Concrete Technology
Test no: 3
Time of Setting of Hydraulic Cement by Vicat Needle
Student Name: Muhammad Saleem Asaad
Group: B
Expr Date:29-11-2015
Submission Date: 13-12-2015
Introduction
This test method is performed to determine the setting time of
hydraulic cement by mean of manually operated standard Vicat
apparatus.
The test is carried out to find whether cement sets at a rate suitable
for a particular work or not. There is no necessary relationship
between the time of setting and that of hardening or attaining the
maximum strength. Slow setting cement may harden more rapidly
than a quick setting one, and vice versa. The hardening of cement is
actually a continuation of the chemical action which began with
setting if the cement is placed in the mould. After initial setting time
the cement mould can be detached and after final setting time the
Vicatt’s apparatus plunger gives no impression.
The initial setting time can be defined as “time taken by paste to
stiffen to such an extent that the Vicatt’s needle is not permitted to
move down through the paste more than 25 mm.”
The final setting time can be defined as “it is the time after which the
paste becomes so hard that Vicatt’s 5mm needle doesn’t sinks visibly
and leave no impression”.
With Portland cement and rapid hardening cement the normal initial
setting time should not be less than 30 minutes and the final setting time
should not be more than 10 hours. With quick setting cement the initial
setting time should not be less than 5 minutes and the final setting time
should not be more than 30 minutes.
Apparatus
1. Vicat apparatus: It consists of a frame, bearing a movable rod,
weighing 300±0.5g, and having either:
• A removable needle, 1mm in diameter, for finding out the initial
setting time, or
• A needle, 5mm in diameter for determining the final setting time.
2. Conical hard rubber ring having 40 ± 1 mm height, inside diameter
at the bottom of 70 ± 3 mm and inside diameter at the top of 60 ± 3 mm.
3. Sensitive Balance.
4. Paste mixer.
5. Graduated glass cylinder.
6. Glass plate with adequate dimension.
7. Small trowel.
8. Stopwatch.
Test Procedure
Weight out 500g of cement and place it on the mixing plate.
Form a crater in the center and add a measured quantity of water
(the percentage of water obtained from normal consistency test).
Turn the material at the outer edge into the center within 30 sec.
of time by the aid of the trowel.
After an additional interval of 30 sec. for absorption of water,
complete the process by continuous vigorous mixing. Squeeze and
kneading with hands for (1.5 min.).
With the hands quickly form this paste into a ball, complete the
process by tossing the ball six times from one hand to the other hand,
keeping the hands about 6 in. (15 cm) apart.
Press the ball, resting in the palm of one hand, into the large end
of the conical ring of Vicat apparatus which held by the other hand.
Fill up the conical ring and remove the excess at the large end by
a single movement of the palm of the hand.
Place the ring on its large end on a glass plate and slice off excess
paste at the smaller end at the top of the ring by single oblique stroke
of a sharp edged trowel held at a slight angle with the top of the ring,
and smooth the top if necessary, but never compress the paste during
these operations.
Place the ring with the paste under the rod of the Vicat apparatus,
bring the initial setting needle (1mm) in contact with the surface of
the paste, and set the scale to read zero or read the initial reading.
This must not exceed 30 seconds after completion of mixing.
Release the plunger immediately and allow the needle to settle
for 30 s. Determine the penetration of the 1-mm needle every 15 min
until a penetration of 25 mm or less is obtained (Make each
penetration test at least 5 mm away from any previous penetration
and at least 10 mm away from the inner side of the mold).
Record the results of all penetration tests and, by interpolation,
determine the time when a penetration of 25 mm is obtained. The
elapsed time between the initial contact of cement with water and the
penetration of 25 mm is the Vicat time of setting or Vicat initial time
of setting.
Set the (5 mm) diameter needle on the lower end of the rod.
Determine the Vicat final time of setting end point to be the first
penetration measurement
that does not mark the specimen surface with a complete circular
impression.
The elapsed time between the initial contact of cement and water
and the end point determination above is the Vicat final time of
setting.
Calculation of Initial Setting Time
[(
𝐇−𝐄
𝐂−𝐃
)*(𝐶−25)] +𝐸
Where;
E = time in minutes of last penetration greater than 25 mm,
H = time in minutes of first penetration less than 25 mm,
C = penetration reading at time E, and
D = penetration reading at time H.
[(
𝟗𝟎−𝟕𝟓
𝟑𝟎−𝟐𝟎
)*(30−25)] +75 = 82.5



ASTM C150-07 Specification
For all types of Portland cement (I, IA, II, IIA, III, IIIA, IV & V):
• Initial time of setting, not less than 45 min.
• Final time of setting, not more than 375 min.


Iraqi Specification 1984
• Initial time of setting, not less than 45 min.
• Final time of setting, not more than 10 hrs.
Figure 1: Vicat Apparatus for Initial & Final Setting Time
Discussion
Initial setting time is that time period between the time
water is added to cement and time at which 1 mm needle
fails to penetrate the cement paste about 25 mm, by this
test we know the time that cement taken to set initial. Our
initial setting time equal 82.5 and according to Iraqi
specification because not less than 45 min, during this test
we have some factors that affect on the result if weather
not good or the needle during needle penetration not
clean in the result if Initial setting time not qualified we
can’t use it in engineering.

More Related Content

PDF
Setting Time of Hydraulic Cement By Vicat Needle | Jameel Academy
PDF
Normal Consistency of Hydraulic Cement | Jameel Academy
DOCX
Slump Test - Report
PDF
Bulk Density & Voids in Aggregate | Jameel Academy
PDF
Fineness of cement test
DOCX
SLUMP TEST REPORT DCC 2042
PDF
Sieve Analysis of Fine & Coarse Aggregate | Jameel Academy
PPTX
Penetration Test for Bitumen
Setting Time of Hydraulic Cement By Vicat Needle | Jameel Academy
Normal Consistency of Hydraulic Cement | Jameel Academy
Slump Test - Report
Bulk Density & Voids in Aggregate | Jameel Academy
Fineness of cement test
SLUMP TEST REPORT DCC 2042
Sieve Analysis of Fine & Coarse Aggregate | Jameel Academy
Penetration Test for Bitumen

What's hot (20)

PDF
Building materials lab_manual lab 01
DOCX
Sieve analysis of coarse and fine aggregate - Report
DOCX
Proktor compaction
PPT
Laboratory soil compaction test
PDF
Sieve analysis of fine aggregates student experiment
DOCX
Sand replacement
PDF
Normal Consistency and Sitting times of cement paste
PPTX
Aggregates (1).pptx
PPTX
Consistency test,Initial & Final setting time of Hydraulic Cement specimen
PDF
Experiment no 03 setting time of cement.
PDF
Aggregate impact and crushing test
DOCX
Permeability test
DOCX
Atterberg
DOCX
Specific gravity of Coarse aggregate
PDF
Cube test report
PDF
Gradation of fine aggregate by sieve analysis
PDF
2 standard consistency of cement
PDF
Flow test of concrete
PPTX
Flexural strength in concrete test
PDF
Discharge Over a broad Crested Weir | Jameel Academy
Building materials lab_manual lab 01
Sieve analysis of coarse and fine aggregate - Report
Proktor compaction
Laboratory soil compaction test
Sieve analysis of fine aggregates student experiment
Sand replacement
Normal Consistency and Sitting times of cement paste
Aggregates (1).pptx
Consistency test,Initial & Final setting time of Hydraulic Cement specimen
Experiment no 03 setting time of cement.
Aggregate impact and crushing test
Permeability test
Atterberg
Specific gravity of Coarse aggregate
Cube test report
Gradation of fine aggregate by sieve analysis
2 standard consistency of cement
Flow test of concrete
Flexural strength in concrete test
Discharge Over a broad Crested Weir | Jameel Academy
Ad

Similar to Setting time test (20)

DOCX
Rcc lab manual
PDF
PLAIN AND REINFORCED CONRETE (LAB MANUAL)
PDF
3 setting time of cement
DOCX
Concreate technology
PDF
Cement Test.pdf
PPTX
Tests of cement in concrete technology
PPTX
Properties of Concrete (cement)
PDF
AUTOCLAVE, VICAT, GILLMORE - Material Testing.pdf
PPTX
Properties of concrete
PPTX
DOC-20231025- ggffgghjmgghhhjWA0006..pptx
PPTX
Ppt on test certificate-Amit Payal
PDF
Buildingmaterialslabmanuallab01 161125043012 (1)
PDF
Buildingmaterialslabmanuallab01 161125043012
DOCX
cm lab report.docx
PPTX
How to determine Initial and Final Setting Time of Cement?
PDF
Lab_Manual_of_Concrete_Technology(2).pdf
PPTX
694176489-Laboratory-Teshdsfsdjhfsjdts.pptx
PDF
Normal consistency-Amit Payal
PDF
chapter-12.pdf
DOCX
Concrete lab manual - Polytechnics
Rcc lab manual
PLAIN AND REINFORCED CONRETE (LAB MANUAL)
3 setting time of cement
Concreate technology
Cement Test.pdf
Tests of cement in concrete technology
Properties of Concrete (cement)
AUTOCLAVE, VICAT, GILLMORE - Material Testing.pdf
Properties of concrete
DOC-20231025- ggffgghjmgghhhjWA0006..pptx
Ppt on test certificate-Amit Payal
Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012
cm lab report.docx
How to determine Initial and Final Setting Time of Cement?
Lab_Manual_of_Concrete_Technology(2).pdf
694176489-Laboratory-Teshdsfsdjhfsjdts.pptx
Normal consistency-Amit Payal
chapter-12.pdf
Concrete lab manual - Polytechnics
Ad

More from Muhammad Saleem (7)

PDF
Compressive strength of concrete cubs
PDF
Vebe test for workability of fresh concrete
PDF
PDF
Density, (relative density) specific gravity & absorption of coarse aggre...
PDF
Normal consistency test
PPT
Highway Classifications
PPTX
Compressive strength of concrete cubs
Vebe test for workability of fresh concrete
Density, (relative density) specific gravity & absorption of coarse aggre...
Normal consistency test
Highway Classifications

Recently uploaded (20)

PDF
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
PPTX
Sustainable Sites - Green Building Construction
PPTX
CH1 Production IntroductoryConcepts.pptx
PPTX
OOP with Java - Java Introduction (Basics)
PDF
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
PPTX
Current and future trends in Computer Vision.pptx
PDF
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
PPTX
CYBER-CRIMES AND SECURITY A guide to understanding
PPTX
bas. eng. economics group 4 presentation 1.pptx
PDF
PPT on Performance Review to get promotions
PPTX
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
PDF
Operating System & Kernel Study Guide-1 - converted.pdf
PDF
Embodied AI: Ushering in the Next Era of Intelligent Systems
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PDF
Digital Logic Computer Design lecture notes
PDF
Model Code of Practice - Construction Work - 21102022 .pdf
PPT
introduction to datamining and warehousing
PPTX
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
PDF
composite construction of structures.pdf
PPTX
web development for engineering and engineering
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
Sustainable Sites - Green Building Construction
CH1 Production IntroductoryConcepts.pptx
OOP with Java - Java Introduction (Basics)
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
Current and future trends in Computer Vision.pptx
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
CYBER-CRIMES AND SECURITY A guide to understanding
bas. eng. economics group 4 presentation 1.pptx
PPT on Performance Review to get promotions
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
Operating System & Kernel Study Guide-1 - converted.pdf
Embodied AI: Ushering in the Next Era of Intelligent Systems
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
Digital Logic Computer Design lecture notes
Model Code of Practice - Construction Work - 21102022 .pdf
introduction to datamining and warehousing
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
composite construction of structures.pdf
web development for engineering and engineering

Setting time test

  • 1. Koya University Faculty of Engineering Civil Department - 2nd Stage Concrete Technology Test no: 3 Time of Setting of Hydraulic Cement by Vicat Needle Student Name: Muhammad Saleem Asaad Group: B Expr Date:29-11-2015 Submission Date: 13-12-2015
  • 2. Introduction This test method is performed to determine the setting time of hydraulic cement by mean of manually operated standard Vicat apparatus. The test is carried out to find whether cement sets at a rate suitable for a particular work or not. There is no necessary relationship between the time of setting and that of hardening or attaining the maximum strength. Slow setting cement may harden more rapidly than a quick setting one, and vice versa. The hardening of cement is actually a continuation of the chemical action which began with setting if the cement is placed in the mould. After initial setting time the cement mould can be detached and after final setting time the Vicatt’s apparatus plunger gives no impression. The initial setting time can be defined as “time taken by paste to stiffen to such an extent that the Vicatt’s needle is not permitted to move down through the paste more than 25 mm.” The final setting time can be defined as “it is the time after which the paste becomes so hard that Vicatt’s 5mm needle doesn’t sinks visibly and leave no impression”. With Portland cement and rapid hardening cement the normal initial setting time should not be less than 30 minutes and the final setting time should not be more than 10 hours. With quick setting cement the initial setting time should not be less than 5 minutes and the final setting time should not be more than 30 minutes.
  • 3. Apparatus 1. Vicat apparatus: It consists of a frame, bearing a movable rod, weighing 300±0.5g, and having either: • A removable needle, 1mm in diameter, for finding out the initial setting time, or • A needle, 5mm in diameter for determining the final setting time. 2. Conical hard rubber ring having 40 ± 1 mm height, inside diameter at the bottom of 70 ± 3 mm and inside diameter at the top of 60 ± 3 mm. 3. Sensitive Balance. 4. Paste mixer. 5. Graduated glass cylinder. 6. Glass plate with adequate dimension. 7. Small trowel. 8. Stopwatch.
  • 4. Test Procedure Weight out 500g of cement and place it on the mixing plate. Form a crater in the center and add a measured quantity of water (the percentage of water obtained from normal consistency test). Turn the material at the outer edge into the center within 30 sec. of time by the aid of the trowel. After an additional interval of 30 sec. for absorption of water, complete the process by continuous vigorous mixing. Squeeze and kneading with hands for (1.5 min.). With the hands quickly form this paste into a ball, complete the process by tossing the ball six times from one hand to the other hand, keeping the hands about 6 in. (15 cm) apart. Press the ball, resting in the palm of one hand, into the large end of the conical ring of Vicat apparatus which held by the other hand. Fill up the conical ring and remove the excess at the large end by a single movement of the palm of the hand. Place the ring on its large end on a glass plate and slice off excess paste at the smaller end at the top of the ring by single oblique stroke of a sharp edged trowel held at a slight angle with the top of the ring, and smooth the top if necessary, but never compress the paste during these operations. Place the ring with the paste under the rod of the Vicat apparatus, bring the initial setting needle (1mm) in contact with the surface of the paste, and set the scale to read zero or read the initial reading. This must not exceed 30 seconds after completion of mixing. Release the plunger immediately and allow the needle to settle for 30 s. Determine the penetration of the 1-mm needle every 15 min until a penetration of 25 mm or less is obtained (Make each
  • 5. penetration test at least 5 mm away from any previous penetration and at least 10 mm away from the inner side of the mold). Record the results of all penetration tests and, by interpolation, determine the time when a penetration of 25 mm is obtained. The elapsed time between the initial contact of cement with water and the penetration of 25 mm is the Vicat time of setting or Vicat initial time of setting. Set the (5 mm) diameter needle on the lower end of the rod. Determine the Vicat final time of setting end point to be the first penetration measurement that does not mark the specimen surface with a complete circular impression. The elapsed time between the initial contact of cement and water and the end point determination above is the Vicat final time of setting.
  • 6. Calculation of Initial Setting Time [( 𝐇−𝐄 𝐂−𝐃 )*(𝐶−25)] +𝐸 Where; E = time in minutes of last penetration greater than 25 mm, H = time in minutes of first penetration less than 25 mm, C = penetration reading at time E, and D = penetration reading at time H. [( 𝟗𝟎−𝟕𝟓 𝟑𝟎−𝟐𝟎 )*(30−25)] +75 = 82.5    ASTM C150-07 Specification For all types of Portland cement (I, IA, II, IIA, III, IIIA, IV & V): • Initial time of setting, not less than 45 min. • Final time of setting, not more than 375 min.   Iraqi Specification 1984 • Initial time of setting, not less than 45 min. • Final time of setting, not more than 10 hrs.
  • 7. Figure 1: Vicat Apparatus for Initial & Final Setting Time
  • 8. Discussion Initial setting time is that time period between the time water is added to cement and time at which 1 mm needle fails to penetrate the cement paste about 25 mm, by this test we know the time that cement taken to set initial. Our initial setting time equal 82.5 and according to Iraqi specification because not less than 45 min, during this test we have some factors that affect on the result if weather not good or the needle during needle penetration not clean in the result if Initial setting time not qualified we can’t use it in engineering.