Root Cause and Corrective Action Workshop January 2009
Root Cause and  Corrective Action  is a five step process Step 1.  Understand the problem Step 2.  Put in short term fix Step 3.  Determine the Root Cause of  the problem Step 4.  Determine Corrective Action necessary Step 5.  Verify that the Corrective Action has    eliminated the Root Cause of the problem With an embedded eight step corrective action process 1.Develop alternative solutions 2. Pick the best solution 3. Establish a plan to do the solution 4. Establish the timing of the solution 5. Establish the details of the solution 6. Document the plan 7. Get management approval 8. Do it
What  Corrective Action means  The point of corrective action is to is to eliminate the problem FOREVER. First put in an immediate fix Then a corrective action
Typical Corrective Action request
Typical Corrective Action log
Corrective Action log 1910 1910 /12 = 160 160 Corrective Action requests per month!
Prerequisite:  Quality Management System  [ISO 9000  (1994)] Management Responsibility Quality System Contract Review Design Control Document & Data Control Purchasing Control of Customer-Supplied Product Product Identification & Traceability Process Control Inspection & Testing Control of Inspection, M & TE Inspection & Test Status Control of Non-Conforming Product Corrective & Preventive Action Handling, Storage, Packaging Control of Quality Records Internal Quality Audits Training Servicing Statistical Techniques This is the way we do business to have Quality!
1. Management Responsibility Processes planned Responsibilities for Q  clearly defined, Periodic reviews of  quality and a quality  policy. Knowingly shipped product not to spec to make numbers. Quality policy is for show.  "Defect free, on time"  is really "Some defects, mostly not more then a week  late". Send the salesman out to take care of  it.
 
Juran’s  (1960)  Steering committee and action committee Steering committee  selects the task for the action committee Action Committee  Collects data  and makes improvements Reports to management
Classic  Five step    Root Cause    and    Corrective Action Process Step 1.  Understand the problem Step 2.  Put in short term fix Step 3.  Determine the Root Cause of the    problem Step 4.  Determine Corrective Action    necessary Step 5.  Verify that the Corrective Action has  eliminated the Root Cause of the problem.
ITCHY RASH   ON GRANDKIDS 1. 2. 3. 4. 5.
Step 1.  Understand the problem Step 2.  Put in short term fix Step 3.  Determine the Root Cause of  the problem Step 4.  Determine Corrective Action necessary Step 5.  Verify that the Corrective Action has    eliminated the Root Cause of the problem . Translate symptoms into an exact understanding Collect the data When Where How long has it happened Describe the problem with a problem statement Clear  Concise Factual Technically correct Get help if the problem is not understood
The short term fix is called an  interim fix  by some authors Take action to fix the problem now What immediate action must be taken? Major problem? Safety involved? Other  processes, or “parts” involved? Other people involved? Into the ” REJECT CAGE”? Caution:  Fixing the problem this does not remove the root cause! The “fix or “fixing the problem” is the emergency, temporary action. Step 1.  Understand the problem Step 2.  Put in short term fix Step 3.  Determine the Root Cause of the problem Step 4.  Determine Corrective Action necessary Step 5.  Verify that the Corrective Action has    eliminated the Root Cause of the problem .
A Band-aid is a Fix This is not Corrective Action It is a temporary  ” fix” Talked to the operator. Sorted out the bad stuff. Got the right print to the floor Re entered the right order number.
… W hen you complete the blank on many quality forms  Receiving inspection In Process inspection Final Inspection Customer complaints Audit reports This is really a short term  fix  to keep production going Unless the 5 step process was used. What RCCA is not “ Corrective Acton done  _ _ _ _ _ _ _ _ _ _ _ _ _”
Determining the root cause is the  most difficult task. It usually involves a team  and the use of the basic   Quality Tools Tool 1::  Brainstorming Tool 2:  Pareto Diagram Tool 3:  Histogram Tool 4:  Cause and effect diagram Tool 5:  Flow chart Tool 6: Check Sheet Tool 7:  Charts &  graphs Step 1.  Understand the problem Step 2.  Put in short term fix Step 3.  Determine the Root Cause of  the problem Step 4.  Determine Corrective Action necessary Step 5.  Verify that the Corrective Action has    eliminated the Root Cause of the problem .
Found it!
The fix was immediate. It did not address the Root Cause Corrective action finds and eliminates the root cause The difference between the Fixing the problem  and Corrective action is forever The point is to eliminate the problem FOREVER. Step 1.  Understand the problem Step 2.  Put in short term fix Step 3.  Determine the Root Cause of  the problem St ep 4.  Determine Corrective Action necessary Step 5.  Verify that the Corrective Action has    eliminated the Root Cause of the problem .
An eight item checklist is used to determine Corrective Action 1. Develop alternative solutions 2. Pick the best solution 3. Establish a plan to do the solution 4. Establish the timing of the solution 5. Establish the details of the solution 6. Document the plan 7. Get management approval 8. Do it ! .
What are the solutions?  1. Develop alternative solutions 2. Pick the best solution 3. Establish a plan to do the solution 4. Establish the timing of the solution 5. Establish the details of the solution 6. Document the plan 7. Get management approval 8. Do it  “ There are many ways to skin a cat.” ( The saying came from collecting pelts!) Team brainstorm is the most commonly used tool to develop  solutions
Decide on the best solution. 1. Develop alternative solutions 2. Pick the best solution 3. Establish a plan to do the solution 4. Establish the timing of the solution 5. Establish the details of the solution 6. Document the plan 7. Get management approval 8. Do it  Consider .... Cost Effectiveness Negative side effects Ease of doing the correction
Make a plan 1. Develop alternative solutions 2. Pick the best solution 3. Establish a plan to do the solution 4. Establish the timing of the solution 5. Establish the details of the solution 6. Document the plan 7. Get management approval 8. Do it  What needs to be done? Who will do it? When and how will it be done  ? What is the measure of success? How about a pilot run to test the plan?
  Exactly when? 1. Develop alternative solutions 2. Pick the best solution 3. Establish a plan to do the solution 4. Establish the timing of the solution 5. Establish the details of the solution 6. Document the plan 7. Get management approval 8. Do it  Time, date, shift? Can solution  be ”worked  into” the regular production? Exactly how will the solution, be scheduled along with regular activities ? When is the regular production scheduled to be run?
Complete the details for the plan 1. Develop alternative solutions 2. Pick the best solution 3. Establish a plan to do the solution 4. Establish the timing of the solution 5. Establish the details of the solution 6. Document the plan 7. Get management approval 8. Do it  Special training ? Special testing or inspection ? Special equipment ? Who else needs to be involved ? Data collection and record forms? “ Baby sit” it all the way through.  “ Debugging” attempt first?
Write the plan down and have a team understanding. 1. Develop alternative solutions 2. Pick the best solution 3. Establish a plan to do the solution 4. Establish the timing of the solution 5. Establish the details of the solution 6. Document the plan 7. Get management approval 8. Do it Summarize into a planned, written, outline Detailed game plan. The way we are going to do it. Distribute it! Else you’ll get that 3 am  phone call “ How we supposed to..?)
Management buy in is essential 1 . Develop alternative solutions 2. Pick the best solution 3. Establish a plan to do the solution 4. Establish the timing of the solution 5. Establish the details of the solution 6. Document the plan 7. Get management approval 8. Do it Approval means support Dollars and people   Allotted time for all involved OK to interrupt normal activity No surprises Reinforcement for future  improvements  Finding future team leaders Finding people who can succeed and contribute Future atta boys
Put the correction action into action 1. Develop alternative solutions 2. Pick the best solution 3. Establish a plan to do the solution 4. Establish the timing of the solution 5. Establish the details of the solution 6. Document the plan 7. Get management approval 8. Do it Caution: You will never do it according to the plan.  Something will always change or be different  ... absentees or breakdowns, or lost data or  not enough debugging  or not  enough trial run. You  will need to lead the action!
Remember Root Cause and  Corrective Action  is a five step process Step 1.  Understand the problem Step 2.  Put in short term fix Step 3.  Determine the Root Cause of  the problem Step 4.  Determine Corrective Action necessary With an embedded eight step corrective action process 1.Develop alternative solutions 2. Pick the best solution 3. Establish a plan to do the solution 4. Establish the timing of the solution 5. Establish the details of the solution 6. Document the plan 7. Get management approval 8. Do it  Step 5.  Verify that the Corrective Action has eliminated the Root Cause of the problem
Make sure it works Step 1.  Understand the problem Step 2.  Put in short term fix Step 3.  Determine the Root Cause of  the problem Step 4.  Determine Corrective Action necessary Step 5.  Verify that the Corrective Action has  eliminated the Root Cause of the problem What  facts show the problem was solved? Auditing Control charts Loss reports Increased throughput Less hassle Make it part of your  Standard Operating Procedure  SOP .
Root Cause and  Corrective Action  is a five step process Step 1.  Understand the problem Step 2.  Put in short term fix Step 3.  Determine the Root Cause of  the problem Step 4.  Determine Corrective Action necessary Step 5.  Verify that the Corrective Action has    eliminated the Root Cause of the problem With an embedded eight step corrective action process 1.Develop alternative solutions 2. Pick the best solution 3. Establish a plan to do the solution 4. Establish the timing of the solution 5. Establish the details of the solution 6. Document the plan 7. Get management approval 8. Do it
Questions or comments

More Related Content

PDF
Mini-Training: Using root-cause analysis for problem management
PPT
Root Cause Analysis
PPS
PPTX
Root Cause Analysis ( RCA )
PPTX
Root cause analysis 1
PDF
5 why training_presentation
PPTX
5 Why Training Slides Oct 14, 2009
PPTX
Root cause analysis using 5 whys
Mini-Training: Using root-cause analysis for problem management
Root Cause Analysis
Root Cause Analysis ( RCA )
Root cause analysis 1
5 why training_presentation
5 Why Training Slides Oct 14, 2009
Root cause analysis using 5 whys

What's hot (20)

PDF
8 Disciplines (8D) Training
PPT
Root cause analysis training
PDF
Global 8D Problem Solving Process Training Module
PDF
Root Cause Analysis
PPTX
Corrective & Preventive Action
PDF
Basic 8D Problem Solving Tools & Methods - Part 1
PPTX
8D Problem Solving
PPT
Root Cause Corrective Action
PPTX
8D Problem Solving - Automotive Industry
PPT
Root Cause Analysis
PDF
Fmea handout
PDF
8D analysis presentation
PDF
Basic 8D Problem Solving Tools & Methods - Part 2
PDF
The Global 8D Problem Solving Process
PDF
Root cause analysis
PPTX
Root cause analysis - tools and process
PPT
7 qc tools
PPT
8D Problem Solving Approach
PPTX
Root Cause Analysis
PPT
8 Disciplines (8D) Training
Root cause analysis training
Global 8D Problem Solving Process Training Module
Root Cause Analysis
Corrective & Preventive Action
Basic 8D Problem Solving Tools & Methods - Part 1
8D Problem Solving
Root Cause Corrective Action
8D Problem Solving - Automotive Industry
Root Cause Analysis
Fmea handout
8D analysis presentation
Basic 8D Problem Solving Tools & Methods - Part 2
The Global 8D Problem Solving Process
Root cause analysis
Root cause analysis - tools and process
7 qc tools
8D Problem Solving Approach
Root Cause Analysis
Ad

Similar to Root Cause And Corrective Action Workshop Cinci Asq 2009 (20)

PPT
Root_Cause_Analysis.ppt
PPT
Root Cause Analysis....................................
PPT
Root_Cause_Analysiggghhfcguhfdrybvfs.ppt
PPTX
Problem Solving Techniques - LEAN
PPT
Asq toronto10 jan2007effectcorraction
PPT
Root_Cause_Analysis.ppt HOW TO GO TO THE CORE
PPTX
SEMINAR - CAPA.pptx ..........................
PPTX
Problem Solving Frameworks
PPT
Problem solving
PPT
Problem Solving
PDF
Problem Solving:9S Methodology
PDF
ABC's of Problem Solving
PPT
problem_solving_-_pdca.ppt
PDF
8d_en.pdf
DOCX
8D Problem Solving WorksheetGroup NumberGroup Member Nam.docx
PDF
8D Training Presentation (tai lieu tham khao)
PDF
Corrective and Preventive Actions | Gaurav Singh Rajput
PDF
Problem Solving Tools and Techniques by TQMI
PDF
Problem Solving Tools and Techniques by TQMI
PPTX
Corrective action training april 2013
Root_Cause_Analysis.ppt
Root Cause Analysis....................................
Root_Cause_Analysiggghhfcguhfdrybvfs.ppt
Problem Solving Techniques - LEAN
Asq toronto10 jan2007effectcorraction
Root_Cause_Analysis.ppt HOW TO GO TO THE CORE
SEMINAR - CAPA.pptx ..........................
Problem Solving Frameworks
Problem solving
Problem Solving
Problem Solving:9S Methodology
ABC's of Problem Solving
problem_solving_-_pdca.ppt
8d_en.pdf
8D Problem Solving WorksheetGroup NumberGroup Member Nam.docx
8D Training Presentation (tai lieu tham khao)
Corrective and Preventive Actions | Gaurav Singh Rajput
Problem Solving Tools and Techniques by TQMI
Problem Solving Tools and Techniques by TQMI
Corrective action training april 2013
Ad

Root Cause And Corrective Action Workshop Cinci Asq 2009

  • 1. Root Cause and Corrective Action Workshop January 2009
  • 2. Root Cause and Corrective Action is a five step process Step 1. Understand the problem Step 2. Put in short term fix Step 3. Determine the Root Cause of the problem Step 4. Determine Corrective Action necessary Step 5. Verify that the Corrective Action has eliminated the Root Cause of the problem With an embedded eight step corrective action process 1.Develop alternative solutions 2. Pick the best solution 3. Establish a plan to do the solution 4. Establish the timing of the solution 5. Establish the details of the solution 6. Document the plan 7. Get management approval 8. Do it
  • 3. What Corrective Action means The point of corrective action is to is to eliminate the problem FOREVER. First put in an immediate fix Then a corrective action
  • 6. Corrective Action log 1910 1910 /12 = 160 160 Corrective Action requests per month!
  • 7. Prerequisite: Quality Management System [ISO 9000 (1994)] Management Responsibility Quality System Contract Review Design Control Document & Data Control Purchasing Control of Customer-Supplied Product Product Identification & Traceability Process Control Inspection & Testing Control of Inspection, M & TE Inspection & Test Status Control of Non-Conforming Product Corrective & Preventive Action Handling, Storage, Packaging Control of Quality Records Internal Quality Audits Training Servicing Statistical Techniques This is the way we do business to have Quality!
  • 8. 1. Management Responsibility Processes planned Responsibilities for Q clearly defined, Periodic reviews of quality and a quality policy. Knowingly shipped product not to spec to make numbers. Quality policy is for show. "Defect free, on time" is really "Some defects, mostly not more then a week late". Send the salesman out to take care of it.
  • 9.  
  • 10. Juran’s (1960) Steering committee and action committee Steering committee selects the task for the action committee Action Committee Collects data and makes improvements Reports to management
  • 11. Classic Five step Root Cause and Corrective Action Process Step 1. Understand the problem Step 2. Put in short term fix Step 3. Determine the Root Cause of the problem Step 4. Determine Corrective Action necessary Step 5. Verify that the Corrective Action has eliminated the Root Cause of the problem.
  • 12. ITCHY RASH ON GRANDKIDS 1. 2. 3. 4. 5.
  • 13. Step 1. Understand the problem Step 2. Put in short term fix Step 3. Determine the Root Cause of the problem Step 4. Determine Corrective Action necessary Step 5. Verify that the Corrective Action has eliminated the Root Cause of the problem . Translate symptoms into an exact understanding Collect the data When Where How long has it happened Describe the problem with a problem statement Clear Concise Factual Technically correct Get help if the problem is not understood
  • 14. The short term fix is called an interim fix by some authors Take action to fix the problem now What immediate action must be taken? Major problem? Safety involved? Other processes, or “parts” involved? Other people involved? Into the ” REJECT CAGE”? Caution: Fixing the problem this does not remove the root cause! The “fix or “fixing the problem” is the emergency, temporary action. Step 1. Understand the problem Step 2. Put in short term fix Step 3. Determine the Root Cause of the problem Step 4. Determine Corrective Action necessary Step 5. Verify that the Corrective Action has eliminated the Root Cause of the problem .
  • 15. A Band-aid is a Fix This is not Corrective Action It is a temporary ” fix” Talked to the operator. Sorted out the bad stuff. Got the right print to the floor Re entered the right order number.
  • 16. … W hen you complete the blank on many quality forms Receiving inspection In Process inspection Final Inspection Customer complaints Audit reports This is really a short term fix to keep production going Unless the 5 step process was used. What RCCA is not “ Corrective Acton done _ _ _ _ _ _ _ _ _ _ _ _ _”
  • 17. Determining the root cause is the most difficult task. It usually involves a team and the use of the basic Quality Tools Tool 1:: Brainstorming Tool 2: Pareto Diagram Tool 3: Histogram Tool 4: Cause and effect diagram Tool 5: Flow chart Tool 6: Check Sheet Tool 7: Charts & graphs Step 1. Understand the problem Step 2. Put in short term fix Step 3. Determine the Root Cause of the problem Step 4. Determine Corrective Action necessary Step 5. Verify that the Corrective Action has eliminated the Root Cause of the problem .
  • 19. The fix was immediate. It did not address the Root Cause Corrective action finds and eliminates the root cause The difference between the Fixing the problem and Corrective action is forever The point is to eliminate the problem FOREVER. Step 1. Understand the problem Step 2. Put in short term fix Step 3. Determine the Root Cause of the problem St ep 4. Determine Corrective Action necessary Step 5. Verify that the Corrective Action has eliminated the Root Cause of the problem .
  • 20. An eight item checklist is used to determine Corrective Action 1. Develop alternative solutions 2. Pick the best solution 3. Establish a plan to do the solution 4. Establish the timing of the solution 5. Establish the details of the solution 6. Document the plan 7. Get management approval 8. Do it ! .
  • 21. What are the solutions? 1. Develop alternative solutions 2. Pick the best solution 3. Establish a plan to do the solution 4. Establish the timing of the solution 5. Establish the details of the solution 6. Document the plan 7. Get management approval 8. Do it “ There are many ways to skin a cat.” ( The saying came from collecting pelts!) Team brainstorm is the most commonly used tool to develop solutions
  • 22. Decide on the best solution. 1. Develop alternative solutions 2. Pick the best solution 3. Establish a plan to do the solution 4. Establish the timing of the solution 5. Establish the details of the solution 6. Document the plan 7. Get management approval 8. Do it Consider .... Cost Effectiveness Negative side effects Ease of doing the correction
  • 23. Make a plan 1. Develop alternative solutions 2. Pick the best solution 3. Establish a plan to do the solution 4. Establish the timing of the solution 5. Establish the details of the solution 6. Document the plan 7. Get management approval 8. Do it What needs to be done? Who will do it? When and how will it be done ? What is the measure of success? How about a pilot run to test the plan?
  • 24. Exactly when? 1. Develop alternative solutions 2. Pick the best solution 3. Establish a plan to do the solution 4. Establish the timing of the solution 5. Establish the details of the solution 6. Document the plan 7. Get management approval 8. Do it Time, date, shift? Can solution be ”worked into” the regular production? Exactly how will the solution, be scheduled along with regular activities ? When is the regular production scheduled to be run?
  • 25. Complete the details for the plan 1. Develop alternative solutions 2. Pick the best solution 3. Establish a plan to do the solution 4. Establish the timing of the solution 5. Establish the details of the solution 6. Document the plan 7. Get management approval 8. Do it Special training ? Special testing or inspection ? Special equipment ? Who else needs to be involved ? Data collection and record forms? “ Baby sit” it all the way through. “ Debugging” attempt first?
  • 26. Write the plan down and have a team understanding. 1. Develop alternative solutions 2. Pick the best solution 3. Establish a plan to do the solution 4. Establish the timing of the solution 5. Establish the details of the solution 6. Document the plan 7. Get management approval 8. Do it Summarize into a planned, written, outline Detailed game plan. The way we are going to do it. Distribute it! Else you’ll get that 3 am phone call “ How we supposed to..?)
  • 27. Management buy in is essential 1 . Develop alternative solutions 2. Pick the best solution 3. Establish a plan to do the solution 4. Establish the timing of the solution 5. Establish the details of the solution 6. Document the plan 7. Get management approval 8. Do it Approval means support Dollars and people Allotted time for all involved OK to interrupt normal activity No surprises Reinforcement for future improvements Finding future team leaders Finding people who can succeed and contribute Future atta boys
  • 28. Put the correction action into action 1. Develop alternative solutions 2. Pick the best solution 3. Establish a plan to do the solution 4. Establish the timing of the solution 5. Establish the details of the solution 6. Document the plan 7. Get management approval 8. Do it Caution: You will never do it according to the plan. Something will always change or be different ... absentees or breakdowns, or lost data or not enough debugging or not enough trial run. You will need to lead the action!
  • 29. Remember Root Cause and Corrective Action is a five step process Step 1. Understand the problem Step 2. Put in short term fix Step 3. Determine the Root Cause of the problem Step 4. Determine Corrective Action necessary With an embedded eight step corrective action process 1.Develop alternative solutions 2. Pick the best solution 3. Establish a plan to do the solution 4. Establish the timing of the solution 5. Establish the details of the solution 6. Document the plan 7. Get management approval 8. Do it Step 5. Verify that the Corrective Action has eliminated the Root Cause of the problem
  • 30. Make sure it works Step 1. Understand the problem Step 2. Put in short term fix Step 3. Determine the Root Cause of the problem Step 4. Determine Corrective Action necessary Step 5. Verify that the Corrective Action has eliminated the Root Cause of the problem What facts show the problem was solved? Auditing Control charts Loss reports Increased throughput Less hassle Make it part of your Standard Operating Procedure SOP .
  • 31. Root Cause and Corrective Action is a five step process Step 1. Understand the problem Step 2. Put in short term fix Step 3. Determine the Root Cause of the problem Step 4. Determine Corrective Action necessary Step 5. Verify that the Corrective Action has eliminated the Root Cause of the problem With an embedded eight step corrective action process 1.Develop alternative solutions 2. Pick the best solution 3. Establish a plan to do the solution 4. Establish the timing of the solution 5. Establish the details of the solution 6. Document the plan 7. Get management approval 8. Do it