This document contains revision information and drawings for an integrated workshop fitout project. It includes 4 3D views of the design with callouts and labels. A revision schedule on the side lists changes made between revisions on dates from January 9-12, 2012. These include revising the structural model, adding a canopy link from the base build, and revising grids and drawings while adding a bike and smokers enclosure. Project information at the bottom provides the client, designer, and other details.