DepartmentEngineer: Gannett Fleming, Inc.General Contractor: Hensel Phelps Construction CompanyCoreslab Structures (ARIZ) Inc. recently fabricated, delivered, and erected 125' long 'U' 54 precast beams for Hensel Phelps Construction Company, utilized in the City of Phoenix Sky Train Bridge Crossing into the 40th Street station.April 2011
  • 3. FOUNTAINHEAD OFFICE PLAZA“On behalf of all of us at Sundt including Managers, Marty Hedlund, & Jeff Esgar , and our entire field staff, we would like to extend our appreciation to Coreslab, and to Jesse Steichen and the Coreslab field staff for superb execution of management, coordination and installation of the structural precast scope for the six story parking garage, six story office building and ten story office building on the Fountainhead project.” per Brian Kleve, Project ManagerSundt ConstructionOwner: USAAArchitect: DAVISEngineer: TLCP Structural General Contractor: Sundt ConstructionCoreslab provided value engineering design ideas and numerous pricing options for the Architect and Owner.
  • 4. Coreslab provided a preliminary schedule which was exceeded by two weeks on the garage.March 2011
  • 5. GRAND CANYON UNIVERSITY EVENT CENTER“The owner and the design team have commented that the precast is the best they have seen and have expressed their appreciation to Perini and Coreslab for performing above their expectations.”Per Tony Meyer, Project Manager Perini Building CompanyOwner: Grand Canyon UniversityArchitect:: Architekton + Three Sixty ArchitectureEngineer: Paragon Structural Design, Inc.General Contractor: Perini Building CompanyCoreslab provided 16 precast raker beams and 144 stadia units for this 3,678 seat event center, in basketball mode.
  • 6. Precast raker walls supported the corner precast stadia units and accommodated the mechanical plenum.
  • 7. Precast walls form the vomitory entrances.
  • 8. Individual precast steps were provided to create the access aisles.March 2011
  • 9. MARICOPA COUNTY DOWNTOWN COURT TOWEROwner: Maricopa CountyArchitect: Gould Evans + DMJM DesignEngineer: Paragon Structural Design Inc.General Contractor: Gilbane/RyanCoreslab was the design assist trade contractor for the architectural precast concrete on the 16-story, 685,000 S.F. Downtown Court Tower for Maricopa County.
  • 10. The project team utilized BIM in the virtual design process which enabled Coreslab to complete shop drawings & begin fabrication before the design was 50% complete.
  • 11. Architectural precast concrete components; individual round column covers, custom form liner spandrels, louvered ventilation panels, as well as cast-in lettering in panels.
  • 12. The project is currently under construction and on schedule for completion on 11/11/11.COX DEER VALLEY TECHNOLOGY CENTEROwner: Cox Technologies, LLCArchitect: GenslerEngineer: KSI StructuralGeneral Contractor: Holder Construction CompanySingle story mission critical data center, 114,000 S.F. total precast framing solution with insulated exterior load bearing architectural wall panels. Tier III facility with exterior wind loading of 120 mph.
  • 13. Insulated wall panels 4" inside + 2" insulation + 3" exterior architectural concrete with light sandblast finish.
  • 14. Roof structure consists of long span 28" deep double tees to support the heavy piping and mechanical loads required.
  • 15. Mechanical yard surrounded by self-supporting architectural precast concrete.January 2011
  • 16. HAVE A PROJECT IN MIND?Contact your Coreslab Project Consultant. We are experts when it comes to early design, estimating, budgeting, value engineering, BIM modeling, capturing LEED points, project fabrication, product delivery, field installation, on through to project closeout.