7 Reasons Why Configurator Projects Fail
A “by the numbers” guide on how to make your project a success
For sales, product, process or workflow configuration projects
Contents




  Contents ...............................................................................................................2
  1: Not Strategic ...................................................................................................4
  2: Just Another IT Project ...................................................................................6
  3: Doesn’t Integrate ............................................................................................7
  4: No Input from Users .......................................................................................8
  5: Limited Deployment Options .........................................................................9
  6: Difficult to Use ..............................................................................................10
  7: No Support for Complex Knowledge .........................................................12
  Suggested Actions ............................................................................................15
Introduction                                                                                     3




   Jimi Hendrix: Are You Experienced?
   Without configuration technology, vendors have to rely on creative salespeople to
   visualize product solutions that might address needs described by prospects.
   Prospects have to learn to make do with solutions that may only partially address a
   need.

   There are times when this inaccurate process may work, but it is a strategy loaded
   with risk, high cost and a high failure rate.

   Consider the ‘60s guitar icon, Jimi Hendrix. During his short career, Jimi was
   frequently seen playing a white Fender Stratocaster guitar. If you happen to know
   anything about guitars, you will likely notice in photos that Jimi is playing a right-
   hand-model Strat even though he was a lefty. He played the instrument upside down
   and restrung with the string positions reversed.

   Was this intentional? Was there some perceived benefit to this configuration? Did a
   creative salesperson with no left-hand model guitars in stock sell a right-hand model
   to Jimi? There are stories that support either scenario.

   It is safe to say that the manufacturer did not offer this as an optional configuration. In
   addition, it is not likely that any right-hand guitarist would buy a left-hand model and
   restring it as an alternative to buying the right-hand model to begin with.
Reason 1: Not Strategic                                                                        4




   Reason # 1 – The configurator is not
   seen as strategic and doesn’t have
   backing from senior management.
   There is a great temptation to look at these projects as a simple technology solution
   applied to the sales transaction process. After all, the sales rep and managers get
   some software loaded onto their PCs, the software communicates with assorted back-
   office systems and “poof” the sales rep is instantly more productive. Senior
   management will be needed to help “tear down” those silos or walls within the
   enterprise and to motivate all involved. Without that muscle, the project will
   compromise itself into failure.

   By the Numbers – Getting Senior Management Buy-In
   1.1 Link the configurator project to the strategic plan. Before the project even gets
       started, it is best to review the strategic plan to see how this particular
       configurator project will help upper management accomplish their goals. A SWOT
       (Strengths, Weaknesses, Opportunities and Threats) analysis is a great format that
       many senior managers understand.
   1.2 Obtain buy-in from other internal groups. A configurator project touches many
       parts of the organization (Sales, IT, Engineering, Operations, etc.), so it is a good
       idea to gain allies from different groups before the project begins.
   1.3 Show the problem. Senior managers tend to be visually oriented. Simple graphics
       showing the present quote-to-order system and the proposed system will keep
       their interest. Linking the ROI (return on investment) to these diagrams will help
       the executives quickly see how the project is an essential investment.
Reason 1: Not Strategic               (continued)                                          5




   1.4 Conduct an assessment. Low-cost assessments or informal surveys can be
       created. Senior management will pay more attention to an internal request that is
       supported by statements from their customers and prospects.
   1.5 Develop an internal marketing plan. To many, this may sound like a waste of time.
       However, since problems will occur with any project, having a pre-conceived
       internal marketing plan can squash the “rumor mill.” Plan bi-weekly update
       meetings that show the progress of the project.
   1.6 Create a project plan so that senior management can see how quickly the project
       will translate into dollars.
   Every project will have problems, and some will exceed the budgeted amount.
   Making sure that senior management buys-in to the project before it begins will make
   these hurdles easier to navigate.
Reason 2: Just Another IT Project                                                          6




   Reason # 2 – The configurator project is
   regarded as “just another IT project.”
   The selling process (the configuration process) is spread all over the enterprise and
   touches many groups including sales, IT, engineering, finance, distribution and order
   management. The planning and development of the whole solution must involve all of
   these organizations and must carefully address the requirements of one group while
   simultaneously fulfilling the expectations of the other groups.

   This means involvement from everyone during the planning, system-specification,
   vendor-selection, implementation and training phases of the project. You can’t expect
   IT to “just know” what the organization needs with regard to configuration.

   By the Numbers – Extending the Project beyond IT
   2.1 Solicit requirements input from all levels and all functional groups using the
       system. Kaizen events are a proven tool to accomplish this.
   2.2 Include senior-level managers, users, group managers and professionals on the
       planning team as well as the implementation team.
   2.3 Establish clear goals and milestones for the project.
   2.4 Publish plans and progress reports throughout the implementation project.
   2.5 Survey the user community throughout the implementation process to help
       identify misperceptions, problems and potential conflicts.
   2.6 Report on successes, problems and in particular, solutions developed in response
       to problems identified by the user community.
Reason 3: Doesn’t Integrate                                                                   7




   Reason # 3 – The configurator doesn’t
   integrate appropriately with existing
   CRM or ERP Systems.
   Obviously, any configuration solution is going to have to effectively work with your
   front- and back-office systems in order to work at all. When your project team is in the
   vendor-selection phase, your initial selection should identify those solutions that do
   not work with your existing systems.

   Some Product Configuration vendors have considerable experience in developing
   products that interface well with Oracle, SAP, MS Dynamics, Salesforce.com and other
   products. However, others do not.

   This is a good time to ask for references and testimonials.

   By the Numbers – Assuring Integration with Existing CRM and ERP
   3.1 Inventory existing CRM and ERP systems and identify their footprint within your
       organization.
   3.2 Identify technical and operational ownership for each installed and legacy system.
       These people will need to be actively involved in the planning, selection and
       implementation phases of your configurator project.
   3.3 Obtain technical requirements for integrating the configurator with each CRM
       and ERP system.
   3.4 Require named references from other companies that are currently running the
       chosen system with your incumbent CRM and ERP systems.
   3.5 Evaluate risks associated with integrating the configuration technology with any
       untested CRM and ERP solutions. Be sure these risks are understood and
       acceptable to your implementation team and management.
Reason 4: No Input from Users                                                                      8




  Reason #4 – The configurator project is
  planned without input from the full user
  community.
  This is a community-wide project. It touches virtually everyone from supplier to customer.
  All of these functional elements must be represented in the planning, development and
  implementation phases of the project. For any configurator project to succeed every
  department, division and employee affected needs to have a chance to own the outcomes
  they will be responsible for.

  Growing up, we all experienced that point where clothes Mom and Dad bought for our
  back-to-school wardrobe just were not going to work for us anymore. Either through overt
  refusal to wear certain clothing items or through negotiation, we gained some level of
  input into the clothing selection process.

  The corporate world is no different. Each of your user groups have specific needs and can
  supply unique inputs that will ultimately make the project a success or failure, an okay
  system or an excellent system. Designing a system without this input is an invitation to fail.

  By the Numbers – Assuring Input Is Received from All Appropriate Groups within
  the Organization
  4.1 Publicize the configuration project within the organization. This should be a campaign
      organized and directed toward all groups, departments, divisions and functions
      potentially touched by the project. This should include everyone in the organization.
  4.2 Educate everyone about the importance, scope and reach of the project. Emphasize
      the need for input from all.
  4.3 Survey all areas in the organization touched by the configuration project. Look for any
      special needs, potential problem areas and any useful information that might be
      helpful.
  4.4 Report the findings to specific areas with special concerns or needs.
  4.5 Maintain contact with all affected organizational areas throughout the project.
Reason 5: Limited Deployment Options                                                              9




p u b l i c
hosted
               c l o u d
         on-premise             Reason #5 – The configurator doesn’t
web enabled                     offer multiple deployment and
IaaS   . N E T SaaS             technology options.
                                Best practices in product configuration strategies are dependent on having systems that can
disconnected                    flex and change to meet the changing demands of your business. Deployment options need

PaaS A J A X  private cloud
                                to flex to support the changing direction your business may take, depending on market
                                conditions and demand.

                                Select a vendor or supplier that offers a wide range of deployment and technology options
                                (hosted, on-premise, web-enabled, disconnected, AJAX, .NET, SaaS, PaaS, IaaS, public
                                cloud, private cloud, etc.). Don’t lock up your ability to move or change down the road.

                                To extend the clothing analogy a bit further, consider the Sears Six-Way Suit for men.
                                This garment featured an extra pair of trousers and a reversible vest. All together you
                                could re-configure the thing into six separate outfits. Okay, it didn’t win any designer
                                endorsements, but you have to agree that it does provide flexibility.

                                The world of IT is ever-changing, so it only makes sense to seek flexible solutions where
                                possible; particularly with major investments.

                                By the Numbers – Assuring the Best Deployment Strategy for the Organization
                                5.1 Evaluate the dynamics of your organizational structure. Is your organization growing,
                                    shrinking, merging, acquiring, consolidating, decentralizing or otherwise changing?
                                5.2 Obtain input from your IT group. Are there any major environmental changes in the offing?
                                5.3 Gather input from your systems people. Are your incumbent ERP and CRM systems
                                    stable and likely to remain in place for several years?
                                5.4 Discuss high-level deployment strategies with IT, management and functional heads.
                                    Are there any strong reasons to go one way versus another? Do you have a mobile
                                    sales force? Do you rely on telemarketing? Do you offer web self-service?
Reason 6: Difficult to Navigate                                                                                                                          10




                                                        Reason # 6 – The configurator isn’t easy
                                                        to use.
                                                        If the solution is difficult to use, cryptic in concept and requires routine memorization
                                                        of multiple rules and steps, it will fail. Your solution should simplify a complex process,
                                                        not replace one complex process with another. There are often tradeoffs in
                                                        functionality when simplicity is the primary goal. Make sure your configurator is
                                                        achieving a good balance between these two elements.

                                                        By the Numbers – Optimizing Navigation Options to Your User Group
                                                        6.1 Determine if a needs-based configurator or a parametric configurator is best for
                                                                                                             your users. If the vendor has
                                                                                                             more knowledge than the
                                                                                                             user, a needs-based
                                                                                                             architecture is best. If the user
                                                                                                             is very knowledgeable, then a
                                                                                                             parametric-based configurator
                                                                                                             is the best choice.




Figure 1: The parameter-based user interface (UI)i on the left, and the needs-based user interfaceii on the right show two different approaches to a configurator UI. The parameter-based (parametric)
configurator requires that the user specifically know which options they need. The needs-based interface asks for the importance of different criteria, and selects the components for you.
Reason 6: Difficult to Navigate                   (continued)                              11




                                6.2 Train all users in all aspects of the new system. Build refresher and ongoing
                                    update sessions into your training program.
                                6.3 Survey users 30 to 60 days following implementation to evaluate the effectiveness
                                    of the configurator. Modify the UI as indicated by your survey responses.
                                6.4 Review those areas where simplicity and functionality were at odds, and look for
                                    ways to optimize that balance.




The world is changing at
an accelerating rate and
the strategies that worked
five years ago may no
longer be profitable. Some
configurators are not used
simply because they have
not kept up with
strategies, product
directions and content.
Additionally, your
customers’ needs and
buying habits may be
changing at an increasing
rate. Is your configurator
agile enough to map to
how people want to buy?
More specifically “Is your
configurator relevant to
your customers’ needs?”
Reason 7: No Support for Complex Knowledge                                                   12




  Reason # 7 – The configurator is not
  integrated with a rules or constraint
  engine.
  The more complex your product and sales process, the more important it is to employ
  rules or constraint engine technology in your configuration solution. This is what
  differentiates a true configurator from mere order-entry technology.

  A fast-food outlet cash register equipped with pictures of food products rather than
  numeric keys is not a product configurator.

  A product configurator must look beyond model numbers and inventory part
  availability. A myriad of factors can affect the availability of a product, the
  interrelationship between parts and components and assemblies, the final price and
  specific delivery requirements. Make sure your chosen configurator can handle these
  complex variables.

  By the Numbers – Make Sure Your Configurator Can Handle Complexity
  7.1 Re-evaluate how easy it is to change business rules in your current application.
      Pre-emptive compatibility rules prevent the user from making an invalid selection
      that can virtually eliminate configuration errors. Years of modifications can make a
      “spaghetti code mix” of business rules difficult to untangle. A robust constraint
      engine can represent thousands of business rules with a few hundred constraints.
  7.2 Examine the need for nested configuration constraints. Companies that deliver
      engineer-to-order solutions or systems require the ability to define constraints of
      subassemblies as part of a broader project. Check to make sure the vendor has
      delivered this as part of an actual customer implementation.
Reason 7: No Support for Complex Knowledge                                   (continued)     13




  7.3 Determine if your past solutions have been able to show missing knowledge. The
      modeling environment should automatically highlight missing knowledge.
     Some organizations may use a truth table, but there are limitations to this
     approach. A truth table is a simple, two-dimensional matrix that represents all of
     the possible combinations for a given product, process or service. The first two
     columns in Figure 2 show the inputs, usage and color. The third column
     (UsageToColor) shows the result of combining usage and color.




     Figure 2: A simple truth table with two inputsiii

     At first glance, the truth table above looks complete, but actually data is missing.
     Not all possible combinations are represented, and this is a limitation of truth
     tables. A skilled person can analyze this truth table and find the errors, but a more
     accurate method is to use the data from the truth table and create a decision
     tree. The decision tree in Figure 3 shows the same data from the truth table, but
     it is displayed in a decision-tree format. Notice how two of the leaves of the
     decision tree show up as empty. This induced decision tree shows where
     knowledge is missing, and this is the power of a graphical representation of
     knowledge.
Reason 7: No Support for Complex Knowledge                                                                   (continued)   14




    Figure 3: In the decision tree on the right, the leaves titled “empty” reveal missing knowledge. Someone with a deep
    understanding of truth tables would have to examine the truth table on the left to come to the same conclusion.iv

    An unskilled person can look at this format and quickly see specifically which
    knowledge is missing. Since “90% of the work done on an application throughout
    its lifetime is maintenance … [these] decision trees are even more valuable in the
    maintenance process because the graphical representation makes it easy to make
    changes by dragging and dropping values into the correct tree branch.v”
    As the quote above implies, one must think of the ongoing care and feeding of
    the configurator. A graphical display of knowledge is becoming more and more
    prevalent, and it allows knowledge users to easily make changes.
Suggested Actions                                                                           15




  Cincom is pleased to have the opportunity to present these eBooks. We would
  suggest that you share this eBook with anyone in your organization touched by the
  specific areas discussed. Those people will likely have additional feedback.

  In many cases, this will open up a spirited discussion for change. We can help you
  with that via our consultation services. We have a superb team of professionals who
  are highly experienced in all aspects of CRM, ERP, MRP, sales and product
  configuration; quotation and proposal management; bidding and estimating; process
  improvement; collaboration and sales automation. We offer two consultative tracks for
  our customers. Please visit our websites to sign up or to take a closer look at Cincom.

  Cincom Front-Office Solutions: www.cincomacquire.com
        Pursuing the Perfect Order
        Sales and Product Configuration
        Quotation and Proposal Management
        Pricing
        Eliminating Replication and Waste
        Guided Selling
        Sales Channel Management

  Cincom Back-Office Solutions: www.cincomerp.com
        Order Management
        Operations
        Procurement
        Accounting
        Lean Manufacturing
About the Authors                                                                           16




                   Louis Columbus is a member of the Cincom Complex Manufacturing Business
                   Solutions Team and a former Senior Analyst at AMR Research.

                   Louis Columbus’ career has included senior management positions with Gateway,
                   Ingram Micro and a software start-up, where he served as Vice President, Marketing
                   and Business Development.

                   Mr. Columbus has published 15 books on a variety of technology and currently serves
                   as a weekly columnist with CRMBuyer.com and Informit.com. Mr. Columbus is also
Louis Columbus
                   currently a lecturer for graduate-level International Business and Marketing courses at
                   Webster Loyola-Marymount University.



                   Lou Washington started his career in information management with the University of
                   Missouri System’s Office of Records Management.

                   He joined Tab Products Co. in 1980. After being transferred to Tab’s then corporate
                   HQ in Palo Alto, CA, he was the first Product Manager for Tab’s Tracker systems
                   software products. In addition, he was peripherally involved in Tab’s Laser Optics
                   division. In 1990, Lou returned to Cincinnati and joined Cincom Systems.

                   Mr. Washington’s present role at Cincom is as senior marketing manager in Cincom’s
Lou Washington
                   Manufacturing Business Solutions area.
17




                                 References:
                                 Randall, T.; Terwiesch, C.; and Ulrich, K. (2003). User Design of Customized Products
                                 Ely Dahan and John R. Hauser, “The Virtual Customer,”Journal of Product Innovation
                                 Management, 19/5 (September 2002); 332-353; Jerry Wind and Arvind Rangaswamy.
                                 “Customerization: The Next Revolution in Mass Customization,” Journal of Interactive
                                 Marketing, 15/1 (Winter 2001): 13-32

                                 Endnotes:
                                 i
                                       Randall, Terwiesch & Ulrich (2003) pg. 268
                                 ii
                                       Randall, Terwiesch & Ulrich (2003) pg. 268
                                 iii
                                       Cincom, 2008
                                 iv
                                       Cincom, 2008
                                 v
                                       Cincom, 2005, p. 5




Cincom and the Quadrant Logo are registered trademarks of Cincom Systems, Inc.
All other trademarks belong to their respective companies.

© 2010 Cincom Systems, Inc.
FORM CMUS1001013 01/10
Printed in U.S.A.

All Rights Reserved

More Related Content

PDF
Predictable NPD Execution
PDF
The Art of Building a Process Design Team
PDF
FusionPoint: 11 signs your marketing analytic project may be in trouble
PDF
Crm 8 trends of successful crm projects
PDF
ODT
It Project And Agile
PPTX
Ba tips: the complexity of workshops
PDF
Top 10 Pitfalls Of Am
Predictable NPD Execution
The Art of Building a Process Design Team
FusionPoint: 11 signs your marketing analytic project may be in trouble
Crm 8 trends of successful crm projects
It Project And Agile
Ba tips: the complexity of workshops
Top 10 Pitfalls Of Am

What's hot (20)

PDF
Crm Success
DOCX
Presentation by somdatta banerjee
DOCX
Presentation by subhajit bhattacharya1
PDF
The 7 enablers and constraints of itsm 2011 v1 final
DOCX
importance of resources allocation in formal method of software engineering ...
PDF
Presentation by Gaurav Sapra
PPTX
Aditya Kaul
PDF
JAD Guidelines
PDF
Project management best practices
PDF
Is PPM Enough?
PDF
5 Way PDM can help you succeed through design reuse
PPTX
雲端服務系統之專案管理
DOCX
Presentation by sameer murdeshwar
PDF
Lowering business costs: Mitigating risk in the software delivery lifecycle
PDF
Top10 integrationmistakes whitaker&co_2013
PDF
How to manage organization re-design processes
PDF
Building blocks for lean agile requirements (c) technology expresso v12 @Jacq...
PPTX
Is project failure
PDF
Requirement elicitation
DOCX
Presentation by dakshinamoorthi g
Crm Success
Presentation by somdatta banerjee
Presentation by subhajit bhattacharya1
The 7 enablers and constraints of itsm 2011 v1 final
importance of resources allocation in formal method of software engineering ...
Presentation by Gaurav Sapra
Aditya Kaul
JAD Guidelines
Project management best practices
Is PPM Enough?
5 Way PDM can help you succeed through design reuse
雲端服務系統之專案管理
Presentation by sameer murdeshwar
Lowering business costs: Mitigating risk in the software delivery lifecycle
Top10 integrationmistakes whitaker&co_2013
How to manage organization re-design processes
Building blocks for lean agile requirements (c) technology expresso v12 @Jacq...
Is project failure
Requirement elicitation
Presentation by dakshinamoorthi g
Ad

Similar to 7 reasons why configurator projects fail ebook.pdf' (20)

DOC
Sales up, margins down
PDF
Interactive selling solutions for complex manufacturing
PDF
system-selection-guide_synergist-v106
PDF
Leads360 WP - Why CRM Fails
DOCX
CHAPTER 10 SystemArchitectureChapter 10 is the final chapter.docx
PDF
Synergist System Selection & Implementation Guide
DOCX
Why sandy got fired
PPT
How to select and Implement an ERP System
PDF
Practical tips for implementing corporate performance management system
PDF
How to prevent your tpm project from failing
PPTX
Product Management Essentials
PDF
10 Steps To Successful Enterprise Software Selection
PPTX
Should I Stay or Should I Go
PPTX
Qualitative methods for choosing projects
PPTX
QUALITATIVE METHODS FOR CHOOSING PROJECTS
PDF
How to Overcome CRM User Adoption Barriers
PDF
Everything Guide to Choosing the Right CRM
PPT
From Vision Statement to Product Backlog
PDF
October 2010 - Marketing Roundtable - Todd Smithee
PPTX
Top 10 Reasons Why CRM Implementations Fail
Sales up, margins down
Interactive selling solutions for complex manufacturing
system-selection-guide_synergist-v106
Leads360 WP - Why CRM Fails
CHAPTER 10 SystemArchitectureChapter 10 is the final chapter.docx
Synergist System Selection & Implementation Guide
Why sandy got fired
How to select and Implement an ERP System
Practical tips for implementing corporate performance management system
How to prevent your tpm project from failing
Product Management Essentials
10 Steps To Successful Enterprise Software Selection
Should I Stay or Should I Go
Qualitative methods for choosing projects
QUALITATIVE METHODS FOR CHOOSING PROJECTS
How to Overcome CRM User Adoption Barriers
Everything Guide to Choosing the Right CRM
From Vision Statement to Product Backlog
October 2010 - Marketing Roundtable - Todd Smithee
Top 10 Reasons Why CRM Implementations Fail
Ad

More from Cincom Systems (13)

PPTX
Mobile CPQ for Highly Engineered Custom Products
PPTX
Advanced bidding and estimating for manufacturers of highly engineered products
PDF
2014 Australian Complex Manufacturing and Enterprise Technology Benchmark Report
PPTX
An Expert in Every Chair - Knowledge-enabled MRP
PDF
5 strategies for making manufacturing pay in challenging times
PDF
2013 best practices for aerospace and defense
PDF
Greenheck fan simplifying complex selling for increased market share and a mo...
PDF
Complex selling in today's global economy.pdf'
PDF
Cincom acquire™ enables fassi cranes to reach new heights.pdf'
PDF
Smit textile 100% configuration accuracy with a 60% reduction in quote expens...
PDF
Siemens Profile in Success
PDF
E-ONE Profile in Success
PDF
Alliant Energy Profile in Success
Mobile CPQ for Highly Engineered Custom Products
Advanced bidding and estimating for manufacturers of highly engineered products
2014 Australian Complex Manufacturing and Enterprise Technology Benchmark Report
An Expert in Every Chair - Knowledge-enabled MRP
5 strategies for making manufacturing pay in challenging times
2013 best practices for aerospace and defense
Greenheck fan simplifying complex selling for increased market share and a mo...
Complex selling in today's global economy.pdf'
Cincom acquire™ enables fassi cranes to reach new heights.pdf'
Smit textile 100% configuration accuracy with a 60% reduction in quote expens...
Siemens Profile in Success
E-ONE Profile in Success
Alliant Energy Profile in Success

Recently uploaded (20)

PDF
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
PPTX
Belch_12e_PPT_Ch18_Accessible_university.pptx
PDF
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
PPTX
5 Stages of group development guide.pptx
PDF
MSPs in 10 Words - Created by US MSP Network
PDF
COST SHEET- Tender and Quotation unit 2.pdf
PDF
Training And Development of Employee .pdf
PDF
Reconciliation AND MEMORANDUM RECONCILATION
PDF
Laughter Yoga Basic Learning Workshop Manual
PPTX
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
DOCX
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
PDF
Power and position in leadershipDOC-20250808-WA0011..pdf
PDF
Types of control:Qualitative vs Quantitative
PDF
Nidhal Samdaie CV - International Business Consultant
DOCX
Business Management - unit 1 and 2
PDF
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
PDF
Chapter 5_Foreign Exchange Market in .pdf
PDF
WRN_Investor_Presentation_August 2025.pdf
PPTX
Amazon (Business Studies) management studies
PPTX
Business Ethics - An introduction and its overview.pptx
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
Belch_12e_PPT_Ch18_Accessible_university.pptx
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
5 Stages of group development guide.pptx
MSPs in 10 Words - Created by US MSP Network
COST SHEET- Tender and Quotation unit 2.pdf
Training And Development of Employee .pdf
Reconciliation AND MEMORANDUM RECONCILATION
Laughter Yoga Basic Learning Workshop Manual
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
Power and position in leadershipDOC-20250808-WA0011..pdf
Types of control:Qualitative vs Quantitative
Nidhal Samdaie CV - International Business Consultant
Business Management - unit 1 and 2
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
Chapter 5_Foreign Exchange Market in .pdf
WRN_Investor_Presentation_August 2025.pdf
Amazon (Business Studies) management studies
Business Ethics - An introduction and its overview.pptx

7 reasons why configurator projects fail ebook.pdf'

  • 1. 7 Reasons Why Configurator Projects Fail A “by the numbers” guide on how to make your project a success For sales, product, process or workflow configuration projects
  • 2. Contents Contents ...............................................................................................................2 1: Not Strategic ...................................................................................................4 2: Just Another IT Project ...................................................................................6 3: Doesn’t Integrate ............................................................................................7 4: No Input from Users .......................................................................................8 5: Limited Deployment Options .........................................................................9 6: Difficult to Use ..............................................................................................10 7: No Support for Complex Knowledge .........................................................12 Suggested Actions ............................................................................................15
  • 3. Introduction 3 Jimi Hendrix: Are You Experienced? Without configuration technology, vendors have to rely on creative salespeople to visualize product solutions that might address needs described by prospects. Prospects have to learn to make do with solutions that may only partially address a need. There are times when this inaccurate process may work, but it is a strategy loaded with risk, high cost and a high failure rate. Consider the ‘60s guitar icon, Jimi Hendrix. During his short career, Jimi was frequently seen playing a white Fender Stratocaster guitar. If you happen to know anything about guitars, you will likely notice in photos that Jimi is playing a right- hand-model Strat even though he was a lefty. He played the instrument upside down and restrung with the string positions reversed. Was this intentional? Was there some perceived benefit to this configuration? Did a creative salesperson with no left-hand model guitars in stock sell a right-hand model to Jimi? There are stories that support either scenario. It is safe to say that the manufacturer did not offer this as an optional configuration. In addition, it is not likely that any right-hand guitarist would buy a left-hand model and restring it as an alternative to buying the right-hand model to begin with.
  • 4. Reason 1: Not Strategic 4 Reason # 1 – The configurator is not seen as strategic and doesn’t have backing from senior management. There is a great temptation to look at these projects as a simple technology solution applied to the sales transaction process. After all, the sales rep and managers get some software loaded onto their PCs, the software communicates with assorted back- office systems and “poof” the sales rep is instantly more productive. Senior management will be needed to help “tear down” those silos or walls within the enterprise and to motivate all involved. Without that muscle, the project will compromise itself into failure. By the Numbers – Getting Senior Management Buy-In 1.1 Link the configurator project to the strategic plan. Before the project even gets started, it is best to review the strategic plan to see how this particular configurator project will help upper management accomplish their goals. A SWOT (Strengths, Weaknesses, Opportunities and Threats) analysis is a great format that many senior managers understand. 1.2 Obtain buy-in from other internal groups. A configurator project touches many parts of the organization (Sales, IT, Engineering, Operations, etc.), so it is a good idea to gain allies from different groups before the project begins. 1.3 Show the problem. Senior managers tend to be visually oriented. Simple graphics showing the present quote-to-order system and the proposed system will keep their interest. Linking the ROI (return on investment) to these diagrams will help the executives quickly see how the project is an essential investment.
  • 5. Reason 1: Not Strategic (continued) 5 1.4 Conduct an assessment. Low-cost assessments or informal surveys can be created. Senior management will pay more attention to an internal request that is supported by statements from their customers and prospects. 1.5 Develop an internal marketing plan. To many, this may sound like a waste of time. However, since problems will occur with any project, having a pre-conceived internal marketing plan can squash the “rumor mill.” Plan bi-weekly update meetings that show the progress of the project. 1.6 Create a project plan so that senior management can see how quickly the project will translate into dollars. Every project will have problems, and some will exceed the budgeted amount. Making sure that senior management buys-in to the project before it begins will make these hurdles easier to navigate.
  • 6. Reason 2: Just Another IT Project 6 Reason # 2 – The configurator project is regarded as “just another IT project.” The selling process (the configuration process) is spread all over the enterprise and touches many groups including sales, IT, engineering, finance, distribution and order management. The planning and development of the whole solution must involve all of these organizations and must carefully address the requirements of one group while simultaneously fulfilling the expectations of the other groups. This means involvement from everyone during the planning, system-specification, vendor-selection, implementation and training phases of the project. You can’t expect IT to “just know” what the organization needs with regard to configuration. By the Numbers – Extending the Project beyond IT 2.1 Solicit requirements input from all levels and all functional groups using the system. Kaizen events are a proven tool to accomplish this. 2.2 Include senior-level managers, users, group managers and professionals on the planning team as well as the implementation team. 2.3 Establish clear goals and milestones for the project. 2.4 Publish plans and progress reports throughout the implementation project. 2.5 Survey the user community throughout the implementation process to help identify misperceptions, problems and potential conflicts. 2.6 Report on successes, problems and in particular, solutions developed in response to problems identified by the user community.
  • 7. Reason 3: Doesn’t Integrate 7 Reason # 3 – The configurator doesn’t integrate appropriately with existing CRM or ERP Systems. Obviously, any configuration solution is going to have to effectively work with your front- and back-office systems in order to work at all. When your project team is in the vendor-selection phase, your initial selection should identify those solutions that do not work with your existing systems. Some Product Configuration vendors have considerable experience in developing products that interface well with Oracle, SAP, MS Dynamics, Salesforce.com and other products. However, others do not. This is a good time to ask for references and testimonials. By the Numbers – Assuring Integration with Existing CRM and ERP 3.1 Inventory existing CRM and ERP systems and identify their footprint within your organization. 3.2 Identify technical and operational ownership for each installed and legacy system. These people will need to be actively involved in the planning, selection and implementation phases of your configurator project. 3.3 Obtain technical requirements for integrating the configurator with each CRM and ERP system. 3.4 Require named references from other companies that are currently running the chosen system with your incumbent CRM and ERP systems. 3.5 Evaluate risks associated with integrating the configuration technology with any untested CRM and ERP solutions. Be sure these risks are understood and acceptable to your implementation team and management.
  • 8. Reason 4: No Input from Users 8 Reason #4 – The configurator project is planned without input from the full user community. This is a community-wide project. It touches virtually everyone from supplier to customer. All of these functional elements must be represented in the planning, development and implementation phases of the project. For any configurator project to succeed every department, division and employee affected needs to have a chance to own the outcomes they will be responsible for. Growing up, we all experienced that point where clothes Mom and Dad bought for our back-to-school wardrobe just were not going to work for us anymore. Either through overt refusal to wear certain clothing items or through negotiation, we gained some level of input into the clothing selection process. The corporate world is no different. Each of your user groups have specific needs and can supply unique inputs that will ultimately make the project a success or failure, an okay system or an excellent system. Designing a system without this input is an invitation to fail. By the Numbers – Assuring Input Is Received from All Appropriate Groups within the Organization 4.1 Publicize the configuration project within the organization. This should be a campaign organized and directed toward all groups, departments, divisions and functions potentially touched by the project. This should include everyone in the organization. 4.2 Educate everyone about the importance, scope and reach of the project. Emphasize the need for input from all. 4.3 Survey all areas in the organization touched by the configuration project. Look for any special needs, potential problem areas and any useful information that might be helpful. 4.4 Report the findings to specific areas with special concerns or needs. 4.5 Maintain contact with all affected organizational areas throughout the project.
  • 9. Reason 5: Limited Deployment Options 9 p u b l i c hosted c l o u d on-premise Reason #5 – The configurator doesn’t web enabled offer multiple deployment and IaaS . N E T SaaS technology options. Best practices in product configuration strategies are dependent on having systems that can disconnected flex and change to meet the changing demands of your business. Deployment options need PaaS A J A X private cloud to flex to support the changing direction your business may take, depending on market conditions and demand. Select a vendor or supplier that offers a wide range of deployment and technology options (hosted, on-premise, web-enabled, disconnected, AJAX, .NET, SaaS, PaaS, IaaS, public cloud, private cloud, etc.). Don’t lock up your ability to move or change down the road. To extend the clothing analogy a bit further, consider the Sears Six-Way Suit for men. This garment featured an extra pair of trousers and a reversible vest. All together you could re-configure the thing into six separate outfits. Okay, it didn’t win any designer endorsements, but you have to agree that it does provide flexibility. The world of IT is ever-changing, so it only makes sense to seek flexible solutions where possible; particularly with major investments. By the Numbers – Assuring the Best Deployment Strategy for the Organization 5.1 Evaluate the dynamics of your organizational structure. Is your organization growing, shrinking, merging, acquiring, consolidating, decentralizing or otherwise changing? 5.2 Obtain input from your IT group. Are there any major environmental changes in the offing? 5.3 Gather input from your systems people. Are your incumbent ERP and CRM systems stable and likely to remain in place for several years? 5.4 Discuss high-level deployment strategies with IT, management and functional heads. Are there any strong reasons to go one way versus another? Do you have a mobile sales force? Do you rely on telemarketing? Do you offer web self-service?
  • 10. Reason 6: Difficult to Navigate 10 Reason # 6 – The configurator isn’t easy to use. If the solution is difficult to use, cryptic in concept and requires routine memorization of multiple rules and steps, it will fail. Your solution should simplify a complex process, not replace one complex process with another. There are often tradeoffs in functionality when simplicity is the primary goal. Make sure your configurator is achieving a good balance between these two elements. By the Numbers – Optimizing Navigation Options to Your User Group 6.1 Determine if a needs-based configurator or a parametric configurator is best for your users. If the vendor has more knowledge than the user, a needs-based architecture is best. If the user is very knowledgeable, then a parametric-based configurator is the best choice. Figure 1: The parameter-based user interface (UI)i on the left, and the needs-based user interfaceii on the right show two different approaches to a configurator UI. The parameter-based (parametric) configurator requires that the user specifically know which options they need. The needs-based interface asks for the importance of different criteria, and selects the components for you.
  • 11. Reason 6: Difficult to Navigate (continued) 11 6.2 Train all users in all aspects of the new system. Build refresher and ongoing update sessions into your training program. 6.3 Survey users 30 to 60 days following implementation to evaluate the effectiveness of the configurator. Modify the UI as indicated by your survey responses. 6.4 Review those areas where simplicity and functionality were at odds, and look for ways to optimize that balance. The world is changing at an accelerating rate and the strategies that worked five years ago may no longer be profitable. Some configurators are not used simply because they have not kept up with strategies, product directions and content. Additionally, your customers’ needs and buying habits may be changing at an increasing rate. Is your configurator agile enough to map to how people want to buy? More specifically “Is your configurator relevant to your customers’ needs?”
  • 12. Reason 7: No Support for Complex Knowledge 12 Reason # 7 – The configurator is not integrated with a rules or constraint engine. The more complex your product and sales process, the more important it is to employ rules or constraint engine technology in your configuration solution. This is what differentiates a true configurator from mere order-entry technology. A fast-food outlet cash register equipped with pictures of food products rather than numeric keys is not a product configurator. A product configurator must look beyond model numbers and inventory part availability. A myriad of factors can affect the availability of a product, the interrelationship between parts and components and assemblies, the final price and specific delivery requirements. Make sure your chosen configurator can handle these complex variables. By the Numbers – Make Sure Your Configurator Can Handle Complexity 7.1 Re-evaluate how easy it is to change business rules in your current application. Pre-emptive compatibility rules prevent the user from making an invalid selection that can virtually eliminate configuration errors. Years of modifications can make a “spaghetti code mix” of business rules difficult to untangle. A robust constraint engine can represent thousands of business rules with a few hundred constraints. 7.2 Examine the need for nested configuration constraints. Companies that deliver engineer-to-order solutions or systems require the ability to define constraints of subassemblies as part of a broader project. Check to make sure the vendor has delivered this as part of an actual customer implementation.
  • 13. Reason 7: No Support for Complex Knowledge (continued) 13 7.3 Determine if your past solutions have been able to show missing knowledge. The modeling environment should automatically highlight missing knowledge. Some organizations may use a truth table, but there are limitations to this approach. A truth table is a simple, two-dimensional matrix that represents all of the possible combinations for a given product, process or service. The first two columns in Figure 2 show the inputs, usage and color. The third column (UsageToColor) shows the result of combining usage and color. Figure 2: A simple truth table with two inputsiii At first glance, the truth table above looks complete, but actually data is missing. Not all possible combinations are represented, and this is a limitation of truth tables. A skilled person can analyze this truth table and find the errors, but a more accurate method is to use the data from the truth table and create a decision tree. The decision tree in Figure 3 shows the same data from the truth table, but it is displayed in a decision-tree format. Notice how two of the leaves of the decision tree show up as empty. This induced decision tree shows where knowledge is missing, and this is the power of a graphical representation of knowledge.
  • 14. Reason 7: No Support for Complex Knowledge (continued) 14 Figure 3: In the decision tree on the right, the leaves titled “empty” reveal missing knowledge. Someone with a deep understanding of truth tables would have to examine the truth table on the left to come to the same conclusion.iv An unskilled person can look at this format and quickly see specifically which knowledge is missing. Since “90% of the work done on an application throughout its lifetime is maintenance … [these] decision trees are even more valuable in the maintenance process because the graphical representation makes it easy to make changes by dragging and dropping values into the correct tree branch.v” As the quote above implies, one must think of the ongoing care and feeding of the configurator. A graphical display of knowledge is becoming more and more prevalent, and it allows knowledge users to easily make changes.
  • 15. Suggested Actions 15 Cincom is pleased to have the opportunity to present these eBooks. We would suggest that you share this eBook with anyone in your organization touched by the specific areas discussed. Those people will likely have additional feedback. In many cases, this will open up a spirited discussion for change. We can help you with that via our consultation services. We have a superb team of professionals who are highly experienced in all aspects of CRM, ERP, MRP, sales and product configuration; quotation and proposal management; bidding and estimating; process improvement; collaboration and sales automation. We offer two consultative tracks for our customers. Please visit our websites to sign up or to take a closer look at Cincom. Cincom Front-Office Solutions: www.cincomacquire.com Pursuing the Perfect Order Sales and Product Configuration Quotation and Proposal Management Pricing Eliminating Replication and Waste Guided Selling Sales Channel Management Cincom Back-Office Solutions: www.cincomerp.com Order Management Operations Procurement Accounting Lean Manufacturing
  • 16. About the Authors 16 Louis Columbus is a member of the Cincom Complex Manufacturing Business Solutions Team and a former Senior Analyst at AMR Research. Louis Columbus’ career has included senior management positions with Gateway, Ingram Micro and a software start-up, where he served as Vice President, Marketing and Business Development. Mr. Columbus has published 15 books on a variety of technology and currently serves as a weekly columnist with CRMBuyer.com and Informit.com. Mr. Columbus is also Louis Columbus currently a lecturer for graduate-level International Business and Marketing courses at Webster Loyola-Marymount University. Lou Washington started his career in information management with the University of Missouri System’s Office of Records Management. He joined Tab Products Co. in 1980. After being transferred to Tab’s then corporate HQ in Palo Alto, CA, he was the first Product Manager for Tab’s Tracker systems software products. In addition, he was peripherally involved in Tab’s Laser Optics division. In 1990, Lou returned to Cincinnati and joined Cincom Systems. Mr. Washington’s present role at Cincom is as senior marketing manager in Cincom’s Lou Washington Manufacturing Business Solutions area.
  • 17. 17 References: Randall, T.; Terwiesch, C.; and Ulrich, K. (2003). User Design of Customized Products Ely Dahan and John R. Hauser, “The Virtual Customer,”Journal of Product Innovation Management, 19/5 (September 2002); 332-353; Jerry Wind and Arvind Rangaswamy. “Customerization: The Next Revolution in Mass Customization,” Journal of Interactive Marketing, 15/1 (Winter 2001): 13-32 Endnotes: i Randall, Terwiesch & Ulrich (2003) pg. 268 ii Randall, Terwiesch & Ulrich (2003) pg. 268 iii Cincom, 2008 iv Cincom, 2008 v Cincom, 2005, p. 5 Cincom and the Quadrant Logo are registered trademarks of Cincom Systems, Inc. All other trademarks belong to their respective companies. © 2010 Cincom Systems, Inc. FORM CMUS1001013 01/10 Printed in U.S.A. All Rights Reserved