©-Peninsula v1 Form LPC – Lifting Plan Checklist Page 1 of 5
Lifting Plan Checklist and Method Statement (Mobile Cranes)
Site or Contract: ………………………………….Managed or Contract lift; ………………….…
Task description: ………………………………….….
Date planned for lift: ………………………………….
Use this checklist before carrying out a lifting operation. It is based on requirements set out in
British Standard 7121-1:2016 Code of practice for safe use of cranes. If you are using a contractor
expect them to ask for the information set out in Section A. Require the contractor to supply you
with the information as in Sections Band C before the lifting operation takes place.
Section A: PRE-PLANNING
For completion before a lifting operation under your control and supply to the crane operating
company before a crane is ordered.
1. The load to be lifted;
Size
Shape
Lifting eyes, lifting points
Centre of gravity and stability
Location
2. Access route for crane and space
available at planned operating position.
3. Crane position before, during and after
the lift.
(see sketch plan overleaf)
4. Maximum load to be lifted in tonnes.
5. Lifting accessories and attachments.
Specify their weight if not included
above.
6. Expected operating radius in meters.
7. Lift height required, in meters.
8. Presence of overhead cables and other
hazards that could affect the lifting
operation.
9. Ground conditions - foundations,
made-up ground, impact loading, etc.
10. Crane configuration and arrangements
for erection and dismantling
11. Crane to be used and configuration
12. Maximum permissible motion speeds,
acceleration and deceleration
©-Peninsula v1 Form LPC – Lifting Plan Checklist Page 2 of 5
13. Other factors taken into account.
Sketch plan.
Site access for crane and position of crane before, during and after the lifting operation. Show crane safety
working zone and any exclusion zones.
Completed by: on date
©-Peninsula v1 Form LPC – Lifting Plan Checklist Page 3 of 5
Section B: CRANE ON SITE
To be completed by the appointed person in control of the lifting operation before the lift begins.
Crane Details
Type of Crane Size of Crane
Identification No
Hire Company if applicable
Thorough Examination of Lifting Accessories?
Valid only if completed within the last 6 months.
Thorough Examination of Lifting Equipment?
Valid only if completed within the last 12 months.
SWL Indicator Functional?
Weekly Inspection Book in Cab?
Is the crane of the correct size and type?
Driver, Operator Details
Driver, Operator name
CPCS Card No
Or other qualification
Crane Position
Adequate and suitable base? All outriggers fully extended?
Adequate packing under outriggers? Position of outriggers satisfactory?
Lifting Gear
Type Identification No
SWL Test Certificate in place No
Visual Check
(i.e. general condition)
Can the lift proceed in safety?
Comments;
Completed by on-
©-Peninsula v1 Form LPC – Lifting Plan Checklist Page 4 of 5
Section C: METHOD STATEMENT & AUTHORISATION OF LIFTING
OPERATION
Task to be carried out.
Where the work is expected to take
more than a day specify the
configuration of the crane at the end
of each day’s work.
Explain the control measures required
to eliminate or minimise risk to those
involved.
Explain the steps required to eliminate
risk to other people e.g. road closures
and segregation zones.
Pre work checks of crane, site, and
load.
Task allocation to named people;
 Appointed person in control of
lifting operation.
 Crane supervisor.
 Crane operator.
 Slingers – signalers.
 Others
Confirmation of load details; weight,
dimensions, CoG.
Lifting points and lifting method
including accessories to be used and
their configuration.
Pickup and landing points
Height and radius of lift
Model and configuration of crane.
Configuration of outriggers and
ground supports
Overhead and underground hazards
©-Peninsula v1 Form LPC – Lifting Plan Checklist Page 5 of 5
Sequence of lifting operations
Control measures to eliminate or
minimise risk.
Environmental limitations – wind
speed, sea state etc.
Access to attach and remove slings and
lifting accessories.
Measures to ensure that the load
remains stable once slings and
attachments have been removed.
Arrangements for working at height
and rescue plans – if applicable.
Method of communication e.g. hand
signals, radio, etc.
PROVISION OF AUTHORITY -
Authorisation commences (date and time)
Authorisation issued by
Name
Signature
The person givingthis authorisationconfirms thatthe operator, slingers, signalers, supervisorsand others
involved in this lifting operation have taken part in a team briefing at which this method statement was
explained and they were given all necessary information and made aware of specific hazards i.e. position
of load, loads to be lifted, any excavation, soft ground, overhead cables, etc.
Accepted by Crane Driver
Name
Signature
THIS AUTHORISATION IS VALID UNTIL -

More Related Content

PDF
Lifting plan template
PDF
Rigging & Slinging Training Course.pdf
PDF
Lifting plan
DOCX
LADDER PERMIT REV 1 MARCH 28 2018 Form # HSEQ - LP Rev 2.docx
PDF
Working at height slides
DOC
Daily mobile crane inspection checklist
PDF
Rigging and lifting
PDF
AIS Torque Cal, Torque Chart and Bolting Pattern.pdf
Lifting plan template
Rigging & Slinging Training Course.pdf
Lifting plan
LADDER PERMIT REV 1 MARCH 28 2018 Form # HSEQ - LP Rev 2.docx
Working at height slides
Daily mobile crane inspection checklist
Rigging and lifting
AIS Torque Cal, Torque Chart and Bolting Pattern.pdf

What's hot (20)

PDF
BS 7121-1 Cranes General 06.pdf
PPTX
Overhead Crane Operator Safety 2021.pptx
DOCX
8 lifting operations with mobile crane risk assessment templates
DOCX
9 lifting operations with tower crane risk assessment templates
PPTX
Crane Operation - Lifting
PPTX
Safe operating of forklift
PDF
252113184 method-statement-for-office-container-and-equipment-mobilization (1)
PPTX
Tower crane safety
DOCX
3 emergency management risk assessment templates
PPTX
FORKLIFT SAFETY
PDF
313440656 crane-lifting-calculation-sheet
PDF
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
PDF
A Part 6 Lifting Operations
PDF
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh Rajput
DOCX
27 hydrostatic pressure testing inside buildings risk assessment templates
PDF
Lifting tools
PDF
Wrs rigging practice
PPTX
SAFE USE OF LIFTING EQUIPMENT LEEA
PDF
Standard hand signals for controlling crane operations Rigging Information, R...
PPTX
LIFTING OPERATIONS BEST PRACTICES - SEMINAR 1
BS 7121-1 Cranes General 06.pdf
Overhead Crane Operator Safety 2021.pptx
8 lifting operations with mobile crane risk assessment templates
9 lifting operations with tower crane risk assessment templates
Crane Operation - Lifting
Safe operating of forklift
252113184 method-statement-for-office-container-and-equipment-mobilization (1)
Tower crane safety
3 emergency management risk assessment templates
FORKLIFT SAFETY
313440656 crane-lifting-calculation-sheet
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
A Part 6 Lifting Operations
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh Rajput
27 hydrostatic pressure testing inside buildings risk assessment templates
Lifting tools
Wrs rigging practice
SAFE USE OF LIFTING EQUIPMENT LEEA
Standard hand signals for controlling crane operations Rigging Information, R...
LIFTING OPERATIONS BEST PRACTICES - SEMINAR 1
Ad

Similar to 10. lifting-plan-checklist-and-method-statement-2 (20)

DOC
SDV-20253 VALVE MOD 9 lift plan 1
DOC
PA PIPE WORK 14 inch spool TH11177-06-PI-10-004-5
DOCX
Pr 1709 - lifting and hoisting procedure lift planning execution
PPTX
2016 CRW - An inside look at Kiewit's Crane & Rigging Management System
PDF
Campion_Crane-Safety.pdf
PPT
Const cranes 9 3 10
PDF
2000 08 safe use of mobile cranes in construction sites
PPTX
Lifting and Rigging Safety AQG-2025-2.pptx
PDF
2017 cranes_hoists_and_elevators_ codes_regulations.pdf
PPTX
Summary of all type of lifting_16th Nov.pptx
DOCX
9 Lifting Operations with Tower crane Risk Assessment Templates.docx
PPTX
308585532-Presentation-about-lifting.pptx
PDF
Abs 1975 single point moorings
DOCX
Paul CV 2017-2
DOCX
Liffting supervisor
PDF
IZAJE DE CARGA EN MANIOBRAS PARA OPERADORES DE CARGA
PPT
const_cranes_090310 (1).ppt
DOCX
22 casting of concrete columns risk assessment templates
PPTX
Quality Control Operator Training &.pptx
PDF
CRANE SAFETY HANDBOOK
SDV-20253 VALVE MOD 9 lift plan 1
PA PIPE WORK 14 inch spool TH11177-06-PI-10-004-5
Pr 1709 - lifting and hoisting procedure lift planning execution
2016 CRW - An inside look at Kiewit's Crane & Rigging Management System
Campion_Crane-Safety.pdf
Const cranes 9 3 10
2000 08 safe use of mobile cranes in construction sites
Lifting and Rigging Safety AQG-2025-2.pptx
2017 cranes_hoists_and_elevators_ codes_regulations.pdf
Summary of all type of lifting_16th Nov.pptx
9 Lifting Operations with Tower crane Risk Assessment Templates.docx
308585532-Presentation-about-lifting.pptx
Abs 1975 single point moorings
Paul CV 2017-2
Liffting supervisor
IZAJE DE CARGA EN MANIOBRAS PARA OPERADORES DE CARGA
const_cranes_090310 (1).ppt
22 casting of concrete columns risk assessment templates
Quality Control Operator Training &.pptx
CRANE SAFETY HANDBOOK
Ad

More from Sergio Augusto Esteves (6)

PDF
Cartazes covid19-v25-02-2020 unidadessaude
PDF
Pick carry-cranes-risk-assessment
PDF
0505 breaker heavy -110230v
PDF
0316 sawbench 110230v
PDF
0306 jigsaw 110230v
PDF
0308 circular saw 110230v
Cartazes covid19-v25-02-2020 unidadessaude
Pick carry-cranes-risk-assessment
0505 breaker heavy -110230v
0316 sawbench 110230v
0306 jigsaw 110230v
0308 circular saw 110230v

Recently uploaded (20)

PDF
III.4.1.2_The_Space_Environment.p pdffdf
PPTX
tack Data Structure with Array and Linked List Implementation, Push and Pop O...
PDF
Design Guidelines and solutions for Plastics parts
PPTX
ASME PCC-02 TRAINING -DESKTOP-NLE5HNP.pptx
PDF
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
PDF
Improvement effect of pyrolyzed agro-food biochar on the properties of.pdf
PPTX
Feature types and data preprocessing steps
PPTX
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
PDF
distributed database system" (DDBS) is often used to refer to both the distri...
PDF
Visual Aids for Exploratory Data Analysis.pdf
PDF
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
PDF
Abrasive, erosive and cavitation wear.pdf
PPTX
Software Engineering and software moduleing
PDF
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
PPTX
Management Information system : MIS-e-Business Systems.pptx
PDF
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
PDF
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf
PDF
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
PPTX
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
PPTX
Module 8- Technological and Communication Skills.pptx
III.4.1.2_The_Space_Environment.p pdffdf
tack Data Structure with Array and Linked List Implementation, Push and Pop O...
Design Guidelines and solutions for Plastics parts
ASME PCC-02 TRAINING -DESKTOP-NLE5HNP.pptx
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
Improvement effect of pyrolyzed agro-food biochar on the properties of.pdf
Feature types and data preprocessing steps
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
distributed database system" (DDBS) is often used to refer to both the distri...
Visual Aids for Exploratory Data Analysis.pdf
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
Abrasive, erosive and cavitation wear.pdf
Software Engineering and software moduleing
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
Management Information system : MIS-e-Business Systems.pptx
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
Module 8- Technological and Communication Skills.pptx

10. lifting-plan-checklist-and-method-statement-2

  • 1. ©-Peninsula v1 Form LPC – Lifting Plan Checklist Page 1 of 5 Lifting Plan Checklist and Method Statement (Mobile Cranes) Site or Contract: ………………………………….Managed or Contract lift; ………………….… Task description: ………………………………….…. Date planned for lift: …………………………………. Use this checklist before carrying out a lifting operation. It is based on requirements set out in British Standard 7121-1:2016 Code of practice for safe use of cranes. If you are using a contractor expect them to ask for the information set out in Section A. Require the contractor to supply you with the information as in Sections Band C before the lifting operation takes place. Section A: PRE-PLANNING For completion before a lifting operation under your control and supply to the crane operating company before a crane is ordered. 1. The load to be lifted; Size Shape Lifting eyes, lifting points Centre of gravity and stability Location 2. Access route for crane and space available at planned operating position. 3. Crane position before, during and after the lift. (see sketch plan overleaf) 4. Maximum load to be lifted in tonnes. 5. Lifting accessories and attachments. Specify their weight if not included above. 6. Expected operating radius in meters. 7. Lift height required, in meters. 8. Presence of overhead cables and other hazards that could affect the lifting operation. 9. Ground conditions - foundations, made-up ground, impact loading, etc. 10. Crane configuration and arrangements for erection and dismantling 11. Crane to be used and configuration 12. Maximum permissible motion speeds, acceleration and deceleration
  • 2. ©-Peninsula v1 Form LPC – Lifting Plan Checklist Page 2 of 5 13. Other factors taken into account. Sketch plan. Site access for crane and position of crane before, during and after the lifting operation. Show crane safety working zone and any exclusion zones. Completed by: on date
  • 3. ©-Peninsula v1 Form LPC – Lifting Plan Checklist Page 3 of 5 Section B: CRANE ON SITE To be completed by the appointed person in control of the lifting operation before the lift begins. Crane Details Type of Crane Size of Crane Identification No Hire Company if applicable Thorough Examination of Lifting Accessories? Valid only if completed within the last 6 months. Thorough Examination of Lifting Equipment? Valid only if completed within the last 12 months. SWL Indicator Functional? Weekly Inspection Book in Cab? Is the crane of the correct size and type? Driver, Operator Details Driver, Operator name CPCS Card No Or other qualification Crane Position Adequate and suitable base? All outriggers fully extended? Adequate packing under outriggers? Position of outriggers satisfactory? Lifting Gear Type Identification No SWL Test Certificate in place No Visual Check (i.e. general condition) Can the lift proceed in safety? Comments; Completed by on-
  • 4. ©-Peninsula v1 Form LPC – Lifting Plan Checklist Page 4 of 5 Section C: METHOD STATEMENT & AUTHORISATION OF LIFTING OPERATION Task to be carried out. Where the work is expected to take more than a day specify the configuration of the crane at the end of each day’s work. Explain the control measures required to eliminate or minimise risk to those involved. Explain the steps required to eliminate risk to other people e.g. road closures and segregation zones. Pre work checks of crane, site, and load. Task allocation to named people;  Appointed person in control of lifting operation.  Crane supervisor.  Crane operator.  Slingers – signalers.  Others Confirmation of load details; weight, dimensions, CoG. Lifting points and lifting method including accessories to be used and their configuration. Pickup and landing points Height and radius of lift Model and configuration of crane. Configuration of outriggers and ground supports Overhead and underground hazards
  • 5. ©-Peninsula v1 Form LPC – Lifting Plan Checklist Page 5 of 5 Sequence of lifting operations Control measures to eliminate or minimise risk. Environmental limitations – wind speed, sea state etc. Access to attach and remove slings and lifting accessories. Measures to ensure that the load remains stable once slings and attachments have been removed. Arrangements for working at height and rescue plans – if applicable. Method of communication e.g. hand signals, radio, etc. PROVISION OF AUTHORITY - Authorisation commences (date and time) Authorisation issued by Name Signature The person givingthis authorisationconfirms thatthe operator, slingers, signalers, supervisorsand others involved in this lifting operation have taken part in a team briefing at which this method statement was explained and they were given all necessary information and made aware of specific hazards i.e. position of load, loads to be lifted, any excavation, soft ground, overhead cables, etc. Accepted by Crane Driver Name Signature THIS AUTHORISATION IS VALID UNTIL -