The document provides details about the fabrication of an open web girder for a railway bridge project. It discusses the salient features of the girder such as its dimensions and loading specifications. It also includes flow charts of the fabrication process and details various inspection methods used during welding and assembly to ensure quality. Trial assembly was conducted at the workshop by first selecting an assembly site and erecting necessary facilities before assembling the girder components using drifts and bolts and measuring its camber.