SlideShare a Scribd company logo
GENERAL NOTES:
                                                                                                                                                                                                                                                                                                                  GROUND FLOOR LEVEL 0 MM = 10.200 SURVEY LEVEL
                                                                                                                                                                                                      CEILING TYPES
                                                                                                                                                                                                                                                                                                                  1. ALL LEVELS INDICATED ARE STRUCTURAL LEVELS.
                                                                                                                                                                                                                           CE 1 - 600MMx1200MM SUSPENDED MINERAL FIBRE BOARD                                      2. ALL DIMENSIONS ARE METRIC AND SHOWN IN MILLIMETERS.
                                                                                                                                                                                                                           CEILING WITH SHADOWLINE ANGLE AT THE                                                   3. WRITTEN DIMENSIONS SHALL TAKE PREFERENCE OVER SCALED DIMS.
                                                                                                                                                                                                                           PERIMETER. 600MMX600MM ACCESS PANEL (AP)                                               4. LARGE SCALE DRAWINGS SHALL TAKE PREFERENCE OVER SMALL
                                                                                                                                                                                                                           AND CEILING LEVELS AS SHOWN. PROVIDE R2.0                                                  SCALE DRAWINGS.
                                                                                                                                                                                                                           INSULATION BATTS AT LEVEL 3 UNDER ROOF SPACE.                                          5. THE CONTRACTOR SHALL CARRY OUT THE WORK IN ACCORDANCE WITH
                                                                                                                                                                                                                           FPBR - WATER RESISTANT PLASTERBOARD SUSPENDED                                               THE B.C.A. & LOCAL AUTHORITY REQUIREMENTS.
                                                                                                                                                                                                                           CEILING FIXED WITH SHADOWLINE ANGLE AT THE                                             6. ALL MATERIAL SHALL BE NEW, GOOD QUALITY & CONFORM TO WHAT IS
                                                                                                                                                                                                                           PERIMETER. 600MMx600MM ACCESS PANEL (AP)                                                   SHOWN IN SPECIFICATION AND ON THE DRAWINGS.
                                                                                                                                                                                                                           AND CEILING LEVELS AS SHOWN. PROVIDE R2.0                                              7. THE CONTRACTOR MUST CHECK & VERIFY ALL DIMS. & ALL LEVELS ON
                                                                                                                                                                                                                           INSULATION BATTS AT LEVEL 3 UNDER ROOF SPACE.                                              SITE PRIOR TO THE COMMENCEMENT OF ANY FACTORY FABRICATION AND
                                                                                                                                                                                                                                                                                                                      BUILDING WORK.
                                                                                                                                                                                                                           FPB - PLASTERBOARD SUSPENDED CEILING WITH SHADOWLINE                                   8. ARCHITECTS' DRGS. ARE TO BE READ IN CONJUNCTION WITH CONSULTANTS
                                                                                                                                                                                                                           ANGLE AT THE PERIMETER. 600MMx600MM ACCESS PANEL (AP)                                      DRGS.(INCLUDING STRUCTURAL, ELECTRICAL, MECHANICAL, HYDRAULIC,
                                                                                                                                                                                                                           AND CEILING LEVELS AS SHOWN. PROVIDE R2.0                                                  ACOUSTIC & FIRE SPRINKLER DRGS).
                                                                                                                                                                                                                           INSULATION BATTS AT LEVEL 3 UNDER ROOF SPACE.                                          9. CONTRACTOR TO INCLUDE ALL BUILDER'S WORK ASSOCIATED WITH HYDRAULIC,
                                                                                                                                                                                                                           CFC 1 - VILLABOARD SUSPENDED CEILING WITH SHADOWLINE                                       ELECTRICAL, MECHANICAL AND LANDSCAPING SERVICES.
                                                                                                                                                                                                                           ANGLE AT THE PERIMETER. 600MMx600MM ACCESS PANEL (AP)                                  10. TACTILE INDICATORS ARE TO BE SUPPLIED & INSTALLED WHERE REQUIRED IN
                                                                                                                                                                                                                           AND CEILING LEVELS AS SHOWN. PROVIDE R2.0                                                  ACCORDANCE WITH A.S. 1428.4
                                                                                                                                                                                                                           INSULATION BATTS AT LEVEL 3 UNDER ROOF SPACE.                                          11. 50mm SLAB SETDOWN IN WET AREAS UNLESS OTHERWISE SPECIFIED. FALL
                                                                                                                                                                                                                           C1 - UNDERSIDE OF CONCRETE SLAB AS PER LEVEL SHOWN. NOTE                                   FLOOR TILES TO FD/FW's. REFER HYD. & S.E. DRGS.
                                                                                                                                                                                                                           10 mm DISCONTINUITY GAP AT STAIR TO                                                    12. TGSI - TACTILE GROUND SURFACE INDICATORS
                                                                                                                                                                                                                           ROOM OR PARTY WALL TO BE MAINTAINED. PAINT FINISHED TO                                 13. ALL FLOOR PENETRATIONS TO BE FIRE SEALED/COLLARED IN ACCORDANCE
                                                                                                                                                                                                                           SCHEDULE.                                                                                  WITH THE BCA & A.S.




                                                                                                                                                                                                             WALL TYPES
                                                                                                                                                                                                                               TP - 30 MM TOILET PARTITION
                                                                                                                                                                                                                               CP 01 - EXTERNAL TILES CLADDING OVER 8MM CFC
                                                                                                                                                                                                                               ON 50MM FURRING CHANNELS
                                                                                                                                                                                                                               FC 19 - 13 MM FC FIXED TO A CONCRETE COL WITH 6
                                                                                                                                                                                                                               MM CFC LINING.
                                                                                                                                                                                                                               FC 63 - 50 MM FURRING CHANNEL FIXED TO BASE
                                                                                                                                                                                                                               WALL WITH 13 MM WR PB LINING.
                                                                                                                                                                                                                               SD 77 - 64 MM STUD WITH 2 x 6.5 MM FLEXIBOARD
                                                                                                                                                                                                                               LINING ON ONE SIDE.
                                                                                                                                                                                                                               SD 82 - 76 MM STUD WITH A 6 MM CFC LINING
                                                                                                                                                                                                                               ON ONE SIDE.
                                                                                                                                                                                                                               SD(R) 89 - BASE WALL 20 MM CAVITY (NO CAVITY
                                                                                                                                                                                                                               TIES), 76 MM STUD WITH INSULATION(75MM,R2.8,14
                                                            RESIDENTIAL UNITS                                                                                                                                                  KG/M3),13 MM PB LINING. R SUFFIX = WATER
                                                                                                                                                                                                                               RESISTANT PLASTERBOARD(WRPB)
                                                            1 FLOOR                                                                                                                                                            SD 95 - TO CSR-605, 76 MM STUD, 13 MM PB LINING
                                                                                                                                                                                                                               AND 6MM CFC IN WET AREAS
                                                                                                                                                                                                                               SD(R) 102 - TO CSR-010, 76 MM STUD, 13 MM PB LINING
                                                                                                                                                                                                                               ON BOTH SIDES. R SUFFIX = WRPB TO WET AREAS
                                                                                                                                                                                  513 HAY STREET                               SD 111 - TO CSR 605, 92 MM STUD,13 MM PB ONE
                                                                                                                                                                                                                               SIDE AND 6MM CFC OTHER SIDE (WET AREA)
                                                                                                                                                                                  EXISTING BUILDING                            SD(R) 118 -TO CSR 010, 92 MM STUD,13 MM PB LINING
                                                                                                                                                                                                                               BOTH SIDES R SUFFIX WRPB TO WET AREAS
                                                                                                                                                                                                                               HEB 116 - SPANDREL,75 MM THICK HEBEL WALL WITH                                                                                                                  Drawing List
                                                                                                                                                                                                               FRL-/60/60      13MM PB LINING OVER 28MM FC
                                                                                                                                      35 ROWLAND                                                                               SF 124 - TO CSR-093, 76 MM STUD 3x16 MM FYRCHEK
                                                                                                                                                                                                                                                                                                                                                                           Sheet
                                                                                                                                      STREET PROPOSED                                                         FRL-/120/120     LINING ON ONE SIDE.                                                                                                                        Number                          Sheet Name
                                                                                                                                                                                                                               SF 130 - TO CSR 093, 76 MM STUD 3 x 16 MM
                                                                                                                                      DEVELOPMENT                                                             FRL-/120/120     FYRCHEK 1x 6 MM CFC LINING ON ONE SIDE.
                                                           OFFICES                                                                                                                                                             SYC 148 - 8 MM SYCON MATRIX EXTERNAL CLADDING                                                                                          A-000          COVER SHEET
                                                           2 FLOORS                                                                                                                                                             WITH A 19 MM SYCON CAVITY TRIM,VAPOUR BARRIER ON
                                                                                                                                                                                                                               92 MM STUD WITH INSULATION (R2.8,14 KG/M3                                                                                              A-001          SURVEY PLAN
                                                                                                                                                                                                                               DENSITY),13 MM PB LINING INTERNALLY.
                                                                                                                                                                                                             Rw57/Rw+Ctr49     SF 156 - TO CSR 108, 92MM STUD WITH 90MM                                                                                               A-101          LOWER BASEMENT PLAN
                                                                                                                                                                                                                               INSULATION AT 14 KG/M3 DENSITY, 2 x 16 MM FYRCHEK
                                                                                                                                                                                                              FRL-/120/120     BOTH SIDES.                                                                                                                            A-102          UPPER BASEMENT PLAN
                                                                                                                                                                                                                               ALU 194 - INTERNAL LEAF 92 MM STUD, 9MM INSULATION
                                                                                                                                                                                                                               (R2.8,14 KG/M3), 2x16MM FYRCHEK INTERNALLY, VAPOUR
                                                                                                                                                                                                                                                                                                                                                                      A-103          GF Plan
                                                                                                                                                                                                              FRL-/60/60
                                                                                                                                                                                                                               BARRIER, ALUCABOND FURRING CHANNELS,                                                                                                   A-104          L1 Plan
                                                                                                                                                                                                                               ALUCABOND CLADDING EXTERNALLY
                                                                                                                                                                                                              FRL -/120/120    SF 200 - TO CSR 275 2x 64 MM STUD FRAMES WITH 20MM                                                                                     A-105          L2 Plan
                                                                                                                                                                                                                               CAVITY (NO TIES) INSULATION 2x 60MM(14 KG/M3 DENSITY),
                                                                                                                                                                                                             Rw60/Rw+Ctr52     2x13MM FYRCHEK EACH SIDE. PLUS 6MM CFC TO WET AREAS                                                                                    A-106          L3 Plan
                                                                                                                                                                                                                               AFS 120     A.F.S. WALLS TO MANU. RECOMMENDATIONS
                                                                                                                                                                                                                                                                                                                                                                      A-107          ROOF PLAN
                                                                                                                                                                                                                                           & S.E. DRGS & SPECS THICKNESS VARIES                                                                                       A-201          RCP LB
                                                          RETAIL/LOBBIES                                                                                                                                                                   AS SHOWN. GAPS TO BE SEALED WITH
                                                                                                                                                                                                                               AFS 150
                                                          GROUND FLOOR                                                                                                                                                                     MASTIC JOINT MIN 12 MM OR EQ TO THE
                                                                                                                                                                                                                                           WIDTH OF THE GAP BETWEEN THE PANELS
                                                                                                                                                                                                                                                                                                                                                                      A-202          RCP UB
                                                                                                                                                                                                                               AFS 200
                                                                                                                                                                                                                                           (WHICHEVER GREATER). ALL GAPS TO BE                                                                                        A-203          RCP GF
                                                                                                                                                                                                                                           FULLY SEALED & PACKED WITH
                                                                                                                                                                                                                                           COMPRESSED FIBREGLASS INSULATION.                                                                                          A-204          RCP L1
                                                                                                                                                                                                                                           CONC/STUD WALLS TO BE SCRIBED & SEALED TO
                                                                                                                                                                                                                               RCC 200     U/S OF THE ROOF SHEETING. PROVIDE                                                                                          A-205          RCP L2
                                                                                                                                                                                                                                           SUPPORT FOR THE INSULATION
                                                                                                                                                                                                                                           IN THE CAVITY.                                                                                                             A-206          RCP L3
                                                                                                                                                                                                                                           CONC WALLS TO S.E. DRGS/NOTES & SPECS
                                                                                                                                                                                                                               RCC 350     THICKNESS VARIES AS SHOWN. REFER                                                                                           A-301          NORTH ELEVATION
                                                                                                                                                                                                                                           TO THE FINISHES SCHEDULE
                                                                                                                                                                                                                                                                                                                                                                      A-302          SOUTH ELEVATION
                                                                                                                                                                                                                                                                                                                                                                      A-303          EAST/WEST ELEVATIONS
                                                                                                                                                                                                                                                                                                                                                                      A-401          SECTIONS
                                                            BASEMENT PARKING
                                                            2 LEVELS                                                                                                                                                                                                                                                                                                  A-402          SECTIONS
                                                                                                                                                                                                               FINISHES CODES                                                                                                                                         A-403          SECTIONS
                                                                                                    FO                                                                                                         TTC - TROWELED TEXTURE COAT
                                                                                                                                                                                                                                                                                                                                                                      A-501          STAIR 1 PLAN DETAILS
                                                                                                      RR                                                                                                       RTC - ROLLED TEXTURE COAT
                                                                                                                                                                                                               VP - VISION PANEL
                                                                                                        ES                                                                                                                                                                                                                                                            A-502          STAIR 1 SECTION DETAILS
                                                                                                          T                                               ET                                                   SP - SPANDREL PANEL

                                                                                                               ST                                     T RE                                                                                                                                                                                                            A-503          STAIR 2 DETAILS
                                                                                                                 RE                                 DS                                                                                                                                                                                                                A-504          PLAN DETAILS
                                                                                                                   ET                             AN
                                                                                                                                                WL                                                                                                                                                                                                                    A-510          LOBBY DETAILS
                                                                                                                                              RO
                                                                                                                                                                                                       ELECTRICAL/MECHANICAL LEGEND                                                                                                                                   A-520          SECTION DETAILS
                                                                                                                                                                                                                                                                                                                                                                      A-521          SECTION DETAILS
                                                                                                                                                                                                       S     SMOKE DETECTORS
                                                                                                                                                                                                                                                                                                                                                                      A-522          SECTION DETAILS
                                                                                                                                                                                                       S     SMOKE DETECTORS WITH EVACUATION TONE SOUNDER                          RECESSED FLURO               EG      EXHAUST GRILL
                                                                                                                                                                                                                                                                                                                                                                      A-523          SECTION DETAILS
                                                                                                                                                                                                       N     EVACUATION TONE SOUNDER
                                                                                                                                                                                                                                                                                   RECESSED DOWNLIGHT
                                                                                                                                                                                                                                                                                                                                                                      A-601          WASHROOMS
                                                                                                                                                                                                             PHOTO ELECTRIC SMOKE DETECTORS
                                                                                                                                                                                                                                                                              E                                                                                       A-602          KITCHENS
                                                                                                                                                                                                      EXIT   EXIT                                                                  WALL MOUNTED FITTING
                                                                                                                                                                                                                                                                                                                                                                      A-603          ENSUITES, TEA ROOMS
                                                                                                                                                                                                             HEAT DETECTORS                                                   EA
                                                                                                                                                                                                                                                                                   RECESSED EMERGENCY LIGHT                                                           A-604          ROBES
                                                                                                                                                                                                             HEAT DETECTORS WITH EVACUATION TONE SOUNDER
                                                                                                                                                                                                                                                                                                                                                                      A-801          DOOR SCHEDULE
                                                                                                                                                                                                             EMERGENCY LIGHTING                                                    RECESSED DOWNLIGHT                                                                 A-802          WINDOW SCHEDULE
                                                                                                                                                                                                       CONTRACTOR TO COORDINATE SKIRTING DUCTS                                     FOR ALL OF THE ABOVE REFER TO E.E SPECIFICATIONS                                   A-803          FINISHES SCHEDULE
                                                                                                                                                                                                       AS PER E.E DRAWINGS/SPECIFICATIONS
                                                                                                                                                                                                                                                                                                                                                                      Grand total: 37



                                            1
                                                Isometric from South East




                                                                                                                                                                                                                                                                                                                                                                                                           TENDER ISSUE
                                                                                                                                 Revision Schedule                                                                                                                                                                                      Mixed use Development                                              COVER SHEET
                          Oldfield Knott Architects Pty Ltd                                            A
                                                                                                       B
                                                                                                        No.    Date
                                                                                                              241110
                                                                                                              040411
                                                                                                                                           Description
                                                                                                                       DA revision; apartment configuration ammd, ht. increased
                                                                                                                       BUILDING LICENCE ISSUE
                                                                                                                                                                                                                                                                                                                                                 Lot 43 on Plan 1489 Project Number
                                                                                                                                                                                                                                                                                                                                                  25 Rowland Street
                                                                                                                                                                                                                                                                                                                                                                     Date
                                                                                                                                                                                                                                                                                                                                                                                                08143
                                                                                                                                                                                                                                                                                                                                                            Subiaco                8/07/2011 3:23:59 PM

The Royal Australian
                          567 Hay Street, Daglish, WA. 6008                                            C      080411   Office Space Revision as Per DA Application                                                                                                                                                                                                   Design/drawn by            AC                A-000 rev.D
Institute of Architects   Phone (08)9381 6788 . Fax (08) 9381 4619   PO Box 849, Subiaco, WA 6904      D      150411   TENDER ISSUE
                                                                                                                                                                                                                                                                                                      for                       Cappelli Superannuation Fund        Checked by                DAS         Scale                   1 : 50
                                                                                                                                                                                                                                                                                                                                                                             C:UsersachachadDocuments0814308143 Master_110616_Local.rvt

More Related Content

PDF
Pab.Web Capabilities.2011
PDF
Dtw 1 - sept 2011
PDF
Libraryfurniture
PDF
Amanda Eubanks Interior Design Portfolio
PDF
100 broadway flyer
PDF
Masonry Detailing Series v.3.4
PDF
My Portfolio
PDF
100 broadway
Pab.Web Capabilities.2011
Dtw 1 - sept 2011
Libraryfurniture
Amanda Eubanks Interior Design Portfolio
100 broadway flyer
Masonry Detailing Series v.3.4
My Portfolio
100 broadway

Viewers also liked (10)

PPTX
Mixed-Use Tower Project
PPT
Mixed Use Development Project Presentation to Merrimack Town Council/School B...
PPTX
Detroit's Housing & Mixed Use Projects
PPTX
Mms Mixed Use Architectural Ii Final Project
PPTX
LEED 2009 applied to a mixed - use building
PDF
Urban Design SWOT Analysis, Doha, Qatar
PPTX
perancangan-hotel-bintang-4
PPTX
MIXED USED BUILDING (APARTEMENT & SCHOOL)
PDF
Sustainable Design - Mixed Residential/Commercial Use
PPTX
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
Mixed-Use Tower Project
Mixed Use Development Project Presentation to Merrimack Town Council/School B...
Detroit's Housing & Mixed Use Projects
Mms Mixed Use Architectural Ii Final Project
LEED 2009 applied to a mixed - use building
Urban Design SWOT Analysis, Doha, Qatar
perancangan-hotel-bintang-4
MIXED USED BUILDING (APARTEMENT & SCHOOL)
Sustainable Design - Mixed Residential/Commercial Use
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
Ad

More from arunchachad (12)

PDF
PDF
PDF
PDF
PDF
3D External Views
PDF
3 D Views for a Complex Fitout
PDF
My Car Plate
PDF
Large Office Building
PDF
A3.01 [South Elevation]
PDF
Ac3.01 [Elevations]
PDF
0830 Bal Sd Iss A
PDF
Waterford Plaza
3D External Views
3 D Views for a Complex Fitout
My Car Plate
Large Office Building
A3.01 [South Elevation]
Ac3.01 [Elevations]
0830 Bal Sd Iss A
Waterford Plaza
Ad

Recently uploaded (20)

PPTX
Probability Distribution, binomial distribution, poisson distribution
PDF
Laughter Yoga Basic Learning Workshop Manual
DOCX
unit 1 COST ACCOUNTING AND COST SHEET
PDF
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
PDF
Reconciliation AND MEMORANDUM RECONCILATION
PDF
Tata consultancy services case study shri Sharda college, basrur
PPTX
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
PPTX
HR Introduction Slide (1).pptx on hr intro
PPT
Chapter four Project-Preparation material
PDF
Unit 1 Cost Accounting - Cost sheet
PDF
Digital Marketing & E-commerce Certificate Glossary.pdf.................
PPTX
Amazon (Business Studies) management studies
PPTX
2025 Product Deck V1.0.pptxCATALOGTCLCIA
PPTX
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
PDF
Cours de Système d'information about ERP.pdf
PDF
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
PDF
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
PDF
Power and position in leadershipDOC-20250808-WA0011..pdf
PPTX
ICG2025_ICG 6th steering committee 30-8-24.pptx
DOCX
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
Probability Distribution, binomial distribution, poisson distribution
Laughter Yoga Basic Learning Workshop Manual
unit 1 COST ACCOUNTING AND COST SHEET
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
Reconciliation AND MEMORANDUM RECONCILATION
Tata consultancy services case study shri Sharda college, basrur
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
HR Introduction Slide (1).pptx on hr intro
Chapter four Project-Preparation material
Unit 1 Cost Accounting - Cost sheet
Digital Marketing & E-commerce Certificate Glossary.pdf.................
Amazon (Business Studies) management studies
2025 Product Deck V1.0.pptxCATALOGTCLCIA
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
Cours de Système d'information about ERP.pdf
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
Power and position in leadershipDOC-20250808-WA0011..pdf
ICG2025_ICG 6th steering committee 30-8-24.pptx
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement

Mixed Use Development

  • 1. GENERAL NOTES: GROUND FLOOR LEVEL 0 MM = 10.200 SURVEY LEVEL CEILING TYPES 1. ALL LEVELS INDICATED ARE STRUCTURAL LEVELS. CE 1 - 600MMx1200MM SUSPENDED MINERAL FIBRE BOARD 2. ALL DIMENSIONS ARE METRIC AND SHOWN IN MILLIMETERS. CEILING WITH SHADOWLINE ANGLE AT THE 3. WRITTEN DIMENSIONS SHALL TAKE PREFERENCE OVER SCALED DIMS. PERIMETER. 600MMX600MM ACCESS PANEL (AP) 4. LARGE SCALE DRAWINGS SHALL TAKE PREFERENCE OVER SMALL AND CEILING LEVELS AS SHOWN. PROVIDE R2.0 SCALE DRAWINGS. INSULATION BATTS AT LEVEL 3 UNDER ROOF SPACE. 5. THE CONTRACTOR SHALL CARRY OUT THE WORK IN ACCORDANCE WITH FPBR - WATER RESISTANT PLASTERBOARD SUSPENDED THE B.C.A. & LOCAL AUTHORITY REQUIREMENTS. CEILING FIXED WITH SHADOWLINE ANGLE AT THE 6. ALL MATERIAL SHALL BE NEW, GOOD QUALITY & CONFORM TO WHAT IS PERIMETER. 600MMx600MM ACCESS PANEL (AP) SHOWN IN SPECIFICATION AND ON THE DRAWINGS. AND CEILING LEVELS AS SHOWN. PROVIDE R2.0 7. THE CONTRACTOR MUST CHECK & VERIFY ALL DIMS. & ALL LEVELS ON INSULATION BATTS AT LEVEL 3 UNDER ROOF SPACE. SITE PRIOR TO THE COMMENCEMENT OF ANY FACTORY FABRICATION AND BUILDING WORK. FPB - PLASTERBOARD SUSPENDED CEILING WITH SHADOWLINE 8. ARCHITECTS' DRGS. ARE TO BE READ IN CONJUNCTION WITH CONSULTANTS ANGLE AT THE PERIMETER. 600MMx600MM ACCESS PANEL (AP) DRGS.(INCLUDING STRUCTURAL, ELECTRICAL, MECHANICAL, HYDRAULIC, AND CEILING LEVELS AS SHOWN. PROVIDE R2.0 ACOUSTIC & FIRE SPRINKLER DRGS). INSULATION BATTS AT LEVEL 3 UNDER ROOF SPACE. 9. CONTRACTOR TO INCLUDE ALL BUILDER'S WORK ASSOCIATED WITH HYDRAULIC, CFC 1 - VILLABOARD SUSPENDED CEILING WITH SHADOWLINE ELECTRICAL, MECHANICAL AND LANDSCAPING SERVICES. ANGLE AT THE PERIMETER. 600MMx600MM ACCESS PANEL (AP) 10. TACTILE INDICATORS ARE TO BE SUPPLIED & INSTALLED WHERE REQUIRED IN AND CEILING LEVELS AS SHOWN. PROVIDE R2.0 ACCORDANCE WITH A.S. 1428.4 INSULATION BATTS AT LEVEL 3 UNDER ROOF SPACE. 11. 50mm SLAB SETDOWN IN WET AREAS UNLESS OTHERWISE SPECIFIED. FALL C1 - UNDERSIDE OF CONCRETE SLAB AS PER LEVEL SHOWN. NOTE FLOOR TILES TO FD/FW's. REFER HYD. & S.E. DRGS. 10 mm DISCONTINUITY GAP AT STAIR TO 12. TGSI - TACTILE GROUND SURFACE INDICATORS ROOM OR PARTY WALL TO BE MAINTAINED. PAINT FINISHED TO 13. ALL FLOOR PENETRATIONS TO BE FIRE SEALED/COLLARED IN ACCORDANCE SCHEDULE. WITH THE BCA & A.S. WALL TYPES TP - 30 MM TOILET PARTITION CP 01 - EXTERNAL TILES CLADDING OVER 8MM CFC ON 50MM FURRING CHANNELS FC 19 - 13 MM FC FIXED TO A CONCRETE COL WITH 6 MM CFC LINING. FC 63 - 50 MM FURRING CHANNEL FIXED TO BASE WALL WITH 13 MM WR PB LINING. SD 77 - 64 MM STUD WITH 2 x 6.5 MM FLEXIBOARD LINING ON ONE SIDE. SD 82 - 76 MM STUD WITH A 6 MM CFC LINING ON ONE SIDE. SD(R) 89 - BASE WALL 20 MM CAVITY (NO CAVITY TIES), 76 MM STUD WITH INSULATION(75MM,R2.8,14 RESIDENTIAL UNITS KG/M3),13 MM PB LINING. R SUFFIX = WATER RESISTANT PLASTERBOARD(WRPB) 1 FLOOR SD 95 - TO CSR-605, 76 MM STUD, 13 MM PB LINING AND 6MM CFC IN WET AREAS SD(R) 102 - TO CSR-010, 76 MM STUD, 13 MM PB LINING ON BOTH SIDES. R SUFFIX = WRPB TO WET AREAS 513 HAY STREET SD 111 - TO CSR 605, 92 MM STUD,13 MM PB ONE SIDE AND 6MM CFC OTHER SIDE (WET AREA) EXISTING BUILDING SD(R) 118 -TO CSR 010, 92 MM STUD,13 MM PB LINING BOTH SIDES R SUFFIX WRPB TO WET AREAS HEB 116 - SPANDREL,75 MM THICK HEBEL WALL WITH Drawing List FRL-/60/60 13MM PB LINING OVER 28MM FC 35 ROWLAND SF 124 - TO CSR-093, 76 MM STUD 3x16 MM FYRCHEK Sheet STREET PROPOSED FRL-/120/120 LINING ON ONE SIDE. Number Sheet Name SF 130 - TO CSR 093, 76 MM STUD 3 x 16 MM DEVELOPMENT FRL-/120/120 FYRCHEK 1x 6 MM CFC LINING ON ONE SIDE. OFFICES SYC 148 - 8 MM SYCON MATRIX EXTERNAL CLADDING A-000 COVER SHEET 2 FLOORS WITH A 19 MM SYCON CAVITY TRIM,VAPOUR BARRIER ON 92 MM STUD WITH INSULATION (R2.8,14 KG/M3 A-001 SURVEY PLAN DENSITY),13 MM PB LINING INTERNALLY. Rw57/Rw+Ctr49 SF 156 - TO CSR 108, 92MM STUD WITH 90MM A-101 LOWER BASEMENT PLAN INSULATION AT 14 KG/M3 DENSITY, 2 x 16 MM FYRCHEK FRL-/120/120 BOTH SIDES. A-102 UPPER BASEMENT PLAN ALU 194 - INTERNAL LEAF 92 MM STUD, 9MM INSULATION (R2.8,14 KG/M3), 2x16MM FYRCHEK INTERNALLY, VAPOUR A-103 GF Plan FRL-/60/60 BARRIER, ALUCABOND FURRING CHANNELS, A-104 L1 Plan ALUCABOND CLADDING EXTERNALLY FRL -/120/120 SF 200 - TO CSR 275 2x 64 MM STUD FRAMES WITH 20MM A-105 L2 Plan CAVITY (NO TIES) INSULATION 2x 60MM(14 KG/M3 DENSITY), Rw60/Rw+Ctr52 2x13MM FYRCHEK EACH SIDE. PLUS 6MM CFC TO WET AREAS A-106 L3 Plan AFS 120 A.F.S. WALLS TO MANU. RECOMMENDATIONS A-107 ROOF PLAN & S.E. DRGS & SPECS THICKNESS VARIES A-201 RCP LB RETAIL/LOBBIES AS SHOWN. GAPS TO BE SEALED WITH AFS 150 GROUND FLOOR MASTIC JOINT MIN 12 MM OR EQ TO THE WIDTH OF THE GAP BETWEEN THE PANELS A-202 RCP UB AFS 200 (WHICHEVER GREATER). ALL GAPS TO BE A-203 RCP GF FULLY SEALED & PACKED WITH COMPRESSED FIBREGLASS INSULATION. A-204 RCP L1 CONC/STUD WALLS TO BE SCRIBED & SEALED TO RCC 200 U/S OF THE ROOF SHEETING. PROVIDE A-205 RCP L2 SUPPORT FOR THE INSULATION IN THE CAVITY. A-206 RCP L3 CONC WALLS TO S.E. DRGS/NOTES & SPECS RCC 350 THICKNESS VARIES AS SHOWN. REFER A-301 NORTH ELEVATION TO THE FINISHES SCHEDULE A-302 SOUTH ELEVATION A-303 EAST/WEST ELEVATIONS A-401 SECTIONS BASEMENT PARKING 2 LEVELS A-402 SECTIONS FINISHES CODES A-403 SECTIONS FO TTC - TROWELED TEXTURE COAT A-501 STAIR 1 PLAN DETAILS RR RTC - ROLLED TEXTURE COAT VP - VISION PANEL ES A-502 STAIR 1 SECTION DETAILS T ET SP - SPANDREL PANEL ST T RE A-503 STAIR 2 DETAILS RE DS A-504 PLAN DETAILS ET AN WL A-510 LOBBY DETAILS RO ELECTRICAL/MECHANICAL LEGEND A-520 SECTION DETAILS A-521 SECTION DETAILS S SMOKE DETECTORS A-522 SECTION DETAILS S SMOKE DETECTORS WITH EVACUATION TONE SOUNDER RECESSED FLURO EG EXHAUST GRILL A-523 SECTION DETAILS N EVACUATION TONE SOUNDER RECESSED DOWNLIGHT A-601 WASHROOMS PHOTO ELECTRIC SMOKE DETECTORS E A-602 KITCHENS EXIT EXIT WALL MOUNTED FITTING A-603 ENSUITES, TEA ROOMS HEAT DETECTORS EA RECESSED EMERGENCY LIGHT A-604 ROBES HEAT DETECTORS WITH EVACUATION TONE SOUNDER A-801 DOOR SCHEDULE EMERGENCY LIGHTING RECESSED DOWNLIGHT A-802 WINDOW SCHEDULE CONTRACTOR TO COORDINATE SKIRTING DUCTS FOR ALL OF THE ABOVE REFER TO E.E SPECIFICATIONS A-803 FINISHES SCHEDULE AS PER E.E DRAWINGS/SPECIFICATIONS Grand total: 37 1 Isometric from South East TENDER ISSUE Revision Schedule Mixed use Development COVER SHEET Oldfield Knott Architects Pty Ltd A B No. Date 241110 040411 Description DA revision; apartment configuration ammd, ht. increased BUILDING LICENCE ISSUE Lot 43 on Plan 1489 Project Number 25 Rowland Street Date 08143 Subiaco 8/07/2011 3:23:59 PM The Royal Australian 567 Hay Street, Daglish, WA. 6008 C 080411 Office Space Revision as Per DA Application Design/drawn by AC A-000 rev.D Institute of Architects Phone (08)9381 6788 . Fax (08) 9381 4619 PO Box 849, Subiaco, WA 6904 D 150411 TENDER ISSUE for Cappelli Superannuation Fund Checked by DAS Scale 1 : 50 C:UsersachachadDocuments0814308143 Master_110616_Local.rvt