Sudhir Vaidya How to select PMC?
07) How to Select PMC? (Project Management Consultant)
Selection of PMC (Project Management Consultant)
1 Approved PMC (Team of 5 Professionals – Architect, Advocate, Society Consultant,
Structural Engineer and Chartered Accountant) should be from the panel maintained by
Government/Federation / Registrar of Co-operative societies.
2 Bio data of directors and key personnel should be obtained. The details of his
organization, key personnel, staff strength etc. should be obtained.
3 Financial position of the PMC should be reviewed.
4 PMC from the Corporate field should be selected. PMC carrying on business in
individual name, Proprietary firm or Partnership firm, LLP should not be appointed.
5 The details of Redevelopment projects (Name, Address, No. Flats constructed, Total Plot
area, Built up area, timely completion, project delays, delay in obtaining occupation
certificate - completion certificate etc) executed in last 5 years and details of projects
under execution as on date should be obtained. Relationship with MCGM, Political
Parties etc. should also be reviewed.
6 The copies of all necessary registrations, certificates, empanelment etc. should be
obtained. (Refer Annexture)
7 Income Tax Clearance Certificate should be obtained.
8 Statement of Legal cases filed against the PMC and status as on date should be obtained.
9 Panel of committee members & Senior / Experienced members should visit the
Redevelopment projects executed 5 years back/executed recently / under execution by
the PMC before any final decision is taken about short listing his name. The agreements
entered by these societies and their feedback on the PMC may also be reviewed.
10 Confidential report of the PMC may also be obtained from the office bearers of
redeveloped societies done by the PMC & from the PMC’s Bankers.
11 The PMC should be subjected to 3 Cs Test namely Capital (Financial position) Capacity
(Technical, Manpower) and Character (Brand value, Goodwill)
12 It is suggested that Quotation for PMC Professional fees should be obtained job wise
instead of consolidated % of construction cost. This is necessary to avoid the dispute at a
later date, in case the redevelopment project gets cancelled for any reasons.
13 Separate discussion should be held with each PMC after he submits his proposal.
Sudhir Vaidya How to select PMC?2
Five PMC’s should be short listed before 1st SGM. PMC should give their presentation at
the time of 1st SGM.
14.0 Disclaimer:
14.1 I do not claim that this is the exhaustive note for the selection of PMC.
Managing Committee / Redevelopment Committee appointed by the society should
consider these suggestions before short listing PMC
15.0 Annexture – Details of Registrations with various Authorities:
Name of the Authority Since
15.1 Institute of Engineers (India)
15.2 License of Structural Engineers from MCGM / Municipal Authorities
15.3 Practicing Engineers, Architects & Town Planner Association
15.4 Indian Society of Structural Engineer (ISSE)
15.5 Institute of Valuer
15.6 Mumbai Building Repair & Reconstruction Board (MHADA UNIT)
15.7 License of Surveyor
15.8 License of Site Supervisor
15.9 American Society of Civil Engineers (ASCE)
15.10 Institute for Steel Development & Growth
15.11 Indian Society for Technical Education (ISTE)
15.12 Registered Member of the council Architect New Delhi
15.13 Associated member of the Indian Institute of Architects
15.14 ISO Certificate (specify the number )
15.15 IT PAN Card, Service Tax , VAT etc.
15.16 Certificate of Incorporation issued by ROC
15.17 Memorandum of Association & Articles of Association of a company /
Partnership deed duly registered with ROC /ROF.
15.18 Whether empanelled by MHADA? If yes, Letter to that effect.
15.19 Any other relevant documents in respect of business.
Sudhir Vaidya How to select PMC?3
16.0 Suggested Scope of Work of Project Management Consultants: (Illustrative)
16.1 Pre-Tendering Stage (Phase I) :-
i Preparing feasibility report with respect to present government policy about utilization
of T.D.R.
ii Recommending the list of amenities, extra area corpus fund etc and preparing rough
designs of the building as per utilization of TDR and preparing a detail report to the
society before inviting Tender from builder/developer.
iii Preparing draft tender documents and to float the tender after discussion with the
committee.
iv Inviting the tenders (Technical and Commercial) from various approved
builders/developers, doing the technical evaluation, preparing comparison statement
and submitting the same to committee members.
v Conducting joint meeting with the short listed Builders / Developer along with the
committee members and finalizing the most suitable developer.
16.2 Before Construction Stage (Phase II) :
i Drafting Letter of Intent based on terms negotiated with the selected Developer.
ii Measurement of each flat and finalizing the carpet area of each member.
iii Listing down the requirement of each member and coordinating with the design
architect for the final drawing.
iv To arrange plane table survey / digital survey in order to work out the area of entire
plot precisely and accurately.
v Approving the plans prepared by the developer keeping in mind the interest of the
society only.
vi Assisting the society in selecting upon Solicitors/Legal Consultants and Tax
Consultants.
vii Preparing Bar charts/CPM-PERT Networks etc. for monitoring of the project.
viii Approving of all detailed Electrical and Plumbing layouts by Architect of
Builder/Developer.
ix Approving all working drawings and Structural drawings by Architect of
Builder/Developer.
x To carry out various Soil Investigation so to decide and select the required material or
Sudhir Vaidya How to select PMC?4
construction techniques at the time actual work of foundation.
xi To confirm submission of layout proposal after its approval.
xii To obtain Layout approval.
xiii To confirm Submission of Building files.
xiv To review the progress of obtaining of I.O.D./ C.C. etc. & to take remedial steps.
16.3 Construction Stage (Phase III)
i Overall co-ordination with the society on technical and financial matter and co-
ordination with Builders/Developers as may be required and between various
engineering disciplines.
ii Maintaining complete co-ordination on the entire redevelopment project.
iii Preparation and issue of a project co-ordination procedure documents to committee
and developer.
iv Monitoring the entire redevelopment project from all angles and to issue of monthly
Project Reports to the Society indicating the status and progress of work.
v Preparation and issue of change notices, indicating any change in project which will
affect costs, planning etc.
vi To have overall co-ordination with the Society, Design Architects, Developers with
respect to the Municipal Drawings so as to ensure smooth progress of the Municipal
follow up.
vii Monitoring Work Progress as per the Agreed Construction Schedule.

More Related Content

PDF
03 flow chart - redevelopment of the building
PDF
06 formation of redevelopment committee
PDF
Building redevelopment referencer 27-09-2015-protected
PDF
Redevelopment under dcpr 2034 regulation section 33(7),33(7)a & 33(7)b
PDF
14 intimation of disapproval - iod
PPSX
Redevelopment project ppt
PDF
Self Redevelopment of Housing Society
PDF
19 agreements – documents to be executed for redevelopment
03 flow chart - redevelopment of the building
06 formation of redevelopment committee
Building redevelopment referencer 27-09-2015-protected
Redevelopment under dcpr 2034 regulation section 33(7),33(7)a & 33(7)b
14 intimation of disapproval - iod
Redevelopment project ppt
Self Redevelopment of Housing Society
19 agreements – documents to be executed for redevelopment

What's hot (20)

PDF
04 redevelopment road map - prior to 1st sgm
PDF
13 development agreement - precautions to be taken by the society
PDF
10 flow chart - redevelopment decision - business to be transacted at 1st sgm
PDF
Building redevelopment referencer 27-09-2015-protected
PPT
Construction labor
PDF
Redevlopement of Co-operative Society
PDF
Fidic contracts management introduction
DOC
Apartment Association AGM Notice Template provided by ApnaComplex
PPTX
How To Conduct AGM for Housing Societies
PPTX
# FIDIC Payment Flow Charts # By SN Panigrahi
PDF
Training fidic moustafa ismail 2017 _ lec 4
PDF
Notice of Annual General Meeting AGM
PPTX
Theapprenticesact1961 130307110744-phpapp01
PPTX
Fidic conditions of contract presentation
PDF
Ss 06 training fidic moustafa ismail 2018 _ lec 6
PPT
Meeting Manners and Parliamentary Procedure
PDF
Related Party Transactions
PDF
PDF
Claims 20.1 (Flow chart)
04 redevelopment road map - prior to 1st sgm
13 development agreement - precautions to be taken by the society
10 flow chart - redevelopment decision - business to be transacted at 1st sgm
Building redevelopment referencer 27-09-2015-protected
Construction labor
Redevlopement of Co-operative Society
Fidic contracts management introduction
Apartment Association AGM Notice Template provided by ApnaComplex
How To Conduct AGM for Housing Societies
# FIDIC Payment Flow Charts # By SN Panigrahi
Training fidic moustafa ismail 2017 _ lec 4
Notice of Annual General Meeting AGM
Theapprenticesact1961 130307110744-phpapp01
Fidic conditions of contract presentation
Ss 06 training fidic moustafa ismail 2018 _ lec 6
Meeting Manners and Parliamentary Procedure
Related Party Transactions
Claims 20.1 (Flow chart)
Ad

Viewers also liked (18)

PDF
2008 dis samaraújo
PDF
PPTX
Git Descomplicado
DOCX
Actividad 8 de josé cristian
DOCX
10 macam cara mengamankan file dan hardware
DOC
Movimiento misionero moderno
PPTX
foto spring bed
PDF
Arqueologia regional da província cárstica henriques
PPTX
PPTX
PPTX
Stayner Collegiate Institute Announcements - October 27, 2016
PPTX
Desenvolver Um Linear Mais Atractivo
PDF
Guia de construcción del PEI
PDF
15 building material quality control
PPTX
Tugas tik ppt bab 6
PDF
7 Application Engagement Techniques
PDF
Arquitetura como currículo
2008 dis samaraújo
Git Descomplicado
Actividad 8 de josé cristian
10 macam cara mengamankan file dan hardware
Movimiento misionero moderno
foto spring bed
Arqueologia regional da província cárstica henriques
Stayner Collegiate Institute Announcements - October 27, 2016
Desenvolver Um Linear Mais Atractivo
Guia de construcción del PEI
15 building material quality control
Tugas tik ppt bab 6
7 Application Engagement Techniques
Arquitetura como currículo
Ad

Similar to 07 how to select pmc (20)

PDF
12 how to select developer
PDF
1217 loc tenders
PPT
Procedure to start small scale industries
PPTX
PDF
Navi mumbai metro new
PPTX
Formalities to start ssi entrepreneurship devp.
PPTX
Understanding the bidding and contract.pptx
PDF
Mithila MFOA 2009 Minutes-EGM_6Oct2024.pdf
PDF
Ak contract management
PPTX
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
PPTX
Starting an enterprise
DOC
Pc iv-new
PPT
building plan and designing and ppt.ppt
PPTX
Mode of Bidding & E dsdsfdfTendering.pptx
PDF
Starting an-enterprise
PPTX
RERA- Certification and issues in Alteration
PPT
Disputes ans Arbitration..
PPT
proceduretostartsmallscaleindustries-150501004358-conversion-gate01.ppt
PPT
Fidic law1
PDF
02 directive of maharashtra co-operative housing society (notification) dt....
12 how to select developer
1217 loc tenders
Procedure to start small scale industries
Navi mumbai metro new
Formalities to start ssi entrepreneurship devp.
Understanding the bidding and contract.pptx
Mithila MFOA 2009 Minutes-EGM_6Oct2024.pdf
Ak contract management
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Starting an enterprise
Pc iv-new
building plan and designing and ppt.ppt
Mode of Bidding & E dsdsfdfTendering.pptx
Starting an-enterprise
RERA- Certification and issues in Alteration
Disputes ans Arbitration..
proceduretostartsmallscaleindustries-150501004358-conversion-gate01.ppt
Fidic law1
02 directive of maharashtra co-operative housing society (notification) dt....

More from spandane (20)

PDF
Karneeti 542.pdf choose insurance cover wisely
PDF
Part 534 - Planning Finances in Youth - By CA Sharma.pdf
PDF
Self -Analysis.pdf The article aims at self appraisal
PDF
Our Life’s journey.pdf who am i, where i am going
PDF
Chart--Time Management.pdf How to time is spent
PDF
Failure Management.pdf ... How to analyze failure
PDF
816) Mental Thoughts.pdf .. Reflections,
PDF
32) RULES OF LIVING WITH PEOPLE.pdf rules to follow
PDF
691) Click.. Article aims to outline the process for taking various decisions...
PDF
777) Right and Wrong..Stray thoughts on various matters such as life perspect...
PDF
92) Clapping Therapy, 200-400 claps every day.pdf
PDF
179) Tichi Goshta, माधुरी शानबाग / नव चैतन्य प्रकाशन.pdf
PDF
723) CAR Article is about how to face life by following simple principles.pdf
PDF
712) Khant - Regret, Article about missing friends and my life.pdf
PDF
797) Olakhane , ओळखणे, information, knowledge, recognition .pdf
PDF
19) Senior Citizen, major, old age, exit.pdf
PDF
179) Tichi Goshta, society, women, moral.pdf
PDF
782) Suvichar - Management, random thoughts, reflections.pdf
PDF
802) Mental Thoughts. mind, vibration.pdf
PDF
92) Clapping Therapy, health, therapy, well beingpdf
Karneeti 542.pdf choose insurance cover wisely
Part 534 - Planning Finances in Youth - By CA Sharma.pdf
Self -Analysis.pdf The article aims at self appraisal
Our Life’s journey.pdf who am i, where i am going
Chart--Time Management.pdf How to time is spent
Failure Management.pdf ... How to analyze failure
816) Mental Thoughts.pdf .. Reflections,
32) RULES OF LIVING WITH PEOPLE.pdf rules to follow
691) Click.. Article aims to outline the process for taking various decisions...
777) Right and Wrong..Stray thoughts on various matters such as life perspect...
92) Clapping Therapy, 200-400 claps every day.pdf
179) Tichi Goshta, माधुरी शानबाग / नव चैतन्य प्रकाशन.pdf
723) CAR Article is about how to face life by following simple principles.pdf
712) Khant - Regret, Article about missing friends and my life.pdf
797) Olakhane , ओळखणे, information, knowledge, recognition .pdf
19) Senior Citizen, major, old age, exit.pdf
179) Tichi Goshta, society, women, moral.pdf
782) Suvichar - Management, random thoughts, reflections.pdf
802) Mental Thoughts. mind, vibration.pdf
92) Clapping Therapy, health, therapy, well beingpdf

Recently uploaded (20)

PDF
Move In Checklist Using eAuditor Audits & Inspections
PDF
Website Redesign Strategy: When and Why Malaysian Businesses Should Upgrade
PPT
SBP StarHills DeraBassi | 2 & 3 BHK Flats
PDF
India Real Estate 2025Hottest Markets & Investment Insights.pdf
PDF
Plots in Jattari Near Noida International Airport Yamuna Expressway Call:-858...
PDF
SkyHills Astra at Dubai Science Park.pdf
PDF
Wellness Villas in Hyderabad – Forest Nation
PDF
Top Reasons to Buy a Home in Mundhwa Pune in 2025
PDF
Robin Pahuja – The Driving Force Among Gurgaon’s Top Real Estate Partners
PDF
Aspirz Tower at Dubai Sports City - Danube.pdf
PDF
Appraisal Report | Appraisal Data Entry Services
PDF
Century Sankhya Plots Bangalore - Brochure
DOCX
Government Support for Indian Construction Companie.docx
PDF
Tata Housing: Redefining Real Estate in India
DOC
价格咨询WAU毕业证学历认证,达特茅斯学院毕业证学士学历
PPTX
The Driving Principles of Anthony Lester Fresno: Integrity and Impact
PDF
Building Wealth with Multifamily Strategy Seller Finance
PDF
Signature global Orchard Avenue sector 93
PPT
industrial theory for the urban economics
PDF
Technology & Flexibility: Tools for Retention Success | Christopher Birli
Move In Checklist Using eAuditor Audits & Inspections
Website Redesign Strategy: When and Why Malaysian Businesses Should Upgrade
SBP StarHills DeraBassi | 2 & 3 BHK Flats
India Real Estate 2025Hottest Markets & Investment Insights.pdf
Plots in Jattari Near Noida International Airport Yamuna Expressway Call:-858...
SkyHills Astra at Dubai Science Park.pdf
Wellness Villas in Hyderabad – Forest Nation
Top Reasons to Buy a Home in Mundhwa Pune in 2025
Robin Pahuja – The Driving Force Among Gurgaon’s Top Real Estate Partners
Aspirz Tower at Dubai Sports City - Danube.pdf
Appraisal Report | Appraisal Data Entry Services
Century Sankhya Plots Bangalore - Brochure
Government Support for Indian Construction Companie.docx
Tata Housing: Redefining Real Estate in India
价格咨询WAU毕业证学历认证,达特茅斯学院毕业证学士学历
The Driving Principles of Anthony Lester Fresno: Integrity and Impact
Building Wealth with Multifamily Strategy Seller Finance
Signature global Orchard Avenue sector 93
industrial theory for the urban economics
Technology & Flexibility: Tools for Retention Success | Christopher Birli

07 how to select pmc

  • 1. Sudhir Vaidya How to select PMC? 07) How to Select PMC? (Project Management Consultant) Selection of PMC (Project Management Consultant) 1 Approved PMC (Team of 5 Professionals – Architect, Advocate, Society Consultant, Structural Engineer and Chartered Accountant) should be from the panel maintained by Government/Federation / Registrar of Co-operative societies. 2 Bio data of directors and key personnel should be obtained. The details of his organization, key personnel, staff strength etc. should be obtained. 3 Financial position of the PMC should be reviewed. 4 PMC from the Corporate field should be selected. PMC carrying on business in individual name, Proprietary firm or Partnership firm, LLP should not be appointed. 5 The details of Redevelopment projects (Name, Address, No. Flats constructed, Total Plot area, Built up area, timely completion, project delays, delay in obtaining occupation certificate - completion certificate etc) executed in last 5 years and details of projects under execution as on date should be obtained. Relationship with MCGM, Political Parties etc. should also be reviewed. 6 The copies of all necessary registrations, certificates, empanelment etc. should be obtained. (Refer Annexture) 7 Income Tax Clearance Certificate should be obtained. 8 Statement of Legal cases filed against the PMC and status as on date should be obtained. 9 Panel of committee members & Senior / Experienced members should visit the Redevelopment projects executed 5 years back/executed recently / under execution by the PMC before any final decision is taken about short listing his name. The agreements entered by these societies and their feedback on the PMC may also be reviewed. 10 Confidential report of the PMC may also be obtained from the office bearers of redeveloped societies done by the PMC & from the PMC’s Bankers. 11 The PMC should be subjected to 3 Cs Test namely Capital (Financial position) Capacity (Technical, Manpower) and Character (Brand value, Goodwill) 12 It is suggested that Quotation for PMC Professional fees should be obtained job wise instead of consolidated % of construction cost. This is necessary to avoid the dispute at a later date, in case the redevelopment project gets cancelled for any reasons. 13 Separate discussion should be held with each PMC after he submits his proposal.
  • 2. Sudhir Vaidya How to select PMC?2 Five PMC’s should be short listed before 1st SGM. PMC should give their presentation at the time of 1st SGM. 14.0 Disclaimer: 14.1 I do not claim that this is the exhaustive note for the selection of PMC. Managing Committee / Redevelopment Committee appointed by the society should consider these suggestions before short listing PMC 15.0 Annexture – Details of Registrations with various Authorities: Name of the Authority Since 15.1 Institute of Engineers (India) 15.2 License of Structural Engineers from MCGM / Municipal Authorities 15.3 Practicing Engineers, Architects & Town Planner Association 15.4 Indian Society of Structural Engineer (ISSE) 15.5 Institute of Valuer 15.6 Mumbai Building Repair & Reconstruction Board (MHADA UNIT) 15.7 License of Surveyor 15.8 License of Site Supervisor 15.9 American Society of Civil Engineers (ASCE) 15.10 Institute for Steel Development & Growth 15.11 Indian Society for Technical Education (ISTE) 15.12 Registered Member of the council Architect New Delhi 15.13 Associated member of the Indian Institute of Architects 15.14 ISO Certificate (specify the number ) 15.15 IT PAN Card, Service Tax , VAT etc. 15.16 Certificate of Incorporation issued by ROC 15.17 Memorandum of Association & Articles of Association of a company / Partnership deed duly registered with ROC /ROF. 15.18 Whether empanelled by MHADA? If yes, Letter to that effect. 15.19 Any other relevant documents in respect of business.
  • 3. Sudhir Vaidya How to select PMC?3 16.0 Suggested Scope of Work of Project Management Consultants: (Illustrative) 16.1 Pre-Tendering Stage (Phase I) :- i Preparing feasibility report with respect to present government policy about utilization of T.D.R. ii Recommending the list of amenities, extra area corpus fund etc and preparing rough designs of the building as per utilization of TDR and preparing a detail report to the society before inviting Tender from builder/developer. iii Preparing draft tender documents and to float the tender after discussion with the committee. iv Inviting the tenders (Technical and Commercial) from various approved builders/developers, doing the technical evaluation, preparing comparison statement and submitting the same to committee members. v Conducting joint meeting with the short listed Builders / Developer along with the committee members and finalizing the most suitable developer. 16.2 Before Construction Stage (Phase II) : i Drafting Letter of Intent based on terms negotiated with the selected Developer. ii Measurement of each flat and finalizing the carpet area of each member. iii Listing down the requirement of each member and coordinating with the design architect for the final drawing. iv To arrange plane table survey / digital survey in order to work out the area of entire plot precisely and accurately. v Approving the plans prepared by the developer keeping in mind the interest of the society only. vi Assisting the society in selecting upon Solicitors/Legal Consultants and Tax Consultants. vii Preparing Bar charts/CPM-PERT Networks etc. for monitoring of the project. viii Approving of all detailed Electrical and Plumbing layouts by Architect of Builder/Developer. ix Approving all working drawings and Structural drawings by Architect of Builder/Developer. x To carry out various Soil Investigation so to decide and select the required material or
  • 4. Sudhir Vaidya How to select PMC?4 construction techniques at the time actual work of foundation. xi To confirm submission of layout proposal after its approval. xii To obtain Layout approval. xiii To confirm Submission of Building files. xiv To review the progress of obtaining of I.O.D./ C.C. etc. & to take remedial steps. 16.3 Construction Stage (Phase III) i Overall co-ordination with the society on technical and financial matter and co- ordination with Builders/Developers as may be required and between various engineering disciplines. ii Maintaining complete co-ordination on the entire redevelopment project. iii Preparation and issue of a project co-ordination procedure documents to committee and developer. iv Monitoring the entire redevelopment project from all angles and to issue of monthly Project Reports to the Society indicating the status and progress of work. v Preparation and issue of change notices, indicating any change in project which will affect costs, planning etc. vi To have overall co-ordination with the Society, Design Architects, Developers with respect to the Municipal Drawings so as to ensure smooth progress of the Municipal follow up. vii Monitoring Work Progress as per the Agreed Construction Schedule.