ADVANCED
OPERATIONS
RESEARCH
By: -
Hakeem–Ur–Rehman
IQTM–PU 1
RA O
LINEAR PROGRAMMING USING EXCEL SOLVER
LINEAR PROGRAMMING USING EXCEL SOLVER
2
Excel Lingo
On the toolbar at the bottom of the screen, click on:
 Start  All Programs  Microsoft Office  Microsoft Office Excel 2007
 Spreadsheet: A two-dimensional array of rectangles.
 Cell: Each rectangle in excel (Four types of information can be typed into a cell:
Number, Fraction, Function, and Text.) It is identified by its column and row
location on the spreadsheet, which are designated by letter and numbers,
respectively (i.e. cell A1).
 SUMPRODUCT: A function that first multiplies the numbers in n consecutive cells
(i.e. A1 through E1) by the numbers in another set of n consecutive cells (i.e. A5
through E5), respectively, then takes the sum of the n number of products (i.e.
A1*A5 + B1*B5 + C1*C5 + D1*D5 + E1*E5), and finally deposits that sum in the
cell you have selected (i.e. F1).
 Cell reference: Lets you repeat patterns of information between cells, which
occurs a selected cell refers to information typed in another cell.
 Absolute reference: A cell that always refers to the originally referred cell; if
the location of the selected cell changes, the referred cell will not change. It
includes a “$” sign before the cell’s column (i.e. $A1), row (i.e. A$1), or both
(i.e. $A$1).
 Relative reference: A cell that initially refers to the originally selected cell; if
the location of the selected cell changes, the referred cell will change and the
location of the new referred cell will reflect the location change of the selected
cell. It omits the “$” sign (i.e. A1).
LINEAR PROGRAMMING USING EXCEL SOLVER
3
How to activate Solver:
LINEAR PROGRAMMING USING EXCEL SOLVER
4
Solver can find a solution to:
 Systems of equations
 Inequalities
 Optimization problems
 Linear programs***
 Integer programs
 Nonlinear programs
EXAMPLE
5
XYZ manufacturing company has a division that produces two models of
grates, model–A and model–B. To produce each model–A grate requires ‘3’ g.
of cast iron and ‘6’ minutes of labor. To produce each model–B grate requires
‘4’ g. of cast iron and ‘3’ minutes of labor. The profit for each model–A grate
is Rs.2 and the profit for each model–B grate is Rs.1.50. One thousand g. of
cast iron and 20 hours of labor are available for grate production each day.
Because of an excess inventory of model–A grates, Company’s manager has
decided to limit the production of model–A grates to no more than 180 grates
per day.
Solve the given LP problem and perform sensitivity analysis.
LP MODEL: Let X1 and X2 be the number of model–A and model–B grates
respectively.
The complete LP model is as follow:
Maximum: Z = 2X1 + 1.5X2  2X1 + (3/2)X2
Subject to:
3X1 + 4X2 ≤ 1000 (Cast Iron Constraint)
6X1 + 3X2 ≤ 1200 (Labor Hour Constraint)
X1 ≤ 180 (Production limit of Model-A Constraint)
X1, X2 ≥ 0
LINEAR PROGRAMMING USING EXCEL SOLVER
STEP – I: ENTER THE DATA & FUNCTION
Cell I8: Enter:
=SUMPRODUCT($G$6:$H$6,G8:H8)
Drag to cells G11:H11
LINEAR PROGRAMMING USING EXCEL SOLVER
STEP – II: RECORD THE SOLVER PARAMETERS
8
The “Solver Parameters” dialog box:
WINDOWS
 “Set Target Cell” window:
Identifies the cell that Solver
will use to record the optimal
z-value for the problem.
 “By Changing Cells”
window: Identifies the cells
that Solver will use to record
the optimal solution for the
decision variables.
 “Subject to the
Constraints” window:
Identifies the non-negativity
constraints and the constraints
given by the problem.
Buttons
 “Options” button: Identifies
the type of optimization
problem; remember to check
off the “Assume Linear Model”
option.
 “Add” button: Used to insert
the constraints; identified
constraints are displayed in the
“Subject to the Constraints”
window.
 “Solve” button: Used to
determine the optimal value
for the objective z and the
decision variables.
LINEAR PROGRAMMING USING EXCEL SOLVER
STEP – II: RECORD THE SOLVER PARAMETERS (Cont…)
LINEAR PROGRAMMING USING EXCEL SOLVER
STEP – II: RECORD THE SOLVER PARAMETERS (Cont…)
With the CURSOR in the
“Set Target Cell Box”: Click
on Cell “I8”
SET TARGET CELL:
LINEAR PROGRAMMING USING EXCEL SOLVER
STEP – II: RECORD THE SOLVER PARAMETERS (Cont…)
LEAVE THE BUTTON
FOR Max
HIGHLIGHTED
EQUAL TO:
LINEAR PROGRAMMING USING EXCEL SOLVER
STEP – II: RECORD THE SOLVER PARAMETERS (Cont…)
WITH THE CURSOR IN THE
“BY CHANGING CELLS
BOX”: HIGHLIGHT CELLS
“G6” & “H6”
BY CHANGING
CELLS:
LINEAR PROGRAMMING USING EXCEL SOLVER
STEP – II: RECORD THE SOLVER PARAMETERS (Cont…)
SUBJECT TO THE CONSTRAINTS:
 In the “Solver
Parameters” dialog
box, click on the “Add”
button.
 Fill in the “Cell
Reference” and
“Constraint” windows
by clicking on the
changing cells and the
function cells.
 Click on the “OK”
button after adding
each constraint.
LINEAR PROGRAMMING USING EXCEL SOLVER
STEP – II: RECORD THE SOLVER PARAMETERS (Cont…)
 With the cursor in the cell reference box: highlight cells “I9 through
I11”. Leave the direction as “≤”. With the cursor in the constraint
box: : highlight cells “K9 through K11”.
 If more constraints were to be added, click “Add” and follow the
same procedure.
SUBJECT TO THE CONSTRAINTS (Cont…):
LINEAR PROGRAMMING USING EXCEL SOLVER
STEP – II: RECORD THE SOLVER PARAMETERS (Cont…)
OPTIONS:
LINEAR PROGRAMMING USING EXCEL SOLVER
STEP – II: RECORD THE SOLVER PARAMETERS (Cont…)
SOLVE:
LINEAR PROGRAMMING USING EXCEL SOLVER
STEP – II: RECORD THE SOLVER PARAMETERS (Cont…)
REPORT:
LINEAR PROGRAMMING USING EXCEL SOLVER
Analyzing the Excel Spreadsheet
LINEAR PROGRAMMING USING EXCEL SOLVER
THE ANSWER REPROT
LINEAR PROGRAMMING USING EXCEL SOLVER
THE SENSITIVITY REPROT
Range of Optimality
 Changing the profit coefficient of the objective function
 Will the original optimal solution still be optimal?
 Range of Optimality?
 Profit coefficient for X1
 2, range of optimality (2 + 1, 2 – 0.875) = (3, 1.125)
 Profit coefficient for X2
 1.5, range of optimality (1.5 + 1.167, 1.5 – 0.5) = (2.667, 1)
LINEAR PROGRAMMING USING EXCEL SOLVER
THE SENSITIVITY REPROT
Changing the RHS – CAST IRONS
 Binding Constraints
 3X1 + 4X2 ≤ 1000 (Cast Irons Constraint)
 3(120) + 4 (160) = 1000
 Suppose we increase one gram Cast Iron, what’s the impact on
the optimal profit?
 The unit change in the objective function is the shadow price
of the resource.
 Shadow price of Cast Iron Gram = 0.2
 Range of Feasibility: (1000 + 600, 1000 – 300) = (1600, 700)
LINEAR PROGRAMMING USING EXCEL SOLVER
THE SENSITIVITY REPROT
Changing the RHS – LABOUR HOUR
 Binding Constraints
 6X1 + 3X2 ≤ 1200 (Labor Hours Const.)
 6(120) + 3(160) = 1200
 Suppose we increase one Labour hour, what’s the impact on the
optimal profit?
 The unit change in the objective function is the shadow price
of the resource.
 Shadow price of Labour Hour = 0.23333
 Range of Feasibility: (1200 + 225, 1000 – 450) = (1425, 550)
LINEAR PROGRAMMING USING EXCEL SOLVER
THE SENSITIVITY REPROT
Changing the RHS – LABOUR HOUR
 NON–Binding Constraints
 X1 ≤ 180 (Model-A Production Cont.)
 Optimum: 120 + 0 = 120 (Model–A Grates)
 We have 60 excessive Model–A Grates (slack)
 Increasing the Grates?
 Decreasing the Grates?
 Shadow price of Model–A = 0
 Range of Feasibility: (180 + ∞, 180 – 60) = (∞, 120)
EXAMPLE: PRODUCTION SCHEDULING
23
Cool-bike Industries manufactures boys and girls bicycles in both 20-inch and 26-inch models. Each week it
must produce at least 200 girl models and 200 boy models. The following table gives the unit profit and the
number of minutes required for production and assembly for each model.
X1 = Number of 20-inch girls bicycles produced this week; X2 = Number of 20-inch boys bicycles
produced this week; X3 = Number of 26-inch girls bicycles produced this week; X4 = Number of 26-inch
boys bicycles produced this week
MAX 27X1 + 32X2 + 38X3 + 51X4
S.T.
X1 + X3  200 (Min girls models)
X2 + X4  200 (Min boys models)
12X1 + 12X2 + 9X3 + 9X4  4800 (Production minutes)
6X1 + 9X2 + 12X3 + 18X4  4800 (Assembly minutes)
2X1 + 2X2  500 (20-inch tires)
2X3 + 2X4  800 (26-inch tires)
All X's  0
Bicycle Unit Profit Production Minutes Assembly Minutes
20-inches girls $27 12 6
20-inches boys $32 12 9
26-inches girls $38 9 12
26-inches boys $51 9 18
The Production and assembly areas run two (eight-hour) shifts per day, five days per week. This week there
are 500 tires available for 20-inch models and 800 tires available for 26-inch models. Determine Cool-bike’s
optimal schedule for the week. What profit will it realize for the week?
EXAMPLE: PRODUCTION SCHEDULING (Cont…)
24
X1 = Number of 20-inch girls bicycles produced this week; X2 = Number of 20-inch boys bicycles
produced this week; X3 = Number of 26-inch girls bicycles produced this week; X4 = Number of 26-inch
boys bicycles produced this week
MAX 27X1 + 32X2 + 38X3 + 51X4
S.T.
X1 + X3  200 (Min girls models)
X2 + X4  200 (Min boys models)
12X1 + 12X2 + 9X3 + 9X4  4800 (Production minutes)
6X1 + 9X2 + 12X3 + 18X4  4800 (Assembly minutes)
2X1 + 2X2  500 (20-inch tires)
2X3 + 2X4  800 (26-inch tires)
All X's  0
EXAMPLE: PRODUCTION SCHEDULING (Cont…)
25
MAX 27X1 + 32X2 + 38X3 + 51X4
S.T.
X1 + X3  200 (Min girls models)
X2 + X4  200 (Min boys models)
12X1 + 12X2 + 9X3 + 9X4  4800 (Production minutes)
6X1 + 9X2 + 12X3 + 18X4  4800 (Assembly minutes)
2X1 + 2X2  500 (20-inch tires)
2X3 + 2X4  800 (26-inch tires)
All X's  0
EXAMPLE: PRODUCTION SCHEDULING (Cont…)
26
MAX 27X1 + 32X2 + 38X3 + 51X4
S.T.
X1 + X3  200 (Min girls models)
X2 + X4  200 (Min boys models)
12X1 + 12X2 + 9X3 + 9X4  4800 (Production minutes)
6X1 + 9X2 + 12X3 + 18X4  4800 (Assembly minutes)
2X1 + 2X2  500 (20-inch tires)
2X3 + 2X4  800 (26-inch tires)
All X's  0
QUESTIONS
27

More Related Content

PDF
3. linear programming senstivity analysis
PPTX
Excel solver
PPTX
PPTX
Linear Programming Application
PPTX
Sensitivity analysis in linear programming problem ( Muhammed Jiyad)
PPTX
LP special cases and Duality.pptx
PPTX
8625-PPT-ENG (1).pptx
PPTX
Sensitivity analysis linear programming copy
3. linear programming senstivity analysis
Excel solver
Linear Programming Application
Sensitivity analysis in linear programming problem ( Muhammed Jiyad)
LP special cases and Duality.pptx
8625-PPT-ENG (1).pptx
Sensitivity analysis linear programming copy

What's hot (20)

PPT
Chapter 19 decision-making under risk
PPT
simplex method
PDF
Assignment problems
PPTX
Branch and Bound technique to solve Integer Linear Programming
PPTX
DECISION THEORY WITH EXAMPLE
PPTX
Simulation in Operation Research
PDF
Duality in Linear Programming Problem
PPTX
Game Theory Operation Research
PPT
Simplex Method
PPTX
Operations research - an overview
PPTX
Linear Programming
PPTX
Canonical form and Standard form of LPP
PPTX
Decision theory
DOC
Procedure Of Simplex Method
PPT
Simplex Method
PPT
Operations strategy
PPT
Unit i-2-dt
PPTX
Integer Linear Programming
PPTX
Transportation problems
PPTX
Operations research ppt
Chapter 19 decision-making under risk
simplex method
Assignment problems
Branch and Bound technique to solve Integer Linear Programming
DECISION THEORY WITH EXAMPLE
Simulation in Operation Research
Duality in Linear Programming Problem
Game Theory Operation Research
Simplex Method
Operations research - an overview
Linear Programming
Canonical form and Standard form of LPP
Decision theory
Procedure Of Simplex Method
Simplex Method
Operations strategy
Unit i-2-dt
Integer Linear Programming
Transportation problems
Operations research ppt
Ad

Viewers also liked (20)

DOCX
Linear programming manufacturing application
PPTX
Linear programming - Model formulation, Graphical Method
PDF
Linear programming with excel
PPT
Mathematical Programming Introduction
PPT
Rate of change
PDF
Ilp modeling with excel
PPT
Asv corporate finance
PPT
Chapter 5 Rate of Change and Slopes
PPT
Rate of change and slope
PPT
Product Mix Optimization Case Study - OPL/ CPLEX Code
PDF
1. intro. to or & lp
PPTX
Simple and compound interest
PPTX
Unit 4 simple and compound interest
PDF
Linear Programming and Excel Solver Functions for Dairy Ration Calculation
PDF
2. cost of quality
PPT
Bba 3274 qm week 8 linear programming
PPTX
Managerial economics linearprogramming
PDF
Math 1300: Section 5- 3 Linear Programing in Two Dimensions: Geometric Approach
PDF
CPLEX Optimization Studio, Modeling, Theory, Best Practices and Case Studies
PPT
Linear programming in market application
Linear programming manufacturing application
Linear programming - Model formulation, Graphical Method
Linear programming with excel
Mathematical Programming Introduction
Rate of change
Ilp modeling with excel
Asv corporate finance
Chapter 5 Rate of Change and Slopes
Rate of change and slope
Product Mix Optimization Case Study - OPL/ CPLEX Code
1. intro. to or & lp
Simple and compound interest
Unit 4 simple and compound interest
Linear Programming and Excel Solver Functions for Dairy Ration Calculation
2. cost of quality
Bba 3274 qm week 8 linear programming
Managerial economics linearprogramming
Math 1300: Section 5- 3 Linear Programing in Two Dimensions: Geometric Approach
CPLEX Optimization Studio, Modeling, Theory, Best Practices and Case Studies
Linear programming in market application
Ad

Similar to 4. linear programming using excel solver (20)

PPTX
Solution of a simplex problem using excel
PPT
Linear Programming pour des solutions-- Solver (1).ppt
PPT
Excel solver
PPTX
Linear programming manzoor nabi
PPT
Chap019.ppt
PPTX
Management Science
PDF
Lecture - Linear Programming.pdf
PPT
LPILP Models-1.ppt
PPTX
Evans_Analytics2e_ppt_13.pptxbbbbbbbbbbb
PDF
Linear programing
PDF
Excel Solver(By Mahsa Rezaei)
PDF
Optimization Problems Solved by Different Platforms Say Optimum Tool Box (Mat...
DOCX
Linear programming
PPTX
linear programing is the model that can be
PDF
Linear programming problems and models.pdf
PPT
Ch02.ppt
DOCX
Basic linear programming
PDF
Chapter 2.Linear Programming.pdf
PPTX
Operation reasearch
PPTX
Operation Research
Solution of a simplex problem using excel
Linear Programming pour des solutions-- Solver (1).ppt
Excel solver
Linear programming manzoor nabi
Chap019.ppt
Management Science
Lecture - Linear Programming.pdf
LPILP Models-1.ppt
Evans_Analytics2e_ppt_13.pptxbbbbbbbbbbb
Linear programing
Excel Solver(By Mahsa Rezaei)
Optimization Problems Solved by Different Platforms Say Optimum Tool Box (Mat...
Linear programming
linear programing is the model that can be
Linear programming problems and models.pdf
Ch02.ppt
Basic linear programming
Chapter 2.Linear Programming.pdf
Operation reasearch
Operation Research

More from Hakeem-Ur- Rehman (20)

PDF
PM using P6
PDF
Qfd house of quality
PDF
7. cqia (kaizen, 5 s, tpm)
PDF
1.introduction to quality & total quality management
PDF
Goal programming
PDF
Queueing theory
PDF
Integer programming
PDF
Network analysis
PDF
6. assignment problems
PDF
5. transportation problems
PPTX
5. advance topics in lp
PDF
Into to simulation
PDF
Mendeley (new)
PPTX
(Ntu talk) lean six sigma & scholarship info.
PPTX
Application of or for industrial engineers
PDF
Lean six sigma (green belt)new
PDF
Process improvement techniques
PDF
Production planning & control (PPC)
PDF
2. lp iterative methods
PM using P6
Qfd house of quality
7. cqia (kaizen, 5 s, tpm)
1.introduction to quality & total quality management
Goal programming
Queueing theory
Integer programming
Network analysis
6. assignment problems
5. transportation problems
5. advance topics in lp
Into to simulation
Mendeley (new)
(Ntu talk) lean six sigma & scholarship info.
Application of or for industrial engineers
Lean six sigma (green belt)new
Process improvement techniques
Production planning & control (PPC)
2. lp iterative methods

Recently uploaded (20)

PDF
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PPTX
Internet of Things (IOT) - A guide to understanding
PPTX
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
PDF
PPT on Performance Review to get promotions
PDF
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
PDF
Operating System & Kernel Study Guide-1 - converted.pdf
PDF
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
PDF
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
PDF
Digital Logic Computer Design lecture notes
PDF
Structs to JSON How Go Powers REST APIs.pdf
PPTX
additive manufacturing of ss316l using mig welding
PPTX
Sustainable Sites - Green Building Construction
PPTX
bas. eng. economics group 4 presentation 1.pptx
PPTX
Foundation to blockchain - A guide to Blockchain Tech
PDF
composite construction of structures.pdf
PPTX
Welding lecture in detail for understanding
PPTX
Lesson 3_Tessellation.pptx finite Mathematics
DOCX
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
PPTX
Lecture Notes Electrical Wiring System Components
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
Internet of Things (IOT) - A guide to understanding
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
PPT on Performance Review to get promotions
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
Operating System & Kernel Study Guide-1 - converted.pdf
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
Digital Logic Computer Design lecture notes
Structs to JSON How Go Powers REST APIs.pdf
additive manufacturing of ss316l using mig welding
Sustainable Sites - Green Building Construction
bas. eng. economics group 4 presentation 1.pptx
Foundation to blockchain - A guide to Blockchain Tech
composite construction of structures.pdf
Welding lecture in detail for understanding
Lesson 3_Tessellation.pptx finite Mathematics
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
Lecture Notes Electrical Wiring System Components

4. linear programming using excel solver

  • 2. LINEAR PROGRAMMING USING EXCEL SOLVER 2 Excel Lingo On the toolbar at the bottom of the screen, click on:  Start  All Programs  Microsoft Office  Microsoft Office Excel 2007  Spreadsheet: A two-dimensional array of rectangles.  Cell: Each rectangle in excel (Four types of information can be typed into a cell: Number, Fraction, Function, and Text.) It is identified by its column and row location on the spreadsheet, which are designated by letter and numbers, respectively (i.e. cell A1).  SUMPRODUCT: A function that first multiplies the numbers in n consecutive cells (i.e. A1 through E1) by the numbers in another set of n consecutive cells (i.e. A5 through E5), respectively, then takes the sum of the n number of products (i.e. A1*A5 + B1*B5 + C1*C5 + D1*D5 + E1*E5), and finally deposits that sum in the cell you have selected (i.e. F1).  Cell reference: Lets you repeat patterns of information between cells, which occurs a selected cell refers to information typed in another cell.  Absolute reference: A cell that always refers to the originally referred cell; if the location of the selected cell changes, the referred cell will not change. It includes a “$” sign before the cell’s column (i.e. $A1), row (i.e. A$1), or both (i.e. $A$1).  Relative reference: A cell that initially refers to the originally selected cell; if the location of the selected cell changes, the referred cell will change and the location of the new referred cell will reflect the location change of the selected cell. It omits the “$” sign (i.e. A1).
  • 3. LINEAR PROGRAMMING USING EXCEL SOLVER 3 How to activate Solver:
  • 4. LINEAR PROGRAMMING USING EXCEL SOLVER 4 Solver can find a solution to:  Systems of equations  Inequalities  Optimization problems  Linear programs***  Integer programs  Nonlinear programs
  • 5. EXAMPLE 5 XYZ manufacturing company has a division that produces two models of grates, model–A and model–B. To produce each model–A grate requires ‘3’ g. of cast iron and ‘6’ minutes of labor. To produce each model–B grate requires ‘4’ g. of cast iron and ‘3’ minutes of labor. The profit for each model–A grate is Rs.2 and the profit for each model–B grate is Rs.1.50. One thousand g. of cast iron and 20 hours of labor are available for grate production each day. Because of an excess inventory of model–A grates, Company’s manager has decided to limit the production of model–A grates to no more than 180 grates per day. Solve the given LP problem and perform sensitivity analysis. LP MODEL: Let X1 and X2 be the number of model–A and model–B grates respectively. The complete LP model is as follow: Maximum: Z = 2X1 + 1.5X2  2X1 + (3/2)X2 Subject to: 3X1 + 4X2 ≤ 1000 (Cast Iron Constraint) 6X1 + 3X2 ≤ 1200 (Labor Hour Constraint) X1 ≤ 180 (Production limit of Model-A Constraint) X1, X2 ≥ 0
  • 6. LINEAR PROGRAMMING USING EXCEL SOLVER STEP – I: ENTER THE DATA & FUNCTION Cell I8: Enter: =SUMPRODUCT($G$6:$H$6,G8:H8) Drag to cells G11:H11
  • 7. LINEAR PROGRAMMING USING EXCEL SOLVER STEP – II: RECORD THE SOLVER PARAMETERS
  • 8. 8 The “Solver Parameters” dialog box: WINDOWS  “Set Target Cell” window: Identifies the cell that Solver will use to record the optimal z-value for the problem.  “By Changing Cells” window: Identifies the cells that Solver will use to record the optimal solution for the decision variables.  “Subject to the Constraints” window: Identifies the non-negativity constraints and the constraints given by the problem. Buttons  “Options” button: Identifies the type of optimization problem; remember to check off the “Assume Linear Model” option.  “Add” button: Used to insert the constraints; identified constraints are displayed in the “Subject to the Constraints” window.  “Solve” button: Used to determine the optimal value for the objective z and the decision variables. LINEAR PROGRAMMING USING EXCEL SOLVER STEP – II: RECORD THE SOLVER PARAMETERS (Cont…)
  • 9. LINEAR PROGRAMMING USING EXCEL SOLVER STEP – II: RECORD THE SOLVER PARAMETERS (Cont…) With the CURSOR in the “Set Target Cell Box”: Click on Cell “I8” SET TARGET CELL:
  • 10. LINEAR PROGRAMMING USING EXCEL SOLVER STEP – II: RECORD THE SOLVER PARAMETERS (Cont…) LEAVE THE BUTTON FOR Max HIGHLIGHTED EQUAL TO:
  • 11. LINEAR PROGRAMMING USING EXCEL SOLVER STEP – II: RECORD THE SOLVER PARAMETERS (Cont…) WITH THE CURSOR IN THE “BY CHANGING CELLS BOX”: HIGHLIGHT CELLS “G6” & “H6” BY CHANGING CELLS:
  • 12. LINEAR PROGRAMMING USING EXCEL SOLVER STEP – II: RECORD THE SOLVER PARAMETERS (Cont…) SUBJECT TO THE CONSTRAINTS:  In the “Solver Parameters” dialog box, click on the “Add” button.  Fill in the “Cell Reference” and “Constraint” windows by clicking on the changing cells and the function cells.  Click on the “OK” button after adding each constraint.
  • 13. LINEAR PROGRAMMING USING EXCEL SOLVER STEP – II: RECORD THE SOLVER PARAMETERS (Cont…)  With the cursor in the cell reference box: highlight cells “I9 through I11”. Leave the direction as “≤”. With the cursor in the constraint box: : highlight cells “K9 through K11”.  If more constraints were to be added, click “Add” and follow the same procedure. SUBJECT TO THE CONSTRAINTS (Cont…):
  • 14. LINEAR PROGRAMMING USING EXCEL SOLVER STEP – II: RECORD THE SOLVER PARAMETERS (Cont…) OPTIONS:
  • 15. LINEAR PROGRAMMING USING EXCEL SOLVER STEP – II: RECORD THE SOLVER PARAMETERS (Cont…) SOLVE:
  • 16. LINEAR PROGRAMMING USING EXCEL SOLVER STEP – II: RECORD THE SOLVER PARAMETERS (Cont…) REPORT:
  • 17. LINEAR PROGRAMMING USING EXCEL SOLVER Analyzing the Excel Spreadsheet
  • 18. LINEAR PROGRAMMING USING EXCEL SOLVER THE ANSWER REPROT
  • 19. LINEAR PROGRAMMING USING EXCEL SOLVER THE SENSITIVITY REPROT Range of Optimality  Changing the profit coefficient of the objective function  Will the original optimal solution still be optimal?  Range of Optimality?  Profit coefficient for X1  2, range of optimality (2 + 1, 2 – 0.875) = (3, 1.125)  Profit coefficient for X2  1.5, range of optimality (1.5 + 1.167, 1.5 – 0.5) = (2.667, 1)
  • 20. LINEAR PROGRAMMING USING EXCEL SOLVER THE SENSITIVITY REPROT Changing the RHS – CAST IRONS  Binding Constraints  3X1 + 4X2 ≤ 1000 (Cast Irons Constraint)  3(120) + 4 (160) = 1000  Suppose we increase one gram Cast Iron, what’s the impact on the optimal profit?  The unit change in the objective function is the shadow price of the resource.  Shadow price of Cast Iron Gram = 0.2  Range of Feasibility: (1000 + 600, 1000 – 300) = (1600, 700)
  • 21. LINEAR PROGRAMMING USING EXCEL SOLVER THE SENSITIVITY REPROT Changing the RHS – LABOUR HOUR  Binding Constraints  6X1 + 3X2 ≤ 1200 (Labor Hours Const.)  6(120) + 3(160) = 1200  Suppose we increase one Labour hour, what’s the impact on the optimal profit?  The unit change in the objective function is the shadow price of the resource.  Shadow price of Labour Hour = 0.23333  Range of Feasibility: (1200 + 225, 1000 – 450) = (1425, 550)
  • 22. LINEAR PROGRAMMING USING EXCEL SOLVER THE SENSITIVITY REPROT Changing the RHS – LABOUR HOUR  NON–Binding Constraints  X1 ≤ 180 (Model-A Production Cont.)  Optimum: 120 + 0 = 120 (Model–A Grates)  We have 60 excessive Model–A Grates (slack)  Increasing the Grates?  Decreasing the Grates?  Shadow price of Model–A = 0  Range of Feasibility: (180 + ∞, 180 – 60) = (∞, 120)
  • 23. EXAMPLE: PRODUCTION SCHEDULING 23 Cool-bike Industries manufactures boys and girls bicycles in both 20-inch and 26-inch models. Each week it must produce at least 200 girl models and 200 boy models. The following table gives the unit profit and the number of minutes required for production and assembly for each model. X1 = Number of 20-inch girls bicycles produced this week; X2 = Number of 20-inch boys bicycles produced this week; X3 = Number of 26-inch girls bicycles produced this week; X4 = Number of 26-inch boys bicycles produced this week MAX 27X1 + 32X2 + 38X3 + 51X4 S.T. X1 + X3  200 (Min girls models) X2 + X4  200 (Min boys models) 12X1 + 12X2 + 9X3 + 9X4  4800 (Production minutes) 6X1 + 9X2 + 12X3 + 18X4  4800 (Assembly minutes) 2X1 + 2X2  500 (20-inch tires) 2X3 + 2X4  800 (26-inch tires) All X's  0 Bicycle Unit Profit Production Minutes Assembly Minutes 20-inches girls $27 12 6 20-inches boys $32 12 9 26-inches girls $38 9 12 26-inches boys $51 9 18 The Production and assembly areas run two (eight-hour) shifts per day, five days per week. This week there are 500 tires available for 20-inch models and 800 tires available for 26-inch models. Determine Cool-bike’s optimal schedule for the week. What profit will it realize for the week?
  • 24. EXAMPLE: PRODUCTION SCHEDULING (Cont…) 24 X1 = Number of 20-inch girls bicycles produced this week; X2 = Number of 20-inch boys bicycles produced this week; X3 = Number of 26-inch girls bicycles produced this week; X4 = Number of 26-inch boys bicycles produced this week MAX 27X1 + 32X2 + 38X3 + 51X4 S.T. X1 + X3  200 (Min girls models) X2 + X4  200 (Min boys models) 12X1 + 12X2 + 9X3 + 9X4  4800 (Production minutes) 6X1 + 9X2 + 12X3 + 18X4  4800 (Assembly minutes) 2X1 + 2X2  500 (20-inch tires) 2X3 + 2X4  800 (26-inch tires) All X's  0
  • 25. EXAMPLE: PRODUCTION SCHEDULING (Cont…) 25 MAX 27X1 + 32X2 + 38X3 + 51X4 S.T. X1 + X3  200 (Min girls models) X2 + X4  200 (Min boys models) 12X1 + 12X2 + 9X3 + 9X4  4800 (Production minutes) 6X1 + 9X2 + 12X3 + 18X4  4800 (Assembly minutes) 2X1 + 2X2  500 (20-inch tires) 2X3 + 2X4  800 (26-inch tires) All X's  0
  • 26. EXAMPLE: PRODUCTION SCHEDULING (Cont…) 26 MAX 27X1 + 32X2 + 38X3 + 51X4 S.T. X1 + X3  200 (Min girls models) X2 + X4  200 (Min boys models) 12X1 + 12X2 + 9X3 + 9X4  4800 (Production minutes) 6X1 + 9X2 + 12X3 + 18X4  4800 (Assembly minutes) 2X1 + 2X2  500 (20-inch tires) 2X3 + 2X4  800 (26-inch tires) All X's  0