Background: (about hospital)
• RoyalCare super specality hospital Inaugrated on 14th,Nov,2016 as a 750 bedded
project at Neelambur, Coimbatore, Tamilnadu
• Current bed strength - 270
• The hospital is provided with State of Art CSSD.
• The study choosen to implement systematic workflow, sterilization performance and
Quality Assurance.
Objective:
• To impliment and monitor the necessary systems to ensure efficient functioning
and support of the sterile service in the hospital.
• To assess the effectiveness of sterilisation methods and turn-around by
implementing Quality in CSSD performance.
• To maintain record of effectiveness of cleaning, disinfection and sterilization
process by physical and biological controls.
Audit case type (Descriptive)
• Area Audited - CSSD
• A checklist of APSIC used to analyse the performance quality (PQ) of CSSD and to
impliment the necessary requirements.
• Some of these questions have forced options and some are open ended questions
regarding CSSD.
• Project started on 18/12/2017 to 27/02/2018
• Data collected through Observation and interaction with CSSD personnel.
Checklist content
1. Handling,Collection and transportation of contaminated instruments
2. Cleaning and decontamination processes
3. Instrumentation inspection,preparation & Packaging
4. Sterilization and monitoring
5. Sterile storage and distribution
6. Documentation
7. Facility Design
8. Personnel Considerations
Handling,Collection and transportation of contaminated
instruments:
NON COMPLIANCE OBSERVED
ITEM REVIEVED PROCESS
Secured,dedicated containers are provided for soiled instruments Not practiced
Use of puncture resistant leak proof containers for soiled items Not practiced
Policy and procedure in place for transportation of contaminated items between buildings Not Applicable
Transportation carts should be covered and should prevent items from falling over or off Not practiced
Cleaning and decontamination processes
ITEM REVIEVED PROCESS
Written policies and procedures in place for all cleaning and decontamination process Policy available but
not practiced
Appropriate brushes or cleaning implements designed for use on medical devices are used Partial practice
Brushes/cleaning implemented are either disposable or if reusable ,are decontaminated atleast
daily
Partial practice
Instrumentation inspection,preparation & Packaging
ITEM REVIEVED PROCESS
Cleaning verification by users should include visual inspection combined with other verification ( ATP)
methods that allow assessment of instrument surfaces
Partial Practice
Deligate/ sharp instruments are protected while being handled / assembled for sterilization (may use
special holder ,tip guards, or foam sleeves).
Tip protectors should be sterilant permiable
Not practiced
Basins :
• graduated basins sholuld differ in diameter by one inch
• use non lining absorbant material between nested basins.
• wraped basin sets should not exceed 11.3 kg ( 7 pounds)
Partial practice
Ridged container system instructions are being followed regarding weight and density of instrument sets. Not practiced
• Packing materials are held for a min.of 2 hours . prior to use at room temp (20 degree C - 23 Degree
C) at a relative humidity ranging from 30-60%
Not practiced
Sterilization and monitoring
Sterilization and monitoring
ITEM REVIEVED PROCESS
1.Paper - plastic pouches - use baskets to facilitate placing pouches on edge Not practiced
2.Implant loads : Monitor with a BI PCD containing a class 5 integrating indicator.Implants should be
quarantined until BI results are known,except in emergency situations
Not practiced
3.Non implant loads:optional monitoring with a PCD containing either : a class 5 integrating indicator Not practiced
4.Routine sterilizer efficacy testing testing with a BI PCD is done daily Not practiced
5.Use appropriate BI PCD depending on type of sterilizer Not practiced
6.Qualification testing :For sterilization process failures where the cause is not immediately identifiable and
after majorsteam or sterilizers repairs,run 3 empty cycles BI PCD followed by 3 empty cycles with a Bowie -
Dick test oif prevaccum sterilizer.
Not practiced
7. Sterilizer maintenance :-drain strainers are inspected daily for debris
-sterilizer external and internal surfaces are routinely cleaned
Not practiced
Sterile storage and distribution
ITEM REVIEVED PROCESS
• Transport carts should have a physical barrier between the bottom shelf and the floor.
• Reusable covers should be cleaned after each use.
Not practiced
• Carts are3 decontaminated/ dried before reused for transporting sterile supplies Not practiced
Documentation
ITEM REVIEVED PROCESS
PRODUCT RECALLS:
• Policies &procedures are clear and concise record maintened
• lot control label are used to include : sterilizer ID , lot number, sterilization date
,expiration date, name of pack and initials.
Partial
• Sterilization process failure : when cannot immediately identify cause of failure ( eg .
selected incorrect cycle setting ), reprocess the load and recall / reprocess all items
dating back to last load in sterilizer with negative BI results
Not practiced
Facility Design
ITEM REVIEVED PROCESS
If centralized reprocessing is not possible , consistant policies and procedures between locations
are in place
Not applicable
Emergency eyewash stations ( required by OSHA) located within 10 seconds travel time of all
chemical usage locations , with a continuous flush for at least 15 minutes . E.g.,
Decontamination area
Not practiced
Temperature and Humidity monitoring controls in decontamination and clean areas and daily
record
Not practiced
Appropriate positive and negative pressure ventilation system in place Not practiced
Personnel Consideration
ITEM REVIEVED PROCESS
All CS Personnel recieve a minimum annual training on department policies and procedures All
CS personnel demonstrate comprtency annually
Partial
Wriiten policy on personal hygiene Not practiced
Written policy on adherence to appropriate CS personnel attire Partial
Written policy on adherence to appropriate PPE in decontamination area Partial
Pre - Audit Outcome
PROBLEM
PRIMARY
MEANS
SECONDARY MEANS FEASIBILITY ACTION TAKEN
Pre - Audit
Outcome
Policies and
Procedures
Standard operating protocols
are not created
Preventable
CSSD manual implemented
Facility
there is seperate lift for
transportation of but not
having divider contaminated
items
Dedicated elevators provided
Instrument
Handling
and
Packaging
Improper assembling of
multipart instruments &
overweight
Regular instrrument sets weight
monitoring and proper assembling
Manpower
Proper usage of PPE,
Absenteesam
Training on PPE usage is given
Equipment Process Failure & Improper
cleaning
Cleaning Checklist implemented
Documetation done for process failure
Quality
Assurance
Monitoring
PCD not implemented PCD Initiated for every cycle
Deployment Chart
Cssd ppt
Handling,Collection and transportation of contaminated
instruments:
POST AUDIT COMPLIANCES
ITEM REVIEVED PROCESS
Secured,dedicated containers are provided for soiled instruments Implemented, yet to
practice
Use of puncture resistant leak proof containers for soiled items implemented
policy and procedure in place for transportation of contaminated items between buildings Implemented, yet to
practice
transportation carts should be covered and should prevent items from falling over or off yet to implement
dedicated elevators with direct access to decontamination area practicing
Cleaning and decontamination
processes
ITEM REVIEVED PROCESS
written policies and procedures in place for all cleaning and decontamination process Implemented
appropriate brushes or cleaning implements designed for use on medical devices are used Implemented
brushes/cleaning implement are either disposable or if reusable ,are decontaminated atleast daily Implemented
Instruments
Receiving and
Cleaning
Instrumentation inspection,preparation & Packaging
ITEM REVIEVED PROCESS
Cleaning verification by users should include visual inspection combined with other verification ( ATP)
methods that allow assessment of instrument surfaces
On discussion
-Deligate/ sharp instruments are protected while being handled / assembled for sterilization (may use
special holder ,tip guards, or foam sleeves).
- Tip protectors should be sterilant permiable
Implemented
complex instruments (air-powered, endoscopes, having lumens or channels) are prepared according to
written instructions from device mfr.
Implemented
basins :
• graduated basins sholuld differ in diameter by one inch
• use non lining absorbant material between nested basins.
• wraped basin sets should not exceed 11.3 kg ( 7 pounds)
Implemented and
nested basins are
yet to impliment
Ridged container system instructions are being followed regarding weight and density of instrument sets. Yet to practice
• Packing materials are held for a min.of 2 hours . prior to use at room temp (20 degree C - 23 Degree
C) at a relative humidity ranging from 30-60%
Implemented
Instrument preperartion
and sterilization
Sterilization and monitoring
Sterilization and monitoring
ITEM REVIEVED PROCESS
1.Paper - plastic pouches - use baskets to facilitate placing pouches on edge implemented
2.Implant loads :Monitor with a BI PCD containing a class 5 integrating indicator.Implants should be
quarantined until BI results are known,except in emergency situations
implemented
3.Non implant loads:optional monitoring with a PCD containing either : a class 5 integrating indicator implemented
4.Routine sterilizer efficacy testing testing with a BI PCD is done daily implemented
5.Use appropriate BI PCD depending on type of sterilizer implemented
6.Qualification testing :For sterilization process failures where the cause is not immediately identifiable and
after majorsteam or sterilizers repairs,run 3 empty cycles BI PCD followed by 3 empty cycles with a Bowie -
Dick test oif prevaccum sterilizer.
implemented
7. Sterilizer maintenance :-drain strainers are inspected daily for debris
-sterilizer external and internal surfaces are routinely cleaned
implemented
Sterile storage and distribution
ITEM REVIEVED PROCESS
• Transport carts should have a physical barrier between the bottom shelf and the floor.
• Reusable covers should be cleaned after each use.
implemented
• Carts are3 decontaminated/ dried before reused for transporting sterile supplies implemented
Storage and Monitoring
Documentation
ITEM REVIWED PROCESS
PRODUCT RECALLS:
• Policies &procedures are clear and concise
• record maintened
• lot control label are used to include : sterilizer ID , lot number, sterilization date
,expiration date, name of pack and initials.
implemented
• Sterilization process failure : when cannot immediately identify cause of failure ( eg .
selected incorrect cycle setting ), reprocess the load and recall / reprocess all items
dating back to last load in sterilizer with negative BI results
implemented
Facility Design
ITEM REVIEVED PROCESS
If centralized reprocessing is not possible , consistant policies and procedures between locations
are in place
implemented
Emergency eyewash stations ( required by OSHA) located within 10 seconds travel time of all
chemical usage locations , with a continuous flush for at least 15 minutes . E.g.,
Decontamination area
implemented
Functional workflow pattern clear distinction (ie physical wall) between dirty and clean implemented
Temperature and Humidity monitoring controls in decontamination and clean areas and daily
record
implemented
Appropriate positive and negative pressure ventilation system in place implemented
Floors and walls are constructed from materials that can withstand frequent cleaning implemented
Ceilings are flush surfaces and not of materials that are of particulate or fiber- shedding
composition
implemented
Personnel Consideration
ITEM REVIEVED PROCESS
All CS Personnel recieve a minimum annual training on department policies and procedures All
CS personnel demonstrate comprtency annually
Implemented, yet to
practice
Written policy on personal hygiene Implemented, yet to
practice
Written policy on adherence to appropriate CS personnel attire Implemented, yet to
practice
Written policy on adherence to appropriate PPE in decontamination area Implemented, yet to
practice
Conclusions
• CSSD is an independent department with facilities to receive, clean, pack, disinfect, sterilizes, store and distribute
instruments as per well-delineated protocols. Thus it provides all the departments of a hospital with guaranteed
sterile equipment ready and available for immediate use in patient care – a step towards the prevention of hospital
acquired infections(HAI’s).
• Implementation of standard protocols can reduce loss of surgical instruments, reduce instrument damage and
reduce repair costs, automate many tedious training and reporting tasks and reduce the cost spent on investigations
for infection control issues.
• The problems faced in the audit are all common- missing instruments, proper trolleys, infection control issues, lack
of training, monitoring reporting leading to delay in surgeries, procedures. Along with issues like requirement of
adequate staff, regular training, better communication between departments is must to streamline the process and
make it tailor made for individual departments.
• To bring about continuous improvement and update procedures one needs to recommend tools like end user
satisfaction questionnaires and Infection control team audit and feedback.
• End users need to be trained and make them aware of the techniques used. All the reusable medical devices must
be decontaminated following each episode of use.
References or Bibliography
• William A Rutala, David J. Weber(Health Infection Control Practices Advisory Committee),
Guidelines for disinfection and sterilization in healthcare facilities, 2008.
www.cdc.gov/hipac/disinfectionsterilization.
• The APSIC guidelines for Disinfection and Sterilization of Instruments in healthcare facilities,
Revised Jan 2017.
• ‘Decontamination and Reprocessing Manual for Healthcare Facilities’ WHO Revised CSSD
Manual and Guidelines.

More Related Content

PDF
CSSD Basics Chemical Indicators, Biological Indicators and Recall Process
PPTX
Central sterile supply department
PPTX
PPTX
Central Sterile Supply Department
PPTX
central sterile supply department
PPT
Ot mang
PPTX
Hospital Linen and Laundry Services
PDF
Laundry services in hospitals –linen handling
CSSD Basics Chemical Indicators, Biological Indicators and Recall Process
Central sterile supply department
Central Sterile Supply Department
central sterile supply department
Ot mang
Hospital Linen and Laundry Services
Laundry services in hospitals –linen handling

What's hot (20)

DOCX
A study on safety quality care in cssd
PPTX
Central Sterile & Supply Department (CSSD)
PPTX
laundry & linen service
PPT
Project on cssd
PDF
1. concepts of ot & setting of ot
PPT
3343555-Operation-Theatre-Management.ppt
PPT
Equipping hospital
PPTX
Operation theatres
PPTX
PDF
CSSD by Dr Zulfiquer Ahmed Amin
PPTX
Zone in operation theater
PPTX
11 rights of medication, read back policy
PDF
5th ed. NABH Accreditation Standards for Hospitals April 2020
PDF
Maintaining Surgical Instruments
PDF
OT Check List
PPTX
Central Sterile & Supply Department (CSSD)
PPTX
History and developoment of cssd 2
PDF
Sterile Supply Department
PPTX
CSSD PPT.pptx
PPTX
Infection Control Bundles
A study on safety quality care in cssd
Central Sterile & Supply Department (CSSD)
laundry & linen service
Project on cssd
1. concepts of ot & setting of ot
3343555-Operation-Theatre-Management.ppt
Equipping hospital
Operation theatres
CSSD by Dr Zulfiquer Ahmed Amin
Zone in operation theater
11 rights of medication, read back policy
5th ed. NABH Accreditation Standards for Hospitals April 2020
Maintaining Surgical Instruments
OT Check List
Central Sterile & Supply Department (CSSD)
History and developoment of cssd 2
Sterile Supply Department
CSSD PPT.pptx
Infection Control Bundles
Ad

Similar to Cssd ppt (20)

PPTX
CENTRAL STERILE SUPPLY DEPARTMENT (CSSD) By Sachin dwivedi.pptx
PPTX
HACCP and GMP in Project Planning
PPTX
Auditing of microbiology laboratory
PDF
Module 4 Safety equipment .pdf
PPTX
Good manufacturing
PPT
PRPs Training.ppt
PPTX
Good lab practices
PDF
CPCSEA Guidelines ,GLP & Bioassay.pdf
PPTX
Theory Lec-2.pptx Good Laboratory Practices
PPTX
jyoti ppt final.pptx
PPTX
Good practice in production
PPTX
cGMP Guidelines according to USFDA
PPTX
Microbiology lab QC
PPTX
Aseptic filling
PPTX
Devendra kumar chand.pptx
PDF
1 - Quality Control. pdf
PPTX
Aseptic Process Operation.pptx
PPT
Ketindan 25 april 2013
PDF
Update on-pda-tr22-revisions-for-aseptic-process-simulations
CENTRAL STERILE SUPPLY DEPARTMENT (CSSD) By Sachin dwivedi.pptx
HACCP and GMP in Project Planning
Auditing of microbiology laboratory
Module 4 Safety equipment .pdf
Good manufacturing
PRPs Training.ppt
Good lab practices
CPCSEA Guidelines ,GLP & Bioassay.pdf
Theory Lec-2.pptx Good Laboratory Practices
jyoti ppt final.pptx
Good practice in production
cGMP Guidelines according to USFDA
Microbiology lab QC
Aseptic filling
Devendra kumar chand.pptx
1 - Quality Control. pdf
Aseptic Process Operation.pptx
Ketindan 25 april 2013
Update on-pda-tr22-revisions-for-aseptic-process-simulations
Ad

Recently uploaded (20)

PPTX
First aid in common emergency conditions.pptx
PDF
Priorities Critical Care Nursing 7th Edition by Urden Stacy Lough Test Bank.pdf
PPTX
Current Treatment Of Heart Failure By Dr Masood Ahmed
PPTX
BLS, BCLS Module-A life saving procedure
PPTX
Medical aspects of impairment including all the domains mentioned in ICF
PPTX
Immunity....(shweta).................pptx
PPTX
NUTRITIONAL PROBLEMS, CHANGES NEEDED TO PREVENT MALNUTRITION
PDF
MINERAL & VITAMIN CHARTS fggfdtujhfd.pdf
PPT
Adrenergic drugs (sympathomimetics ).ppt
PDF
Structure Composition and Mechanical Properties of Australian O.pdf
PDF
CHAPTER 9 MEETING SAFETY NEEDS FOR OLDER ADULTS.pdf
PPTX
PE and Health 7 Quarter 3 Lesson 1 Day 3,4 and 5.pptx
PPTX
First Aid and Basic Life Support Training.pptx
PDF
Myers’ Psychology for AP, 1st Edition David G. Myers Test Bank.pdf
PPTX
Rheumatic heart diseases with Type 2 Diabetes Mellitus
PPTX
3. Adherance Complianace.pptx pharmacy pci
PPTX
HEMODYNAMICS - I DERANGEMENTS OF BODY FLUIDS.pptx
PDF
Megan Miller Colona Illinois - Passionate About CrossFit
PPTX
Nursing Care Aspects for High Risk newborn.pptx
PPT
Microscope is an instrument that makes an enlarged image of a small object, t...
First aid in common emergency conditions.pptx
Priorities Critical Care Nursing 7th Edition by Urden Stacy Lough Test Bank.pdf
Current Treatment Of Heart Failure By Dr Masood Ahmed
BLS, BCLS Module-A life saving procedure
Medical aspects of impairment including all the domains mentioned in ICF
Immunity....(shweta).................pptx
NUTRITIONAL PROBLEMS, CHANGES NEEDED TO PREVENT MALNUTRITION
MINERAL & VITAMIN CHARTS fggfdtujhfd.pdf
Adrenergic drugs (sympathomimetics ).ppt
Structure Composition and Mechanical Properties of Australian O.pdf
CHAPTER 9 MEETING SAFETY NEEDS FOR OLDER ADULTS.pdf
PE and Health 7 Quarter 3 Lesson 1 Day 3,4 and 5.pptx
First Aid and Basic Life Support Training.pptx
Myers’ Psychology for AP, 1st Edition David G. Myers Test Bank.pdf
Rheumatic heart diseases with Type 2 Diabetes Mellitus
3. Adherance Complianace.pptx pharmacy pci
HEMODYNAMICS - I DERANGEMENTS OF BODY FLUIDS.pptx
Megan Miller Colona Illinois - Passionate About CrossFit
Nursing Care Aspects for High Risk newborn.pptx
Microscope is an instrument that makes an enlarged image of a small object, t...

Cssd ppt

  • 1. CSSD Performance Quality Analysis at a Super Speciality Hospital NAME : D. Gandhiraj DESIGNATION : Microbiologist
  • 2. Background: (about hospital) • RoyalCare super specality hospital Inaugrated on 14th,Nov,2016 as a 750 bedded project at Neelambur, Coimbatore, Tamilnadu • Current bed strength - 270 • The hospital is provided with State of Art CSSD. • The study choosen to implement systematic workflow, sterilization performance and Quality Assurance.
  • 3. Objective: • To impliment and monitor the necessary systems to ensure efficient functioning and support of the sterile service in the hospital. • To assess the effectiveness of sterilisation methods and turn-around by implementing Quality in CSSD performance. • To maintain record of effectiveness of cleaning, disinfection and sterilization process by physical and biological controls.
  • 4. Audit case type (Descriptive) • Area Audited - CSSD • A checklist of APSIC used to analyse the performance quality (PQ) of CSSD and to impliment the necessary requirements. • Some of these questions have forced options and some are open ended questions regarding CSSD. • Project started on 18/12/2017 to 27/02/2018 • Data collected through Observation and interaction with CSSD personnel.
  • 5. Checklist content 1. Handling,Collection and transportation of contaminated instruments 2. Cleaning and decontamination processes 3. Instrumentation inspection,preparation & Packaging 4. Sterilization and monitoring 5. Sterile storage and distribution 6. Documentation 7. Facility Design 8. Personnel Considerations
  • 6. Handling,Collection and transportation of contaminated instruments: NON COMPLIANCE OBSERVED ITEM REVIEVED PROCESS Secured,dedicated containers are provided for soiled instruments Not practiced Use of puncture resistant leak proof containers for soiled items Not practiced Policy and procedure in place for transportation of contaminated items between buildings Not Applicable Transportation carts should be covered and should prevent items from falling over or off Not practiced
  • 7. Cleaning and decontamination processes ITEM REVIEVED PROCESS Written policies and procedures in place for all cleaning and decontamination process Policy available but not practiced Appropriate brushes or cleaning implements designed for use on medical devices are used Partial practice Brushes/cleaning implemented are either disposable or if reusable ,are decontaminated atleast daily Partial practice
  • 8. Instrumentation inspection,preparation & Packaging ITEM REVIEVED PROCESS Cleaning verification by users should include visual inspection combined with other verification ( ATP) methods that allow assessment of instrument surfaces Partial Practice Deligate/ sharp instruments are protected while being handled / assembled for sterilization (may use special holder ,tip guards, or foam sleeves). Tip protectors should be sterilant permiable Not practiced Basins : • graduated basins sholuld differ in diameter by one inch • use non lining absorbant material between nested basins. • wraped basin sets should not exceed 11.3 kg ( 7 pounds) Partial practice Ridged container system instructions are being followed regarding weight and density of instrument sets. Not practiced • Packing materials are held for a min.of 2 hours . prior to use at room temp (20 degree C - 23 Degree C) at a relative humidity ranging from 30-60% Not practiced
  • 9. Sterilization and monitoring Sterilization and monitoring ITEM REVIEVED PROCESS 1.Paper - plastic pouches - use baskets to facilitate placing pouches on edge Not practiced 2.Implant loads : Monitor with a BI PCD containing a class 5 integrating indicator.Implants should be quarantined until BI results are known,except in emergency situations Not practiced 3.Non implant loads:optional monitoring with a PCD containing either : a class 5 integrating indicator Not practiced 4.Routine sterilizer efficacy testing testing with a BI PCD is done daily Not practiced 5.Use appropriate BI PCD depending on type of sterilizer Not practiced 6.Qualification testing :For sterilization process failures where the cause is not immediately identifiable and after majorsteam or sterilizers repairs,run 3 empty cycles BI PCD followed by 3 empty cycles with a Bowie - Dick test oif prevaccum sterilizer. Not practiced 7. Sterilizer maintenance :-drain strainers are inspected daily for debris -sterilizer external and internal surfaces are routinely cleaned Not practiced
  • 10. Sterile storage and distribution ITEM REVIEVED PROCESS • Transport carts should have a physical barrier between the bottom shelf and the floor. • Reusable covers should be cleaned after each use. Not practiced • Carts are3 decontaminated/ dried before reused for transporting sterile supplies Not practiced
  • 11. Documentation ITEM REVIEVED PROCESS PRODUCT RECALLS: • Policies &procedures are clear and concise record maintened • lot control label are used to include : sterilizer ID , lot number, sterilization date ,expiration date, name of pack and initials. Partial • Sterilization process failure : when cannot immediately identify cause of failure ( eg . selected incorrect cycle setting ), reprocess the load and recall / reprocess all items dating back to last load in sterilizer with negative BI results Not practiced
  • 12. Facility Design ITEM REVIEVED PROCESS If centralized reprocessing is not possible , consistant policies and procedures between locations are in place Not applicable Emergency eyewash stations ( required by OSHA) located within 10 seconds travel time of all chemical usage locations , with a continuous flush for at least 15 minutes . E.g., Decontamination area Not practiced Temperature and Humidity monitoring controls in decontamination and clean areas and daily record Not practiced Appropriate positive and negative pressure ventilation system in place Not practiced
  • 13. Personnel Consideration ITEM REVIEVED PROCESS All CS Personnel recieve a minimum annual training on department policies and procedures All CS personnel demonstrate comprtency annually Partial Wriiten policy on personal hygiene Not practiced Written policy on adherence to appropriate CS personnel attire Partial Written policy on adherence to appropriate PPE in decontamination area Partial
  • 14. Pre - Audit Outcome
  • 15. PROBLEM PRIMARY MEANS SECONDARY MEANS FEASIBILITY ACTION TAKEN Pre - Audit Outcome Policies and Procedures Standard operating protocols are not created Preventable CSSD manual implemented Facility there is seperate lift for transportation of but not having divider contaminated items Dedicated elevators provided Instrument Handling and Packaging Improper assembling of multipart instruments & overweight Regular instrrument sets weight monitoring and proper assembling Manpower Proper usage of PPE, Absenteesam Training on PPE usage is given Equipment Process Failure & Improper cleaning Cleaning Checklist implemented Documetation done for process failure Quality Assurance Monitoring PCD not implemented PCD Initiated for every cycle Deployment Chart
  • 17. Handling,Collection and transportation of contaminated instruments: POST AUDIT COMPLIANCES ITEM REVIEVED PROCESS Secured,dedicated containers are provided for soiled instruments Implemented, yet to practice Use of puncture resistant leak proof containers for soiled items implemented policy and procedure in place for transportation of contaminated items between buildings Implemented, yet to practice transportation carts should be covered and should prevent items from falling over or off yet to implement dedicated elevators with direct access to decontamination area practicing
  • 18. Cleaning and decontamination processes ITEM REVIEVED PROCESS written policies and procedures in place for all cleaning and decontamination process Implemented appropriate brushes or cleaning implements designed for use on medical devices are used Implemented brushes/cleaning implement are either disposable or if reusable ,are decontaminated atleast daily Implemented
  • 20. Instrumentation inspection,preparation & Packaging ITEM REVIEVED PROCESS Cleaning verification by users should include visual inspection combined with other verification ( ATP) methods that allow assessment of instrument surfaces On discussion -Deligate/ sharp instruments are protected while being handled / assembled for sterilization (may use special holder ,tip guards, or foam sleeves). - Tip protectors should be sterilant permiable Implemented complex instruments (air-powered, endoscopes, having lumens or channels) are prepared according to written instructions from device mfr. Implemented basins : • graduated basins sholuld differ in diameter by one inch • use non lining absorbant material between nested basins. • wraped basin sets should not exceed 11.3 kg ( 7 pounds) Implemented and nested basins are yet to impliment Ridged container system instructions are being followed regarding weight and density of instrument sets. Yet to practice • Packing materials are held for a min.of 2 hours . prior to use at room temp (20 degree C - 23 Degree C) at a relative humidity ranging from 30-60% Implemented
  • 22. Sterilization and monitoring Sterilization and monitoring ITEM REVIEVED PROCESS 1.Paper - plastic pouches - use baskets to facilitate placing pouches on edge implemented 2.Implant loads :Monitor with a BI PCD containing a class 5 integrating indicator.Implants should be quarantined until BI results are known,except in emergency situations implemented 3.Non implant loads:optional monitoring with a PCD containing either : a class 5 integrating indicator implemented 4.Routine sterilizer efficacy testing testing with a BI PCD is done daily implemented 5.Use appropriate BI PCD depending on type of sterilizer implemented 6.Qualification testing :For sterilization process failures where the cause is not immediately identifiable and after majorsteam or sterilizers repairs,run 3 empty cycles BI PCD followed by 3 empty cycles with a Bowie - Dick test oif prevaccum sterilizer. implemented 7. Sterilizer maintenance :-drain strainers are inspected daily for debris -sterilizer external and internal surfaces are routinely cleaned implemented
  • 23. Sterile storage and distribution ITEM REVIEVED PROCESS • Transport carts should have a physical barrier between the bottom shelf and the floor. • Reusable covers should be cleaned after each use. implemented • Carts are3 decontaminated/ dried before reused for transporting sterile supplies implemented
  • 25. Documentation ITEM REVIWED PROCESS PRODUCT RECALLS: • Policies &procedures are clear and concise • record maintened • lot control label are used to include : sterilizer ID , lot number, sterilization date ,expiration date, name of pack and initials. implemented • Sterilization process failure : when cannot immediately identify cause of failure ( eg . selected incorrect cycle setting ), reprocess the load and recall / reprocess all items dating back to last load in sterilizer with negative BI results implemented
  • 26. Facility Design ITEM REVIEVED PROCESS If centralized reprocessing is not possible , consistant policies and procedures between locations are in place implemented Emergency eyewash stations ( required by OSHA) located within 10 seconds travel time of all chemical usage locations , with a continuous flush for at least 15 minutes . E.g., Decontamination area implemented Functional workflow pattern clear distinction (ie physical wall) between dirty and clean implemented Temperature and Humidity monitoring controls in decontamination and clean areas and daily record implemented Appropriate positive and negative pressure ventilation system in place implemented Floors and walls are constructed from materials that can withstand frequent cleaning implemented Ceilings are flush surfaces and not of materials that are of particulate or fiber- shedding composition implemented
  • 27. Personnel Consideration ITEM REVIEVED PROCESS All CS Personnel recieve a minimum annual training on department policies and procedures All CS personnel demonstrate comprtency annually Implemented, yet to practice Written policy on personal hygiene Implemented, yet to practice Written policy on adherence to appropriate CS personnel attire Implemented, yet to practice Written policy on adherence to appropriate PPE in decontamination area Implemented, yet to practice
  • 28. Conclusions • CSSD is an independent department with facilities to receive, clean, pack, disinfect, sterilizes, store and distribute instruments as per well-delineated protocols. Thus it provides all the departments of a hospital with guaranteed sterile equipment ready and available for immediate use in patient care – a step towards the prevention of hospital acquired infections(HAI’s). • Implementation of standard protocols can reduce loss of surgical instruments, reduce instrument damage and reduce repair costs, automate many tedious training and reporting tasks and reduce the cost spent on investigations for infection control issues. • The problems faced in the audit are all common- missing instruments, proper trolleys, infection control issues, lack of training, monitoring reporting leading to delay in surgeries, procedures. Along with issues like requirement of adequate staff, regular training, better communication between departments is must to streamline the process and make it tailor made for individual departments. • To bring about continuous improvement and update procedures one needs to recommend tools like end user satisfaction questionnaires and Infection control team audit and feedback. • End users need to be trained and make them aware of the techniques used. All the reusable medical devices must be decontaminated following each episode of use.
  • 29. References or Bibliography • William A Rutala, David J. Weber(Health Infection Control Practices Advisory Committee), Guidelines for disinfection and sterilization in healthcare facilities, 2008. www.cdc.gov/hipac/disinfectionsterilization. • The APSIC guidelines for Disinfection and Sterilization of Instruments in healthcare facilities, Revised Jan 2017. • ‘Decontamination and Reprocessing Manual for Healthcare Facilities’ WHO Revised CSSD Manual and Guidelines.