Building on a strong financial
foundation
Harri Nikunen
CFO
November 27, 2013
London, UK
1

Main financials

2

Balance sheet,
cash flow & financing

3

Other topics

Financial information for Metso’s continuing
operations is unaudited and illustrative.
Accounting principles are presented in a stock
exchange release published on September 23,
2013
Metso by business type in 2012
EUR million

• Project business operates with a

216

flexible business model and a light
balance sheet

• Equipment and product business ties
1,483

2,072

up more capital employed, but good
margins secure good returns

• Services business is central to

building strong customer relationships
and offers good profitability and
returns

728
Service business
Equipment and product business
Project business
Valmet Automotive
3

© Metso

Capital Markets Day 2013
Big mining orders have been missing since 2012
Orders received for continuing operations,12-month rolling
EUR Million

Mining orders at
an all time high

6,000

5,000

4,000

3,000

2,000

Services

4

© Metso

Capital Markets Day 2013

Capital equipment

08/13

06/13

04/13

02/13

12/12

10/12

08/12

06/12

04/12

02/12

12/11

10/11

08/11

06/11

04/11

02/11

12/10

10/10

08/10

06/10

04/10

02/10

0

12/09

1,000
Orders by quarter
Continuing operations
EUR million
2,000
1,800
1 533

1,600
1,400

1 185

1,200
1,000
800

650

778

842

871

1 245

1 125

1 151
1 011

904

874

1 025

1 078

1 025
869

564

570

Q1

Q2

Q3

Q4

Q1

Q2

Q3

Q4

Q1

Q2

Q3

Q4

Q1

Q2

Q3

Q4

Q1

Q2

Q3

2009

600

579

2009

2009

2009

2010

2010

2010

2010

2011

2011

2011

2011

2012

2012

2012

2012

2013

2013

2013

400
200
0

Services orders received, ext.

5

© Metso

Capital Markets Day 2013

Capital orders received, ext.
Annual orders received
Continuing operations
EUR million

2009

2010

2011

2012

1-9/2013

Mining and Construction
capital

737

1,313

2,103

1,658

905

Automation capital

270

337

407

404

339

1,035

1,322

1,604

1,771

1,255

265

309

352

382

326

56

84

281

216

148

2,363

3,365

4,747

4,432

2,972

344

745

1,416

1,102

519

Mining and Construction
services
Automation services
Valmet Automotive
Total
Mining equipment

6

© Metso

Capital Markets Day 2013
Healthy order backlog of EUR 2.1 billion –
services backlog higher than ever
EUR million

EUR million, September 2013

3,000

2,500

2,500

2,000

2,000
1,500

1,500
1,000

1,000
500

500

0

2009

2010

2011

Mining and Construction
7

Around 45%
of deliveries
for 2013
consist of
services
orders

© Metso

Capital Markets Day 2013

2012
Automation

2013

0
Deliveries in 2013

Deliveries after 2013
Net sales for continuing operations
Rolling 12 months
EUR Million
5,000
4,500
4,000
3,500
3,000
2,500
2,000
1,500
1,000

Services
8

© Metso

Capital Markets Day 2013

Capital equipment

08/13

06/13

04/13

02/13

12/12

10/12

08/12

06/12

04/12

02/12

12/11

10/11

08/11

06/11

04/11

02/11

12/10

10/10

08/10

06/10

04/10

02/10

0

12/09

500
Profit & loss statement
Continuing operations
EUR million

2012

1-9/2013

Net sales

4,499

2,989

Operating profit

463

299

Net financial income and expenses

-59

-43

Profit before taxes

404

256

Amortization of intangible assets

-20

-16

Depreciation of tangible assets

-57

-46

-11.9

0

0

-1

Other NRE

-0,4

-20.7

Operating profit

463

299

10.3%

10.0%

EBITA, before non-recurring items

495.3

336.7

EBITA-%, before non-recurring items

11.0%

11.3%

540

361

12.0%

12.1%

Non-recurring items
Capacity adjustment expenses
Cost related to demerger process

Operating profit -%

EBITDA
EBITDA-%
9

© Metso

Capital Markets Day 2013
EBITA before NRE
Continuing operations
%

EUR Million

5,000

11.0

11.2

11.3

4,500

10

4,000
3,500

8

3,000
2,500

6

2,000

4

1,500
1,000

2

500
0

2012
Net sales

10

© Metso

12

Capital Markets Day 2013

Q2 / 2013

Q3 / 2013

EBITA % before non-recurring items

0
Return on capital employed targeted to exceed
30% (excl. impact of major acquisitions)
Continuing operations
%

19.5

19.2

19
18.5
18

17.6

17.5
16.9

17
16.5
16
15.5

11

2012

© Metso

Capital Markets Day 2013

1-6/2013

1-9/2013
Earnings per share
Continuing operations
EUR

2.0

1.82

1.8
1.6
1.4

1.21

1.2
1.0
0.8

0.71

0.6
0.4
0.2
0.0

12

2012

© Metso

Capital Markets Day 2013

1-6/2013

1-9/2013
EBITA-% before NRE and ROCE-%
Mining and Construction & Automation
EBITA-% before NRE

%
Operational ROCE-%
45.0

16.0
13.5

14.0
12.0

12.0

11.2

13.0

12.6
11.1

10.9

11.8

39.0

40.0

35.3

35.0

31.8
28.9

30.0

10.0
25.0

24.3

25.3

28.7
25.2

8.0
20.0

6.0

15.0

4.0

10.0

2.0
0.0

5.0
0.0

Mining and Construction
2010

13

© Metso

2011

Automation
2012

Capital Markets Day 2013

1-9/2013

Mining and Construction
2010

2011

Automation
2012

1-9/2013
We have a strong financial foundation
Net sales1

EBITA before NRI1

Operational ROCE1

EUR billion

EUR million

Percentage

CAGR (2006-12)

7.5%

1.2

1.2

1.2
3.3

2.8

12.4%

1.1

3.7
1.0

2.9

4.4

3.7

1.0

Average margin (2006-12)

14.1%

13.9%

12.0%
11.2% 11.5%

14.0%
10.3%

3.1
463

0.8

-06

-07

Equipment

14

© Metso

-09

390

-10

-11

35.1% 34.9%
31.3%

30.2%
24.0% 25.0%
20.2%

428
344

Strong return
on capital

Improving
profitability

Services
CAGR 9.0%
-08

Average (2006-12)

521

517

305

Services

28.7%

-12

Book-to-bill ratio

Capital Markets Day 2013

-06

-07

-08
EBITA

-09

-10

-11

-12

-06

-07

EBITA-%

1) Combined Mining and Construction and Automation figures unless
otherwise noted

-08

-09

-10

ROCE-%

-11

-12
Balance sheet
Continuing operations
EUR million

2012 Dec

2013 Sep

Balance sheet total

4,000

3,915

Total non-current assets

1,110

1,261

Goodwill

442

448

Other intangible assets

120

117

Property, plant and equipment

392

478

Financial and other non-current assets

156

218

Total current assets

2,890

2,654

Equity

1,359

1,232

Interest-bearing liabilities

1,094

1,107

Net debt

385

491

Gearing

28.3%

39.9%

ROCE before taxes

19.2%

17.6%

ROCE after taxes

13.8%

12.9%

n/a

36.5%

Equity to assets ratio

15

© Metso

Capital Markets Day 2013
Balance sheet structure as of September 30, 2013
Continuing operations
EUR million

4,500
3,915

4,000

3,000

448

Goodwill

3,500

813

Fixed assets

2,500
Inventories

2,000
1,500
1,000

Other
receivables*

Capital Markets Day 2013

616

Equity

1,070

Other
liabilities

Net working
capital

112
394

1,004

0

© Metso

1,232

1,034

Bank and cash
500 and interestbearing
receivables

16

3,915

Net interest
bearing loans

1,107

Provisions
Advances
received
Interestbearing debt
Capital employed
Continuing operations
MEUR
20%

3,000
2,500

19%

2,000
18%
1,500
17%
1,000
16%

500
0

2012
Net working capital

17

© Metso

Q2/2013
Fixed assets

Capital Markets Day 2013

Goodwill

Interest bearing and non-operative items

Q3/2013
ROCE-% before taxes

15%
Net debt and net working capital
Continuing operations
Net debt and gearing

Net working capital and NWC to
net sales

EUR million
1200

%
60
48.0

1000

39.9

800

50

EUR million
800
700

692

16

15.2

14.4
580

600
40

13.7

630

14
12

565

600

491
385

400

20

200

10

0

0

Net Debt

18

30

© Metso

Capital Markets Day 2013

Gearing

500

10

400

8

300

6

200

28.3

4

100

2

0

0

Net working capital, EUR

NWC, as % of net sales

%
Net working capital
Mining and Construction & Automation
MEUR
900

25%

800
20%

700
600

15%

500
400

10%

300
200

5%

100
0

2008

2009

2010
NWC

19

© Metso

Capital Markets Day 2013

2011
NWC/NS -%

2012

Q3 / 2013

0%
Gross capital expenditure
Continuing operations
MEUR
160

250%

140
200%

120
100

150%

80
100%

60
40

50%

20
0

A2005

A2006

A2007

Gross capex

20

© Metso

Capital Markets Day 2013

A2008

Capex acquisitions

A2009

A2010

A2011

A2012

Q3 A2013

Gross capex / depreciations and amortizations -%

0%
Free cash flow
Continuing operations
500

125%

450

140%
114%
120%

400

100%

350
300

80%

250
60%

200
150

40%

100

20%

50
0

2008

2009

2010
Free cash flow

21

© Metso

Capital Markets Day 2013

2011

2012

Cash conversion -%

From 2006 onwards only maintenance investments are included in FCF.

1-9/2013

0%
Capital structure ratios
Continuing operations
%

90
80
70
60

48.0

50
36.1

40

36.5

39.9

28.3

30
20
10
0

2012
Equity to assets ratio -%

22

© Metso

Capital Markets Day 2013

Q2/2013
Gearing -%

Q3/2013
Debt to capital -%
Funding facilities
Corporate-level funding facilities as of October 10, 2013,
excluding loans to be transferred to Valmet

•

EUR 1.5 billion EMTN program

-

EUR 200 million 7.25% bond due in 2014
EUR 400 million 2.75% bond due in 2019
EUR 174 million private placements due in 2018 – 2022

•

Bilateral long-term loans: EUR 5 million maturing
in January 2014

•

Syndicated long-term loan: USD 287 million maturing
in 2018

•

Committed EUR 500 million 5-year syndicated revolving
credit facility available until 2015 (currently undrawn)

•
•

EUR 500 million domestic CP program

23

Uncommitted lines of credit

© Metso

Capital Markets Day 2013
Debt and maturity structure
Excluding loans to be transferred to Valmet
MEUR

October 10, 2013

2000
1800
1600

Undrawn committed
facilities

1400
1200

Short-term debt

1000

Other long-term debt
Syndicated long-term debt

800

Private placements

600
400

Euro Bond 2014
Euro Bond 2011

200

Euro Bond 2019

0
1.1.2011 09/2011 06/2012 03/2013 10/2013 06/2014 03/2015 12/2015 09/2016 06/2017 03/2018 12/2018
YTD Monthly
24

© Metso

Capital Markets Day 2013

Maturities monthly >
Balance sheet & financing
• Metso’s capital allocation policy is based on a commitment
to maintain the Group investment grade rating and honor
Metso’s dividend policy

• Metso’s business portfolio and business model generate
solid cash flows both good and less good times

• All balance sheet key indicators indicate solid capital

management, and improvement of net working capital
management remain high on the agenda

• Financial measures and the balance sheet impact are seen
as key M&A criteria

25

© Metso

Capital Markets Day 2013
EUR 100 million global efficiency program under way
Announced on October 24, 2013
Two phases – fast track and structural / development projects

• Fast track = project identified and ongoing at different stages
-

26

Projects announced

Large number of other ongoing but unannounced projects

• Divestment of parts of the industrial conveyor belt business in Europe
• Restructuring of the metal recycling business
• Union negotiations related to Finnish foundry operations
• Restructuring of the EMEA sales and services organization
• Transfer or closure of small operations in various countries
• Resizing of Metso’s headquarters
• Restructuring of Process Automation Systems
Most of the decisions will be taken in 2013, leading to one time costs in 2013
Decisions and costs will also affect 2014
The identified gross savings are EUR 60 – 80 million and we expect to have the full
run rate during late 3Q/2014

© Metso

Capital Markets Day 2013
EUR 100 million global efficiency program under way
Announced October 24, 2013
Two phases – fast track and structural / development pojects

• Structural and development projects = projects in the planning pipeline (2014
decisions)

-

Streamlining of support functions
Streamlining of legal structure
New projects derived from cost structure studies
Capacity adjustment needs related to unexpected demand changes
The improvement impact is neing assessed and not part of the EUR 60 – 80 million
fast track project referred to before

• Global effeciency program also includes our global procurement development
activitities. We are targeting annual savings between EUR 30 – 50 million

-

27

In 2013, we expect to save EUR 20 – 30 million

© Metso

Capital Markets Day 2013
Guidance & market outlook terms
Guidance:

Market outlook:

At around = +/- 0 - 5% on EUR-based
net sales and EBITA

Excellent = Demand exceeding supply
and excellent pricing environment

At around = +/- 0 - 0.5% on EBITA -%

Good = Demand and supply in balance
Somewhat = +/- 5 - 10% on EUR-based and healthy pricing environment
net sales and EBITA
Satisfactory = Supply exceeds demand
and more work is needed to fill capacity.
OR
Pricing is becoming more volatile
Somewhat = +/- 0.5 –1.0% on EBITA -%
Weak = Buyers market! Suppliers have
Significant = +/- > 10% on EUR-based
overcapacity and pricing may become
net sales and EBITA
unhealthy
OR
Significant = +/- > 1.0% on EBITA -%

28

© Metso

Capital Markets Day 2013
Backlog coverage & delivery times
Automation

Mining and Construction

Flow control = Normal backlog
covers 5-6 months of net sales

Minerals processing systems = High
project content; coverage ~1 year

Process automation system = High
project content; coverage ~1 year

Construction equipment = Normal
backlog covers 3-4 months

Services = Coverage 2-3 months
on average

Services = Coverage 3-4 months
on average
In general, when delivery times (backlog
coverage) get longer the better the market
conditions are. Largest change takes place
in major build-to-order equipment.

29

© Metso

Capital Markets Day 2013
Metso Capital Markets Day 2013 presentations: Harri Nikunen, CFO

More Related Content

PDF
Metso's Interim Review January 1 - June 30, 2014: Presentation
PDF
FDI attraction: the italian policy
PDF
Metso's Interim Review January 1 - September 30, 2014. Presentation.
PDF
Investor Day 2012 - A View on Health Care
PDF
AT&S Annual financial report 2018/19
PDF
2013 Full Year Results Snam
PDF
Kloeckner & Co Analysts and Investor Presentation 3rd Quarter results 2014
PDF
Deutsche EuroShop - Conference Call Presentation - Interim Report Q1 2013
Metso's Interim Review January 1 - June 30, 2014: Presentation
FDI attraction: the italian policy
Metso's Interim Review January 1 - September 30, 2014. Presentation.
Investor Day 2012 - A View on Health Care
AT&S Annual financial report 2018/19
2013 Full Year Results Snam
Kloeckner & Co Analysts and Investor Presentation 3rd Quarter results 2014
Deutsche EuroShop - Conference Call Presentation - Interim Report Q1 2013

What's hot (20)

PDF
The way forward_to_2015_one_year_on
PDF
Investor Day 2012 - Continental Europe
PDF
Investor Day 2012 - The Way Forward to 2015
PDF
Relatório ArcelorMittal - Julho 2020
PDF
Investor Day 2012 - Non-Life Strategy
PDF
2014 Full Year Results & Strategy Update
PDF
Goldman Sachs European Financials conference 2010
PDF
AIM Italia Facts FY2014
PDF
Investor Day 2015 - Continuing the Growth Journey
PDF
2013 Full Year Results
PDF
Deutsche EuroShop - Conference Call Presentation - Interim Report H1 2014
PDF
AT&S Annual Report 2011/12
PDF
Leonardo Full-Year 2017 Presentation
PDF
Aegon Q4 2015 results infographic
PDF
Annual Financial Report 2011/12
PDF
Quarterly Report 1st Quarter 2012/13
PDF
Acm report Q4 2010
PDF
Technopolis Presentation Q2 2016
PDF
2019 Preliminary Results - Banca IFIS
PPTX
Orbis Hotel Group: vision and strategy 8.05.2016
The way forward_to_2015_one_year_on
Investor Day 2012 - Continental Europe
Investor Day 2012 - The Way Forward to 2015
Relatório ArcelorMittal - Julho 2020
Investor Day 2012 - Non-Life Strategy
2014 Full Year Results & Strategy Update
Goldman Sachs European Financials conference 2010
AIM Italia Facts FY2014
Investor Day 2015 - Continuing the Growth Journey
2013 Full Year Results
Deutsche EuroShop - Conference Call Presentation - Interim Report H1 2014
AT&S Annual Report 2011/12
Leonardo Full-Year 2017 Presentation
Aegon Q4 2015 results infographic
Annual Financial Report 2011/12
Quarterly Report 1st Quarter 2012/13
Acm report Q4 2010
Technopolis Presentation Q2 2016
2019 Preliminary Results - Banca IFIS
Orbis Hotel Group: vision and strategy 8.05.2016
Ad

Viewers also liked (20)

PDF
Metso January-June 2013 Interim review presentation
PPTX
Presentation7
PPTX
Presentation1
PPTX
Weekly update 5
DOCX
El arte de la guerra
 
PDF
Reglamento Interno EAIC
PDF
Metso Capital Markets Day 2013 presentations: João Ney Colagrossi, President,...
PDF
6б клас6б
DOCX
Energía
PDF
Metson osavuosikatsaus 1. tammikuuta - 31. maaliskuuta 2014. Presentaatiokalvot.
PPTX
Sustainability as risk management
PDF
Metso Interim Review Q3 2015 presentation
PDF
Bauma presentation cws_aggregate_academy_2016
PDF
Metso capital markets day 2015: Services Business Area (President, Perttu Lou...
PPTX
New generation crusher upgrades
PDF
Metso Capital Markets Day 2013 presentations: Perttu Louhiluoto, President, A...
PPT
Pertemuan ke 4 injuries
PDF
Metso Annual General Meeting 2013 CEO's review
PDF
Low-carbon and resource-efficient wellbeing for Finland through Bioenergy (in...
PDF
Forest full of opportunity UPM's Biofore concept (in Finnish)
Metso January-June 2013 Interim review presentation
Presentation7
Presentation1
Weekly update 5
El arte de la guerra
 
Reglamento Interno EAIC
Metso Capital Markets Day 2013 presentations: João Ney Colagrossi, President,...
6б клас6б
Energía
Metson osavuosikatsaus 1. tammikuuta - 31. maaliskuuta 2014. Presentaatiokalvot.
Sustainability as risk management
Metso Interim Review Q3 2015 presentation
Bauma presentation cws_aggregate_academy_2016
Metso capital markets day 2015: Services Business Area (President, Perttu Lou...
New generation crusher upgrades
Metso Capital Markets Day 2013 presentations: Perttu Louhiluoto, President, A...
Pertemuan ke 4 injuries
Metso Annual General Meeting 2013 CEO's review
Low-carbon and resource-efficient wellbeing for Finland through Bioenergy (in...
Forest full of opportunity UPM's Biofore concept (in Finnish)
Ad

Similar to Metso Capital Markets Day 2013 presentations: Harri Nikunen, CFO (20)

PDF
CMD 2017 CFO closing Eeva Sipilä
PDF
Metso Interim Review January-March 2013 presentation
PDF
Metso 2018 Half-Year Review presentation
PDF
Metso Capital markets day 2015: CFO Harri Nikunen
PDF
Metso Interim Review presentation January-September 2013
PDF
Metso Q3 2018 Interim Review
PDF
Accelerating financial excellence - Harri Nikunen
PDF
Metso Q4 2018 financial statements release presentation
PDF
Metso Q4 2019 financial statements review presentation
PDF
Metso 2014 q2_presentation_interim_review
PDF
Metso's Interim Review January 1 - March 31, 2014. Presentation.
PDF
Delivering greater shareholder value - CEO Matti Kähkönen
PDF
Metso Financial Statements Review 2013 - presentation
PDF
Metso Interim Review Q3 2016 presentation
PDF
Metso Q3 2019 Interim Review presentation
PDF
Metso Capital Markets Day 2013 presentations: Matti Kähkönen, President and CEO
PDF
Metso 2014 Financial Statements Review
PDF
Metso H1 2019 half year review presentation
PDF
Metso Q1 2019 Interim Review presentation
PDF
Metso Financial Statements Review 2014: presentation
CMD 2017 CFO closing Eeva Sipilä
Metso Interim Review January-March 2013 presentation
Metso 2018 Half-Year Review presentation
Metso Capital markets day 2015: CFO Harri Nikunen
Metso Interim Review presentation January-September 2013
Metso Q3 2018 Interim Review
Accelerating financial excellence - Harri Nikunen
Metso Q4 2018 financial statements release presentation
Metso Q4 2019 financial statements review presentation
Metso 2014 q2_presentation_interim_review
Metso's Interim Review January 1 - March 31, 2014. Presentation.
Delivering greater shareholder value - CEO Matti Kähkönen
Metso Financial Statements Review 2013 - presentation
Metso Interim Review Q3 2016 presentation
Metso Q3 2019 Interim Review presentation
Metso Capital Markets Day 2013 presentations: Matti Kähkönen, President and CEO
Metso 2014 Financial Statements Review
Metso H1 2019 half year review presentation
Metso Q1 2019 Interim Review presentation
Metso Financial Statements Review 2014: presentation

More from Metso Group (20)

PDF
Metso Q4 2019 tilinpäätostiedote esitys
PDF
Metson tilinpäätostiedote 2019
PDF
Metso Q3 2019 osavuosikatsaus esitys
PDF
Metso Q3 2019 osavuosikatsaus
PDF
Metso Q3 2019 Interim Review
PDF
Metso H1 2019 puolivuosivuosikatsaus esitys
PDF
Metso H1 2019 puolivuosivuosikatsaus
PDF
Metso H1 2019 half year review
PDF
Metson vuosikertomus 2018
PDF
Metso Q1 2019 osavuosikatsaus esitys
PDF
Metso Q1 Osavuosikatsaus tammi-maaliskuu 2019
PDF
Metso Q1 2019 Interim Review
PDF
Metso Q4 2018 tilinpäätostiedote esitys
PDF
Metso 2018 tilinpäätostiedote
PDF
Metso Financial statements Review 2018
PDF
Metso Q3 2018 osavuosikatsaus
PDF
Metson puolivuosikatsaus 2018 esitys
PDF
Metson puolivuosikatsaus 2018
PDF
Metso's Half-Year Review 2018
PDF
Intelligent minerals processing powered by AI and IoT
Metso Q4 2019 tilinpäätostiedote esitys
Metson tilinpäätostiedote 2019
Metso Q3 2019 osavuosikatsaus esitys
Metso Q3 2019 osavuosikatsaus
Metso Q3 2019 Interim Review
Metso H1 2019 puolivuosivuosikatsaus esitys
Metso H1 2019 puolivuosivuosikatsaus
Metso H1 2019 half year review
Metson vuosikertomus 2018
Metso Q1 2019 osavuosikatsaus esitys
Metso Q1 Osavuosikatsaus tammi-maaliskuu 2019
Metso Q1 2019 Interim Review
Metso Q4 2018 tilinpäätostiedote esitys
Metso 2018 tilinpäätostiedote
Metso Financial statements Review 2018
Metso Q3 2018 osavuosikatsaus
Metson puolivuosikatsaus 2018 esitys
Metson puolivuosikatsaus 2018
Metso's Half-Year Review 2018
Intelligent minerals processing powered by AI and IoT

Recently uploaded (20)

PDF
DTC TRADIND CLUB MAKE YOUR TRADING BETTER
PDF
The Right Social Media Strategy Can Transform Your Business
PDF
How to join illuminati agent in Uganda Kampala call 0782561496/0756664682
PDF
Principal of magaement is good fundamentals in economics
PPTX
social-studies-subject-for-high-school-globalization.pptx
PPTX
kyc aml guideline a detailed pt onthat.pptx
PDF
5a An Age-Based, Three-Dimensional Distribution Model Incorporating Sequence ...
PDF
Lecture1.pdf buss1040 uses economics introduction
PDF
Statistics for Management and Economics Keller 10th Edition by Gerald Keller ...
PPTX
introuction to banking- Types of Payment Methods
PDF
Dialnet-DynamicHedgingOfPricesOfNaturalGasInMexico-8788871.pdf
PDF
USS pension Report and Accounts 2025.pdf
PDF
Financial discipline for educational purpose
PPTX
PPT-Lesson-2-Recognize-a-Potential-Market-2-3.pptx
PDF
Chapter 9 IFRS Ed-Ed4_2020 Intermediate Accounting
PDF
discourse-2025-02-building-a-trillion-dollar-dream.pdf
PDF
Pitch Deck.pdf .pdf all about finance in
PDF
NAPF_RESPONSE_TO_THE_PENSIONS_COMMISSION_8 _2_.pdf
PDF
CLIMATE CHANGE AS A THREAT MULTIPLIER: ASSESSING ITS IMPACT ON RESOURCE SCARC...
PPT
features and equilibrium under MONOPOLY 17.11.20.ppt
DTC TRADIND CLUB MAKE YOUR TRADING BETTER
The Right Social Media Strategy Can Transform Your Business
How to join illuminati agent in Uganda Kampala call 0782561496/0756664682
Principal of magaement is good fundamentals in economics
social-studies-subject-for-high-school-globalization.pptx
kyc aml guideline a detailed pt onthat.pptx
5a An Age-Based, Three-Dimensional Distribution Model Incorporating Sequence ...
Lecture1.pdf buss1040 uses economics introduction
Statistics for Management and Economics Keller 10th Edition by Gerald Keller ...
introuction to banking- Types of Payment Methods
Dialnet-DynamicHedgingOfPricesOfNaturalGasInMexico-8788871.pdf
USS pension Report and Accounts 2025.pdf
Financial discipline for educational purpose
PPT-Lesson-2-Recognize-a-Potential-Market-2-3.pptx
Chapter 9 IFRS Ed-Ed4_2020 Intermediate Accounting
discourse-2025-02-building-a-trillion-dollar-dream.pdf
Pitch Deck.pdf .pdf all about finance in
NAPF_RESPONSE_TO_THE_PENSIONS_COMMISSION_8 _2_.pdf
CLIMATE CHANGE AS A THREAT MULTIPLIER: ASSESSING ITS IMPACT ON RESOURCE SCARC...
features and equilibrium under MONOPOLY 17.11.20.ppt

Metso Capital Markets Day 2013 presentations: Harri Nikunen, CFO

  • 1. Building on a strong financial foundation Harri Nikunen CFO November 27, 2013 London, UK
  • 2. 1 Main financials 2 Balance sheet, cash flow & financing 3 Other topics Financial information for Metso’s continuing operations is unaudited and illustrative. Accounting principles are presented in a stock exchange release published on September 23, 2013
  • 3. Metso by business type in 2012 EUR million • Project business operates with a 216 flexible business model and a light balance sheet • Equipment and product business ties 1,483 2,072 up more capital employed, but good margins secure good returns • Services business is central to building strong customer relationships and offers good profitability and returns 728 Service business Equipment and product business Project business Valmet Automotive 3 © Metso Capital Markets Day 2013
  • 4. Big mining orders have been missing since 2012 Orders received for continuing operations,12-month rolling EUR Million Mining orders at an all time high 6,000 5,000 4,000 3,000 2,000 Services 4 © Metso Capital Markets Day 2013 Capital equipment 08/13 06/13 04/13 02/13 12/12 10/12 08/12 06/12 04/12 02/12 12/11 10/11 08/11 06/11 04/11 02/11 12/10 10/10 08/10 06/10 04/10 02/10 0 12/09 1,000
  • 5. Orders by quarter Continuing operations EUR million 2,000 1,800 1 533 1,600 1,400 1 185 1,200 1,000 800 650 778 842 871 1 245 1 125 1 151 1 011 904 874 1 025 1 078 1 025 869 564 570 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 2009 600 579 2009 2009 2009 2010 2010 2010 2010 2011 2011 2011 2011 2012 2012 2012 2012 2013 2013 2013 400 200 0 Services orders received, ext. 5 © Metso Capital Markets Day 2013 Capital orders received, ext.
  • 6. Annual orders received Continuing operations EUR million 2009 2010 2011 2012 1-9/2013 Mining and Construction capital 737 1,313 2,103 1,658 905 Automation capital 270 337 407 404 339 1,035 1,322 1,604 1,771 1,255 265 309 352 382 326 56 84 281 216 148 2,363 3,365 4,747 4,432 2,972 344 745 1,416 1,102 519 Mining and Construction services Automation services Valmet Automotive Total Mining equipment 6 © Metso Capital Markets Day 2013
  • 7. Healthy order backlog of EUR 2.1 billion – services backlog higher than ever EUR million EUR million, September 2013 3,000 2,500 2,500 2,000 2,000 1,500 1,500 1,000 1,000 500 500 0 2009 2010 2011 Mining and Construction 7 Around 45% of deliveries for 2013 consist of services orders © Metso Capital Markets Day 2013 2012 Automation 2013 0 Deliveries in 2013 Deliveries after 2013
  • 8. Net sales for continuing operations Rolling 12 months EUR Million 5,000 4,500 4,000 3,500 3,000 2,500 2,000 1,500 1,000 Services 8 © Metso Capital Markets Day 2013 Capital equipment 08/13 06/13 04/13 02/13 12/12 10/12 08/12 06/12 04/12 02/12 12/11 10/11 08/11 06/11 04/11 02/11 12/10 10/10 08/10 06/10 04/10 02/10 0 12/09 500
  • 9. Profit & loss statement Continuing operations EUR million 2012 1-9/2013 Net sales 4,499 2,989 Operating profit 463 299 Net financial income and expenses -59 -43 Profit before taxes 404 256 Amortization of intangible assets -20 -16 Depreciation of tangible assets -57 -46 -11.9 0 0 -1 Other NRE -0,4 -20.7 Operating profit 463 299 10.3% 10.0% EBITA, before non-recurring items 495.3 336.7 EBITA-%, before non-recurring items 11.0% 11.3% 540 361 12.0% 12.1% Non-recurring items Capacity adjustment expenses Cost related to demerger process Operating profit -% EBITDA EBITDA-% 9 © Metso Capital Markets Day 2013
  • 10. EBITA before NRE Continuing operations % EUR Million 5,000 11.0 11.2 11.3 4,500 10 4,000 3,500 8 3,000 2,500 6 2,000 4 1,500 1,000 2 500 0 2012 Net sales 10 © Metso 12 Capital Markets Day 2013 Q2 / 2013 Q3 / 2013 EBITA % before non-recurring items 0
  • 11. Return on capital employed targeted to exceed 30% (excl. impact of major acquisitions) Continuing operations % 19.5 19.2 19 18.5 18 17.6 17.5 16.9 17 16.5 16 15.5 11 2012 © Metso Capital Markets Day 2013 1-6/2013 1-9/2013
  • 12. Earnings per share Continuing operations EUR 2.0 1.82 1.8 1.6 1.4 1.21 1.2 1.0 0.8 0.71 0.6 0.4 0.2 0.0 12 2012 © Metso Capital Markets Day 2013 1-6/2013 1-9/2013
  • 13. EBITA-% before NRE and ROCE-% Mining and Construction & Automation EBITA-% before NRE % Operational ROCE-% 45.0 16.0 13.5 14.0 12.0 12.0 11.2 13.0 12.6 11.1 10.9 11.8 39.0 40.0 35.3 35.0 31.8 28.9 30.0 10.0 25.0 24.3 25.3 28.7 25.2 8.0 20.0 6.0 15.0 4.0 10.0 2.0 0.0 5.0 0.0 Mining and Construction 2010 13 © Metso 2011 Automation 2012 Capital Markets Day 2013 1-9/2013 Mining and Construction 2010 2011 Automation 2012 1-9/2013
  • 14. We have a strong financial foundation Net sales1 EBITA before NRI1 Operational ROCE1 EUR billion EUR million Percentage CAGR (2006-12) 7.5% 1.2 1.2 1.2 3.3 2.8 12.4% 1.1 3.7 1.0 2.9 4.4 3.7 1.0 Average margin (2006-12) 14.1% 13.9% 12.0% 11.2% 11.5% 14.0% 10.3% 3.1 463 0.8 -06 -07 Equipment 14 © Metso -09 390 -10 -11 35.1% 34.9% 31.3% 30.2% 24.0% 25.0% 20.2% 428 344 Strong return on capital Improving profitability Services CAGR 9.0% -08 Average (2006-12) 521 517 305 Services 28.7% -12 Book-to-bill ratio Capital Markets Day 2013 -06 -07 -08 EBITA -09 -10 -11 -12 -06 -07 EBITA-% 1) Combined Mining and Construction and Automation figures unless otherwise noted -08 -09 -10 ROCE-% -11 -12
  • 15. Balance sheet Continuing operations EUR million 2012 Dec 2013 Sep Balance sheet total 4,000 3,915 Total non-current assets 1,110 1,261 Goodwill 442 448 Other intangible assets 120 117 Property, plant and equipment 392 478 Financial and other non-current assets 156 218 Total current assets 2,890 2,654 Equity 1,359 1,232 Interest-bearing liabilities 1,094 1,107 Net debt 385 491 Gearing 28.3% 39.9% ROCE before taxes 19.2% 17.6% ROCE after taxes 13.8% 12.9% n/a 36.5% Equity to assets ratio 15 © Metso Capital Markets Day 2013
  • 16. Balance sheet structure as of September 30, 2013 Continuing operations EUR million 4,500 3,915 4,000 3,000 448 Goodwill 3,500 813 Fixed assets 2,500 Inventories 2,000 1,500 1,000 Other receivables* Capital Markets Day 2013 616 Equity 1,070 Other liabilities Net working capital 112 394 1,004 0 © Metso 1,232 1,034 Bank and cash 500 and interestbearing receivables 16 3,915 Net interest bearing loans 1,107 Provisions Advances received Interestbearing debt
  • 17. Capital employed Continuing operations MEUR 20% 3,000 2,500 19% 2,000 18% 1,500 17% 1,000 16% 500 0 2012 Net working capital 17 © Metso Q2/2013 Fixed assets Capital Markets Day 2013 Goodwill Interest bearing and non-operative items Q3/2013 ROCE-% before taxes 15%
  • 18. Net debt and net working capital Continuing operations Net debt and gearing Net working capital and NWC to net sales EUR million 1200 % 60 48.0 1000 39.9 800 50 EUR million 800 700 692 16 15.2 14.4 580 600 40 13.7 630 14 12 565 600 491 385 400 20 200 10 0 0 Net Debt 18 30 © Metso Capital Markets Day 2013 Gearing 500 10 400 8 300 6 200 28.3 4 100 2 0 0 Net working capital, EUR NWC, as % of net sales %
  • 19. Net working capital Mining and Construction & Automation MEUR 900 25% 800 20% 700 600 15% 500 400 10% 300 200 5% 100 0 2008 2009 2010 NWC 19 © Metso Capital Markets Day 2013 2011 NWC/NS -% 2012 Q3 / 2013 0%
  • 20. Gross capital expenditure Continuing operations MEUR 160 250% 140 200% 120 100 150% 80 100% 60 40 50% 20 0 A2005 A2006 A2007 Gross capex 20 © Metso Capital Markets Day 2013 A2008 Capex acquisitions A2009 A2010 A2011 A2012 Q3 A2013 Gross capex / depreciations and amortizations -% 0%
  • 21. Free cash flow Continuing operations 500 125% 450 140% 114% 120% 400 100% 350 300 80% 250 60% 200 150 40% 100 20% 50 0 2008 2009 2010 Free cash flow 21 © Metso Capital Markets Day 2013 2011 2012 Cash conversion -% From 2006 onwards only maintenance investments are included in FCF. 1-9/2013 0%
  • 22. Capital structure ratios Continuing operations % 90 80 70 60 48.0 50 36.1 40 36.5 39.9 28.3 30 20 10 0 2012 Equity to assets ratio -% 22 © Metso Capital Markets Day 2013 Q2/2013 Gearing -% Q3/2013 Debt to capital -%
  • 23. Funding facilities Corporate-level funding facilities as of October 10, 2013, excluding loans to be transferred to Valmet • EUR 1.5 billion EMTN program - EUR 200 million 7.25% bond due in 2014 EUR 400 million 2.75% bond due in 2019 EUR 174 million private placements due in 2018 – 2022 • Bilateral long-term loans: EUR 5 million maturing in January 2014 • Syndicated long-term loan: USD 287 million maturing in 2018 • Committed EUR 500 million 5-year syndicated revolving credit facility available until 2015 (currently undrawn) • • EUR 500 million domestic CP program 23 Uncommitted lines of credit © Metso Capital Markets Day 2013
  • 24. Debt and maturity structure Excluding loans to be transferred to Valmet MEUR October 10, 2013 2000 1800 1600 Undrawn committed facilities 1400 1200 Short-term debt 1000 Other long-term debt Syndicated long-term debt 800 Private placements 600 400 Euro Bond 2014 Euro Bond 2011 200 Euro Bond 2019 0 1.1.2011 09/2011 06/2012 03/2013 10/2013 06/2014 03/2015 12/2015 09/2016 06/2017 03/2018 12/2018 YTD Monthly 24 © Metso Capital Markets Day 2013 Maturities monthly >
  • 25. Balance sheet & financing • Metso’s capital allocation policy is based on a commitment to maintain the Group investment grade rating and honor Metso’s dividend policy • Metso’s business portfolio and business model generate solid cash flows both good and less good times • All balance sheet key indicators indicate solid capital management, and improvement of net working capital management remain high on the agenda • Financial measures and the balance sheet impact are seen as key M&A criteria 25 © Metso Capital Markets Day 2013
  • 26. EUR 100 million global efficiency program under way Announced on October 24, 2013 Two phases – fast track and structural / development projects • Fast track = project identified and ongoing at different stages - 26 Projects announced Large number of other ongoing but unannounced projects • Divestment of parts of the industrial conveyor belt business in Europe • Restructuring of the metal recycling business • Union negotiations related to Finnish foundry operations • Restructuring of the EMEA sales and services organization • Transfer or closure of small operations in various countries • Resizing of Metso’s headquarters • Restructuring of Process Automation Systems Most of the decisions will be taken in 2013, leading to one time costs in 2013 Decisions and costs will also affect 2014 The identified gross savings are EUR 60 – 80 million and we expect to have the full run rate during late 3Q/2014 © Metso Capital Markets Day 2013
  • 27. EUR 100 million global efficiency program under way Announced October 24, 2013 Two phases – fast track and structural / development pojects • Structural and development projects = projects in the planning pipeline (2014 decisions) - Streamlining of support functions Streamlining of legal structure New projects derived from cost structure studies Capacity adjustment needs related to unexpected demand changes The improvement impact is neing assessed and not part of the EUR 60 – 80 million fast track project referred to before • Global effeciency program also includes our global procurement development activitities. We are targeting annual savings between EUR 30 – 50 million - 27 In 2013, we expect to save EUR 20 – 30 million © Metso Capital Markets Day 2013
  • 28. Guidance & market outlook terms Guidance: Market outlook: At around = +/- 0 - 5% on EUR-based net sales and EBITA Excellent = Demand exceeding supply and excellent pricing environment At around = +/- 0 - 0.5% on EBITA -% Good = Demand and supply in balance Somewhat = +/- 5 - 10% on EUR-based and healthy pricing environment net sales and EBITA Satisfactory = Supply exceeds demand and more work is needed to fill capacity. OR Pricing is becoming more volatile Somewhat = +/- 0.5 –1.0% on EBITA -% Weak = Buyers market! Suppliers have Significant = +/- > 10% on EUR-based overcapacity and pricing may become net sales and EBITA unhealthy OR Significant = +/- > 1.0% on EBITA -% 28 © Metso Capital Markets Day 2013
  • 29. Backlog coverage & delivery times Automation Mining and Construction Flow control = Normal backlog covers 5-6 months of net sales Minerals processing systems = High project content; coverage ~1 year Process automation system = High project content; coverage ~1 year Construction equipment = Normal backlog covers 3-4 months Services = Coverage 2-3 months on average Services = Coverage 3-4 months on average In general, when delivery times (backlog coverage) get longer the better the market conditions are. Largest change takes place in major build-to-order equipment. 29 © Metso Capital Markets Day 2013