APEX GROUP OF INSTITUTION
SITAPURA , JAIPUR
• A INTERNSHIP PRESENTATION
ON
“CONSTRCTION NATIONAL HIGHWAY PROJECT”
SUBMITTED TO : SUBMITTED BY:
MR.PUSHPENDRA SHARMA RAKESH
(ASS. PROF.) B.TECH.(CIVIL) 7TH SEM.
DEPARTMENT OF CIVIL ENGINEERING ROLL NO.-15EAGCE066
STATEMENT OF PROJECT
• PROJECT NAME : NH 112- 4-LANING OF BAR-BILARA JODHPUR
ROAD PROJECT
• NH NO. : 112
• LENGTH : 111KM
• PROJECT COST : 895 CRORE
• CONTRACTOR`S NAME : LAESEN & TOUBRO LIMITED
• AUTHORITY : NHAI
• PROJECT MANAGER : MR. K. CHINNASWAMY
PROJECT DETAILS
• BYPASSES : 2 (1) BAR – 3.25 KM
(2) BILARA – 6.70 KM
• FLYOVERS : 4
• PEDESTRIAN UNDER PASSES : 3
• MAJOR BIRDGES : 4
• SCHEDULED TIME OF COMPLETION : 30 MONTHS
• PAVEMENT TYPE : RIGID & FLEXIBLE PAVEMENTS
ROAD STRUCTURE
There are two main types of pavement.
1. Flexible Pavement
2. Rigid Pavement
1. Flexible pavement 2. Rigid pavement
RIGID PAVEMENT ROAD
Rigid pavement is the technical term any road surface
made of concrete.
The largest advantages to using concrete pavement are
in its durability and ability to hold a shape.
Having high flexural strength.
Have low repairing cost but completion cost is high.
Eco friendly process.
Vehicles consume less fuel.
Rigid pavements have sufficient flexural strength to transmit the
wheel load stresses to wider area below.
Bending of slab due to wheel load and
temperature variation and the resulting
Tensile and compressive stress.
Components of rigid pavement:
1. Surface course
2. Sub-base course
3. Drainage layer
4. Subgrade
•Sub-grade :
The top soil or subgrade is layer of natural soil prepared to receive
the stresses from the layers above. It is essential that at no time soil
subgrade is overstressed. It should be compacted to the desirable
density, near the optimum moisture content.
Test on sub-grade:-
1. CBR TEST
2. NDG TEST
3. PROCTOR COMPACTION TEST
1. CALIFORNIA BEARING RATIO TEST:
CBR test is the ratio of force per unit area required to penetrate a soil mass
with standard circular piston at the rate of 1.25 mm/min. to that required for
the corresponding penetration of standard material.
CBR = (test load/standard load)*100
• The material used should pass 20mm sieve but should be retained on 4.75mm
sieve.
• CBR value for sandy soil: 5-40
for silty soil : 3-15
for clay soil: 3-10
rigid and flexiable pavement design ppt
2. FIELD DENSITY TEST BY NUCLEAR DENSITY GAUGE:
• NDG are used to determine compaction acceptance of earth-work
, granular and stabilised pavement materials and asphalt.
• It consists of a radiation source that emits cloud of particles and
sensor.
• Minimum % of compaction for-
i. OGL – 95-96% at mode depth 150mm
ii. Subgrade- 97-98% at mode depth 250mm.
• Moisture content limit is 5-15%.
rigid and flexiable pavement design ppt
PROCTOR COMPACTION TEST:-
The proctor compaction test is a laboratory method of determining
the optimum moisture content at which a given soil type will become
most dense and achieve its max. dry density.
• bulk density in gm/cm3
Yb= (W2-W1)/Vm
W1=weight in gm of mould +
base plate
W2=weight in gm of mould +
base plate + soil
Vm=volume of mould i.e. 1000 cm3
dry density in gm/cm3
Yd= 100Yb/(100+M)
M= moisture content in soil
rigid and flexiable pavement design ppt
 GRANULAR SUB-BASE COURSE
• A layer of granular material provided in between the subgrade and the
base course in a road pavement.
• It is provided as an additional layer when subgrade is of poor quality.
• Provide strength and support to the overlying pavement
• Provide drainage
TEST LIST FOR GSB COURSE:-
1. Sieve analysis test – IS:2386, part-1
2. Proctor test – IS: 2720, part-8
3. CBR test – IS:2720, part-16
4. Aggregate impact value test – IS:2720, part-4
5. Field density test by sand replacement method – IS:2720, part-28
• Field density test by sand replacement method – IS:2720, part-28 :-
The dry density of the compacted soil or pavement material is a common
measure of the amount of the compaction achieved during the
construction. Knowing the field density and field moisture content, the dry
density is calculated.
 DRY LEAN CONCRETE:-
In highway construction required a layer of DLC as a base coarse
over which pavement.
DLC as mostly manufactured with OPC as per IRC and min.
cement in it shall not less than 150 kg/m^3 of concrete.
The average compressive strength of DLC mix shall not be less
than 10 mpa at 7 days.
The thickness of DLC layer is 100 mm.
The slump of concrete is zero.
Paving of dry lean concrete layer
Paving of
pavement quality
concrete layer
PAVEMENT QUALITY CONCRETE:-
• It is the upper most layer of concrete on which the loads are acting
directly and transferred to the underneath layers such as base and
sub-base layers.
• The grade of concrete for PQC is generally M40 as per IRC:15-
2002.
• A control mix for PQC was prepared with 400kg/m^3 of opc.
• The water cement ratio for this layer is 0.40.
• Compressive strength of the mixtures is 40-43 Mpa at 7 days and
54-56 Mpa at 28 days.
• The flexural strength of mix is vary between 5.1-6.2 Mpa .
TESTS ON PQC AND DLC LAYER:-
1. Workability test:-
• Workability is defined as the property of
Concrete which determines the amount of useful
Internal work necessary to produce full compaction.
• The concrete slump test measures the
consistency of fresh concrete before it sets.
• It is performed to check the workability
of freshly made concrete, and therefore
the ease with which concrete flows.
2. Compressive strength test
• Compressive strength is capacity of
Material or structure to withstand axially
Directed pushing forces.
3. Flexural strength test:-
• Flexural strength is one measure of tensile
Strength of concrete.
• It is a measure of an un-reinforced concrete
Beam or slab to resist failure in bending.
PLACING OF CONCRETE
rigid and flexiable pavement design ppt
JOINTS IN CONCRETE PAVEMENT
1. Contraction joint:- contraction joints are provided along the transverse
direction to take care of the contraction of concrete slab due to its
shrinkage.
2. Construction joint:- construction joint are provided whenever the construction
work stops temporarily. The joints direction could be either along the
transverse or longitudinal direction.
3. Expansion joint:- expansion joints are provided along the transverse direction to
allow movement (expansion & contraction ) of the concrete slab due to temperature
and sub-grade moisture variation.
4. Warping joint:- warping joints are provided along the longitudinal direction to
prevent warping of concrete slab due to temperature and sub-grade moisture
variation.
DOWEL BAR:-
• The purpose of dowel bar is to effectively transfer the load between two concrete
slabs and to keep the slabs in same level.
• The dowel bars are provided in the direction of traffic as longitudinal direction.
• It reduces corner cracking.
• It links the two adjacent structure by transferring loads across the joints. Dowel
bar should confirm to IS- 432 grade 1 (plain MS steel).
• It is following generally criteria as-
• For slab thickness 250 mm – dia 32, length 450 mm and spacing 300 mm.
• For slab thickness 300 mm – dia 38, length 500 mm and spacing 300 mm.
TIE BAR:-
• It is deformed bars and can be called as connector. These are installed by
providing suitable chair or these are installed by providing suitable holes in
the side forms depending on the size and spacing of bars.
• Tie bars are not designed to transfer the load.
• Prevent lanes from separation and differential deflections.
• Reduce transfer cracking
• Its following general criteria as-
• For slab thickness 250 mm – dia 16, length 720 mm, spacing 800 mm.
• For slab thickness 300 mm – dia 16, length 720 mm, spacing 660 mm.
THANK YOU
ANY QUERY ?.....................

More Related Content

PPTX
Subbase Construction.pptx
PDF
Construction of rigid pavement
PPTX
FLEXIBLE And Rigid Pavement
PPTX
PPTX
Different layers of flexible pavement
PPT
Bituminous pavement
PPT
Lect 6 pavement design
PPTX
Rigid Pavement Design Part II
Subbase Construction.pptx
Construction of rigid pavement
FLEXIBLE And Rigid Pavement
Different layers of flexible pavement
Bituminous pavement
Lect 6 pavement design
Rigid Pavement Design Part II

What's hot (20)

PPTX
Determining equivalent single wheel load.(ESWL)
PPTX
Bituminous mix design.pptx
PPTX
Bituminous road construction
PPTX
Flexible pavement presentation
PPTX
Design of rigid pavements
PPTX
Plate load test ppt
PPT
Rigid Pavements Design Part - I
PDF
TERZAGHI’S BEARING CAPACITY THEORY
PPTX
HIGHWAY CONSTRUCTION MATERIAL & PRACTICE
PPTX
Construction of flexible pavements
PPTX
Pavement Materials Bitumen
PPTX
Types of failure in rigid pavements
PPTX
Box culverts
PPTX
Highway Alignment
PPTX
Highway Construction Materials and Practice
PPT
Granular subbase and equipments used for its construction
PDF
highway maintenance and evaluation
PPTX
PPTX
Road Construction
PPTX
Benkelman beam deflection studies
Determining equivalent single wheel load.(ESWL)
Bituminous mix design.pptx
Bituminous road construction
Flexible pavement presentation
Design of rigid pavements
Plate load test ppt
Rigid Pavements Design Part - I
TERZAGHI’S BEARING CAPACITY THEORY
HIGHWAY CONSTRUCTION MATERIAL & PRACTICE
Construction of flexible pavements
Pavement Materials Bitumen
Types of failure in rigid pavements
Box culverts
Highway Alignment
Highway Construction Materials and Practice
Granular subbase and equipments used for its construction
highway maintenance and evaluation
Road Construction
Benkelman beam deflection studies
Ad

Similar to rigid and flexiable pavement design ppt (20)

PPTX
PAVEMENT DESIGN (Group 9)
PPT
Construction Aspects of Rigid Pavements.ppt
PPTX
MoRT&H section for quality assurance Section 900.pptx
PDF
Pavements PPT
PPTX
PQC concrete road
PPTX
Rigid pavements
PPTX
Cc road summer training ppt @akshay kumar
PPTX
Pavement
PPTX
Concrete: Grade of concrete & Properties of fresh & Hardened concrete ,worka...
PPTX
Phase 1 project for civil engineering 6th sem. Ppt
PPTX
Thirsty Concrete application in Road pavement
PPTX
Construction of rigid pavement
PPTX
Fresh and Hardened Concrete.pptx12345678
PPTX
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
PPTX
Fresh and harden properties of concrete
PPTX
CBC P12345HASE asdertyqweII updated.pptx
PPTX
VT ka ppthghhhbhgfddfhnhshshbhhPPT.pptx
PDF
steel fibres
PPTX
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
PPTX
Concrete
PAVEMENT DESIGN (Group 9)
Construction Aspects of Rigid Pavements.ppt
MoRT&H section for quality assurance Section 900.pptx
Pavements PPT
PQC concrete road
Rigid pavements
Cc road summer training ppt @akshay kumar
Pavement
Concrete: Grade of concrete & Properties of fresh & Hardened concrete ,worka...
Phase 1 project for civil engineering 6th sem. Ppt
Thirsty Concrete application in Road pavement
Construction of rigid pavement
Fresh and Hardened Concrete.pptx12345678
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Fresh and harden properties of concrete
CBC P12345HASE asdertyqweII updated.pptx
VT ka ppthghhhbhgfddfhnhshshbhhPPT.pptx
steel fibres
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Concrete
Ad

Recently uploaded (20)

PDF
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
PDF
Well-logging-methods_new................
PDF
Model Code of Practice - Construction Work - 21102022 .pdf
PPTX
web development for engineering and engineering
PPTX
Geodesy 1.pptx...............................................
PDF
Automation-in-Manufacturing-Chapter-Introduction.pdf
PDF
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
PDF
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
PPTX
Fundamentals of safety and accident prevention -final (1).pptx
PPTX
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PPTX
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
PPTX
Current and future trends in Computer Vision.pptx
PDF
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
PPTX
Foundation to blockchain - A guide to Blockchain Tech
PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PPTX
OOP with Java - Java Introduction (Basics)
DOCX
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
PDF
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
PDF
Embodied AI: Ushering in the Next Era of Intelligent Systems
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
Well-logging-methods_new................
Model Code of Practice - Construction Work - 21102022 .pdf
web development for engineering and engineering
Geodesy 1.pptx...............................................
Automation-in-Manufacturing-Chapter-Introduction.pdf
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
Fundamentals of safety and accident prevention -final (1).pptx
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
Current and future trends in Computer Vision.pptx
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
Foundation to blockchain - A guide to Blockchain Tech
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
OOP with Java - Java Introduction (Basics)
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
Embodied AI: Ushering in the Next Era of Intelligent Systems

rigid and flexiable pavement design ppt

  • 1. APEX GROUP OF INSTITUTION SITAPURA , JAIPUR • A INTERNSHIP PRESENTATION ON “CONSTRCTION NATIONAL HIGHWAY PROJECT” SUBMITTED TO : SUBMITTED BY: MR.PUSHPENDRA SHARMA RAKESH (ASS. PROF.) B.TECH.(CIVIL) 7TH SEM. DEPARTMENT OF CIVIL ENGINEERING ROLL NO.-15EAGCE066
  • 2. STATEMENT OF PROJECT • PROJECT NAME : NH 112- 4-LANING OF BAR-BILARA JODHPUR ROAD PROJECT • NH NO. : 112 • LENGTH : 111KM • PROJECT COST : 895 CRORE • CONTRACTOR`S NAME : LAESEN & TOUBRO LIMITED • AUTHORITY : NHAI • PROJECT MANAGER : MR. K. CHINNASWAMY
  • 3. PROJECT DETAILS • BYPASSES : 2 (1) BAR – 3.25 KM (2) BILARA – 6.70 KM • FLYOVERS : 4 • PEDESTRIAN UNDER PASSES : 3 • MAJOR BIRDGES : 4 • SCHEDULED TIME OF COMPLETION : 30 MONTHS • PAVEMENT TYPE : RIGID & FLEXIBLE PAVEMENTS
  • 4. ROAD STRUCTURE There are two main types of pavement. 1. Flexible Pavement 2. Rigid Pavement 1. Flexible pavement 2. Rigid pavement
  • 5. RIGID PAVEMENT ROAD Rigid pavement is the technical term any road surface made of concrete. The largest advantages to using concrete pavement are in its durability and ability to hold a shape. Having high flexural strength. Have low repairing cost but completion cost is high. Eco friendly process. Vehicles consume less fuel.
  • 6. Rigid pavements have sufficient flexural strength to transmit the wheel load stresses to wider area below. Bending of slab due to wheel load and temperature variation and the resulting Tensile and compressive stress.
  • 7. Components of rigid pavement: 1. Surface course 2. Sub-base course 3. Drainage layer 4. Subgrade
  • 8. •Sub-grade : The top soil or subgrade is layer of natural soil prepared to receive the stresses from the layers above. It is essential that at no time soil subgrade is overstressed. It should be compacted to the desirable density, near the optimum moisture content. Test on sub-grade:- 1. CBR TEST 2. NDG TEST 3. PROCTOR COMPACTION TEST
  • 9. 1. CALIFORNIA BEARING RATIO TEST: CBR test is the ratio of force per unit area required to penetrate a soil mass with standard circular piston at the rate of 1.25 mm/min. to that required for the corresponding penetration of standard material. CBR = (test load/standard load)*100 • The material used should pass 20mm sieve but should be retained on 4.75mm sieve. • CBR value for sandy soil: 5-40 for silty soil : 3-15 for clay soil: 3-10
  • 11. 2. FIELD DENSITY TEST BY NUCLEAR DENSITY GAUGE: • NDG are used to determine compaction acceptance of earth-work , granular and stabilised pavement materials and asphalt. • It consists of a radiation source that emits cloud of particles and sensor. • Minimum % of compaction for- i. OGL – 95-96% at mode depth 150mm ii. Subgrade- 97-98% at mode depth 250mm. • Moisture content limit is 5-15%.
  • 13. PROCTOR COMPACTION TEST:- The proctor compaction test is a laboratory method of determining the optimum moisture content at which a given soil type will become most dense and achieve its max. dry density. • bulk density in gm/cm3 Yb= (W2-W1)/Vm W1=weight in gm of mould + base plate W2=weight in gm of mould + base plate + soil Vm=volume of mould i.e. 1000 cm3 dry density in gm/cm3 Yd= 100Yb/(100+M) M= moisture content in soil
  • 15.  GRANULAR SUB-BASE COURSE • A layer of granular material provided in between the subgrade and the base course in a road pavement. • It is provided as an additional layer when subgrade is of poor quality. • Provide strength and support to the overlying pavement • Provide drainage TEST LIST FOR GSB COURSE:- 1. Sieve analysis test – IS:2386, part-1 2. Proctor test – IS: 2720, part-8 3. CBR test – IS:2720, part-16 4. Aggregate impact value test – IS:2720, part-4 5. Field density test by sand replacement method – IS:2720, part-28
  • 16. • Field density test by sand replacement method – IS:2720, part-28 :- The dry density of the compacted soil or pavement material is a common measure of the amount of the compaction achieved during the construction. Knowing the field density and field moisture content, the dry density is calculated.
  • 17.  DRY LEAN CONCRETE:- In highway construction required a layer of DLC as a base coarse over which pavement. DLC as mostly manufactured with OPC as per IRC and min. cement in it shall not less than 150 kg/m^3 of concrete. The average compressive strength of DLC mix shall not be less than 10 mpa at 7 days. The thickness of DLC layer is 100 mm. The slump of concrete is zero.
  • 18. Paving of dry lean concrete layer Paving of pavement quality concrete layer
  • 19. PAVEMENT QUALITY CONCRETE:- • It is the upper most layer of concrete on which the loads are acting directly and transferred to the underneath layers such as base and sub-base layers. • The grade of concrete for PQC is generally M40 as per IRC:15- 2002. • A control mix for PQC was prepared with 400kg/m^3 of opc. • The water cement ratio for this layer is 0.40. • Compressive strength of the mixtures is 40-43 Mpa at 7 days and 54-56 Mpa at 28 days. • The flexural strength of mix is vary between 5.1-6.2 Mpa .
  • 20. TESTS ON PQC AND DLC LAYER:- 1. Workability test:- • Workability is defined as the property of Concrete which determines the amount of useful Internal work necessary to produce full compaction. • The concrete slump test measures the consistency of fresh concrete before it sets. • It is performed to check the workability of freshly made concrete, and therefore the ease with which concrete flows.
  • 21. 2. Compressive strength test • Compressive strength is capacity of Material or structure to withstand axially Directed pushing forces.
  • 22. 3. Flexural strength test:- • Flexural strength is one measure of tensile Strength of concrete. • It is a measure of an un-reinforced concrete Beam or slab to resist failure in bending.
  • 25. JOINTS IN CONCRETE PAVEMENT 1. Contraction joint:- contraction joints are provided along the transverse direction to take care of the contraction of concrete slab due to its shrinkage. 2. Construction joint:- construction joint are provided whenever the construction work stops temporarily. The joints direction could be either along the transverse or longitudinal direction.
  • 26. 3. Expansion joint:- expansion joints are provided along the transverse direction to allow movement (expansion & contraction ) of the concrete slab due to temperature and sub-grade moisture variation. 4. Warping joint:- warping joints are provided along the longitudinal direction to prevent warping of concrete slab due to temperature and sub-grade moisture variation. DOWEL BAR:- • The purpose of dowel bar is to effectively transfer the load between two concrete slabs and to keep the slabs in same level. • The dowel bars are provided in the direction of traffic as longitudinal direction. • It reduces corner cracking.
  • 27. • It links the two adjacent structure by transferring loads across the joints. Dowel bar should confirm to IS- 432 grade 1 (plain MS steel). • It is following generally criteria as- • For slab thickness 250 mm – dia 32, length 450 mm and spacing 300 mm. • For slab thickness 300 mm – dia 38, length 500 mm and spacing 300 mm. TIE BAR:-
  • 28. • It is deformed bars and can be called as connector. These are installed by providing suitable chair or these are installed by providing suitable holes in the side forms depending on the size and spacing of bars. • Tie bars are not designed to transfer the load. • Prevent lanes from separation and differential deflections. • Reduce transfer cracking • Its following general criteria as- • For slab thickness 250 mm – dia 16, length 720 mm, spacing 800 mm. • For slab thickness 300 mm – dia 16, length 720 mm, spacing 660 mm.
  • 29. THANK YOU ANY QUERY ?.....................