015 changes-process model
CHANGES -
PROCESS MODEL
• Designers, engineers and other professionals have to
make assumptions based on existing available
information and their experience.
CHANGES -
PROCESS MODEL
• Lack of knowledge is considered to be a main source
of changes in construction.
CHANGES -
PROCESS MODEL
• There should be a Change identification and
evaluation model to provide an early warning to the
management team.
CHANGES -
PROCESS MODEL
• The design of a process model
should consider all the influential
factors such as :
CHANGES -
PROCESS MODEL
• What causes the change?
CHANGES -
PROCESS MODEL
•The likelihood of change
occurrence.
CHANGES -
PROCESS MODEL
•The change consequences.
CHANGES -
PROCESS MODEL
• Changes in themselves do not decrease
productivity or efficiency, it is the manpower
involved in the process.
CHANGES -
PROCESS MODEL
• If a change occurs in the final stage of a
construction project the crew must stop
working until the changes are carried out first.
CHANGES -
PROCESS MODEL
• On average, there is a 30% loss of efficiency
when changes are being performed, although
it is possible to carry out many changes
without a loss of efficiency.
CHANGES -
PROCESS MODEL
• The variables affecting efficiency are believed
to be the time of the change.
CHANGES -
PROCESS MODEL
• A major change may cause consecutive
delays in project schedule Re-estimation of
work statement Additional demands of
equipment Materials Labour Changes.
CHANGES -
PROCESS MODEL
• If not resolved through a formalized change
management process, can become the major
source of contract disputes, which is a severe
risk contributing to project failure.
It can be caused by either internal or external
Factors (ARETHEY AVOIDABLE?).
In construction projects, a change refers to an
alteration or a modification to pre-existing
conditions, assumptions or requirements.
A process model can help management team to manage changes
better.
External causes may be due to technological change
(AVOIDABLE?).
Different changes may have different effects or consequences.
The objective of change management is to forecast
possible changes.
Most researchers distinguish
three kinds of changes:
Rework
change order
and Construction
Change Directive
015 changes-process model
015 changes-process model
015 changes-process model
Initiate change management
Select change management
The main requirements are:
Sufficient resources for change management function
Approaches towards
change management
Align project elements to
change management process
015 changes-process model
The main functions that these
requirements should provide,
are:
Project baseline
detailed cost plan
detailed time plan
The project
programme
should be developed
to manipulate change
(cost, time, quality, safety, Customer
satisfaction, constructability, sustainable
construction,..)
Knowledge base
This must includes criteria for deciding on
change and evaluation in terms of : KPI’s
Integrated system for
design management
An Architect's change may
change the mechanical work
layout or electrical works.
3-D
modelling
• It will assists the
impact of proposed
construction changes
in a more logical
mannor.
Procurement
routes
• A good selection of procurement
should consider change.
• The likelihood of changes
becomes a criterion for selecting
the procurement route.
• A civil engineering project V
building project.
VE andVM
•Value management
(VM) andValue
Engineering (VE)
systems.
IT
communication
•Advance
communication
system
Dispute resolution
mechanism
•A fully developed
dispute
resolution
method.
 RMS must indicate:
 Various risks that may occur at different times
within the project life cycle.
 The possibility of change occurrence that can be
reasonably foreseen should be estimated
(including its timing).
 Risk analysis at an early stage will enable
appropriate procedures to be established and
appropriate contingencies to be prepared.
 Scenario planning will help represent these
changes.
Monitor deviations
from project
programme
Analyse and consider
implications of
identified deviations
Develop mitigation
strategy for change
event
Update change
management
repository
The need to
rework
The volume
of rework due
to change in
terms of
costing and
duration
Size of disruption
to the workflow
015 changes-process model
Pre-
change
plan
Main
functions
Methods
to identify
change
Carry
out
change
Financial models
that incorporate
financial
parameters to
control the
operation at any
one time
Linear models
where decision
criteria are
subjectively
weighted and rated
by a decision-maker
and combined into
a single measure
Linear
models
• incorporating multiple ratings
that add the corresponding
probabilities for the multiple
ratings of a given criterion and
measures the imprecision and
uncertainty associated with
the process
Multi-attribute
utility models
• Combines qualitative
and quantitative
decision criteria that are
aggregated to arrive at
an expected utility
Social
Factors
Technological
Factors
Managerial
Factors
Modification in
physical
properties
Changes in
control
systems
Changes in
processes
Project and
organisational
performance criteria
Analyse work
inactivity and
ineffective work
Resources
Scope
Goals
Removeany Ambiguity
Leadership
Co-ordination
communication
Team work
Resources
Scope
Goals
Remove any Ambiguity
Leadership
Co-ordination
communication
Team work

More Related Content

PPTX
015 changes-process model
PPTX
Reliability Maintenance Engineering 2 - 3 Measuring Maintainability
PPTX
5.2 DMADOV Phase.pptx
PPT
Bse 3105 lecture 3-software evolution planning
PDF
Maintainability engineering
PPTX
Introduction to CAD/CAM
PPTX
1.1 Introduction Six sigma.pptx
DOCX
015 changes-process model
Reliability Maintenance Engineering 2 - 3 Measuring Maintainability
5.2 DMADOV Phase.pptx
Bse 3105 lecture 3-software evolution planning
Maintainability engineering
Introduction to CAD/CAM
1.1 Introduction Six sigma.pptx

What's hot (16)

DOCX
SMU mba sem 4 om fall 2014 assignments
PPTX
Change management
DOCX
Project management techniques
PPTX
3.2 ANALYZE PHASE.pptx
PPT
Ebbpa3 b ch 9
PPTX
5 MRP-II.pptx
PPTX
Presentation
PPT
041 Integrating Lean Construction (PART 2)
DOCX
Mb0044 production and operation management
PPTX
CONTROL
PPT
Controlling (1)
PPTX
2.1 Define Phase.pptx
PDF
Maintenance module1 ppt number 3
PPTX
Controlling
PPTX
Systems Life Cycle
SMU mba sem 4 om fall 2014 assignments
Change management
Project management techniques
3.2 ANALYZE PHASE.pptx
Ebbpa3 b ch 9
5 MRP-II.pptx
Presentation
041 Integrating Lean Construction (PART 2)
Mb0044 production and operation management
CONTROL
Controlling (1)
2.1 Define Phase.pptx
Maintenance module1 ppt number 3
Controlling
Systems Life Cycle
Ad

Similar to 015 changes-process model (20)

PPTX
015 changes-process model
PPTX
015 changes-process model
PDF
Project control and process instrumentation
PDF
4 integration
PPT
Process models
PPTX
CPI_MOM_KBR_20110909_v1
PPTX
Copy of Colorful Pastel Illustrative Effective Study Presentation.pptx
PPT
04. Project Management
PPTX
PPT
Product innovation & process innovation
PPTX
014 changes-cost overrun measurement
PPTX
014 changes-cost overrun measurement
PPTX
014 changes-cost overrun measurement
PPTX
014 changes-cost overrun measurement
PPTX
014 changes-cost overrun measurement
PPTX
014 changes-cost overrun measurement
PDF
APM Practitioner Qualification revision cards
PPTX
Change, Release, Management In-Depth vTom.pptx
PDF
Mitigation And Performance Recovery Using Earned Value
PDF
Schedule Recovery Using Earned Value
015 changes-process model
015 changes-process model
Project control and process instrumentation
4 integration
Process models
CPI_MOM_KBR_20110909_v1
Copy of Colorful Pastel Illustrative Effective Study Presentation.pptx
04. Project Management
Product innovation & process innovation
014 changes-cost overrun measurement
014 changes-cost overrun measurement
014 changes-cost overrun measurement
014 changes-cost overrun measurement
014 changes-cost overrun measurement
014 changes-cost overrun measurement
APM Practitioner Qualification revision cards
Change, Release, Management In-Depth vTom.pptx
Mitigation And Performance Recovery Using Earned Value
Schedule Recovery Using Earned Value
Ad

More from Dr Fereidoun Dejahang (20)

DOCX
27 j20 my news punch -dr f dejahang 27-01-2020
DOCX
28 dej my news punch rev 28-12-2019
DOCX
16 fd my news punch rev 16-12-2019
PPT
029 fast-tracking projects
PPT
028 fast-tracking projects & cost overrun
PPT
027 fast-tracked projects-materials
PPT
026 fast react-productivity improvement
PPT
025 enterprise resources management
PPT
022 b construction productivity-write
PPT
022 a construction productivity (2)
PPT
021 construction productivity (1)
PPTX
019 competencies-managers
PPT
018 company productivity
PPT
017 communication
PPT
016 communication in construction sector
PPTX
013 changes in construction projects
PPT
012 bussiness planning process
PPT
011 business performance management
PPT
010 bmw tpm management training
PPT
009 benefits realization
27 j20 my news punch -dr f dejahang 27-01-2020
28 dej my news punch rev 28-12-2019
16 fd my news punch rev 16-12-2019
029 fast-tracking projects
028 fast-tracking projects & cost overrun
027 fast-tracked projects-materials
026 fast react-productivity improvement
025 enterprise resources management
022 b construction productivity-write
022 a construction productivity (2)
021 construction productivity (1)
019 competencies-managers
018 company productivity
017 communication
016 communication in construction sector
013 changes in construction projects
012 bussiness planning process
011 business performance management
010 bmw tpm management training
009 benefits realization

Recently uploaded (20)

PDF
Digital Logic Computer Design lecture notes
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PDF
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
PPTX
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
PDF
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
PPTX
Foundation to blockchain - A guide to Blockchain Tech
PPTX
Welding lecture in detail for understanding
PDF
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
PPTX
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
PDF
PPT on Performance Review to get promotions
PDF
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
PDF
Model Code of Practice - Construction Work - 21102022 .pdf
PPTX
Geodesy 1.pptx...............................................
PPTX
CYBER-CRIMES AND SECURITY A guide to understanding
PPT
Mechanical Engineering MATERIALS Selection
PPTX
Construction Project Organization Group 2.pptx
PDF
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
PPT
CRASH COURSE IN ALTERNATIVE PLUMBING CLASS
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PPTX
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
Digital Logic Computer Design lecture notes
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
Foundation to blockchain - A guide to Blockchain Tech
Welding lecture in detail for understanding
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
PPT on Performance Review to get promotions
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
Model Code of Practice - Construction Work - 21102022 .pdf
Geodesy 1.pptx...............................................
CYBER-CRIMES AND SECURITY A guide to understanding
Mechanical Engineering MATERIALS Selection
Construction Project Organization Group 2.pptx
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
CRASH COURSE IN ALTERNATIVE PLUMBING CLASS
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx

015 changes-process model