T he never ending  CYCLE in the  5 Steps to Kaizen   5.   Kaizen-Layout 4.   Kaizen-Equipment   3.   Kaizen-Flow & Process 2.   Standardization Observation to become a lean, agile enterprise KAIZEN  F UNDAMENTS KAIZEN eyes for :        the identification and     elimination of Waste  Fluctuation Unreasonable Practices Muda - Mura - Muri Plan - Do - Check - Action- Man - Machine - Material MFG SOURCE:   Implement the best possible, lean combination of the 3M’s UTILIZE CONCEPT :focusing on the 3S’s (SSS tip) Standardization, Simplification,  Specialization
KAIZEN BASIC CONCEPTS Basic But Important Concepts For Kaizen Immediate Kaizen Opportunities Motion Kaizen Material Presentation Kaizen Material Replenishment Kaizen Support the Operator  Find Interruptions  Cycle Time Interruption Management Types of Processes Internal Process External Process Types of Scenarios Normal Scenarios Abnormal Scenarios Plan - Do - Check - Action-
1. OBSERVATION What is happening on the work area? Watch, review, and record each step of the process Break down the process and motion into discrete steps Identify sources of variation in material and information flow Identify all interruptions and their cycle time Identify opportunities for standardization Maintenance systems Quality systems Material systems Management systems Cell processes Information systems Plan - Do - Check - Action-
1. OBSERVATION After an initial observation: Make a process “vision” for each department / area  Track progress using a map based on the 5 kaizen steps Observation – Standardization – Flow – Machine - Layout Plan - Do - Check - Action Review and plan on weekly basis Transfer ownership of lean implementation to area managers Increase overall employee participation in lean implementation Implement countermeasures  Why Standardization, Why Can not? Each activity, motion, method, or process is performed in the same manner,  every time It provides predictability and the values for measuring performance It provides the starting point for Kaizen activity It is everyone’s responsibility to perform but management’s responsibility to enforce Plan - Do - Check - Action-
Interruptions must be standardized and then eliminated, Interruptions are management issues, not operators’ issues Interruptions must be categorized as normal operating interruptions and extra ordinary interruptions Normal interruptions are cyclical and must have countermeasures developed to ensure the material flow continues material replenishment, preventive maintenance, operator support, work place organization, training, etc Management must support the operators and prevent interruptions 2. STANDARDIZATION Plan - Do - Check - Action-
Management must learn how to take advantage of interruptions based on the interruption’s cycle time while working to eliminate them Standardization allow predictability, and predictability allows to take advantage of interruptions Extra ordinary interruptions must have a standard process to deal with them Extra ordinary interruptions must be normalized and converted into normal interruptions 2. STANDARDIZATION % 80/20 Plan - Do - Check - Action- INTERRUPTION MANAGEMENT: ESTABLISH STANDARDS FOR NORMAL SCENARIOS ESTABLISH STANDARDS FOR ABNORMAL SCENARIOS ABNORMAL, BUT NORMAL ABNORMAL NORMALIZE ABNORMAL SCENARIOS ONE LEVEL DOWN % 80/20 % 80/20 % 80/20
Flow & Process Kaizen Improve the material and information flow on or to the work area Re-balance and combine various parts of the baseline process (improve man/machine ratios) Improve all routes (scrap, audit, maintenance, material, rejects) in order to support the operator and the process 3.   KAIZEN-FLOW   & PROCESS Plan - Do - Check - Action-
Equipment /  Tooling / Machine Kaizen All improvements should support the operator Improve fixture placement and / or fixture design Improve machine cycle times Simplify machines and shrink tables / stands Group but do not combine process steps Standardize and simplify health & safety protection devices 4. KAIZEN-EQUIPMENT   Plan - Do - Check - Action-
(Cell) Layout Kaizen Improve the Man-Machine-Material ratios through changes to the overall layout of the cell Scope can be simple rearrangement or complete cell shape/flow re-design 5. KAIZEN-LAYOUT Plan - Do - Check - Action-
LEAN   IMPLEMENTATIO   THROUGH KAIZEN Implementation Method N Focus lean implementation efforts on the  Five Kaizen Steps Utilize standard approach and if necessary worksheets for the five steps Create a process layout “vision” for each work area (3-6 month period) Lean activities progress reviews Review and plan weekly lean activity by area Transfer ownership of lean implementation to area managers Increase overall employee participation in lean implementation Plan - Do - Check - Action-

More Related Content

PPTX
Muda,Mura & Muri
PPT
Muda,muri,mura
PPTX
Poka Yoke in Manufacturing
PDF
Journey to a Lean Enterprise: New Frontiers
PDF
Manufacturing Excellence - Visual Factory
PPT
Kaizen
PPT
Poke yoke
PPTX
Lean Fundamentals Overview Webinar
Muda,Mura & Muri
Muda,muri,mura
Poka Yoke in Manufacturing
Journey to a Lean Enterprise: New Frontiers
Manufacturing Excellence - Visual Factory
Kaizen
Poke yoke
Lean Fundamentals Overview Webinar

What's hot (20)

PPTX
Lean manufacturing ppt
PPTX
Poka Yoke Final Ppt
PPTX
PPTX
Lean Manufacturing
PDF
Kaizen Event Guide
PPT
Kaizen Training
PDF
Poka yoke (mistake proofing)
PDF
Kaizen PDCA Cycle Process PowerPoint Presentation Slides
PPTX
Kaizen
PPT
16 major losses tng
PPTX
Process improvement presentation
PPT
Kaizen Ppt
PPTX
Poka yoke
PDF
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
PPTX
Kaizen
PDF
A Kaizen - Continues Improvement
PPTX
Pareto Analysis
Lean manufacturing ppt
Poka Yoke Final Ppt
Lean Manufacturing
Kaizen Event Guide
Kaizen Training
Poka yoke (mistake proofing)
Kaizen PDCA Cycle Process PowerPoint Presentation Slides
Kaizen
16 major losses tng
Process improvement presentation
Kaizen Ppt
Poka yoke
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
Kaizen
A Kaizen - Continues Improvement
Pareto Analysis
Ad

Viewers also liked (20)

PPSX
Gemba Kaizen
PDF
Free Kaizen guide
PPTX
Kaizen: Good Change with Small Steps
PDF
One Small Step Can Change Your Life: The Kaizen Way by Robert Maurer Ph.D
PPTX
Kaizen Seminar Presentation
PDF
Kaizen Ppt
PDF
Kaizen training
PPTX
How to Do a Gemba Walk
PPT
Gemba Kaizen - TEDO
PDF
[Công nghệ may] tài liệu tiếng anh về kaizen 5s
PDF
Kaizen - the key of continuos improvement
PPTX
Sixsigma
DOCX
6 steps Kaizen Eng
PPT
Kaizen management
PPTX
Total quality management
PPTX
Introduction to computing
PDF
Crisis Communication. 위기를 대비 한 커뮤니케이션 체크리스트 : 체계와 원칙
PDF
شركة سبيرولا للأنظمة والجمعية المصرية للمصادر المفتوحة
PPT
Pptx (3)
PPT
Teaching Lean Workshop Shs Asq Poole Hinton Kraebber 2010 02 25
Gemba Kaizen
Free Kaizen guide
Kaizen: Good Change with Small Steps
One Small Step Can Change Your Life: The Kaizen Way by Robert Maurer Ph.D
Kaizen Seminar Presentation
Kaizen Ppt
Kaizen training
How to Do a Gemba Walk
Gemba Kaizen - TEDO
[Công nghệ may] tài liệu tiếng anh về kaizen 5s
Kaizen - the key of continuos improvement
Sixsigma
6 steps Kaizen Eng
Kaizen management
Total quality management
Introduction to computing
Crisis Communication. 위기를 대비 한 커뮤니케이션 체크리스트 : 체계와 원칙
شركة سبيرولا للأنظمة والجمعية المصرية للمصادر المفتوحة
Pptx (3)
Teaching Lean Workshop Shs Asq Poole Hinton Kraebber 2010 02 25
Ad

Similar to 5 Steps Kaizen (20)

PDF
CMRP PPT ABOUT THE INDUSTRY NAMASTE AND ALL ASSETS
PPT
PPT
Chapter-4-Motion_and_Time_Study in industry.ppt
PPTX
TPM - Total Productive Maintenance
PPT
Lean Bski Essentials
PPTX
tpm presentation
PPT
Zero Tolerancev
PPTX
Lean Management Basics
PDF
What is Lean Maintenance
PDF
PPT
Lean operations presentation
PPT
Motion & time study
PDF
Motion and time study
PPT
Tpm (group 8)
PPTX
Autonomous_Maintenance_Part_1.pptx
PPT
5 S Presentation
CMRP PPT ABOUT THE INDUSTRY NAMASTE AND ALL ASSETS
Chapter-4-Motion_and_Time_Study in industry.ppt
TPM - Total Productive Maintenance
Lean Bski Essentials
tpm presentation
Zero Tolerancev
Lean Management Basics
What is Lean Maintenance
Lean operations presentation
Motion & time study
Motion and time study
Tpm (group 8)
Autonomous_Maintenance_Part_1.pptx
5 S Presentation

5 Steps Kaizen

  • 1. T he never ending CYCLE in the 5 Steps to Kaizen 5. Kaizen-Layout 4. Kaizen-Equipment 3. Kaizen-Flow & Process 2. Standardization Observation to become a lean, agile enterprise KAIZEN F UNDAMENTS KAIZEN eyes for :        the identification and    elimination of Waste Fluctuation Unreasonable Practices Muda - Mura - Muri Plan - Do - Check - Action- Man - Machine - Material MFG SOURCE: Implement the best possible, lean combination of the 3M’s UTILIZE CONCEPT :focusing on the 3S’s (SSS tip) Standardization, Simplification, Specialization
  • 2. KAIZEN BASIC CONCEPTS Basic But Important Concepts For Kaizen Immediate Kaizen Opportunities Motion Kaizen Material Presentation Kaizen Material Replenishment Kaizen Support the Operator Find Interruptions Cycle Time Interruption Management Types of Processes Internal Process External Process Types of Scenarios Normal Scenarios Abnormal Scenarios Plan - Do - Check - Action-
  • 3. 1. OBSERVATION What is happening on the work area? Watch, review, and record each step of the process Break down the process and motion into discrete steps Identify sources of variation in material and information flow Identify all interruptions and their cycle time Identify opportunities for standardization Maintenance systems Quality systems Material systems Management systems Cell processes Information systems Plan - Do - Check - Action-
  • 4. 1. OBSERVATION After an initial observation: Make a process “vision” for each department / area Track progress using a map based on the 5 kaizen steps Observation – Standardization – Flow – Machine - Layout Plan - Do - Check - Action Review and plan on weekly basis Transfer ownership of lean implementation to area managers Increase overall employee participation in lean implementation Implement countermeasures Why Standardization, Why Can not? Each activity, motion, method, or process is performed in the same manner, every time It provides predictability and the values for measuring performance It provides the starting point for Kaizen activity It is everyone’s responsibility to perform but management’s responsibility to enforce Plan - Do - Check - Action-
  • 5. Interruptions must be standardized and then eliminated, Interruptions are management issues, not operators’ issues Interruptions must be categorized as normal operating interruptions and extra ordinary interruptions Normal interruptions are cyclical and must have countermeasures developed to ensure the material flow continues material replenishment, preventive maintenance, operator support, work place organization, training, etc Management must support the operators and prevent interruptions 2. STANDARDIZATION Plan - Do - Check - Action-
  • 6. Management must learn how to take advantage of interruptions based on the interruption’s cycle time while working to eliminate them Standardization allow predictability, and predictability allows to take advantage of interruptions Extra ordinary interruptions must have a standard process to deal with them Extra ordinary interruptions must be normalized and converted into normal interruptions 2. STANDARDIZATION % 80/20 Plan - Do - Check - Action- INTERRUPTION MANAGEMENT: ESTABLISH STANDARDS FOR NORMAL SCENARIOS ESTABLISH STANDARDS FOR ABNORMAL SCENARIOS ABNORMAL, BUT NORMAL ABNORMAL NORMALIZE ABNORMAL SCENARIOS ONE LEVEL DOWN % 80/20 % 80/20 % 80/20
  • 7. Flow & Process Kaizen Improve the material and information flow on or to the work area Re-balance and combine various parts of the baseline process (improve man/machine ratios) Improve all routes (scrap, audit, maintenance, material, rejects) in order to support the operator and the process 3. KAIZEN-FLOW & PROCESS Plan - Do - Check - Action-
  • 8. Equipment / Tooling / Machine Kaizen All improvements should support the operator Improve fixture placement and / or fixture design Improve machine cycle times Simplify machines and shrink tables / stands Group but do not combine process steps Standardize and simplify health & safety protection devices 4. KAIZEN-EQUIPMENT Plan - Do - Check - Action-
  • 9. (Cell) Layout Kaizen Improve the Man-Machine-Material ratios through changes to the overall layout of the cell Scope can be simple rearrangement or complete cell shape/flow re-design 5. KAIZEN-LAYOUT Plan - Do - Check - Action-
  • 10. LEAN IMPLEMENTATIO THROUGH KAIZEN Implementation Method N Focus lean implementation efforts on the Five Kaizen Steps Utilize standard approach and if necessary worksheets for the five steps Create a process layout “vision” for each work area (3-6 month period) Lean activities progress reviews Review and plan weekly lean activity by area Transfer ownership of lean implementation to area managers Increase overall employee participation in lean implementation Plan - Do - Check - Action-