Project Management for
TODAY’S World!
Cambridge Center of Excellence
Project Team
Kwame Ahinkorah, PMP
Principal Trainer
Yaw Ntiamoah
MS Project Tutor
Nana Akua Boateng
Administrator
Juliet Ahinkorah
Administrative Assistant
Course Materials
 PMBOK Guide -5th Edition
 RMC Exam Prep
 PM Prep Cast (Videos)
 PM Fastrack
Notable Industries
 Construction
 Engineering
 Real Estates
 Mining/ Oil & Gas
 Finance & Banking
 Telecommunications
 NGO
 Agriculture
 Sales & Marketing
 I.T
 Health
 Manufacturing
 Education
 Central & Local Government
Course Phases
 PMP Lectures
 Concurrent Evaluation Tests
Our Course Objectives
• Enable you pass the PMP® Exam
• Enable you become proficient on projects
• Offer you greater career mobility
Sheryl Thompson, PMP
Introduction
 Your Name and Professional Background
 Your knowledge in Project Management
 Basic
 Intermediate
 Advance
 If you were an animal, what animal will you be
and why…?
The PMBOK Guide
“The PMBOK Guide is a
recognized standard for the
Project Management
Profession–”
What is a Standard?
A standard is a formal document that
describes established/standardized norms,
methods, processes, and practices.
What is a
project?
What is a Project
?
A project is a temporary endeavor
undertaken to create a unique
product, service or result.
The output of every project is
called
↓
a Deliverable
Temporary
Has a beginning and a definite
end.
Unique
Peculiar, Distinct, Exclusive.
No two projects are the same.
A Project can beundertaken by:
• a single person
• a single organizational unit
• An entire Organization (multiple organizational
units)
Project Triggers
What is a Project Trigger
?
PROJECT TRIGGERS
Why do weundertake Projects?
Projectsoftenariseas a resultofaBusinessNeed,reflectedinthefollowing:
1. Strategic Opportunity
2. In response to market demand
3. Legal requirements
4. Competition
5. Technologicaladvancement
6. Stakeholders request
Creation of an Infrastructure:Roads, Bridges, Buildings, Office
Complex, Expansions, Masts.
Developing a newproduct or service:Machinery, Technology,
Speed Banking,TiGo Cash, Mentor, Ceremonies
Developing a New Model of an existingproduct or service:
Corolla 2017, ipad5, SamsungGalaxy S7, Mentor 7
Creating a Document – A Research finding, book, constitution,
proposals, business plans
Some Examples of Projects
The End of a Project is
reached:
When project objectives have been achieved.
When its objectives will not or cannot be met.
When the need for a project no longer exists.
Factors That Influence Project Delivery
 EnterpriseEnvironmental Factors (EEFs)
 Organizational ProcessAssets (OPAs)
19
Factors That Influence Project Delivery
EnterpriseEnvironmental Factors(EEFs)
These refer to internal and external environmental factors
that are beyond the direct control of the project team.
20
Examples of EEFs:
• Government/Industry Standards
• ExistingInfrastructure
• ExistingHuman Resources
• Market Conditions(E.g. Price, Inflation, Exchangerate)
• Legal, economic or political climate
• The skillsandorganizational culture of the project
environment – The People
Factors That Influence Project Delivery
 Organisational ProcessAssets (OPAs)
These are documentary assets of an organization or from
previous projects that can be used to influencea current
project’s success.
22
Examples of OPAs
• Procedures,Policies& Guidelines
• Formal& InformalPlans
• HistoricalInformation
• LessonsLearned*
• Templates& Checklist
• Data/Recordof PastProjects
LessonsLearned
What are Lessons Learned
?
LessonsLearned
Lessons learnedare generatedas a resultofvariances (a deviation
fromthe expected)
Foursteps totakewhenthere are variances
1.Documentand namethe variance.
2.Identifyand documentthe causes.
3. Correct thevariance and documenttheaction.
4.MakeRecommendationsfor thefuture.
Operations
What are Operations
?
26
Operations
 This refers to the ongoing function of an
organization that are repetitive in nature
and produce recurrent results.
 Operations work support the business
environment where projects are executed
 In shorts, operations are the Day-to-Day
activities of an organization that define
regular roles.
27
Organisational Structure
1. FunctionalOrganisations
2. Projectized Organisations
3. Matrix Organisation
 WeakMatrix
 Balanced Matrix
 Strong Matrix
28
Diagram of Organisational Structure
29
Project Management
What is ProjectManagement
?
30
Project Management
The applicationof knowledge, skills,toolsand
techniquesto projectactivities tomeet the project
requirements.
31
Project Management Office
A project managementoffice(PMO)is an organizationalbody or
entityassigned various responsibilities related to the centralized
and coordinated managementof thoseprojects under its
domain.
The specificform, function,and structure of a PMO is
dependent upon theneeds of the organization thatit supports.
Project Management Context
Project managementexists in a broader context:
• Project Management
• Program Management
• PortfolioManagement
• Strategic Management/Objectives
Program Management
What isa Program
?
Program Management
• A Programis a group of related projects managedin a
coordinated way to obtain benefits and control not available
from managingthemindividually
Portfolio Management
What isa Portfolio
?
Portfolio Management
• A Portfoliois a collection of programs, projects, operations
and other works of an organization thatare grouped and
managedtogetherto meetstrategicobjectives.
Strategic Objectives
Portfolio
Program
1
Project 1 Project 2
Program
2
Project 3 Project 4 Project 5
Other
Works
Project 6
Project Stakeholders
Who are ProjectStakeholders
?
A ProjectStakeholder is one whose interest may be
positively or negatively impacted bythe project
and/orcan impactthe project positivelyor
negatively.
PROJECT STAKEHOLDERS may Include:
1.Project manager
2.Project team
3.Project managementteam
4.ProgramManager
5.PortfolioManager
6.Functional Managers
7.Project sponsor
8.Customers/Users
9.Performingorganization
10.Requesting Organization
11. Informationprovider
12.Government (Legislative, Regulatory,Tax-collectionAgencies, etc.)
Project Manager
The person appointed by theperforming organisation to see
to the accomplishmentof theproject’s objectives.
Qualitiesof a Project Manager:
• Knowledge
• Performance
• Interpersonal/Soft Skill
42
SomeTechniques of the Project Manager
 Team Involvement/Meetings
 Expert Judgment:Involving (asking) experts to offer
knowledge/expertise to support the project
 FacilitationTechniques
 Analytical Techniques
 Interpersonal Skills/Soft Skills
43
PROJECT LIFE CYCLE
 This refers to a collection of the four (4) stages orphases that onehas to go
through whenundertaking any project.
 Irrespective ofthe size orcomplexity of a project, it couldbemappedto the
following structure :
 Initiation Stage (starting the project)
 Planning Stage (Organising and preparing)
 Execution Stage (carrying out the project work)
 Closure Stage (Closing/completing the project)
44
Project Life Cycle
45
Project
Closure
Project LifecycleContinued
Characteristics of the Project
Lifecycle
46
Cost of Change
Over Project Life Cycle
Cost of change or the Cost of correcting errors.
• Is lowest at the commencement of the project when not much has been
committed.
• Increases significantly as the project progresses
Stakeholders’ Influence
Over Project Life Cycle
Because Cost of change increases as the project progresses
• Stakeholders’ Influence is highest during the initial stages.
• And reduces significantly as cost of change increases
Project Resources
Over ProjectLife Cycle
49
Stakeholder Interest
Over ProjectLife Cycle
50
Project Uncertainty
Over Project Life Cycle
51
Project Conflict
Over project Life Cycle
52
Cumulative Resources
Over Project Life Cycle
53
Project Phases
What are project phases?
Why do we phase projects?
Types of phases
54
Project Management Processes (47)
Knowledge Areas/Modules (10)
 Project Integration Mgmt
 Project Scope Mgmt
 Project Time Mgmt
 Project Cost Mgmt
 Project Quality Mgmt
 Project HumanResource Mgmt
 Project Communication Mgmt
 Project Risk Mgmt
 Project Procurement Mgmt
 Project Stakeholder Mgmt
ProcessGroups(5)
 Initiating Process Group
 Planning Process Group
 Executing Process Group
 Monitoring and Controlling Process
Group
 Closing Process Group
55
56
Knowledge Area Process Group
Inputs Tools & Techniques Outputs
Process
Tasks
Tools To Be Used in SelectingViableProjects
 Net Present Value (NPV)
 Internal Rate of Return (IRR)
 Return On Investment (ROI)
 ProfitabilityIndex (PI)
 Benefit toCost Ratio(BCR)
 PaybackPeriod (PP)
 Opportunity Cost (OC)
57
Net Present Value (NPV)
CRITERIA
• Project is profitable if NPV is Positive
• Project breaks even if NPV is Zero
• Project is a loss if NPV is Negative
• The bigger the NPV the Better
Total Value of Future Amounts in
Today’s Terms Less Cost.
Evaluation
1. Mining: -$1.8m
2. Real Estates: $1.2m
3. Financial Serv. $1.6m
Formula Used
Net Present Value
PV = FV
(1+r)n
Internal Rate of Return (IRR)
CRITERIA
• Project is profitable if IRR is Greater
than Cost of Capital or Hurdle Rate
•The bigger the IRR the Better
The Rate at which an Investment
earns money for itself Evaluation
1. Mining: -$1.8m
2. Real Estates: $1.2m
3. Financial Serv. $1.6m
Formula Used
Internal Rate of Return
Return on Investment (ROI)
CRITERIA
• Pursue Project if ROI is higher
• For several Projects choose the one
with the highest ROI
•The bigger the ROI the Better
The Ratio of Net Earnings to the
Value of Investment Evaluation
1. Mining: 1.6
2. Real Estates: 0.8
3. Financial Serv. 1.4
Formula Used
Return on Investment
Profitability Index (PI)
CRITERIA
• Pursue Project if PI is higher
• Reject Project if PI is less than 1.
• PI of 1 means project breaks even.
The Ratio of cash flows to Investment
Evaluation
1. Mining: 1
2. Real Estates: 0.8
3. Financial Serv. 1.4
Formula Used
Profitability Index
Benefit-to-Cost Ratio (BCR)
CRITERIA
• Pursue Project if BCR is higher
• Reject Project if BCR is less than 1.
• BCR of 1 means project breaks even.
Ratio of project’s Benefits to Project
Cost. Evaluation
1. Mining: 1
2. Real Estates: 0.8
3. Financial Serv. 1.4
Formula Used
Benefit-to-Cost Ratio
Payback Period (PP)
CRITERIA
• The shorter the payback period, the
better.
Time within which project investment
cost is recovered. Evaluation
1. Mining: 6years
2. Real Estates: 8years
3. Financial Serv. 3years
Formula Used
Payback Period
Opportunity Cost (OC)
CRITERIA
• Your opportunity cost should be
smaller than your selected option
• For any number of options, your
opportunity cost is the cost of the next
best option
The Cost of the Alternative Forgone in
order to pursue the selected option. Evaluation
1. Mining: $6m
2. Real Estates: $8
3. Financial Serv. $7m
Formula Used
Opportunity Cost
End
o Assessment
o Questions

More Related Content

PPTX
Project Management - Foundation
PPT
Introduction to project management
PDF
Project Management for the Accidental Project Manager
PDF
Organizational Project Management; short workshop
PPT
1 project management framework
PPT
The Project Management Process - Week 1
PPT
Adaptive Project Management
PDF
Project Management (PMP Material)
Project Management - Foundation
Introduction to project management
Project Management for the Accidental Project Manager
Organizational Project Management; short workshop
1 project management framework
The Project Management Process - Week 1
Adaptive Project Management
Project Management (PMP Material)

What's hot (20)

PPTX
PDF
Project Management 09
PPTX
"Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre...
PDF
Basic Project Management Qc Session1
PPSX
DISE - Introduction to Project Management
PPTX
PROJECT MANAGEMENT OFFICE (PMO) SETTING UP AND MANAGEMENT
PPTX
Project Management Foundations Series Course 102 - Project Management Processes
PPTX
Fundamentals of Project Management
PDF
Project Controls Expo, 18th Nov 2014 - "Effective Project Portfolio Managemen...
DOC
An Introduction to Project management(project management tutorials)
PDF
Project management frame work part 1
PDF
project Cost management
PPTX
Project management essentials 3 day training program
PPT
Introduction To Project Management Megat
PPT
pinto_pm2_ch01
PPTX
An Introduction to Project Management
PDF
Project management frame work part 2
PPTX
Project management in pharmaceutical generic industry basics and standards
PPTX
1 project management framework - Fifth edition
PPTX
Pmp inititating process group
Project Management 09
"Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre...
Basic Project Management Qc Session1
DISE - Introduction to Project Management
PROJECT MANAGEMENT OFFICE (PMO) SETTING UP AND MANAGEMENT
Project Management Foundations Series Course 102 - Project Management Processes
Fundamentals of Project Management
Project Controls Expo, 18th Nov 2014 - "Effective Project Portfolio Managemen...
An Introduction to Project management(project management tutorials)
Project management frame work part 1
project Cost management
Project management essentials 3 day training program
Introduction To Project Management Megat
pinto_pm2_ch01
An Introduction to Project Management
Project management frame work part 2
Project management in pharmaceutical generic industry basics and standards
1 project management framework - Fifth edition
Pmp inititating process group
Ad

Viewers also liked (20)

PDF
Project Management Professional (PMP)
PPT
The Project Management Process - Week 2
PPTX
Section 1: introduction
PDF
Project Management - Module 1 Training (Fabio Moioli)
PDF
Risk management overview
PPT
Tips For Solving PMP Exam Questions
PDF
The 7 Questions Every PMP Exam Student Asks Their Coach
PPTX
PPT
CMMi 4 techstaff
DOC
Module5 Project Charter
PPT
Chap014
PDF
Pmp 3 chapter
PDF
Handbook of management_and_leadership
PPTX
Project Management Framework
PPTX
Session 19 4th edition PMP
PPTX
TIME MANAGEMENT chapter(6), PMBOK5
PDF
PMP chapter(4) INTEGRATION MANAGEMENT
PDF
Ranga's 51 hot topics to remember for Risk Management Professional (RMP) exam
PDF
Introduction to Project Management
PPTX
Session 22 4th edition PMP
Project Management Professional (PMP)
The Project Management Process - Week 2
Section 1: introduction
Project Management - Module 1 Training (Fabio Moioli)
Risk management overview
Tips For Solving PMP Exam Questions
The 7 Questions Every PMP Exam Student Asks Their Coach
CMMi 4 techstaff
Module5 Project Charter
Chap014
Pmp 3 chapter
Handbook of management_and_leadership
Project Management Framework
Session 19 4th edition PMP
TIME MANAGEMENT chapter(6), PMBOK5
PMP chapter(4) INTEGRATION MANAGEMENT
Ranga's 51 hot topics to remember for Risk Management Professional (RMP) exam
Introduction to Project Management
Session 22 4th edition PMP
Ad

Similar to 1. Introduction to Project Management and the Project Management Framework (20)

PPTX
Mastering the Five Basic Requirements of a Good Project Plan -.pptx
PPTX
Mastering the Five Basic Requirements of a Good Project Plan -.pptx
PPTX
Project Management Fundamentals based on the PMBOK Guide
PPTX
PPT1-PROJECT-_-Project-Management.pptx
PDF
240914.Project Management_Slides 1 Framework.EN.v01 (2) (1).pdf
PDF
240914.Project Management_Slides 1 Framework.EN.v01 (2).pdf
PPTX
Project Execution and Project management (GT IV batch) 2.pptx
PPTX
Introduction to Project Management - PMP Workgroup
PPTX
Mangemnt3207.pptx
PDF
Topic 1 - Introduction of Project Management.pdf
PPTX
PM & PM LC.pptx
PPTX
01 introductiontoframework
PPT
PM ppt unit 1.ppt
PPT
Ch01
PPTX
Lec 01 - Introduction.pptx
PPTX
theorycccccccccccccccccccccccccccccccccccccccccccc
PPTX
Project Management Overview
PPTX
project management
PPTX
Project Management - An Introduction
PPTX
Lecture 27 Projects (03-11-20).pptx
Mastering the Five Basic Requirements of a Good Project Plan -.pptx
Mastering the Five Basic Requirements of a Good Project Plan -.pptx
Project Management Fundamentals based on the PMBOK Guide
PPT1-PROJECT-_-Project-Management.pptx
240914.Project Management_Slides 1 Framework.EN.v01 (2) (1).pdf
240914.Project Management_Slides 1 Framework.EN.v01 (2).pdf
Project Execution and Project management (GT IV batch) 2.pptx
Introduction to Project Management - PMP Workgroup
Mangemnt3207.pptx
Topic 1 - Introduction of Project Management.pdf
PM & PM LC.pptx
01 introductiontoframework
PM ppt unit 1.ppt
Ch01
Lec 01 - Introduction.pptx
theorycccccccccccccccccccccccccccccccccccccccccccc
Project Management Overview
project management
Project Management - An Introduction
Lecture 27 Projects (03-11-20).pptx

Recently uploaded (20)

PDF
TR - Agricultural Crops Production NC III.pdf
PDF
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
PDF
Module 4: Burden of Disease Tutorial Slides S2 2025
PPTX
BOWEL ELIMINATION FACTORS AFFECTING AND TYPES
PDF
VCE English Exam - Section C Student Revision Booklet
PDF
Mark Klimek Lecture Notes_240423 revision books _173037.pdf
PDF
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
PDF
STATICS OF THE RIGID BODIES Hibbelers.pdf
PPTX
Microbial diseases, their pathogenesis and prophylaxis
PDF
Classroom Observation Tools for Teachers
PDF
FourierSeries-QuestionsWithAnswers(Part-A).pdf
PDF
Abdominal Access Techniques with Prof. Dr. R K Mishra
PDF
Pre independence Education in Inndia.pdf
PDF
Saundersa Comprehensive Review for the NCLEX-RN Examination.pdf
PPTX
Pharmacology of Heart Failure /Pharmacotherapy of CHF
PDF
Physiotherapy_for_Respiratory_and_Cardiac_Problems WEBBER.pdf
PDF
Insiders guide to clinical Medicine.pdf
PPTX
Institutional Correction lecture only . . .
PPTX
Introduction to Child Health Nursing – Unit I | Child Health Nursing I | B.Sc...
PDF
Complications of Minimal Access Surgery at WLH
TR - Agricultural Crops Production NC III.pdf
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
Module 4: Burden of Disease Tutorial Slides S2 2025
BOWEL ELIMINATION FACTORS AFFECTING AND TYPES
VCE English Exam - Section C Student Revision Booklet
Mark Klimek Lecture Notes_240423 revision books _173037.pdf
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
STATICS OF THE RIGID BODIES Hibbelers.pdf
Microbial diseases, their pathogenesis and prophylaxis
Classroom Observation Tools for Teachers
FourierSeries-QuestionsWithAnswers(Part-A).pdf
Abdominal Access Techniques with Prof. Dr. R K Mishra
Pre independence Education in Inndia.pdf
Saundersa Comprehensive Review for the NCLEX-RN Examination.pdf
Pharmacology of Heart Failure /Pharmacotherapy of CHF
Physiotherapy_for_Respiratory_and_Cardiac_Problems WEBBER.pdf
Insiders guide to clinical Medicine.pdf
Institutional Correction lecture only . . .
Introduction to Child Health Nursing – Unit I | Child Health Nursing I | B.Sc...
Complications of Minimal Access Surgery at WLH

1. Introduction to Project Management and the Project Management Framework

  • 1. Project Management for TODAY’S World! Cambridge Center of Excellence
  • 2. Project Team Kwame Ahinkorah, PMP Principal Trainer Yaw Ntiamoah MS Project Tutor Nana Akua Boateng Administrator Juliet Ahinkorah Administrative Assistant
  • 3. Course Materials  PMBOK Guide -5th Edition  RMC Exam Prep  PM Prep Cast (Videos)  PM Fastrack
  • 4. Notable Industries  Construction  Engineering  Real Estates  Mining/ Oil & Gas  Finance & Banking  Telecommunications  NGO  Agriculture  Sales & Marketing  I.T  Health  Manufacturing  Education  Central & Local Government
  • 5. Course Phases  PMP Lectures  Concurrent Evaluation Tests
  • 6. Our Course Objectives • Enable you pass the PMP® Exam • Enable you become proficient on projects • Offer you greater career mobility Sheryl Thompson, PMP
  • 7. Introduction  Your Name and Professional Background  Your knowledge in Project Management  Basic  Intermediate  Advance  If you were an animal, what animal will you be and why…?
  • 8. The PMBOK Guide “The PMBOK Guide is a recognized standard for the Project Management Profession–” What is a Standard? A standard is a formal document that describes established/standardized norms, methods, processes, and practices.
  • 10. What is a Project ?
  • 11. A project is a temporary endeavor undertaken to create a unique product, service or result. The output of every project is called ↓ a Deliverable
  • 12. Temporary Has a beginning and a definite end.
  • 13. Unique Peculiar, Distinct, Exclusive. No two projects are the same.
  • 14. A Project can beundertaken by: • a single person • a single organizational unit • An entire Organization (multiple organizational units)
  • 15. Project Triggers What is a Project Trigger ?
  • 16. PROJECT TRIGGERS Why do weundertake Projects? Projectsoftenariseas a resultofaBusinessNeed,reflectedinthefollowing: 1. Strategic Opportunity 2. In response to market demand 3. Legal requirements 4. Competition 5. Technologicaladvancement 6. Stakeholders request
  • 17. Creation of an Infrastructure:Roads, Bridges, Buildings, Office Complex, Expansions, Masts. Developing a newproduct or service:Machinery, Technology, Speed Banking,TiGo Cash, Mentor, Ceremonies Developing a New Model of an existingproduct or service: Corolla 2017, ipad5, SamsungGalaxy S7, Mentor 7 Creating a Document – A Research finding, book, constitution, proposals, business plans Some Examples of Projects
  • 18. The End of a Project is reached: When project objectives have been achieved. When its objectives will not or cannot be met. When the need for a project no longer exists.
  • 19. Factors That Influence Project Delivery  EnterpriseEnvironmental Factors (EEFs)  Organizational ProcessAssets (OPAs) 19
  • 20. Factors That Influence Project Delivery EnterpriseEnvironmental Factors(EEFs) These refer to internal and external environmental factors that are beyond the direct control of the project team. 20
  • 21. Examples of EEFs: • Government/Industry Standards • ExistingInfrastructure • ExistingHuman Resources • Market Conditions(E.g. Price, Inflation, Exchangerate) • Legal, economic or political climate • The skillsandorganizational culture of the project environment – The People
  • 22. Factors That Influence Project Delivery  Organisational ProcessAssets (OPAs) These are documentary assets of an organization or from previous projects that can be used to influencea current project’s success. 22
  • 23. Examples of OPAs • Procedures,Policies& Guidelines • Formal& InformalPlans • HistoricalInformation • LessonsLearned* • Templates& Checklist • Data/Recordof PastProjects
  • 25. LessonsLearned Lessons learnedare generatedas a resultofvariances (a deviation fromthe expected) Foursteps totakewhenthere are variances 1.Documentand namethe variance. 2.Identifyand documentthe causes. 3. Correct thevariance and documenttheaction. 4.MakeRecommendationsfor thefuture.
  • 27. Operations  This refers to the ongoing function of an organization that are repetitive in nature and produce recurrent results.  Operations work support the business environment where projects are executed  In shorts, operations are the Day-to-Day activities of an organization that define regular roles. 27
  • 28. Organisational Structure 1. FunctionalOrganisations 2. Projectized Organisations 3. Matrix Organisation  WeakMatrix  Balanced Matrix  Strong Matrix 28
  • 30. Project Management What is ProjectManagement ? 30
  • 31. Project Management The applicationof knowledge, skills,toolsand techniquesto projectactivities tomeet the project requirements. 31
  • 32. Project Management Office A project managementoffice(PMO)is an organizationalbody or entityassigned various responsibilities related to the centralized and coordinated managementof thoseprojects under its domain. The specificform, function,and structure of a PMO is dependent upon theneeds of the organization thatit supports.
  • 33. Project Management Context Project managementexists in a broader context: • Project Management • Program Management • PortfolioManagement • Strategic Management/Objectives
  • 35. Program Management • A Programis a group of related projects managedin a coordinated way to obtain benefits and control not available from managingthemindividually
  • 37. Portfolio Management • A Portfoliois a collection of programs, projects, operations and other works of an organization thatare grouped and managedtogetherto meetstrategicobjectives.
  • 38. Strategic Objectives Portfolio Program 1 Project 1 Project 2 Program 2 Project 3 Project 4 Project 5 Other Works Project 6
  • 39. Project Stakeholders Who are ProjectStakeholders ?
  • 40. A ProjectStakeholder is one whose interest may be positively or negatively impacted bythe project and/orcan impactthe project positivelyor negatively.
  • 41. PROJECT STAKEHOLDERS may Include: 1.Project manager 2.Project team 3.Project managementteam 4.ProgramManager 5.PortfolioManager 6.Functional Managers 7.Project sponsor 8.Customers/Users 9.Performingorganization 10.Requesting Organization 11. Informationprovider 12.Government (Legislative, Regulatory,Tax-collectionAgencies, etc.)
  • 42. Project Manager The person appointed by theperforming organisation to see to the accomplishmentof theproject’s objectives. Qualitiesof a Project Manager: • Knowledge • Performance • Interpersonal/Soft Skill 42
  • 43. SomeTechniques of the Project Manager  Team Involvement/Meetings  Expert Judgment:Involving (asking) experts to offer knowledge/expertise to support the project  FacilitationTechniques  Analytical Techniques  Interpersonal Skills/Soft Skills 43
  • 44. PROJECT LIFE CYCLE  This refers to a collection of the four (4) stages orphases that onehas to go through whenundertaking any project.  Irrespective ofthe size orcomplexity of a project, it couldbemappedto the following structure :  Initiation Stage (starting the project)  Planning Stage (Organising and preparing)  Execution Stage (carrying out the project work)  Closure Stage (Closing/completing the project) 44
  • 47. Cost of Change Over Project Life Cycle Cost of change or the Cost of correcting errors. • Is lowest at the commencement of the project when not much has been committed. • Increases significantly as the project progresses
  • 48. Stakeholders’ Influence Over Project Life Cycle Because Cost of change increases as the project progresses • Stakeholders’ Influence is highest during the initial stages. • And reduces significantly as cost of change increases
  • 54. Project Phases What are project phases? Why do we phase projects? Types of phases 54
  • 55. Project Management Processes (47) Knowledge Areas/Modules (10)  Project Integration Mgmt  Project Scope Mgmt  Project Time Mgmt  Project Cost Mgmt  Project Quality Mgmt  Project HumanResource Mgmt  Project Communication Mgmt  Project Risk Mgmt  Project Procurement Mgmt  Project Stakeholder Mgmt ProcessGroups(5)  Initiating Process Group  Planning Process Group  Executing Process Group  Monitoring and Controlling Process Group  Closing Process Group 55
  • 56. 56 Knowledge Area Process Group Inputs Tools & Techniques Outputs Process Tasks
  • 57. Tools To Be Used in SelectingViableProjects  Net Present Value (NPV)  Internal Rate of Return (IRR)  Return On Investment (ROI)  ProfitabilityIndex (PI)  Benefit toCost Ratio(BCR)  PaybackPeriod (PP)  Opportunity Cost (OC) 57
  • 58. Net Present Value (NPV) CRITERIA • Project is profitable if NPV is Positive • Project breaks even if NPV is Zero • Project is a loss if NPV is Negative • The bigger the NPV the Better Total Value of Future Amounts in Today’s Terms Less Cost. Evaluation 1. Mining: -$1.8m 2. Real Estates: $1.2m 3. Financial Serv. $1.6m Formula Used Net Present Value PV = FV (1+r)n
  • 59. Internal Rate of Return (IRR) CRITERIA • Project is profitable if IRR is Greater than Cost of Capital or Hurdle Rate •The bigger the IRR the Better The Rate at which an Investment earns money for itself Evaluation 1. Mining: -$1.8m 2. Real Estates: $1.2m 3. Financial Serv. $1.6m Formula Used Internal Rate of Return
  • 60. Return on Investment (ROI) CRITERIA • Pursue Project if ROI is higher • For several Projects choose the one with the highest ROI •The bigger the ROI the Better The Ratio of Net Earnings to the Value of Investment Evaluation 1. Mining: 1.6 2. Real Estates: 0.8 3. Financial Serv. 1.4 Formula Used Return on Investment
  • 61. Profitability Index (PI) CRITERIA • Pursue Project if PI is higher • Reject Project if PI is less than 1. • PI of 1 means project breaks even. The Ratio of cash flows to Investment Evaluation 1. Mining: 1 2. Real Estates: 0.8 3. Financial Serv. 1.4 Formula Used Profitability Index
  • 62. Benefit-to-Cost Ratio (BCR) CRITERIA • Pursue Project if BCR is higher • Reject Project if BCR is less than 1. • BCR of 1 means project breaks even. Ratio of project’s Benefits to Project Cost. Evaluation 1. Mining: 1 2. Real Estates: 0.8 3. Financial Serv. 1.4 Formula Used Benefit-to-Cost Ratio
  • 63. Payback Period (PP) CRITERIA • The shorter the payback period, the better. Time within which project investment cost is recovered. Evaluation 1. Mining: 6years 2. Real Estates: 8years 3. Financial Serv. 3years Formula Used Payback Period
  • 64. Opportunity Cost (OC) CRITERIA • Your opportunity cost should be smaller than your selected option • For any number of options, your opportunity cost is the cost of the next best option The Cost of the Alternative Forgone in order to pursue the selected option. Evaluation 1. Mining: $6m 2. Real Estates: $8 3. Financial Serv. $7m Formula Used Opportunity Cost