Hydro testing
Abhijeet Nagale.
January 22,2018
Purpose:
Pressure tests are performed to ensure the safety, reliability, and leak tightness of pressure
systems.
Newly constructed pipelines are typically Pressure tested, upon completion of
construction.
OR
Older lines already in service may be re-tested either to confirm an earlier test or to
qualify the line for a higher operating pressure.
(During Plant Modification)
Types of Pressure Tests:
• Hydrostatic Test:
Is performed by using water as the test medium.
• Pneumatic Test:
Is performed by using air, nitrogen, or any non-flammable and
non-toxic gas.
Procedure
• Hydro testing is generally Performed by hydrostatic testing contractor hired by the pipeline
owner, or hydrostatic testing may be included as a part of the main construction contract.
• Water is filled inside the pipe for the pressure test.
• For the Hydro testing the water must be filtered by the means of Strainer or online filters. (The
used water must be non corrosive or treated)
• Deadweight pressure and temperature readings are recorded after the prescribed test pressure
has been reached and the pressures and temperatures have stabilized.
• Pressure vs. time plot is made the reading are usually made at 15 minutes interval for the first
hour and at 30 minutes intervals thereafter.( Procedure may vary from company to company)
• If the there is no Pressure drop for the 3 hours, then the leakage test is accepted.
• Recorded data will become a permanent record which must be retained for as long as the
facility tested remains in operation.
Pressure tests must be performed under controlled condition.
Pneumatic tests are potentially more dangerous than hydrostatic because of the higher
level of potential energy.
Performed only when at least one of the following conditions exists:
• When pressure systems are so designed that they cannot be filled with water.
• When pressure systems are to be used in services where traces of the testing medium
cannot be tolerated.
Hydro testing Test Pressure.
Hydrostatic Test Pressure = 1.5 × Design Pressure × Stress Ratio
𝑆𝑡𝑟𝑒𝑠𝑠 𝑅𝑎𝑡𝑖𝑜 =
𝐴𝑙𝑙𝑜𝑤𝑎𝑏𝑙𝑒 𝑠𝑡𝑟𝑒𝑠𝑠 𝑎𝑡 𝑡𝑒𝑠𝑡 𝑡𝑒𝑚𝑝𝑒𝑟𝑎𝑡𝑢𝑟𝑒 𝑆𝑡 (kg/𝑐𝑚2)
𝐴𝑙𝑙𝑜𝑤𝑎𝑏𝑙𝑒 𝑠𝑡𝑟𝑒𝑠𝑠 𝑎𝑡 𝑑𝑒𝑠𝑖𝑔𝑛 𝑡𝑒𝑚𝑝𝑒𝑟𝑎𝑡𝑢𝑟𝑒 𝑆 (kg/𝑐𝑚2)
𝑃𝑡 =
1.5 × 𝑃 × 𝑆𝑡
𝑆
Where,
Minimum calculated hydrostatic test pressure (Pt) (kg/cm2)
Design pressure (P) is internal design pressure (kg/cm2)
Test pressure for piping
subjected to external pressure
• For the Jacketed lines, the internal line shall be pressure tested on the basis of the
internal or external design pressure, whichever is critical. This test shall be preformed
prior to completion of the jacket.
• The jacket shall be pressure tested of the basis to the jacket design conditions.
• Where systems require hydrostatic testing through static equipment, the test pressure
shall be selected so as not to exceed vessel test pressure.
Test pressure according to
different systems
Test pressure for various process system must be calculated by:
System Code Hydrostatic Pneumatic
• Boiler Power ASME Section I 1.5×MAWP Not Permitted
• Power Piping ASME Section B31.1 1.5×Design Pressure 1.2×Design Pressure
• Process Piping ASME Section B31.3 1.5×Design Pressure 1.1×Design Pressure
• Building Services ASME Section B31.9 1.5×Design Pressure 1.25×Design Pressure
• Sprinkler System NFPA 13 200 Psi 40 Psi
MAWP: Maximum Allowable Working Pressure.( Defined by Mechanical)
NFPA : National Fire Protection Association
Volume required for the
hydro testing
𝑉 = 𝐿 × (𝜋 ×
𝑑2
4
) ×
12
231
𝑉 = 0.0408 × 𝑑2 × 𝐿
L= length of the test section, feet
d= diameter of pipe, inches
V= gallons required to fill @ 0 psig
Volume required at test pressure
𝑉𝑡𝑝 = 𝑉 × 𝐹𝑤𝑝 × 𝐹𝑝𝑝 × 𝐹𝑝𝑤𝑡
𝑉𝑡𝑝= Gallons contained in test section at test pressure P, and temperature T, FO
V = Volume required for hydro test.
𝐹𝑤𝑝=Factor to correct the compressibility of water due to pressure 0 psig to test pressure P psig
𝐹𝑤𝑝 =
1
(1− 4.5×10−5 ×
𝑃
14.73
)
𝐹𝑝𝑝=Factor to correct the volume change due to pressure increase
𝐹𝑃𝑃 = 1 +
𝐷
𝑡
×
0.91×𝑃
30×106 + 3.6 × 10−6
× 𝑇 − 60
𝐹𝑝𝑤𝑡=
𝐹 𝑃𝑡
𝐹 𝑤𝑡
𝐹𝑃𝑡=Correction factor for temperature change, 𝐹𝑝𝑡 = 1 + 𝑇 − 60 × 18.2 × 10−6
𝐹 𝑤𝑡= Factor to correct for the thermal change in water which can be determined from book
Pipeline Rules of Thumb. (Table No.1)
Pipeline Dewatering,
Cleaning & Drying
• Pipelines used to transport natural gas will need some drying, depending on the operating
pressure and the location of the line, to prevent the formation of hydrates.
• Pipelines may require drying to protect the pipe from internal corrosion caused by the
formation of corrosive acids, such as carbonic acid in the case of carbon dioxide pipelines.
• If the pipeline is to be cleaned and/or dried, the pig will be pushed by either compressed
air or gas.
• The pig will form a perfect seal with the inner periphery of the pipe and will not allow any
of the material behind the pig to leak past.
• Brush pig is used in order to remove the debris from the pipe line by the help of air or gas.
• Internal sand blasting is used to dry some section of pipe line. ( Sand is blasted in pipe by
using Nitrogen or air to propel the sand)
References
• Pipeline Rules of thumb Fifth Edition ISBN 0-7506-7471-7
• Hydrostatic Pressure testing for piping by KLM Technology Group.
• SLAC National Accelerator Laboratory Environment, Safety & Health Division
Chapter 14 | Pressure Test Procedures 9
Thank you

More Related Content

PPT
Hydrotest
PDF
20 Essential Hydrotest Safety Checklist
DOCX
Hydrotest REPORT FOR 4'' 158m Line.
PPT
Piping Code & Standards Presentation
DOCX
495265750-Hydro-Test-Procedure.docx
PDF
Hot Tapping Requirement
PDF
Quality aspects in Cross Country Pipeline construction
Hydrotest
20 Essential Hydrotest Safety Checklist
Hydrotest REPORT FOR 4'' 158m Line.
Piping Code & Standards Presentation
495265750-Hydro-Test-Procedure.docx
Hot Tapping Requirement
Quality aspects in Cross Country Pipeline construction

What's hot (20)

PDF
Qc piping guide
PPTX
Introduction to piping design
PPTX
what is process piping
PPT
Piping ppt1
PDF
Piping presentation part ii 2
PPT
pipefitting pressure-test
PPTX
Wellhead and christmas tree components, functions and more
PDF
7) hydro test 3
PPTX
Tank Introduction.pptx
PDF
Basics of Pipe Stress Analysis.pdf
PDF
Safety valve in process industry1
PDF
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
PDF
Tank design - powerpoint slides
PPT
Asme sec viii div 1 s
PDF
Fundamental of Pipes for Oil & Gas Engineer
PDF
Piping Installation and Erection Procedure.pdf
PPTX
Presentation API 570 -510-653.pptx
PPT
Floating head heat exchanger - Maintainance
PDF
Presentation on SECVIII
PPT
190391352-Pressure-Testing.ppt
Qc piping guide
Introduction to piping design
what is process piping
Piping ppt1
Piping presentation part ii 2
pipefitting pressure-test
Wellhead and christmas tree components, functions and more
7) hydro test 3
Tank Introduction.pptx
Basics of Pipe Stress Analysis.pdf
Safety valve in process industry1
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Tank design - powerpoint slides
Asme sec viii div 1 s
Fundamental of Pipes for Oil & Gas Engineer
Piping Installation and Erection Procedure.pdf
Presentation API 570 -510-653.pptx
Floating head heat exchanger - Maintainance
Presentation on SECVIII
190391352-Pressure-Testing.ppt
Ad

Similar to Piping Hydrostatic Test / Hydrotesting (20)

PDF
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
PPTX
Pressure Test and Leak Test STUDY MATERIAL
PPTX
2hr-DistributionSystemsBranded system .pptx
PDF
Surge Pressure Prediction for Running Liners
PDF
HAZARDS-Pneumatic Test(1)
PDF
Pipeline,Vessels Hydrotesting and procedures
DOCX
Key Process Considerations for Pipeline Design Basis
PDF
New prsentation 23 9-2010
PDF
WWW.ZELGHARABAWI.COM
PPTX
04 pipeline-channel hydraulics
PPTX
analysis.pptx
PPTX
Presentation_oil_pipelines.pptx
PPS
Piping basics knowledge
PPS
Basic_piping
PPS
Piping fundamentals
PPS
Basic piping for freshers Engineer
PPS
Piping basics
PPS
Piping basics
PPT
Basic piping
PPS
P&i diagram v flex
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Pressure Test and Leak Test STUDY MATERIAL
2hr-DistributionSystemsBranded system .pptx
Surge Pressure Prediction for Running Liners
HAZARDS-Pneumatic Test(1)
Pipeline,Vessels Hydrotesting and procedures
Key Process Considerations for Pipeline Design Basis
New prsentation 23 9-2010
WWW.ZELGHARABAWI.COM
04 pipeline-channel hydraulics
analysis.pptx
Presentation_oil_pipelines.pptx
Piping basics knowledge
Basic_piping
Piping fundamentals
Basic piping for freshers Engineer
Piping basics
Piping basics
Basic piping
P&i diagram v flex
Ad

Recently uploaded (20)

PDF
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
PDF
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
PPTX
web development for engineering and engineering
PPTX
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
PDF
TFEC-4-2020-Design-Guide-for-Timber-Roof-Trusses.pdf
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PDF
PPT on Performance Review to get promotions
PPTX
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
PPTX
additive manufacturing of ss316l using mig welding
PPTX
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
PDF
Embodied AI: Ushering in the Next Era of Intelligent Systems
PDF
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
PPTX
Welding lecture in detail for understanding
PDF
Well-logging-methods_new................
PPT
CRASH COURSE IN ALTERNATIVE PLUMBING CLASS
PPT
Project quality management in manufacturing
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PDF
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
PPTX
UNIT-1 - COAL BASED THERMAL POWER PLANTS
PPTX
bas. eng. economics group 4 presentation 1.pptx
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
web development for engineering and engineering
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
TFEC-4-2020-Design-Guide-for-Timber-Roof-Trusses.pdf
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PPT on Performance Review to get promotions
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
additive manufacturing of ss316l using mig welding
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
Embodied AI: Ushering in the Next Era of Intelligent Systems
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
Welding lecture in detail for understanding
Well-logging-methods_new................
CRASH COURSE IN ALTERNATIVE PLUMBING CLASS
Project quality management in manufacturing
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
UNIT-1 - COAL BASED THERMAL POWER PLANTS
bas. eng. economics group 4 presentation 1.pptx

Piping Hydrostatic Test / Hydrotesting

  • 2. Purpose: Pressure tests are performed to ensure the safety, reliability, and leak tightness of pressure systems. Newly constructed pipelines are typically Pressure tested, upon completion of construction. OR Older lines already in service may be re-tested either to confirm an earlier test or to qualify the line for a higher operating pressure. (During Plant Modification)
  • 3. Types of Pressure Tests: • Hydrostatic Test: Is performed by using water as the test medium. • Pneumatic Test: Is performed by using air, nitrogen, or any non-flammable and non-toxic gas.
  • 4. Procedure • Hydro testing is generally Performed by hydrostatic testing contractor hired by the pipeline owner, or hydrostatic testing may be included as a part of the main construction contract. • Water is filled inside the pipe for the pressure test. • For the Hydro testing the water must be filtered by the means of Strainer or online filters. (The used water must be non corrosive or treated) • Deadweight pressure and temperature readings are recorded after the prescribed test pressure has been reached and the pressures and temperatures have stabilized. • Pressure vs. time plot is made the reading are usually made at 15 minutes interval for the first hour and at 30 minutes intervals thereafter.( Procedure may vary from company to company) • If the there is no Pressure drop for the 3 hours, then the leakage test is accepted. • Recorded data will become a permanent record which must be retained for as long as the facility tested remains in operation.
  • 5. Pressure tests must be performed under controlled condition. Pneumatic tests are potentially more dangerous than hydrostatic because of the higher level of potential energy. Performed only when at least one of the following conditions exists: • When pressure systems are so designed that they cannot be filled with water. • When pressure systems are to be used in services where traces of the testing medium cannot be tolerated.
  • 6. Hydro testing Test Pressure. Hydrostatic Test Pressure = 1.5 × Design Pressure × Stress Ratio 𝑆𝑡𝑟𝑒𝑠𝑠 𝑅𝑎𝑡𝑖𝑜 = 𝐴𝑙𝑙𝑜𝑤𝑎𝑏𝑙𝑒 𝑠𝑡𝑟𝑒𝑠𝑠 𝑎𝑡 𝑡𝑒𝑠𝑡 𝑡𝑒𝑚𝑝𝑒𝑟𝑎𝑡𝑢𝑟𝑒 𝑆𝑡 (kg/𝑐𝑚2) 𝐴𝑙𝑙𝑜𝑤𝑎𝑏𝑙𝑒 𝑠𝑡𝑟𝑒𝑠𝑠 𝑎𝑡 𝑑𝑒𝑠𝑖𝑔𝑛 𝑡𝑒𝑚𝑝𝑒𝑟𝑎𝑡𝑢𝑟𝑒 𝑆 (kg/𝑐𝑚2) 𝑃𝑡 = 1.5 × 𝑃 × 𝑆𝑡 𝑆 Where, Minimum calculated hydrostatic test pressure (Pt) (kg/cm2) Design pressure (P) is internal design pressure (kg/cm2)
  • 7. Test pressure for piping subjected to external pressure • For the Jacketed lines, the internal line shall be pressure tested on the basis of the internal or external design pressure, whichever is critical. This test shall be preformed prior to completion of the jacket. • The jacket shall be pressure tested of the basis to the jacket design conditions. • Where systems require hydrostatic testing through static equipment, the test pressure shall be selected so as not to exceed vessel test pressure.
  • 8. Test pressure according to different systems Test pressure for various process system must be calculated by: System Code Hydrostatic Pneumatic • Boiler Power ASME Section I 1.5×MAWP Not Permitted • Power Piping ASME Section B31.1 1.5×Design Pressure 1.2×Design Pressure • Process Piping ASME Section B31.3 1.5×Design Pressure 1.1×Design Pressure • Building Services ASME Section B31.9 1.5×Design Pressure 1.25×Design Pressure • Sprinkler System NFPA 13 200 Psi 40 Psi MAWP: Maximum Allowable Working Pressure.( Defined by Mechanical) NFPA : National Fire Protection Association
  • 9. Volume required for the hydro testing 𝑉 = 𝐿 × (𝜋 × 𝑑2 4 ) × 12 231 𝑉 = 0.0408 × 𝑑2 × 𝐿 L= length of the test section, feet d= diameter of pipe, inches V= gallons required to fill @ 0 psig
  • 10. Volume required at test pressure 𝑉𝑡𝑝 = 𝑉 × 𝐹𝑤𝑝 × 𝐹𝑝𝑝 × 𝐹𝑝𝑤𝑡 𝑉𝑡𝑝= Gallons contained in test section at test pressure P, and temperature T, FO V = Volume required for hydro test. 𝐹𝑤𝑝=Factor to correct the compressibility of water due to pressure 0 psig to test pressure P psig 𝐹𝑤𝑝 = 1 (1− 4.5×10−5 × 𝑃 14.73 ) 𝐹𝑝𝑝=Factor to correct the volume change due to pressure increase 𝐹𝑃𝑃 = 1 + 𝐷 𝑡 × 0.91×𝑃 30×106 + 3.6 × 10−6 × 𝑇 − 60 𝐹𝑝𝑤𝑡= 𝐹 𝑃𝑡 𝐹 𝑤𝑡 𝐹𝑃𝑡=Correction factor for temperature change, 𝐹𝑝𝑡 = 1 + 𝑇 − 60 × 18.2 × 10−6 𝐹 𝑤𝑡= Factor to correct for the thermal change in water which can be determined from book Pipeline Rules of Thumb. (Table No.1)
  • 11. Pipeline Dewatering, Cleaning & Drying • Pipelines used to transport natural gas will need some drying, depending on the operating pressure and the location of the line, to prevent the formation of hydrates. • Pipelines may require drying to protect the pipe from internal corrosion caused by the formation of corrosive acids, such as carbonic acid in the case of carbon dioxide pipelines. • If the pipeline is to be cleaned and/or dried, the pig will be pushed by either compressed air or gas. • The pig will form a perfect seal with the inner periphery of the pipe and will not allow any of the material behind the pig to leak past. • Brush pig is used in order to remove the debris from the pipe line by the help of air or gas. • Internal sand blasting is used to dry some section of pipe line. ( Sand is blasted in pipe by using Nitrogen or air to propel the sand)
  • 12. References • Pipeline Rules of thumb Fifth Edition ISBN 0-7506-7471-7 • Hydrostatic Pressure testing for piping by KLM Technology Group. • SLAC National Accelerator Laboratory Environment, Safety & Health Division Chapter 14 | Pressure Test Procedures 9