SlideShare a Scribd company logo
Sandeep Kumar Poonia .
Linear Programming
Sandeep Kumar Poonia .
Module Outline
 Introduction
 The Linear Programming Model
 Examples of Linear Programming Problems
 Developing Linear Programming Models
 Graphical Solution to LP Problems
 The Simplex Method
 Simplex Tableau for Maximization Problem
 Marginal Values of Additional Resources
 Sensitivity Analysis
 Complications in Applying the Simplex Method
 Duality
Sandeep Kumar Poonia .
Introduction
 Mathematical programming is used to find the best or
optimal solution to a problem that requires a decision or set
of decisions about how best to use a set of limited
resources to achieve a state goal of objectives.
 Steps involved in mathematical programming
 Conversion of stated problem into a mathematical model that
abstracts all the essential elements of the problem.
 Exploration of different solutions of the problem.
 Finding out the most suitable or optimum solution.
 Linear programming requires that all the mathematical
functions in the model be linear functions.
Sandeep Kumar Poonia .
The Linear Programming Model (1)
Let: X1, X2, X3, ………, Xn = decision variables
Z = Objective function or linear function
Requirement: Maximization of the linear function Z.
Z = c1X1 + c2X2 + c3X3 + ………+ cnXn …..Eq (1)
subject to the following constraints:
…..Eq (2)
where aij, bi, and cj are given constants.
Sandeep Kumar Poonia .
The Linear Programming Model (2)
 The linear programming model can be written in more
efficient notation as:
…..Eq (3)
The decision variables, xI, x2, ..., xn, represent levels of n
competing activities.
Sandeep Kumar Poonia .
Examples of LP Problems (1)
1. A Product Mix Problem
 A manufacturer has fixed amounts of different resources
such as raw material, labor, and equipment.
 These resources can be combined to produce any one of
several different products.
 The quantity of the ith resource required to produce one unit
of the jth product is known.
 The decision maker wishes to produce the combination of
products that will maximize total income.
Sandeep Kumar Poonia .
Examples of LP Problems (2)
2. A Blending Problem
 Blending problems refer to situations in which a number of
components (or commodities) are mixed together to yield
one or more products.
 Typically, different commodities are to be purchased. Each
commodity has known characteristics and costs.
 The problem is to determine how much of each commodity
should be purchased and blended with the rest so that the
characteristics of the mixture lie within specified bounds
and the total cost is minimized.
Sandeep Kumar Poonia .
Examples of LP Problems (3)
3. A Production Scheduling Problem
 A manufacturer knows that he must supply a given number
of items of a certain product each month for the next n
months.
 They can be produced either in regular time, subject to a
maximum each month, or in overtime. The cost of
producing an item during overtime is greater than during
regular time. A storage cost is associated with each item
not sold at the end of the month.
 The problem is to determine the production schedule that
minimizes the sum of production and storage costs.
Sandeep Kumar Poonia .
Examples of LP Problems (4)
4. A Transportation Problem
 A product is to be shipped in the amounts al, a2, ..., am from
m shipping origins and received in amounts bl, b2, ..., bn at
each of n shipping destinations.
 The cost of shipping a unit from the ith origin to the jth
destination is known for all combinations of origins and
destinations.
 The problem is to determine the amount to be shipped from
each origin to each destination such that the total cost of
transportation is a minimum.
Sandeep Kumar Poonia .
Examples of LP Problems (5)
5. A Flow Capacity Problem
 One or more commodities (e.g., traffic, water, information,
cash, etc.) are flowing from one point to another through a
network whose branches have various constraints and flow
capacities.
 The direction of flow in each branch and the capacity of
each branch are known.
 The problem is to determine the maximum flow, or capacity
of the network.
Sandeep Kumar Poonia .
Developing LP Model (1)
 The variety of situations to which linear programming has
been applied ranges from agriculture to zinc smelting.
 Steps Involved:
 Determine the objective of the problem and describe it by a
criterion function in terms of the decision variables.
 Find out the constraints.
 Do the analysis which should lead to the selection of values
for the decision variables that optimize the criterion function
while satisfying all the constraints imposed on the problem.
Sandeep Kumar Poonia .
Developing LP Model (2)
Example: Product Mix Problem
The N. Dustrious Company produces two products: I and II. The raw
material requirements, space needed for storage, production rates, and
selling prices for these products are given in Table 1.
The total amount of raw material available per day for both products is
1575 lb. The total storage space for all products is 1500 ft2, and a
maximum of 7 hours per day can be used for production.
Sandeep Kumar Poonia .
Developing LP Model (3)
Example Problem
All products manufactured are shipped out of the storage area at the end
of the day. Therefore, the two products must share the total raw material,
storage space, and production time. The company wants to determine
how many units of each product to produce per day to maximize its
total income.
Solution
• The company has decided that it wants to maximize its sale income,
which depends on the number of units of product I and II that it
produces.
• Therefore, the decision variables, x1 and x2 can be the number of units
of products I and II, respectively, produced per day.
Sandeep Kumar Poonia .
Developing LP Model (4)
• The object is to maximize the equation:
Z = 13x1 + 11x2
subject to the constraints on storage space, raw materials, and
production time.
• Each unit of product I requires 4 ft2 of storage space and each unit of
product II requires 5 ft2. Thus a total of 4x1 + 5x2 ft2 of storage space is
needed each day. This space must be less than or equal to the
available storage space, which is 1500 ft2. Therefore,
4X1 + 5X2 1500
• Similarly, each unit of product I and II produced requires 5 and 3 1bs,
respectively, of raw material. Hence a total of 5xl + 3x2 Ib of raw
material is used.
Sandeep Kumar Poonia .
Developing LP Model (5)
• This must be less than or equal to the total amount of raw material
available, which is 1575 Ib. Therefore,
5x1 + 3x2 1575
• Prouct I can be produced at the rate of 60 units per hour. Therefore, it
must take I minute or 1/60 of an hour to produce I unit. Similarly, it
requires 1/30 of an hour to produce 1 unit of product II. Hence a total of
x1/60 + x2/30 hours is required for the daily production. This quantity
must be less than or equal to the total production time available each
day. Therefore,
x1 / 60 + x2 / 30 7
or x1 + 2x2 420
• Finally, the company cannot produce a negative quantity of any
product, therefore x1 and x2 must each be greater than or equal to zero.
Sandeep Kumar Poonia .
Developing LP Model (6)
• The linear programming model for this example can be summarized as:
…..Eq (4)
Sandeep Kumar Poonia .
Graphical Solution to LP Problems (1)
Sandeep Kumar Poonia .
• An equation of the form 4x1 + 5x2 = 1500 defines a straight line in the
x1-x2 plane. An inequality defines an area bounded by a straight line.
Therefore, the region below and including the line 4x1 + 5x2 = 1500 in
the Figure represents the region defined by 4x1 + 5x2 1500.
• Same thing applies to other equations as well.
• The shaded area of the figure comprises the area common to all the
regions defined by the constraints and contains all pairs of xI and x2
that are feasible solutions to the problem.
• This area is known as the feasible region or feasible solution space.
The optimal solution must lie within this region.
• There are various pairs of x1 and x2 that satisfy the constraints such as:
Graphical Solution to LP Problems (2)
Sandeep Kumar Poonia .
• Trying different solutions, the optimal solution will be:
X1 = 270
X2 = 75
• This indicates that maximum income of $4335 is obtained by producing
270 units of product I and 75 units of product II.
• In this solution, all the raw material and available time are used,
because the optimal point lies on the two constraint lines for these
resources.
• However, 1500- [4(270) + 5(75)], or 45 ft2 of storage space, is not used.
Thus the storage space is not a constraint on the optimal solution; that
is, more products could be produced before the company ran out of
storage space. Thus this constraint is said to be slack.
Graphical Solution to LP Problems (3)
Sandeep Kumar Poonia .
• If the objective function happens to be parallel to one of the
edges of the feasible region, any point along this edge between
the two extreme points may be an optimal solution that
maximizes the objective function. When this occurs, there is no
unique solution, but there is an infinite number of optimal
solutions.
• The graphical method of solution may be extended to a case in
which there are three variables. In this case, each constraint is
represented by a plane in three dimensions, and the feasible
region bounded by these planes is a polyhedron.
Graphical Solution to LP Problems (4)
Sandeep Kumar Poonia .
 When decision variables are more than 2, it is always
advisable to use Simplex Method to avoid lengthy
graphical procedure.
 The simplex method is not used to examine all the feasible
solutions.
 It deals only with a small and unique set of feasible
solutions, the set of vertex points (i.e., extreme points) of
the convex feasible space that contains the optimal
solution.
The Simplex Method (1)
Sandeep Kumar Poonia .
 Steps involved:
1. Locate an extreme point of the feasible region.
2. Examine each boundary edge intersecting at this point to
see whether movement along any edge increases the value
of the objective function.
3. If the value of the objective function increases along any
edge, move along this edge to the adjacent extreme point. If
several edges indicate improvement, the edge providing the
greatest rate of increase is selected.
4. Repeat steps 2 and 3 until movement along any edge no
longer increases the value of the objective function.
The Simplex Method (2)
Sandeep Kumar Poonia .
The Simplex Method (3)
Example: Product Mix Problem
The N. Dustrious Company produces two products: I and II. The raw
material requirements, space needed for storage, production rates, and
selling prices for these products are given below:
The total amount of raw material available per day for both products is
15751b. The total storage space for all products is 1500 ft2, and a
maximum of 7 hours per day can be used for production. The company
wants to determine how many units of each product to produce per
day to maximize its total income.
Sandeep Kumar Poonia .
The Simplex Method (4)
Solution
 Step 1: Convert all the inequality constraints into equalities by
the use of slack variables. Let:
As already developed, the LP model is:
…..Eq (4)
Sandeep Kumar Poonia .
The Simplex Method (5)
 Introducing these slack variables into the inequality constraints
and rewriting the objective function such that all variables are on
the left-hand side of the equation. Equation 4 can be expressed
as:
…..Eq (5)
Sandeep Kumar Poonia .
The Simplex Method (6)
 Since the coefficients of x1 and x2 in Eq. (A1) are both negative,
the value of Z can be increased by giving either x1 or x2 some
positive value in the solution.
 In Eq. (B1), if x2 = S1 = 0, then x1 = 1500/4 = 375. That is, there
is only sufficient storage space to produce 375 units at product I.
 From Eq. (C1), there is only sufficient raw materials to produce
1575/5 = 315 units of product I.
 From Eq. (D1), there is only sufficient time to produce 420/1 =
420 units of product I.
 Therefore, considering all three constraints, there is sufficient
resource to produce only 315 units of x1. Thus the maximum
value of x1 is limited by Eq. (C1).
Sandeep Kumar Poonia .
The Simplex Method (7)
 Step 2: From Equation CI, which limits the maximum value
of x1.
…..Eq (6)
Substituting this equation into Eq. (5) yields the following new
formulation of the model.
…..Eq (7)
Sandeep Kumar Poonia .
The Simplex Method (8)
 It is now obvious from these equations that the new feasible
solution is:
x1 = 315, x2 = 0, S1 = 240, S2 = 0, S3 = 105, and Z = 4095
 It is also obvious from Eq.(A2) that it is also not the optimum
solution. The coefficient of x2 in the objective function
represented by A2 is negative ( -16/5), which means that the
value of Z can be further increased by giving x2 some positive
value.
Sandeep Kumar Poonia .
The Simplex Method (9)
 Following the same analysis procedure used in step 1, it is clear
that:
 In Eq. (B2), if S1 = S1 = 0, then x2 = (5/13)(240) = 92.3.
 From Eq. (C2), x2 can take on the value (5/3 )(315) = 525 if
x1 = S2 = 0
 From Eq. (D2), x2 can take on the value (5/7)(105) = 75 if
S2 = S3 = 0
 Therefore, constraint D2 limits the maximum value of x2 to 75.
Thus a new feasible solution includes x2 = 75, S2 = S3 = 0.
Sandeep Kumar Poonia .
The Simplex Method (10)
 Step 3: From Equation D2:
…..Eq (8)
Substituting this equation into Eq. (7) yield:
…..Eq (9)
From these equations, the new feasible solution is readily found to
be: x1 = 270, x2 = 75, S1 = 45, S2 = 0, S3 = 0, Z = 4335.
Sandeep Kumar Poonia .
The Simplex Method (11)
 Because the coefficients in the objective function represented by
Eq. (A3) are all positive, this new solution is also the optimum
solution.
Sandeep Kumar Poonia .
Simplex Tableau for Maximization (1)
 Step I: Set up the initial tableau using Eq. (5).
…..Eq (5)
In any
iteration, a
variable that
has a
nonzero
value in the
solution is
called a
basic
variable.
Sandeep Kumar Poonia .
Simplex Tableau for Maximization (2)
 Step II: . Identify the variable that will be assigned a nonzero
value in the next iteration so as to increase the value of the
objective function. This variable is called the entering variable.
 It is that nonbasic variable which is associated with the
smallest negative coefficient in the objective function.
 If two or more nonbasic variables are tied with the smallest
coefficients, select one of these arbitrarily and continue.
 Step III: Identify the variable, called the leaving variable, which
will be changed from a nonzero to a zero value in the next
solution.
Sandeep Kumar Poonia .
Simplex Tableau for Maximization (3)
 Step IV: . Enter the basic variables for the second tableau. The
row sequence of the previous tableau should be maintained,
with the leaving variable being replaced by the entering variable.
Sandeep Kumar Poonia .
Simplex Tableau for Maximization (4)
 Step V: Compute the coefficients for the second tableau. A
sequence of operations will be performed so that at the end the
x1 column in the second tableau will have the following
coefficients:
The second tableau yields the following feasible solution:
x1 = 315, x2 = 0, SI = 240, S2 = 0, S3 = 105, and Z = 4095
Sandeep Kumar Poonia .
Simplex Tableau for Maximization (5)
 The row operations proceed as fo1lows:
 The coefficients in row C2 are obtained by dividing the
corresponding coefficients in row C1 by 5.
 The coefficients in row A2 are obtained by multiplying the
coefficients of row C2 by 13 and adding the products to the
corresponding coefficients in row Al.
 The coefficients in row B2 are obtained by multiplying the
coefficients of row C2 by -4 and adding the products to the
corresponding coefficients in row Bl.
 The coefficients in row D2 are obtained by multiplying the
coefficients of row C2 by -1 and adding the products to the
corresponding coefficients in row Dl.
Sandeep Kumar Poonia .
Simplex Tableau for Maximization (6)
 Step VI: Check for optimality. The second feasible solution is
also not optimal, because the objective function (row A2)
contains a negative coefficient. Another iteration beginning with
step 2 is necessary.
 In the third tableau (next slide), all the coefficients in the
objective function (row A3) are positive. Thus an optimal solution
has been reached and it is as follows:
x1 = 270, x2 = 75, SI = 45, S2 = 0, S3 = 0, and Z = 4335
Sandeep Kumar Poonia .
Sandeep Kumar Poonia .
Marginal Values of Additional
Resources (1)
 The simplex solution yields the optimum production program for
N. Dustrious Company.
 The company can maximize its sale income to $4335 by
producing 270 units of product I and 75 units of product II.
 There will be no surplus of raw materials or production time.
 But there will be 45 units of unused storage space.
 The managers are interested to know if it is worthwhile to
increase its production by purchasing additional units of
raw materials and by either expanding its production
facilities or working overtime.
Sandeep Kumar Poonia .
Marginal Values of Additional
Resources (2)
 The critical questions are:
 What is the income value (or marginal value) of each additional
unit of each type of resources?
 What is the maximum cost ( or marginal cost) that they should be
willing to pay for each additional unit of resources?
 Answers to these questions can be obtained from the objective
function in the last tableau of the simplex solution:
Sandeep Kumar Poonia .
Marginal Values of Additional
Resources (3)
 Because S1, S2 and S3 represent surplus resources, the
negatives of these variables (i.e., -S1, -S2, -S3) represent
additional units of these resources that can be made available.
 The income values (or marginal values of additional units of
these resources can be obtained by taking the partial derivatives
of Z with respect to -S1, -S2 and -S3.
 Therefore, the marginal value of one additional unit of:
Sandeep Kumar Poonia .
Marginal Values of Additional
Resources (4)
 Thus, the marginal values of additional units of resources can be
obtained directly from the coefficients of the objective function in
the last tableau of a simplex solution.
 The N. Dustrious Company should be willing to pay up to $15/7
for an additional unit of raw materials and $16/7 for an additional
unit of production time.
 If the actual cost of an additional unit (i.e., marginal cost) of
these resources are smaller than the marginal value, the
company should be able to increase its income by increasing
production.
 The marginal values above are valid, however, only as long as
there is surplus storage space available.
Sandeep Kumar Poonia .
Sensitivity Analysis
 Sensitivity analysis helps to test the sensitivity of the optimum
solution with respect to changes of the coefficients in the
objective function, coefficients in the constraints inequalities, or
the constant terms in the constraints.
 For Example in the case study discussed:
 The actual selling prices (or market values) of the two products
may vary from time to time. Over what ranges can these prices
change without affecting the optimality of the present solution?
 Will the present solution remain the optimum solution if the amount
of raw materials, production time, or storage space is suddenly
changed because of shortages, machine failures, or other events?
 The amount of each type of resources needed to produce one unit
of each type of product can be either increased or decreased
slightly. Will such changes affect the optimal solution ?
Sandeep Kumar Poonia .
Complications in Simplex Method (1)
 An objective function to be minimized instead of maximized.
 Greater-than-or-equal-to constraints.
 Equalities instead of inequalities for constraints.
 Decision variables unrestricted in signs.
 Zero constants on the right-hand side of one or more
constraints.
 Some or all decision variables must be integers.
 Non-positive constants on the right-hand side of the constraints.
 More than one optimal solution, that is, multiple solutions such
that there is no unique optimal solution.
Sandeep Kumar Poonia .
Complications in Simplex Method (2)
 The constraints are such that no feasible solution exists.
 The constraints are such that one or more of the variables can
increase without limit and never violate a constraint (i.e., the
solution is unbounded).
 Some or all of the coefficients and right-hand-side terms are
given by a probability distribution rather than a single value.
Sandeep Kumar Poonia .
Complications in Simplex Method (3)
 This objective function can be converted to the standard form of
maximization. Let Z’ = -Z, so:
Minimization Problem – Solution 1
 Since maximum Z’ = minimum (Z), the objective function
becomes:
 After the Z’ value is found, replace Z = -Z’
Sandeep Kumar Poonia .
Complications in Simplex Method (4)
 In the case of a minimization problem, an optimum solution is
reached when:
 All the nonbasic variables have nonpositive coefficients in
row 1 of the simplex tableau
 The entering variable will be one which has the largest
positive coefficient in row I.
 All the other operations in the simplex method remain
unchanged.
Minimization Problem – Solution 2
Sandeep Kumar Poonia .
Complications in Simplex Method (5)
 In the standard form of the linear programming model, the
constraints are all expressed as less than or equal to ( ) a
certain amount, that is,
Greater- Than-Or-Equal- To Constraints
 In many occasions, the constraints must specify the lower
bounds rather than the upper bounds such as:
which involves the inequality "greater than or equal to"
Sandeep Kumar Poonia .
Complications in Simplex Method (6)
Example: Greater- Than-Or-Equal- To Constraints
 To start the solution, slack variables must first be assigned to
convert all in-equalities to equalities. Let S1 and S2 be slack
variables.
 Re- arrange the objective function so that all the variables are on
the left-hand side of the equation.
…….Eq. (1)
Sandeep Kumar Poonia .
Complications in Simplex Method (7)
 The negative signs for S1 and S2 make it no longer feasible to
set all the decision variables (i.e., y1, y2, y3) equal to zero as the
initial solution.
 To assure a starting feasible solution, artificial variables can be
added to the greater-than-or-equal-to constraints. Let W1 and
W2 be two artificial variables. Hence the Eq. (2) becomes:
…….Eq. (2)
…….Eq. (3)
Sandeep Kumar Poonia .
Complications in Simplex Method (8)
 A starting feasible solution can be easily derived from Eq. (3) as
follows:
 The objective function in Eq. (3) then becomes:
 From Eq. (3):
…….Eq. (4)
Sandeep Kumar Poonia .
Complications in Simplex Method (9)
 Substituting these expressions in Eq. (4) yields the following
new expression for the objective function:
 The objective function may now be combined with Eq. (3) to
express the problem model as follows:
 The coefficients and constants in Eq. (5) can now be arranged in
the Tableau format as shown in next slide.
…….Eq. (5)
Sandeep Kumar Poonia .
Complications in Simplex Method (10)
Sandeep Kumar Poonia .
Complications in Simplex Method (11)
 An equality constraint has the following general form:
Equality Constraint
 An artificial variable must be assigned to each equality
constraint to start the simplex solution. Otherwise, the constraint
would be violated when all the decision variables are assumed
to be zero.
 Sometimes a decision variable may take on either negative or
positive values. It x1 is unrestricted in sign, replace it throughout
the model by the difference of two new nonnegative variables:
xj = xj’ – xj’’ where xj’ 0, xj’’ 0
Sandeep Kumar Poonia .
Complications in Simplex Method (12)
 Because xj
’ and xj’’ can have any nonnegative values their
difference (xj’ –xj’’) can have any value (positive or negative).
After substitution, the simplex method can proceed with just
nonnegative variables.
Equality Constraint
Sandeep Kumar Poonia .
Complications in Simplex Method (13)
 If the number of basic variables is fewer than the number of
constraints in a solution, the solution is said to be degenerate.
 A zero constant term for one or more basic variables in any
iteration of the simplex solution would be a clear indication of a
degenerate solution.
 The normal simplex procedure cannot solve a degenerate
problem.
 Advanced methods are available to solve degenerate problems.
Degenerate Solution
Sandeep Kumar Poonia .
Complications in Simplex Method (14)
 A linear programming problem in which all the decision variables
must have integer values is called an integer programming
problem.
 A problem in which only some of the decision variables must
have integer values is called a mixed-integer programming
problem.
 Sometimes, some (or all) of the decision variables must have
the value of either 0 or 1. Such problems are then called zero-
one mixed-integer programming problems.
 Simplex method cannot be used to such problems. Advanced
methods are available for this purpose.
Integer and Mixed-Integer Problems
Sandeep Kumar Poonia .
Duality (1)
 With every linear programming problem, there is associated
another linear programming problem which is called the dual of
the original (or the primal) problem.
Formulating the Dual problem
 Consider again the production mix problem of N. Dustrious
Company.
 Suppose that the company is considering leasing out the entire
production facility to another company, and it must decide on the
minimum daily rental price that will be acceptable.
 This decision problem can also be formulated as a linear
programming problem.
Sandeep Kumar Poonia .
Duality (2)
 Let y1, y2 and y3 represent the unit price of each unit of storage
space, raw materials, and production time, respectively.
 The unit prices are in fact the income values of each unit of
resource to the N. Dustrious Company.
 There are available 500 ft2 of storage space, 1575 lb of raw
materials, and 420 minutes of production time per day.
 Thus the total income value (P) of all the available resources
may be expressed as follows :
P = 1500y1 + 1575y2 + 420y3
 The objective of the problem is to minimize P subject to the
condition that the N. Dustrious Company will earn at least as
much income as when it operates the production facility itself.
Sandeep Kumar Poonia .
Duality (3)
 Since the market value (or selling price) of 1 unit of product I is
$13 and it requires 4 ft2 of storage space, 5 lbs of raw materials,
and 1 minute of production time, the following constraint must be
satisfied:
4y1 + 5y2 + y3 13
 Similarly, for Product II:
5y1 + 3y2 + 2y3 11
 In addition, the unit prices y1, y2 and y3 must all be greater than
or equal to zero.
Sandeep Kumar Poonia .
Duality (4)
 The new linear programming problem may now be summarized
as follows :
…….Eq. (1)
 The following interesting observations can now be made:
o P = Z = $4335
o y1 = $0; y2 = $15/7 and y3 = $16/7
 This problem is the same as maximization problem in the
previous example and can now be solved accordingly.
Sandeep Kumar Poonia .
Duality (5)
The primal-Dual Relationship
Sandeep Kumar Poonia .
Duality (6)
Complete Regularization of the Primal Problem
 Consider the following primal problem:
 The first inequality requires no modification.
Sandeep Kumar Poonia .
Duality (7)
 The second inequality can be changed to the less-than-or-equal-
to type by multiplying both sides of the inequality by -1 and
reversing the direction of the inequality; that is,
 The equality constraint can be replaced by the following two
inequality constraints:
 If both of these inequality constraints are satisfied, the original
equality constraint is also satisfied.
Sandeep Kumar Poonia .
Duality (8)
 Multiplying both sides of the inequality by –1 and reversing the
direction of the inequality yields:
 The primal problem can now take the following standard form:
Sandeep Kumar Poonia .
Duality (9)
 The dual of this problem can now be obtained as follows:
Sandeep Kumar Poonia .
Questions/Queries?

More Related Content

PDF
Unit.3. duality and sensetivity analisis
PPT
Linear programming
PPTX
linear programming
PPTX
Decision theory
PPTX
LINEAR PROGRAMMING
PPTX
Integer Linear Programming
PPSX
Linear programing
Unit.3. duality and sensetivity analisis
Linear programming
linear programming
Decision theory
LINEAR PROGRAMMING
Integer Linear Programming
Linear programing

What's hot (20)

PPTX
Duality in Linear Programming
PPTX
Solving linear programming model by simplex method
PPTX
Linear programming
PPTX
Decision theory
PDF
Linear Programming Problems : Dr. Purnima Pandit
PPTX
Statistical decision theory
PPTX
Decision theory
PDF
Duality in Linear Programming Problem
PPTX
Linear programing
PDF
Integer Programming, Goal Programming, and Nonlinear Programming
PDF
LPP, Duality and Game Theory
PPTX
Linear programming graphical method (feasibility)
PPT
Quantitative Analysis For Decision Making
PPTX
Linear programming
PDF
Optimum Solution of Quadratic Programming Problem: By Wolfe’s Modified Simple...
PPTX
Nonlinear programming 2013
PDF
Basic concepts of probability
PPTX
Binomial Theorem
PPT
Linear Programming 1
Duality in Linear Programming
Solving linear programming model by simplex method
Linear programming
Decision theory
Linear Programming Problems : Dr. Purnima Pandit
Statistical decision theory
Decision theory
Duality in Linear Programming Problem
Linear programing
Integer Programming, Goal Programming, and Nonlinear Programming
LPP, Duality and Game Theory
Linear programming graphical method (feasibility)
Quantitative Analysis For Decision Making
Linear programming
Optimum Solution of Quadratic Programming Problem: By Wolfe’s Modified Simple...
Nonlinear programming 2013
Basic concepts of probability
Binomial Theorem
Linear Programming 1
Ad

Viewers also liked (19)

PPT
Splay tree
PDF
An improved memetic search in artificial bee colony algorithm
PDF
Comparative study of_hybrids_of_artificial_bee_colony_algorithm
PDF
Memetic search in differential evolution algorithm
PPTX
Splay trees by NIKHIL ARORA (www.internetnotes.in)
PDF
Enhanced local search in artificial bee colony algorithm
PDF
Sunzip user tool for data reduction using huffman algorithm
PDF
A novel hybrid crossover based abc algorithm
PDF
Modified position update in spider monkey optimization algorithm
PDF
Multiplication of two 3 d sparse matrices using 1d arrays and linked lists
PDF
Soft computing
PDF
Splay tree
An improved memetic search in artificial bee colony algorithm
Comparative study of_hybrids_of_artificial_bee_colony_algorithm
Memetic search in differential evolution algorithm
Splay trees by NIKHIL ARORA (www.internetnotes.in)
Enhanced local search in artificial bee colony algorithm
Sunzip user tool for data reduction using huffman algorithm
A novel hybrid crossover based abc algorithm
Modified position update in spider monkey optimization algorithm
Multiplication of two 3 d sparse matrices using 1d arrays and linked lists
Soft computing
Ad

Similar to Lecture27 linear programming (20)

PPT
Linear Programming-1.ppt
PPT
Linear programming 1
PPT
Linear programming
PDF
Introduction lp
PPTX
linear programing is the model that can be
PPTX
CHAPTER TWO - OPERATIONS RESEARCH (2).pptx
PPTX
OPERATIONS RCH-2.JKJKJKJKJKJKJKJKJKJKJKJKJKpptx
PDF
202003261537530756sanjeev_eco_Linear_Programming.pdf
PPTX
LPP FORMULATION 21 -22.pptx
PDF
Linear Models for Engineering applications
PPTX
chapter 2 revised.pptx
PPTX
chapter 2 revised.pptx
PDF
Linear Programming Module- A Conceptual Framework
PDF
Lpp through graphical analysis
PDF
linear programming
PPTX
chapter 2 revised.pptx
PDF
Unit.2. linear programming
PPT
13910406.ppt11112233rtyioouu6789op987899999999000
PPTX
QA CHAPTER II.pptx
PPTX
Simplex method concept,
Linear Programming-1.ppt
Linear programming 1
Linear programming
Introduction lp
linear programing is the model that can be
CHAPTER TWO - OPERATIONS RESEARCH (2).pptx
OPERATIONS RCH-2.JKJKJKJKJKJKJKJKJKJKJKJKJKpptx
202003261537530756sanjeev_eco_Linear_Programming.pdf
LPP FORMULATION 21 -22.pptx
Linear Models for Engineering applications
chapter 2 revised.pptx
chapter 2 revised.pptx
Linear Programming Module- A Conceptual Framework
Lpp through graphical analysis
linear programming
chapter 2 revised.pptx
Unit.2. linear programming
13910406.ppt11112233rtyioouu6789op987899999999000
QA CHAPTER II.pptx
Simplex method concept,

More from Dr Sandeep Kumar Poonia (16)

PDF
Improved onlooker bee phase in artificial bee colony algorithm
PDF
New Local Search Strategy in Artificial Bee Colony Algorithm
PDF
A new approach of program slicing
PDF
Performance evaluation of different routing protocols in wsn using different ...
PDF
Enhanced abc algo for tsp
PDF
Database aggregation using metadata
PDF
Performance evaluation of diff routing protocols in wsn using difft network p...
PDF
Problems in parallel computations of tree functions
PDF
Parallel Algorithms
PDF
Parallel Algorithms
PDF
Parallel Algorithms
PDF
Network flow problems
PDF
Shortest Path in Graph
PDF
Topological Sort
Improved onlooker bee phase in artificial bee colony algorithm
New Local Search Strategy in Artificial Bee Colony Algorithm
A new approach of program slicing
Performance evaluation of different routing protocols in wsn using different ...
Enhanced abc algo for tsp
Database aggregation using metadata
Performance evaluation of diff routing protocols in wsn using difft network p...
Problems in parallel computations of tree functions
Parallel Algorithms
Parallel Algorithms
Parallel Algorithms
Network flow problems
Shortest Path in Graph
Topological Sort

Recently uploaded (20)

PDF
Approach and Philosophy of On baking technology
PPTX
Effective Security Operations Center (SOC) A Modern, Strategic, and Threat-In...
PDF
Machine learning based COVID-19 study performance prediction
PDF
Empathic Computing: Creating Shared Understanding
PDF
Advanced methodologies resolving dimensionality complications for autism neur...
PPTX
VMware vSphere Foundation How to Sell Presentation-Ver1.4-2-14-2024.pptx
PDF
Electronic commerce courselecture one. Pdf
PPTX
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
PPTX
Detection-First SIEM: Rule Types, Dashboards, and Threat-Informed Strategy
PPT
“AI and Expert System Decision Support & Business Intelligence Systems”
PDF
Review of recent advances in non-invasive hemoglobin estimation
PPTX
20250228 LYD VKU AI Blended-Learning.pptx
DOCX
The AUB Centre for AI in Media Proposal.docx
PDF
How UI/UX Design Impacts User Retention in Mobile Apps.pdf
PDF
Agricultural_Statistics_at_a_Glance_2022_0.pdf
PDF
Modernizing your data center with Dell and AMD
PDF
Diabetes mellitus diagnosis method based random forest with bat algorithm
PDF
Building Integrated photovoltaic BIPV_UPV.pdf
PPTX
A Presentation on Artificial Intelligence
PDF
Spectral efficient network and resource selection model in 5G networks
Approach and Philosophy of On baking technology
Effective Security Operations Center (SOC) A Modern, Strategic, and Threat-In...
Machine learning based COVID-19 study performance prediction
Empathic Computing: Creating Shared Understanding
Advanced methodologies resolving dimensionality complications for autism neur...
VMware vSphere Foundation How to Sell Presentation-Ver1.4-2-14-2024.pptx
Electronic commerce courselecture one. Pdf
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
Detection-First SIEM: Rule Types, Dashboards, and Threat-Informed Strategy
“AI and Expert System Decision Support & Business Intelligence Systems”
Review of recent advances in non-invasive hemoglobin estimation
20250228 LYD VKU AI Blended-Learning.pptx
The AUB Centre for AI in Media Proposal.docx
How UI/UX Design Impacts User Retention in Mobile Apps.pdf
Agricultural_Statistics_at_a_Glance_2022_0.pdf
Modernizing your data center with Dell and AMD
Diabetes mellitus diagnosis method based random forest with bat algorithm
Building Integrated photovoltaic BIPV_UPV.pdf
A Presentation on Artificial Intelligence
Spectral efficient network and resource selection model in 5G networks

Lecture27 linear programming

  • 1. Sandeep Kumar Poonia . Linear Programming
  • 2. Sandeep Kumar Poonia . Module Outline  Introduction  The Linear Programming Model  Examples of Linear Programming Problems  Developing Linear Programming Models  Graphical Solution to LP Problems  The Simplex Method  Simplex Tableau for Maximization Problem  Marginal Values of Additional Resources  Sensitivity Analysis  Complications in Applying the Simplex Method  Duality
  • 3. Sandeep Kumar Poonia . Introduction  Mathematical programming is used to find the best or optimal solution to a problem that requires a decision or set of decisions about how best to use a set of limited resources to achieve a state goal of objectives.  Steps involved in mathematical programming  Conversion of stated problem into a mathematical model that abstracts all the essential elements of the problem.  Exploration of different solutions of the problem.  Finding out the most suitable or optimum solution.  Linear programming requires that all the mathematical functions in the model be linear functions.
  • 4. Sandeep Kumar Poonia . The Linear Programming Model (1) Let: X1, X2, X3, ………, Xn = decision variables Z = Objective function or linear function Requirement: Maximization of the linear function Z. Z = c1X1 + c2X2 + c3X3 + ………+ cnXn …..Eq (1) subject to the following constraints: …..Eq (2) where aij, bi, and cj are given constants.
  • 5. Sandeep Kumar Poonia . The Linear Programming Model (2)  The linear programming model can be written in more efficient notation as: …..Eq (3) The decision variables, xI, x2, ..., xn, represent levels of n competing activities.
  • 6. Sandeep Kumar Poonia . Examples of LP Problems (1) 1. A Product Mix Problem  A manufacturer has fixed amounts of different resources such as raw material, labor, and equipment.  These resources can be combined to produce any one of several different products.  The quantity of the ith resource required to produce one unit of the jth product is known.  The decision maker wishes to produce the combination of products that will maximize total income.
  • 7. Sandeep Kumar Poonia . Examples of LP Problems (2) 2. A Blending Problem  Blending problems refer to situations in which a number of components (or commodities) are mixed together to yield one or more products.  Typically, different commodities are to be purchased. Each commodity has known characteristics and costs.  The problem is to determine how much of each commodity should be purchased and blended with the rest so that the characteristics of the mixture lie within specified bounds and the total cost is minimized.
  • 8. Sandeep Kumar Poonia . Examples of LP Problems (3) 3. A Production Scheduling Problem  A manufacturer knows that he must supply a given number of items of a certain product each month for the next n months.  They can be produced either in regular time, subject to a maximum each month, or in overtime. The cost of producing an item during overtime is greater than during regular time. A storage cost is associated with each item not sold at the end of the month.  The problem is to determine the production schedule that minimizes the sum of production and storage costs.
  • 9. Sandeep Kumar Poonia . Examples of LP Problems (4) 4. A Transportation Problem  A product is to be shipped in the amounts al, a2, ..., am from m shipping origins and received in amounts bl, b2, ..., bn at each of n shipping destinations.  The cost of shipping a unit from the ith origin to the jth destination is known for all combinations of origins and destinations.  The problem is to determine the amount to be shipped from each origin to each destination such that the total cost of transportation is a minimum.
  • 10. Sandeep Kumar Poonia . Examples of LP Problems (5) 5. A Flow Capacity Problem  One or more commodities (e.g., traffic, water, information, cash, etc.) are flowing from one point to another through a network whose branches have various constraints and flow capacities.  The direction of flow in each branch and the capacity of each branch are known.  The problem is to determine the maximum flow, or capacity of the network.
  • 11. Sandeep Kumar Poonia . Developing LP Model (1)  The variety of situations to which linear programming has been applied ranges from agriculture to zinc smelting.  Steps Involved:  Determine the objective of the problem and describe it by a criterion function in terms of the decision variables.  Find out the constraints.  Do the analysis which should lead to the selection of values for the decision variables that optimize the criterion function while satisfying all the constraints imposed on the problem.
  • 12. Sandeep Kumar Poonia . Developing LP Model (2) Example: Product Mix Problem The N. Dustrious Company produces two products: I and II. The raw material requirements, space needed for storage, production rates, and selling prices for these products are given in Table 1. The total amount of raw material available per day for both products is 1575 lb. The total storage space for all products is 1500 ft2, and a maximum of 7 hours per day can be used for production.
  • 13. Sandeep Kumar Poonia . Developing LP Model (3) Example Problem All products manufactured are shipped out of the storage area at the end of the day. Therefore, the two products must share the total raw material, storage space, and production time. The company wants to determine how many units of each product to produce per day to maximize its total income. Solution • The company has decided that it wants to maximize its sale income, which depends on the number of units of product I and II that it produces. • Therefore, the decision variables, x1 and x2 can be the number of units of products I and II, respectively, produced per day.
  • 14. Sandeep Kumar Poonia . Developing LP Model (4) • The object is to maximize the equation: Z = 13x1 + 11x2 subject to the constraints on storage space, raw materials, and production time. • Each unit of product I requires 4 ft2 of storage space and each unit of product II requires 5 ft2. Thus a total of 4x1 + 5x2 ft2 of storage space is needed each day. This space must be less than or equal to the available storage space, which is 1500 ft2. Therefore, 4X1 + 5X2 1500 • Similarly, each unit of product I and II produced requires 5 and 3 1bs, respectively, of raw material. Hence a total of 5xl + 3x2 Ib of raw material is used.
  • 15. Sandeep Kumar Poonia . Developing LP Model (5) • This must be less than or equal to the total amount of raw material available, which is 1575 Ib. Therefore, 5x1 + 3x2 1575 • Prouct I can be produced at the rate of 60 units per hour. Therefore, it must take I minute or 1/60 of an hour to produce I unit. Similarly, it requires 1/30 of an hour to produce 1 unit of product II. Hence a total of x1/60 + x2/30 hours is required for the daily production. This quantity must be less than or equal to the total production time available each day. Therefore, x1 / 60 + x2 / 30 7 or x1 + 2x2 420 • Finally, the company cannot produce a negative quantity of any product, therefore x1 and x2 must each be greater than or equal to zero.
  • 16. Sandeep Kumar Poonia . Developing LP Model (6) • The linear programming model for this example can be summarized as: …..Eq (4)
  • 17. Sandeep Kumar Poonia . Graphical Solution to LP Problems (1)
  • 18. Sandeep Kumar Poonia . • An equation of the form 4x1 + 5x2 = 1500 defines a straight line in the x1-x2 plane. An inequality defines an area bounded by a straight line. Therefore, the region below and including the line 4x1 + 5x2 = 1500 in the Figure represents the region defined by 4x1 + 5x2 1500. • Same thing applies to other equations as well. • The shaded area of the figure comprises the area common to all the regions defined by the constraints and contains all pairs of xI and x2 that are feasible solutions to the problem. • This area is known as the feasible region or feasible solution space. The optimal solution must lie within this region. • There are various pairs of x1 and x2 that satisfy the constraints such as: Graphical Solution to LP Problems (2)
  • 19. Sandeep Kumar Poonia . • Trying different solutions, the optimal solution will be: X1 = 270 X2 = 75 • This indicates that maximum income of $4335 is obtained by producing 270 units of product I and 75 units of product II. • In this solution, all the raw material and available time are used, because the optimal point lies on the two constraint lines for these resources. • However, 1500- [4(270) + 5(75)], or 45 ft2 of storage space, is not used. Thus the storage space is not a constraint on the optimal solution; that is, more products could be produced before the company ran out of storage space. Thus this constraint is said to be slack. Graphical Solution to LP Problems (3)
  • 20. Sandeep Kumar Poonia . • If the objective function happens to be parallel to one of the edges of the feasible region, any point along this edge between the two extreme points may be an optimal solution that maximizes the objective function. When this occurs, there is no unique solution, but there is an infinite number of optimal solutions. • The graphical method of solution may be extended to a case in which there are three variables. In this case, each constraint is represented by a plane in three dimensions, and the feasible region bounded by these planes is a polyhedron. Graphical Solution to LP Problems (4)
  • 21. Sandeep Kumar Poonia .  When decision variables are more than 2, it is always advisable to use Simplex Method to avoid lengthy graphical procedure.  The simplex method is not used to examine all the feasible solutions.  It deals only with a small and unique set of feasible solutions, the set of vertex points (i.e., extreme points) of the convex feasible space that contains the optimal solution. The Simplex Method (1)
  • 22. Sandeep Kumar Poonia .  Steps involved: 1. Locate an extreme point of the feasible region. 2. Examine each boundary edge intersecting at this point to see whether movement along any edge increases the value of the objective function. 3. If the value of the objective function increases along any edge, move along this edge to the adjacent extreme point. If several edges indicate improvement, the edge providing the greatest rate of increase is selected. 4. Repeat steps 2 and 3 until movement along any edge no longer increases the value of the objective function. The Simplex Method (2)
  • 23. Sandeep Kumar Poonia . The Simplex Method (3) Example: Product Mix Problem The N. Dustrious Company produces two products: I and II. The raw material requirements, space needed for storage, production rates, and selling prices for these products are given below: The total amount of raw material available per day for both products is 15751b. The total storage space for all products is 1500 ft2, and a maximum of 7 hours per day can be used for production. The company wants to determine how many units of each product to produce per day to maximize its total income.
  • 24. Sandeep Kumar Poonia . The Simplex Method (4) Solution  Step 1: Convert all the inequality constraints into equalities by the use of slack variables. Let: As already developed, the LP model is: …..Eq (4)
  • 25. Sandeep Kumar Poonia . The Simplex Method (5)  Introducing these slack variables into the inequality constraints and rewriting the objective function such that all variables are on the left-hand side of the equation. Equation 4 can be expressed as: …..Eq (5)
  • 26. Sandeep Kumar Poonia . The Simplex Method (6)  Since the coefficients of x1 and x2 in Eq. (A1) are both negative, the value of Z can be increased by giving either x1 or x2 some positive value in the solution.  In Eq. (B1), if x2 = S1 = 0, then x1 = 1500/4 = 375. That is, there is only sufficient storage space to produce 375 units at product I.  From Eq. (C1), there is only sufficient raw materials to produce 1575/5 = 315 units of product I.  From Eq. (D1), there is only sufficient time to produce 420/1 = 420 units of product I.  Therefore, considering all three constraints, there is sufficient resource to produce only 315 units of x1. Thus the maximum value of x1 is limited by Eq. (C1).
  • 27. Sandeep Kumar Poonia . The Simplex Method (7)  Step 2: From Equation CI, which limits the maximum value of x1. …..Eq (6) Substituting this equation into Eq. (5) yields the following new formulation of the model. …..Eq (7)
  • 28. Sandeep Kumar Poonia . The Simplex Method (8)  It is now obvious from these equations that the new feasible solution is: x1 = 315, x2 = 0, S1 = 240, S2 = 0, S3 = 105, and Z = 4095  It is also obvious from Eq.(A2) that it is also not the optimum solution. The coefficient of x2 in the objective function represented by A2 is negative ( -16/5), which means that the value of Z can be further increased by giving x2 some positive value.
  • 29. Sandeep Kumar Poonia . The Simplex Method (9)  Following the same analysis procedure used in step 1, it is clear that:  In Eq. (B2), if S1 = S1 = 0, then x2 = (5/13)(240) = 92.3.  From Eq. (C2), x2 can take on the value (5/3 )(315) = 525 if x1 = S2 = 0  From Eq. (D2), x2 can take on the value (5/7)(105) = 75 if S2 = S3 = 0  Therefore, constraint D2 limits the maximum value of x2 to 75. Thus a new feasible solution includes x2 = 75, S2 = S3 = 0.
  • 30. Sandeep Kumar Poonia . The Simplex Method (10)  Step 3: From Equation D2: …..Eq (8) Substituting this equation into Eq. (7) yield: …..Eq (9) From these equations, the new feasible solution is readily found to be: x1 = 270, x2 = 75, S1 = 45, S2 = 0, S3 = 0, Z = 4335.
  • 31. Sandeep Kumar Poonia . The Simplex Method (11)  Because the coefficients in the objective function represented by Eq. (A3) are all positive, this new solution is also the optimum solution.
  • 32. Sandeep Kumar Poonia . Simplex Tableau for Maximization (1)  Step I: Set up the initial tableau using Eq. (5). …..Eq (5) In any iteration, a variable that has a nonzero value in the solution is called a basic variable.
  • 33. Sandeep Kumar Poonia . Simplex Tableau for Maximization (2)  Step II: . Identify the variable that will be assigned a nonzero value in the next iteration so as to increase the value of the objective function. This variable is called the entering variable.  It is that nonbasic variable which is associated with the smallest negative coefficient in the objective function.  If two or more nonbasic variables are tied with the smallest coefficients, select one of these arbitrarily and continue.  Step III: Identify the variable, called the leaving variable, which will be changed from a nonzero to a zero value in the next solution.
  • 34. Sandeep Kumar Poonia . Simplex Tableau for Maximization (3)  Step IV: . Enter the basic variables for the second tableau. The row sequence of the previous tableau should be maintained, with the leaving variable being replaced by the entering variable.
  • 35. Sandeep Kumar Poonia . Simplex Tableau for Maximization (4)  Step V: Compute the coefficients for the second tableau. A sequence of operations will be performed so that at the end the x1 column in the second tableau will have the following coefficients: The second tableau yields the following feasible solution: x1 = 315, x2 = 0, SI = 240, S2 = 0, S3 = 105, and Z = 4095
  • 36. Sandeep Kumar Poonia . Simplex Tableau for Maximization (5)  The row operations proceed as fo1lows:  The coefficients in row C2 are obtained by dividing the corresponding coefficients in row C1 by 5.  The coefficients in row A2 are obtained by multiplying the coefficients of row C2 by 13 and adding the products to the corresponding coefficients in row Al.  The coefficients in row B2 are obtained by multiplying the coefficients of row C2 by -4 and adding the products to the corresponding coefficients in row Bl.  The coefficients in row D2 are obtained by multiplying the coefficients of row C2 by -1 and adding the products to the corresponding coefficients in row Dl.
  • 37. Sandeep Kumar Poonia . Simplex Tableau for Maximization (6)  Step VI: Check for optimality. The second feasible solution is also not optimal, because the objective function (row A2) contains a negative coefficient. Another iteration beginning with step 2 is necessary.  In the third tableau (next slide), all the coefficients in the objective function (row A3) are positive. Thus an optimal solution has been reached and it is as follows: x1 = 270, x2 = 75, SI = 45, S2 = 0, S3 = 0, and Z = 4335
  • 39. Sandeep Kumar Poonia . Marginal Values of Additional Resources (1)  The simplex solution yields the optimum production program for N. Dustrious Company.  The company can maximize its sale income to $4335 by producing 270 units of product I and 75 units of product II.  There will be no surplus of raw materials or production time.  But there will be 45 units of unused storage space.  The managers are interested to know if it is worthwhile to increase its production by purchasing additional units of raw materials and by either expanding its production facilities or working overtime.
  • 40. Sandeep Kumar Poonia . Marginal Values of Additional Resources (2)  The critical questions are:  What is the income value (or marginal value) of each additional unit of each type of resources?  What is the maximum cost ( or marginal cost) that they should be willing to pay for each additional unit of resources?  Answers to these questions can be obtained from the objective function in the last tableau of the simplex solution:
  • 41. Sandeep Kumar Poonia . Marginal Values of Additional Resources (3)  Because S1, S2 and S3 represent surplus resources, the negatives of these variables (i.e., -S1, -S2, -S3) represent additional units of these resources that can be made available.  The income values (or marginal values of additional units of these resources can be obtained by taking the partial derivatives of Z with respect to -S1, -S2 and -S3.  Therefore, the marginal value of one additional unit of:
  • 42. Sandeep Kumar Poonia . Marginal Values of Additional Resources (4)  Thus, the marginal values of additional units of resources can be obtained directly from the coefficients of the objective function in the last tableau of a simplex solution.  The N. Dustrious Company should be willing to pay up to $15/7 for an additional unit of raw materials and $16/7 for an additional unit of production time.  If the actual cost of an additional unit (i.e., marginal cost) of these resources are smaller than the marginal value, the company should be able to increase its income by increasing production.  The marginal values above are valid, however, only as long as there is surplus storage space available.
  • 43. Sandeep Kumar Poonia . Sensitivity Analysis  Sensitivity analysis helps to test the sensitivity of the optimum solution with respect to changes of the coefficients in the objective function, coefficients in the constraints inequalities, or the constant terms in the constraints.  For Example in the case study discussed:  The actual selling prices (or market values) of the two products may vary from time to time. Over what ranges can these prices change without affecting the optimality of the present solution?  Will the present solution remain the optimum solution if the amount of raw materials, production time, or storage space is suddenly changed because of shortages, machine failures, or other events?  The amount of each type of resources needed to produce one unit of each type of product can be either increased or decreased slightly. Will such changes affect the optimal solution ?
  • 44. Sandeep Kumar Poonia . Complications in Simplex Method (1)  An objective function to be minimized instead of maximized.  Greater-than-or-equal-to constraints.  Equalities instead of inequalities for constraints.  Decision variables unrestricted in signs.  Zero constants on the right-hand side of one or more constraints.  Some or all decision variables must be integers.  Non-positive constants on the right-hand side of the constraints.  More than one optimal solution, that is, multiple solutions such that there is no unique optimal solution.
  • 45. Sandeep Kumar Poonia . Complications in Simplex Method (2)  The constraints are such that no feasible solution exists.  The constraints are such that one or more of the variables can increase without limit and never violate a constraint (i.e., the solution is unbounded).  Some or all of the coefficients and right-hand-side terms are given by a probability distribution rather than a single value.
  • 46. Sandeep Kumar Poonia . Complications in Simplex Method (3)  This objective function can be converted to the standard form of maximization. Let Z’ = -Z, so: Minimization Problem – Solution 1  Since maximum Z’ = minimum (Z), the objective function becomes:  After the Z’ value is found, replace Z = -Z’
  • 47. Sandeep Kumar Poonia . Complications in Simplex Method (4)  In the case of a minimization problem, an optimum solution is reached when:  All the nonbasic variables have nonpositive coefficients in row 1 of the simplex tableau  The entering variable will be one which has the largest positive coefficient in row I.  All the other operations in the simplex method remain unchanged. Minimization Problem – Solution 2
  • 48. Sandeep Kumar Poonia . Complications in Simplex Method (5)  In the standard form of the linear programming model, the constraints are all expressed as less than or equal to ( ) a certain amount, that is, Greater- Than-Or-Equal- To Constraints  In many occasions, the constraints must specify the lower bounds rather than the upper bounds such as: which involves the inequality "greater than or equal to"
  • 49. Sandeep Kumar Poonia . Complications in Simplex Method (6) Example: Greater- Than-Or-Equal- To Constraints  To start the solution, slack variables must first be assigned to convert all in-equalities to equalities. Let S1 and S2 be slack variables.  Re- arrange the objective function so that all the variables are on the left-hand side of the equation. …….Eq. (1)
  • 50. Sandeep Kumar Poonia . Complications in Simplex Method (7)  The negative signs for S1 and S2 make it no longer feasible to set all the decision variables (i.e., y1, y2, y3) equal to zero as the initial solution.  To assure a starting feasible solution, artificial variables can be added to the greater-than-or-equal-to constraints. Let W1 and W2 be two artificial variables. Hence the Eq. (2) becomes: …….Eq. (2) …….Eq. (3)
  • 51. Sandeep Kumar Poonia . Complications in Simplex Method (8)  A starting feasible solution can be easily derived from Eq. (3) as follows:  The objective function in Eq. (3) then becomes:  From Eq. (3): …….Eq. (4)
  • 52. Sandeep Kumar Poonia . Complications in Simplex Method (9)  Substituting these expressions in Eq. (4) yields the following new expression for the objective function:  The objective function may now be combined with Eq. (3) to express the problem model as follows:  The coefficients and constants in Eq. (5) can now be arranged in the Tableau format as shown in next slide. …….Eq. (5)
  • 53. Sandeep Kumar Poonia . Complications in Simplex Method (10)
  • 54. Sandeep Kumar Poonia . Complications in Simplex Method (11)  An equality constraint has the following general form: Equality Constraint  An artificial variable must be assigned to each equality constraint to start the simplex solution. Otherwise, the constraint would be violated when all the decision variables are assumed to be zero.  Sometimes a decision variable may take on either negative or positive values. It x1 is unrestricted in sign, replace it throughout the model by the difference of two new nonnegative variables: xj = xj’ – xj’’ where xj’ 0, xj’’ 0
  • 55. Sandeep Kumar Poonia . Complications in Simplex Method (12)  Because xj ’ and xj’’ can have any nonnegative values their difference (xj’ –xj’’) can have any value (positive or negative). After substitution, the simplex method can proceed with just nonnegative variables. Equality Constraint
  • 56. Sandeep Kumar Poonia . Complications in Simplex Method (13)  If the number of basic variables is fewer than the number of constraints in a solution, the solution is said to be degenerate.  A zero constant term for one or more basic variables in any iteration of the simplex solution would be a clear indication of a degenerate solution.  The normal simplex procedure cannot solve a degenerate problem.  Advanced methods are available to solve degenerate problems. Degenerate Solution
  • 57. Sandeep Kumar Poonia . Complications in Simplex Method (14)  A linear programming problem in which all the decision variables must have integer values is called an integer programming problem.  A problem in which only some of the decision variables must have integer values is called a mixed-integer programming problem.  Sometimes, some (or all) of the decision variables must have the value of either 0 or 1. Such problems are then called zero- one mixed-integer programming problems.  Simplex method cannot be used to such problems. Advanced methods are available for this purpose. Integer and Mixed-Integer Problems
  • 58. Sandeep Kumar Poonia . Duality (1)  With every linear programming problem, there is associated another linear programming problem which is called the dual of the original (or the primal) problem. Formulating the Dual problem  Consider again the production mix problem of N. Dustrious Company.  Suppose that the company is considering leasing out the entire production facility to another company, and it must decide on the minimum daily rental price that will be acceptable.  This decision problem can also be formulated as a linear programming problem.
  • 59. Sandeep Kumar Poonia . Duality (2)  Let y1, y2 and y3 represent the unit price of each unit of storage space, raw materials, and production time, respectively.  The unit prices are in fact the income values of each unit of resource to the N. Dustrious Company.  There are available 500 ft2 of storage space, 1575 lb of raw materials, and 420 minutes of production time per day.  Thus the total income value (P) of all the available resources may be expressed as follows : P = 1500y1 + 1575y2 + 420y3  The objective of the problem is to minimize P subject to the condition that the N. Dustrious Company will earn at least as much income as when it operates the production facility itself.
  • 60. Sandeep Kumar Poonia . Duality (3)  Since the market value (or selling price) of 1 unit of product I is $13 and it requires 4 ft2 of storage space, 5 lbs of raw materials, and 1 minute of production time, the following constraint must be satisfied: 4y1 + 5y2 + y3 13  Similarly, for Product II: 5y1 + 3y2 + 2y3 11  In addition, the unit prices y1, y2 and y3 must all be greater than or equal to zero.
  • 61. Sandeep Kumar Poonia . Duality (4)  The new linear programming problem may now be summarized as follows : …….Eq. (1)  The following interesting observations can now be made: o P = Z = $4335 o y1 = $0; y2 = $15/7 and y3 = $16/7  This problem is the same as maximization problem in the previous example and can now be solved accordingly.
  • 62. Sandeep Kumar Poonia . Duality (5) The primal-Dual Relationship
  • 63. Sandeep Kumar Poonia . Duality (6) Complete Regularization of the Primal Problem  Consider the following primal problem:  The first inequality requires no modification.
  • 64. Sandeep Kumar Poonia . Duality (7)  The second inequality can be changed to the less-than-or-equal- to type by multiplying both sides of the inequality by -1 and reversing the direction of the inequality; that is,  The equality constraint can be replaced by the following two inequality constraints:  If both of these inequality constraints are satisfied, the original equality constraint is also satisfied.
  • 65. Sandeep Kumar Poonia . Duality (8)  Multiplying both sides of the inequality by –1 and reversing the direction of the inequality yields:  The primal problem can now take the following standard form:
  • 66. Sandeep Kumar Poonia . Duality (9)  The dual of this problem can now be obtained as follows:
  • 67. Sandeep Kumar Poonia . Questions/Queries?