ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A
ELEMENTAL COST ANALYSIS
GROUP A
PROPOSED 4 AND 5 STOREY SHOP/ APARTMENT BLOCK F
SEPANG, SELANGOR DARUL EHSAN
ANG TOH CHUAN
0333129
CHEAH MAN YEE
0324743
ERIC
WEE HOING
KIET
0329601
GOH XINGXIN
0325587
LAU WAN YEE
0328947
AIMAN AFFIF
0331286
LOH WEI TING
0328314
NGEOW YEE LING
0329178
SHUM WEN JUN
0325151
TEE WAN NEE
0325074
ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A
PROJECT DETAILS
CLIENT PROPOSED PROJECT LOCATION
KEMAJUAN MASTERON SDN
BHD
PROPOSED 4 AND 5 STOREY
SHOP/ APARTMENT
PHASE B
(JATI “I”-BLOCK E & F)
AT TAMAN MAS SEPANG
ON LOT P.T. 10214-10233,
MUKIM DENGKIL, DAERAH
SEPANG, SELANGOR DARUL
EHSAN
ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A
CONTRACT DETAILS
CONTRACT SUM
DATE OF POSSESSION OF
SITE
DATE OF COMPLETION
COMPLETION PERIOD
LIQUIDATED AND ASCERTAIN
DAMAGES FOR NON-
COMPLETION
DEFECTS LIABILITY
PERIOD
RM3,994,031.79
24th July 2002
22nd January 2003
Six (6) Months
RM5000.00 per day
18
months
ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A
CONTRACT DETAILS
ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A
CONTRACT DETAILS
• Total amount in this BQ is only the cost
for balance of work ( Quantity x rate x %
)
• For ECA, to come out the realistic cost
analysis it must be complete BQ.
• We have the quantity per block
Quantity x Rates = Total amount for 1
Complete block
• Part of the work had been done in a
separate contract
• In this contract, the contractor only will
carried out the balance of work that shown
in the form of %
STRUCTURE
WORK
ARCHITECTURE WORK
ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A
BUILDING LAYOUT – ELEVATION VIEW
ELEVATION VIEW
(REFERENCE- NOT TO SCALE)
GROUND
FLOOR
(SHOP)
FIRST FLOOR
SECOND
FLOOR
THIRD FLOOR
FOURTH
FLOOR
5 STOREY
4 STOREY
ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A
BUILDING LAYOUT – GROUND FLOOR PLAN
Corner
unit
Intermediate
unit
End
unit
1
unit
Comprises of 8
units
1
unit
ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A
BUILDING LAYOUT – FIRST, SECOND AND THIRD FLOOR PLAN
Corner
unit
9 Intermediate
unit
End
unit
2
units
Each unit comprises of 2
units
Total: 18 units
2
units
ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A
BUILDING LAYOUT – 4th FLOOR PLAN
Corner
unit
2 Intermediate
unit
2
units
Each unit comprises of 2
units
Total: 4 units
ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A
BUILDING LAYOUT – TOTAL NUMBER FOR EACH UNIT
GROUND FLOOR
(SHOP)
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
FOURTH FLOOR
Total: 8 units
CORNER
UNIT
INTERMEDIATE
UNITS
END UNIT
Total: 58 units Total:
6
units
Total: 1 unit (shop) Total: 8 units
(shop)
Total:
1
units
(shop)
ELEVATION VIEW
(REFERENCE- NOT TO SCALE)
ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A
LIMITATIONS OF DRAWINGS
NOT TO SCALE
*Even we try to sort out the ratio of the scale*
ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A
LIMITATIONS OF DRAWINGS – GROUND FLOOR PLAN
Ratio 1: 216
Ratio 1: 214
Horizontal grid dimension had been bound up
Based on structural drawing dimension
ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A
LIMITATIONS OF DRAWINGS – FIRST FLOOR PLAN
BATH
Length of bathroom can’t determine
Use reasonable assumption = 1190mm
CIRCULATION AREA
Length of circulation area can’t determine
Use reasonable assumption= 1830mm
ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A
LIMITATIONS OF DRAWINGS – 2nd & 3rd FLOOR PLAN
Length of circulation area:
Use reasonable assumption= 1830mm
ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A
LIMITATIONS OF DRAWINGS
Dimension
are only
visible in 4th
floor plan
Only given 4 storey roof plan
Search and refer to Google Map
ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A
Corner unit
End
unit
GFA OF GROUND FLOOR
Intermediate
unit
Intermediate
unit
Usable area
Circulation area
Internal division
Intermediate
unit
ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A
Corner unit End
unit
GFA OF 1st FLOOR
Usable area
Circulation area
Internal division
Roof area (not included in GFA)
Intermediate
unit
ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A
Corner unit End
unit
GFA OF 2nd FLOOR & 3rd FLOOR
Usable area
Circulation area
Internal division
Roof area (not included in GFA)
ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A
GFA OF 4th FLOOR
Corner unit Intermediate
unit
Usable area
Circulation area
Internal division
Roof area (not included in GFA)
ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A
GFA OF 1st FLOOR
Usable area
Circulation area
Internal division
Roof area (not included in GFA)
Ground Floor
Plan
1st Floor Plan
2nd and 3rd Floor
Plan
4th Floor
Plan
GFA : 6777 m2
FLOOR SPACE NOT ENCLOSED
Floor space not enclosed
Total area 218 m2
ROOF AREA
Roof area
roof area 1740 m2
FORM 1
ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A
Different contract sum
• This contract is balance of work
• Contract is based on 2 similar blocks
Provisional Sum + P.C Sum + Preliminaries + Contingencies
2
+ Building work for 1 blocks = CONTRACT S
ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A
FORM 2
For flat roof slab structure is under upper floors element instead of
roof element
WHY?
GROUND FLOOR
(SHOP)
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
FOURTH FLOOR
FLAT ROOF
SLAB
There are no structural element of flat roof slab in the
BQ as first floor suspended slab act as a flat roof to the
ground floor. Therefore, we can’t separate out the roof
slab quantity as no details given.
Reaso
n:
For flat roof slab finishes is under external finishes
WHY?
GROUND FLOOR
(SHOP)
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
-As the flat roof slab structural quantity is not included in
roof element
-Because the flat roof slab is exposed to the weather.
Therefore, for the finishes to flat roof slab put under the
external finishes.
Reaso
n:
VOID
FLAT ROOF
SLAB
FOURTH FLOOR
ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A
FORM 2
Prime cost Sums
allowed
ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A
FORM 3
SEPARATE
ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A
FORM 3
Given Prime Cost Sum allowance is inclusive of
electrical and communication price
Drainage is not included in Contract, but provided in the drawing
ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A
LIMITATIONS OF WORK
Different of 372.33 m2
discrepancy of the bedroom floor area measured from
drawings
and the bedroom floor finishes quantity in BQ
Area measure from drawing : 1873 m2
discrepancy of the dining and living floor area measured from
drawings
and the dining and living floor finishes quantity in BQ
Area measure from drawing : 1604 m2
circulation area take up part of
the quantity of the internal floor
finishes
• Drawing don’t have a accurate scale
• Some dimension can’t be determine
• Lack of details drawings
• Limitation of document
Possible
reason
218
ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A
THANK YOU
GROUP A

More Related Content

PPTX
element
PDF
ECA Presentation
PPTX
Elemental cost analysis Presentation Slides
PDF
Eca presentation
PDF
Elemental Cost Analysis
PPTX
Eca presentation
PDF
ECA Workshop - Presentation
PDF
Eca form2
element
ECA Presentation
Elemental cost analysis Presentation Slides
Eca presentation
Elemental Cost Analysis
Eca presentation
ECA Workshop - Presentation
Eca form2

Similar to Eca presentation slide (group a) (20)

PDF
PP1 Project 3 Feasibility study
PDF
ECA Workshop - ECA Form
PDF
Building Structure : Structural Design Post Mortem
PDF
ECA form
PPTX
Elemental cost analysis
PPT
ECA Presentation slide
PPTX
GBI: Role of BS
PDF
Design example of a six storey building project report
PDF
Bstruc final report
DOC
bstrut report
PDF
cost appraisal
PDF
Sony hospital
PPTX
ECA presentation
PDF
Jj bstructure individual
PDF
Building envelope Design Integrated with Parametric shading system For a Resi...
DOCX
multi storey buidling
PDF
Sai Sanket construction
PDF
Portfolio
DOCX
Bstruc final group component
DOCX
Bstructure calculation
PP1 Project 3 Feasibility study
ECA Workshop - ECA Form
Building Structure : Structural Design Post Mortem
ECA form
Elemental cost analysis
ECA Presentation slide
GBI: Role of BS
Design example of a six storey building project report
Bstruc final report
bstrut report
cost appraisal
Sony hospital
ECA presentation
Jj bstructure individual
Building envelope Design Integrated with Parametric shading system For a Resi...
multi storey buidling
Sai Sanket construction
Portfolio
Bstruc final group component
Bstructure calculation
Ad

More from Wan Nee (20)

PPTX
Presentation 7-pp-final
PDF
Professional practice-1-1-1-autosaved (1)
PDF
Structures final 20th june
PPTX
Estimating final
PDF
Seminar question
PPTX
Estimating presentation
PDF
Evaluation brief qsb2134 tender (1)
PDF
Estimating Assignment Brief
PDF
Estimating Assignment
PPTX
Supply Chain
PPTX
Supply chain
PDF
Supply chain
PPTX
Management Science
DOCX
Qsb 2413 group project august 2017
PPTX
BS 2 PRESENTATION
PDF
CT 3 Group Assignment Presentation Slide
DOCX
CT3 Group Assignment Report
PDF
Ct2 latest1-1 (3)
DOCX
SITE VISIT REPORT
PDF
INTEGRATED ASSIGNMENT - CT BM M
Presentation 7-pp-final
Professional practice-1-1-1-autosaved (1)
Structures final 20th june
Estimating final
Seminar question
Estimating presentation
Evaluation brief qsb2134 tender (1)
Estimating Assignment Brief
Estimating Assignment
Supply Chain
Supply chain
Supply chain
Management Science
Qsb 2413 group project august 2017
BS 2 PRESENTATION
CT 3 Group Assignment Presentation Slide
CT3 Group Assignment Report
Ct2 latest1-1 (3)
SITE VISIT REPORT
INTEGRATED ASSIGNMENT - CT BM M
Ad

Recently uploaded (20)

PPTX
Tissue processing ( HISTOPATHOLOGICAL TECHNIQUE
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PDF
Paper A Mock Exam 9_ Attempt review.pdf.
PDF
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
PDF
Empowerment Technology for Senior High School Guide
PPTX
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
PDF
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
PPTX
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
PPTX
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
PPTX
UNIT III MENTAL HEALTH NURSING ASSESSMENT
PDF
GENETICS IN BIOLOGY IN SECONDARY LEVEL FORM 3
DOC
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
PPTX
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
PDF
Hazard Identification & Risk Assessment .pdf
PPTX
Digestion and Absorption of Carbohydrates, Proteina and Fats
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PDF
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
PDF
Computing-Curriculum for Schools in Ghana
PDF
1_English_Language_Set_2.pdf probationary
PPTX
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
Tissue processing ( HISTOPATHOLOGICAL TECHNIQUE
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
Paper A Mock Exam 9_ Attempt review.pdf.
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
Empowerment Technology for Senior High School Guide
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
UNIT III MENTAL HEALTH NURSING ASSESSMENT
GENETICS IN BIOLOGY IN SECONDARY LEVEL FORM 3
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
Hazard Identification & Risk Assessment .pdf
Digestion and Absorption of Carbohydrates, Proteina and Fats
Final Presentation General Medicine 03-08-2024.pptx
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
Computing-Curriculum for Schools in Ghana
1_English_Language_Set_2.pdf probationary
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...

Eca presentation slide (group a)

  • 1. SCHOOL OF ARCHITECTURE BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONS) ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A ELEMENTAL COST ANALYSIS GROUP A PROPOSED 4 AND 5 STOREY SHOP/ APARTMENT BLOCK F SEPANG, SELANGOR DARUL EHSAN ANG TOH CHUAN 0333129 CHEAH MAN YEE 0324743 ERIC WEE HOING KIET 0329601 GOH XINGXIN 0325587 LAU WAN YEE 0328947 AIMAN AFFIF 0331286 LOH WEI TING 0328314 NGEOW YEE LING 0329178 SHUM WEN JUN 0325151 TEE WAN NEE 0325074
  • 2. ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A PROJECT DETAILS CLIENT PROPOSED PROJECT LOCATION KEMAJUAN MASTERON SDN BHD PROPOSED 4 AND 5 STOREY SHOP/ APARTMENT PHASE B (JATI “I”-BLOCK E & F) AT TAMAN MAS SEPANG ON LOT P.T. 10214-10233, MUKIM DENGKIL, DAERAH SEPANG, SELANGOR DARUL EHSAN
  • 3. ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A CONTRACT DETAILS CONTRACT SUM DATE OF POSSESSION OF SITE DATE OF COMPLETION COMPLETION PERIOD LIQUIDATED AND ASCERTAIN DAMAGES FOR NON- COMPLETION DEFECTS LIABILITY PERIOD RM3,994,031.79 24th July 2002 22nd January 2003 Six (6) Months RM5000.00 per day 18 months
  • 4. ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A CONTRACT DETAILS
  • 5. ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A CONTRACT DETAILS • Total amount in this BQ is only the cost for balance of work ( Quantity x rate x % ) • For ECA, to come out the realistic cost analysis it must be complete BQ. • We have the quantity per block Quantity x Rates = Total amount for 1 Complete block • Part of the work had been done in a separate contract • In this contract, the contractor only will carried out the balance of work that shown in the form of % STRUCTURE WORK ARCHITECTURE WORK
  • 6. ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A BUILDING LAYOUT – ELEVATION VIEW ELEVATION VIEW (REFERENCE- NOT TO SCALE) GROUND FLOOR (SHOP) FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR 5 STOREY 4 STOREY
  • 7. ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A BUILDING LAYOUT – GROUND FLOOR PLAN Corner unit Intermediate unit End unit 1 unit Comprises of 8 units 1 unit
  • 8. ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A BUILDING LAYOUT – FIRST, SECOND AND THIRD FLOOR PLAN Corner unit 9 Intermediate unit End unit 2 units Each unit comprises of 2 units Total: 18 units 2 units
  • 9. ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A BUILDING LAYOUT – 4th FLOOR PLAN Corner unit 2 Intermediate unit 2 units Each unit comprises of 2 units Total: 4 units
  • 10. ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A BUILDING LAYOUT – TOTAL NUMBER FOR EACH UNIT GROUND FLOOR (SHOP) FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR Total: 8 units CORNER UNIT INTERMEDIATE UNITS END UNIT Total: 58 units Total: 6 units Total: 1 unit (shop) Total: 8 units (shop) Total: 1 units (shop) ELEVATION VIEW (REFERENCE- NOT TO SCALE)
  • 11. ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A LIMITATIONS OF DRAWINGS NOT TO SCALE *Even we try to sort out the ratio of the scale*
  • 12. ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A LIMITATIONS OF DRAWINGS – GROUND FLOOR PLAN Ratio 1: 216 Ratio 1: 214 Horizontal grid dimension had been bound up Based on structural drawing dimension
  • 13. ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A LIMITATIONS OF DRAWINGS – FIRST FLOOR PLAN BATH Length of bathroom can’t determine Use reasonable assumption = 1190mm CIRCULATION AREA Length of circulation area can’t determine Use reasonable assumption= 1830mm
  • 14. ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A LIMITATIONS OF DRAWINGS – 2nd & 3rd FLOOR PLAN Length of circulation area: Use reasonable assumption= 1830mm
  • 15. ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A LIMITATIONS OF DRAWINGS Dimension are only visible in 4th floor plan Only given 4 storey roof plan Search and refer to Google Map
  • 16. ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A Corner unit End unit GFA OF GROUND FLOOR Intermediate unit Intermediate unit Usable area Circulation area Internal division
  • 17. Intermediate unit ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A Corner unit End unit GFA OF 1st FLOOR Usable area Circulation area Internal division Roof area (not included in GFA)
  • 18. Intermediate unit ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A Corner unit End unit GFA OF 2nd FLOOR & 3rd FLOOR Usable area Circulation area Internal division Roof area (not included in GFA)
  • 19. ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A GFA OF 4th FLOOR Corner unit Intermediate unit Usable area Circulation area Internal division Roof area (not included in GFA)
  • 20. ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A GFA OF 1st FLOOR Usable area Circulation area Internal division Roof area (not included in GFA) Ground Floor Plan 1st Floor Plan 2nd and 3rd Floor Plan 4th Floor Plan GFA : 6777 m2
  • 21. FLOOR SPACE NOT ENCLOSED Floor space not enclosed Total area 218 m2
  • 22. ROOF AREA Roof area roof area 1740 m2
  • 23. FORM 1 ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A Different contract sum • This contract is balance of work • Contract is based on 2 similar blocks Provisional Sum + P.C Sum + Preliminaries + Contingencies 2 + Building work for 1 blocks = CONTRACT S
  • 24. ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A FORM 2 For flat roof slab structure is under upper floors element instead of roof element WHY? GROUND FLOOR (SHOP) FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR FLAT ROOF SLAB There are no structural element of flat roof slab in the BQ as first floor suspended slab act as a flat roof to the ground floor. Therefore, we can’t separate out the roof slab quantity as no details given. Reaso n: For flat roof slab finishes is under external finishes WHY? GROUND FLOOR (SHOP) FIRST FLOOR SECOND FLOOR THIRD FLOOR -As the flat roof slab structural quantity is not included in roof element -Because the flat roof slab is exposed to the weather. Therefore, for the finishes to flat roof slab put under the external finishes. Reaso n: VOID FLAT ROOF SLAB FOURTH FLOOR
  • 25. ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A FORM 2 Prime cost Sums allowed
  • 26. ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A FORM 3 SEPARATE
  • 27. ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A FORM 3 Given Prime Cost Sum allowance is inclusive of electrical and communication price Drainage is not included in Contract, but provided in the drawing
  • 28. ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A LIMITATIONS OF WORK Different of 372.33 m2 discrepancy of the bedroom floor area measured from drawings and the bedroom floor finishes quantity in BQ Area measure from drawing : 1873 m2 discrepancy of the dining and living floor area measured from drawings and the dining and living floor finishes quantity in BQ Area measure from drawing : 1604 m2 circulation area take up part of the quantity of the internal floor finishes • Drawing don’t have a accurate scale • Some dimension can’t be determine • Lack of details drawings • Limitation of document Possible reason 218
  • 29. ELEMENTAL COST ANALYSIS l PROPOSED 4 &5 STOREY SHOP/ APARTMENT BLOCK F l GROUP A THANK YOU GROUP A