8-Communication Management
Project Management Training,
Qais Ur Rehman Rasooli, PMP
What is Communication?
• Communication is the transfer of information from one
person to another
• A way of transferring ideas, facts, thoughts ,feelings
• Bridge of meaning over the river of misunderstanding
• Communication is key , PM should spends 90% of his
time communicating,
• Two way communication Process (8 steps)
Develop idea Encode Transmit Receive Decode Understand/Accept Use
Bridgeof
meaning Message
Feedback
Communication management
• Include process that are required to ensure timely and
appropriate:
Planning,Collection,creation,distribution,storage,retrieval,
management,control,monitoring and ultimate disposition
of project information,
• Can be internal or external, verbal or written, formal or
informal,Verticle or horizontal
• Carried out in three steps: Plan , Manage and Control
Communications
1 - Plan Communication Management,
2 – Manage Communications
3 – Control Communications
Plan Communication Management
• Process of developing an appropriate approach
and plan for project communications,
• Based on
- stakeholder information needs and requirements,
- Available OPAs, and Project complexity
• Inadequate communication planning can lead to
delay in message delivery, communication to
wrong audience, misunderstanding,
misinterpretation, insufficient communication
• Communication need to be effective and efficient
Types of Communication
• Type of communication include:
Formal,informal,verbal, written and a combination of these
Communication type Situation used
Formal Written Complex Issues, PMP,Charter,Scope statement,
communicating over long distances
Formal Verbal Presentation, Speeches
Informal Written Email, text messaging,
Informal Verbal Meetings, discussions
Communication Models
• Three main parts:
Message, Sender and receiver
• Factors like receiver environment , language , experience,
culture affect the way the receiver decodes the message
• Communication disturbed by Noise,
• Effective Communication:
Encode message carefully, select the appropriate
communication model to send it, confirm the receipt and
understanding,
• Pay attention to these factors: Nonverbal, Para lingual,
Effective listening
• Watch the speaker to capture facial expression and body
language,
• pay attention to the tone of voice,
• Focus on the content of the message without judgement,
distraction, interpretation,
• Think before responding
• Receiver confirms s/he is listening, express agreement or
disagreement and asks for clarification,
• 7 Steps of effective listening by Mark Horstman: Stop what
you are doing, face the speaker, make eye contact, Smile, nod
and take notes
Communication technology
• Part of planning communications it to identify how to
communicate each item
• Examples include: Face to face interactions, by
telephone, email, instant messaging, blogs, fax,
• To determine the right technology to use for your
communications think of:
What technology works best in this instance,
effectiveness?
What technology is the team very much familiar with
and is easy for them to use?
urgency and confidentiality of the information to be
communicated
Communication Methods
• Interactive Communication (converstions,meetings,instant
messaging, conference calls)
• Push communication (Status reports, emailed updates ,blogs
and company memos)
• Pull communication (Communicating large amount of data to a
large number of users)
Meetings
• Meetings are used during communication planning for the
What,when,how,how often of communication,
• Meetings will be used on the project for exchange of informations,
• Plan effective meetings, to have effective ones during the project,
• Set specific timing for the meeting, set reoccurrence,
• Meet with team regularly, based on needs,
• Have an agenda ready for the meeting and distribute it beforehand,
Stick to the AGENDA,
• Bring the right people together,
• Record Action items, decisions and postponed items,
• Distribute to all the attendees of the meeting and ask for questions
additions or omissions.
Communication channels
• Meetings are used during communication planning for the
What,when,how,how often of communication,
• Meetings will be used on the project for exchange of informations,
• Plan effective meetings, to have effective ones during the project,
• Set specific timing for the meeting, set reoccurrence,
• Meet with team regularly, based on needs,
• Have an agenda ready for the meeting and distribute it beforehand,
Stick to the AGENDA,
• Bring the right people together,
• Record Action items, decisions and postponed items,
• Distribute to all the attendees of the meeting and ask for questions
additions or omissions.
Roles & Responsibilities – Functional
Managers
• Responsibility dependent on the Org Structure,
• Avoid conflict by coordinating need of resources with PM
• Let the PM know how other project will impact resources,
• Provide subject matter expertise,
• Contribute to planning and estimating,
• Approve final PMP,
• Recommend changes,
• Improve staff utilization and influence productivity,
• Assist with problem of team member performance and
development
Roles & Responsibilities – Project
Managers
• Manages the project to meet project objectives
• On big projects they have a team to help them out,
• Responsibilities dependent on the Org structure,
• Read the list on page 342 of Rita PMP Exam prep.
Roles & Responsibilities – Program
Managers
• Works on project and program goals,
• Manages related projects toward program goal,
• Ensure selected project support strategic goals,
• Adjust projects for the program benefits,
• Guiding and supporting individual project manager’s efforts
Roles & Responsibilities – Portfolio
Managers
• Works on project and program to meet strategic goals,
• Responsible for governance at the executive level ,
• Ensure value added by unrelated projects and programs
• Working with senior executives to gather support for projects
and programs,
• Getting the best return from resources invested
Exercise
Plan Human Resource Management
• Process of identifying and documenting project roles and
responsibilities,
• Required skills,
• Reporting relationships,
• Staffing management Plan
Inputs include,
PMP, EEF, OPA, Org charts and Position descriptions, these
include:
RAM, RACI Chart
Plan Human Resource
Management- Tool & Techniques
• Responsibility Assignment Matrix (RAM),
• RACI Chart
• OBS,
• RBS,
Output- Plan Human resource
management
• Human Resource Management Plan:
- Roles and Responsibilities
- Project Org Charts,
- Staffing Management Plan
• Staffing Management Plan: Answer questions like,
Where will the staff come from?
Resource Calendars, Staff release plans, trainings required,
What are the Rewards and Recognitions and their criteria?,
how will resources comply with any HR rules?
What are the safety requirements
1 - Plan Human Resource Management,
2 – Acquire Project team
3 – Develop Project team
4- Manage Project team
Develop Project Team
• Improve team members’ competencies and interaction,
• Improve overall team environment, encourage team work
• PM should provide opportunities and challenges,
• PM provides support and feedback whenever required,
• PM should recognize and reward good performance
• Use of soft skills (mentoring, leadership, negotiation,
emotional intelligence, empathy etc.)
• Communicate effectively, honestly and timely with team
• Capitalize on cultural differences,
• Hold team building activities and encourage good decision
making
Develop Project Team – Tools and
Techniques
Team building Activities:
• Build trust among team members,
• WBS is a team building tool,
• Tuckman's ladder model of team building
Forming, Storming, Norming, Perform
Adjourning,
• Team building is planned before team is created and
implemented all the way through the end of the project,
• Includes things like: taking classes together, milestone
parties, holiday and birthday celebrations, WBS Creation,
outside of work trips, involving in planning.
Develop Project Team – Tools and
Techniques
Ground rules:
• Help establish standards and expectations for the team,
• Honesty, conflict resolution techniques,
• methods to coordinate and approve changes to team
members calendars,
• How meetings will be held
Colocation,
Recognition and Reward,
Output:
Team Performance assessment (Team Effectiveness)
1 - Plan Human Resource Management,
2 – Acquire Project team
3 – Develop Project team
4- Manage Project team
Manage Project Team
• Tracking team member’s performance and providing
feedback,
• Resolving issues and conflicts,
• Manage team changes to optimize team performance,
• Inputs include: HRM Plan, Project staffing, Team
performance assessment, Issue log, Work performance
report, PA
Management and Leadership Styles
• No one way fits all, every situation asks for a specific style,
• Underlying factors are personal style, skill and expertise of
team members and complexity of the project,
• Directing: tell others what to do
• Facilitating: coordinates input from others
• Coaching: helps team member achieve their goals
• Supporting: provides assistance along the way
• Autocratic: Top down approach, power lies with the manager
• Consultive; bottom up approach, uses influence to achieve
results
• Consultive-Autocratic:solicits input but retains decision making
Management and Leadership Styles
• Consensus: Problem solving and decision making based on
group agreement,
• Delegating
• Bureaucratic: procedure focused- appropriate for work where
details are very important
• Charismatic: Energizes and encourages team
• Democratic: encourages team participation in decision-making
• Laissez-faire: Allow to act – used for skilled resources
• Analytical: Interview style communication make tech decisions
• Driver: constantly giving directions
• Influencing: emphasizes teamwork, team building, team DM
Conflict Management
• PM can
avoid many conflicts by:
Informing the team,
Clearly assigning work
Making work assign-
ments interesting,
Following good project management
• Sources of conflict:
Schedules, Project Priorities, Resources, Technical Opinions,
Administrative procedures and Personality
Conflict resolution techniques
• Collaborating (Problem
Solving) – Win-win situation
• Compromising
(Reconciling) – Lose-lose
situation
• Withdrawal (Avoidance)
• Smoothing
(Accommodating)
• Forcing (Directing)
Problem solving method
Identify
Solutions
Analyze the
problem
Define the real or
Root problem , not
the TIP OF THE
ICEBERG
Pick a solution and Implement the solution
Review the solution , and make sure the solution
solved the problem
Lessons
Learned
YesNo
Motivation Theories
• McGregor’s Theory of X and Y:
Theory X: people need to watched every minute, employees
are incapable, avoid responsibility , and avoid work whenever
possible,
Theory Y: People are working willing to work without
supervision and want to achieve, employees can direct their
own efforts.
• Maslow’s Hierarchy of needs: people are not most motivated
by money instead they most motivated by contribution and use
of their skills,
Motivation Theories
• Herzberg’s Two factor Model
-Hygiene/Maintenance factors
-Motivational Factors
Self actualization
and Fulfillment
Esteem and Status
Belonging and Social
needs
Safety and Security
Physiological needs
ModelofMaslow’sHierarchyofneeds
Self actualization
and Fulfillment and
Responsibility
Advancement
Recognition,
Professional growth
Relation with
supervisors , peers,
quality of supervision
Company policy and
pay
Working Conditions
Herzberg’smotivationand
maintenanceModel
Motivation Theories
David McClelland’s Theory of needs:
• Affiliation (Seek approval and work better when cooperating)
• Achievement (prefer challenges and recognition)
• Power: need of power socially oriented, are effective leaders ,
like to organize and influence others.
The Active PMP Learner
Research “Supportive leadership and Servant Leadership”
PM Quote of the day
Without open communication, without
tons of it, you won’t succeed…
~David Deleo

More Related Content

PPTX
12-PMP Training - Stakeholder Management
PPTX
PMP Training - 10 project communication management
PPTX
PMP Training - 04 project integration management
PPTX
10- PMP Training - Risk Management
PPTX
Project Resource Management - PMBOK6
PPTX
7- PMP Training - Quality Management
PPTX
5. PMP Training - Time management
PPTX
PMP Training - 06 project time management2
12-PMP Training - Stakeholder Management
PMP Training - 10 project communication management
PMP Training - 04 project integration management
10- PMP Training - Risk Management
Project Resource Management - PMBOK6
7- PMP Training - Quality Management
5. PMP Training - Time management
PMP Training - 06 project time management2

What's hot (20)

PPT
07. Project Integration Management
PPT
PMP Module 4 - Cost
PPTX
08 projectqualitymanagement
PDF
OVERVIEW OF PROJECT MANAGEMENT KNOWLEDGE AREAS 2
PPTX
PMP Training - 05 project scope management
PPT
Project manager roles responsibilities
PPTX
PMP Training - 09 project human resource management
PDF
PMP PMBok 5th ch 5 scope management
PPTX
PMP-Integration Management area
PDF
Introduction to risk management
PDF
11 project risk management
PPTX
Project Management Presentation material
PDF
09 project human resources management pmbok 5th
PDF
04 project integration management
PPTX
Project Planning and Approval Process
PPT
Chap04 project integration management
PPTX
Session 14 4th edition PMP
PDF
PMP PMBOK5 project management processes
PPTX
Project Schedule Management - PMBOK6
PPTX
01 introductiontoframework
07. Project Integration Management
PMP Module 4 - Cost
08 projectqualitymanagement
OVERVIEW OF PROJECT MANAGEMENT KNOWLEDGE AREAS 2
PMP Training - 05 project scope management
Project manager roles responsibilities
PMP Training - 09 project human resource management
PMP PMBok 5th ch 5 scope management
PMP-Integration Management area
Introduction to risk management
11 project risk management
Project Management Presentation material
09 project human resources management pmbok 5th
04 project integration management
Project Planning and Approval Process
Chap04 project integration management
Session 14 4th edition PMP
PMP PMBOK5 project management processes
Project Schedule Management - PMBOK6
01 introductiontoframework
Ad

Viewers also liked (10)

PPTX
PMP Training - 01 introduction to framework
PPTX
11- PMP Training - Procurement Management
PDF
PPTX
Introduction to PMP
PPTX
6- PMP Training - Cost Management
PPTX
Path to PMP
PPT
Learning pmp formulas the easy way
PPTX
PMP Training - 07 project cost management
PPTX
8- PMP Training - Human Resource Management
PPTX
PMP Training - 11 project risk management
PMP Training - 01 introduction to framework
11- PMP Training - Procurement Management
Introduction to PMP
6- PMP Training - Cost Management
Path to PMP
Learning pmp formulas the easy way
PMP Training - 07 project cost management
8- PMP Training - Human Resource Management
PMP Training - 11 project risk management
Ad

Similar to 9- PMP Training - Communication Management (20)

PPT
PMP Communication & Human resource
PPT
Human Resource Management
PPTX
CAPM Muzette Charles Week5 Chapter9-10
PDF
PPTX
OverView to PMP
PDF
Ch09 human resources management v1.2
PDF
Topic 13 - Project Resource Management.pdf
PPTX
Project human resource management
PPTX
Introduction to PMP
PPTX
It project Human resources management.pptx
PPTX
Session 15 4th edition PMP
PDF
Managing High Performance Teams
PDF
Managing High Performance Project Teams
PPTX
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...
PPTX
PDF
PMP summary training for certification be proud
PDF
PMP trianing book summary for certification
PPTX
LO3 Team and Communications - Updated.pptx
PDF
communications.pdf.pdf
PDF
PMP Communication & Human resource
Human Resource Management
CAPM Muzette Charles Week5 Chapter9-10
OverView to PMP
Ch09 human resources management v1.2
Topic 13 - Project Resource Management.pdf
Project human resource management
Introduction to PMP
It project Human resources management.pptx
Session 15 4th edition PMP
Managing High Performance Teams
Managing High Performance Project Teams
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...
PMP summary training for certification be proud
PMP trianing book summary for certification
LO3 Team and Communications - Updated.pptx
communications.pdf.pdf

Recently uploaded (20)

PDF
CHAPTER 14 Manageement of Nursing Educational Institutions- planing and orga...
PPTX
Leadership for Industry 4.0 And Industry 5.0
PDF
CISSP - Domain 7: Security Operations - InfoSec Institute
PDF
Leveraging Intangible Assets Through Campus Entrepreneurship and Tech Transfer
PPTX
2. CYCLE OF FUNCTIONING RIFLE -PP Presentation..pptx
PPTX
TCoE_IT_Concrete industry.why is it required
PPTX
Concluding Session_Wrapup-NA May 5 2024-Oct 10 2025 ZS.pptx
PDF
Contemporary management and it's content
PPTX
Human Resource Management | Introduction,Meaning and Definition
PDF
1_Corporate Goverance presentation topic
PDF
CHAPTER 15- Manageement of Nursing Educational Institutions- Staffing and st...
PPTX
Chapter Three for international political
PDF
Features of Effective decision making in Management
PPTX
Consulting on marketing-The needs wants and demands are a very important comp...
PDF
MANAGEMENT LESSONS FROM ANCIENT KNOWLEDGE SYSTEM-ARTHASHASTRA AND THIRUKKURAL...
PPTX
Human Resources management _HR structure
PDF
Air India AI-171 Crash in Ahmedabad A Tragic Wake-Up Call.
PPTX
Concluding Session_Wrapup-India Jun 5 2024-Oct 5 2025 ZS.pptx
PPTX
School Annual day Presentation, Logo, Animation
PPT
Claims and Adjustment Business_Communication.pptx.ppt
CHAPTER 14 Manageement of Nursing Educational Institutions- planing and orga...
Leadership for Industry 4.0 And Industry 5.0
CISSP - Domain 7: Security Operations - InfoSec Institute
Leveraging Intangible Assets Through Campus Entrepreneurship and Tech Transfer
2. CYCLE OF FUNCTIONING RIFLE -PP Presentation..pptx
TCoE_IT_Concrete industry.why is it required
Concluding Session_Wrapup-NA May 5 2024-Oct 10 2025 ZS.pptx
Contemporary management and it's content
Human Resource Management | Introduction,Meaning and Definition
1_Corporate Goverance presentation topic
CHAPTER 15- Manageement of Nursing Educational Institutions- Staffing and st...
Chapter Three for international political
Features of Effective decision making in Management
Consulting on marketing-The needs wants and demands are a very important comp...
MANAGEMENT LESSONS FROM ANCIENT KNOWLEDGE SYSTEM-ARTHASHASTRA AND THIRUKKURAL...
Human Resources management _HR structure
Air India AI-171 Crash in Ahmedabad A Tragic Wake-Up Call.
Concluding Session_Wrapup-India Jun 5 2024-Oct 5 2025 ZS.pptx
School Annual day Presentation, Logo, Animation
Claims and Adjustment Business_Communication.pptx.ppt

9- PMP Training - Communication Management

  • 1. 8-Communication Management Project Management Training, Qais Ur Rehman Rasooli, PMP
  • 2. What is Communication? • Communication is the transfer of information from one person to another • A way of transferring ideas, facts, thoughts ,feelings • Bridge of meaning over the river of misunderstanding • Communication is key , PM should spends 90% of his time communicating, • Two way communication Process (8 steps) Develop idea Encode Transmit Receive Decode Understand/Accept Use Bridgeof meaning Message Feedback
  • 3. Communication management • Include process that are required to ensure timely and appropriate: Planning,Collection,creation,distribution,storage,retrieval, management,control,monitoring and ultimate disposition of project information, • Can be internal or external, verbal or written, formal or informal,Verticle or horizontal • Carried out in three steps: Plan , Manage and Control Communications
  • 4. 1 - Plan Communication Management, 2 – Manage Communications 3 – Control Communications
  • 5. Plan Communication Management • Process of developing an appropriate approach and plan for project communications, • Based on - stakeholder information needs and requirements, - Available OPAs, and Project complexity • Inadequate communication planning can lead to delay in message delivery, communication to wrong audience, misunderstanding, misinterpretation, insufficient communication • Communication need to be effective and efficient
  • 6. Types of Communication • Type of communication include: Formal,informal,verbal, written and a combination of these Communication type Situation used Formal Written Complex Issues, PMP,Charter,Scope statement, communicating over long distances Formal Verbal Presentation, Speeches Informal Written Email, text messaging, Informal Verbal Meetings, discussions
  • 7. Communication Models • Three main parts: Message, Sender and receiver • Factors like receiver environment , language , experience, culture affect the way the receiver decodes the message • Communication disturbed by Noise, • Effective Communication: Encode message carefully, select the appropriate communication model to send it, confirm the receipt and understanding, • Pay attention to these factors: Nonverbal, Para lingual,
  • 8. Effective listening • Watch the speaker to capture facial expression and body language, • pay attention to the tone of voice, • Focus on the content of the message without judgement, distraction, interpretation, • Think before responding • Receiver confirms s/he is listening, express agreement or disagreement and asks for clarification, • 7 Steps of effective listening by Mark Horstman: Stop what you are doing, face the speaker, make eye contact, Smile, nod and take notes
  • 9. Communication technology • Part of planning communications it to identify how to communicate each item • Examples include: Face to face interactions, by telephone, email, instant messaging, blogs, fax, • To determine the right technology to use for your communications think of: What technology works best in this instance, effectiveness? What technology is the team very much familiar with and is easy for them to use? urgency and confidentiality of the information to be communicated
  • 10. Communication Methods • Interactive Communication (converstions,meetings,instant messaging, conference calls) • Push communication (Status reports, emailed updates ,blogs and company memos) • Pull communication (Communicating large amount of data to a large number of users)
  • 11. Meetings • Meetings are used during communication planning for the What,when,how,how often of communication, • Meetings will be used on the project for exchange of informations, • Plan effective meetings, to have effective ones during the project, • Set specific timing for the meeting, set reoccurrence, • Meet with team regularly, based on needs, • Have an agenda ready for the meeting and distribute it beforehand, Stick to the AGENDA, • Bring the right people together, • Record Action items, decisions and postponed items, • Distribute to all the attendees of the meeting and ask for questions additions or omissions.
  • 12. Communication channels • Meetings are used during communication planning for the What,when,how,how often of communication, • Meetings will be used on the project for exchange of informations, • Plan effective meetings, to have effective ones during the project, • Set specific timing for the meeting, set reoccurrence, • Meet with team regularly, based on needs, • Have an agenda ready for the meeting and distribute it beforehand, Stick to the AGENDA, • Bring the right people together, • Record Action items, decisions and postponed items, • Distribute to all the attendees of the meeting and ask for questions additions or omissions.
  • 13. Roles & Responsibilities – Functional Managers • Responsibility dependent on the Org Structure, • Avoid conflict by coordinating need of resources with PM • Let the PM know how other project will impact resources, • Provide subject matter expertise, • Contribute to planning and estimating, • Approve final PMP, • Recommend changes, • Improve staff utilization and influence productivity, • Assist with problem of team member performance and development
  • 14. Roles & Responsibilities – Project Managers • Manages the project to meet project objectives • On big projects they have a team to help them out, • Responsibilities dependent on the Org structure, • Read the list on page 342 of Rita PMP Exam prep.
  • 15. Roles & Responsibilities – Program Managers • Works on project and program goals, • Manages related projects toward program goal, • Ensure selected project support strategic goals, • Adjust projects for the program benefits, • Guiding and supporting individual project manager’s efforts
  • 16. Roles & Responsibilities – Portfolio Managers • Works on project and program to meet strategic goals, • Responsible for governance at the executive level , • Ensure value added by unrelated projects and programs • Working with senior executives to gather support for projects and programs, • Getting the best return from resources invested
  • 18. Plan Human Resource Management • Process of identifying and documenting project roles and responsibilities, • Required skills, • Reporting relationships, • Staffing management Plan Inputs include, PMP, EEF, OPA, Org charts and Position descriptions, these include: RAM, RACI Chart
  • 19. Plan Human Resource Management- Tool & Techniques • Responsibility Assignment Matrix (RAM), • RACI Chart • OBS, • RBS,
  • 20. Output- Plan Human resource management • Human Resource Management Plan: - Roles and Responsibilities - Project Org Charts, - Staffing Management Plan • Staffing Management Plan: Answer questions like, Where will the staff come from? Resource Calendars, Staff release plans, trainings required, What are the Rewards and Recognitions and their criteria?, how will resources comply with any HR rules? What are the safety requirements
  • 21. 1 - Plan Human Resource Management, 2 – Acquire Project team 3 – Develop Project team 4- Manage Project team
  • 22. Develop Project Team • Improve team members’ competencies and interaction, • Improve overall team environment, encourage team work • PM should provide opportunities and challenges, • PM provides support and feedback whenever required, • PM should recognize and reward good performance • Use of soft skills (mentoring, leadership, negotiation, emotional intelligence, empathy etc.) • Communicate effectively, honestly and timely with team • Capitalize on cultural differences, • Hold team building activities and encourage good decision making
  • 23. Develop Project Team – Tools and Techniques Team building Activities: • Build trust among team members, • WBS is a team building tool, • Tuckman's ladder model of team building Forming, Storming, Norming, Perform Adjourning, • Team building is planned before team is created and implemented all the way through the end of the project, • Includes things like: taking classes together, milestone parties, holiday and birthday celebrations, WBS Creation, outside of work trips, involving in planning.
  • 24. Develop Project Team – Tools and Techniques Ground rules: • Help establish standards and expectations for the team, • Honesty, conflict resolution techniques, • methods to coordinate and approve changes to team members calendars, • How meetings will be held Colocation, Recognition and Reward, Output: Team Performance assessment (Team Effectiveness)
  • 25. 1 - Plan Human Resource Management, 2 – Acquire Project team 3 – Develop Project team 4- Manage Project team
  • 26. Manage Project Team • Tracking team member’s performance and providing feedback, • Resolving issues and conflicts, • Manage team changes to optimize team performance, • Inputs include: HRM Plan, Project staffing, Team performance assessment, Issue log, Work performance report, PA
  • 27. Management and Leadership Styles • No one way fits all, every situation asks for a specific style, • Underlying factors are personal style, skill and expertise of team members and complexity of the project, • Directing: tell others what to do • Facilitating: coordinates input from others • Coaching: helps team member achieve their goals • Supporting: provides assistance along the way • Autocratic: Top down approach, power lies with the manager • Consultive; bottom up approach, uses influence to achieve results • Consultive-Autocratic:solicits input but retains decision making
  • 28. Management and Leadership Styles • Consensus: Problem solving and decision making based on group agreement, • Delegating • Bureaucratic: procedure focused- appropriate for work where details are very important • Charismatic: Energizes and encourages team • Democratic: encourages team participation in decision-making • Laissez-faire: Allow to act – used for skilled resources • Analytical: Interview style communication make tech decisions • Driver: constantly giving directions • Influencing: emphasizes teamwork, team building, team DM
  • 29. Conflict Management • PM can avoid many conflicts by: Informing the team, Clearly assigning work Making work assign- ments interesting, Following good project management • Sources of conflict: Schedules, Project Priorities, Resources, Technical Opinions, Administrative procedures and Personality
  • 30. Conflict resolution techniques • Collaborating (Problem Solving) – Win-win situation • Compromising (Reconciling) – Lose-lose situation • Withdrawal (Avoidance) • Smoothing (Accommodating) • Forcing (Directing)
  • 31. Problem solving method Identify Solutions Analyze the problem Define the real or Root problem , not the TIP OF THE ICEBERG Pick a solution and Implement the solution Review the solution , and make sure the solution solved the problem Lessons Learned YesNo
  • 32. Motivation Theories • McGregor’s Theory of X and Y: Theory X: people need to watched every minute, employees are incapable, avoid responsibility , and avoid work whenever possible, Theory Y: People are working willing to work without supervision and want to achieve, employees can direct their own efforts. • Maslow’s Hierarchy of needs: people are not most motivated by money instead they most motivated by contribution and use of their skills,
  • 33. Motivation Theories • Herzberg’s Two factor Model -Hygiene/Maintenance factors -Motivational Factors Self actualization and Fulfillment Esteem and Status Belonging and Social needs Safety and Security Physiological needs ModelofMaslow’sHierarchyofneeds Self actualization and Fulfillment and Responsibility Advancement Recognition, Professional growth Relation with supervisors , peers, quality of supervision Company policy and pay Working Conditions Herzberg’smotivationand maintenanceModel
  • 34. Motivation Theories David McClelland’s Theory of needs: • Affiliation (Seek approval and work better when cooperating) • Achievement (prefer challenges and recognition) • Power: need of power socially oriented, are effective leaders , like to organize and influence others.
  • 35. The Active PMP Learner Research “Supportive leadership and Servant Leadership”
  • 36. PM Quote of the day Without open communication, without tons of it, you won’t succeed… ~David Deleo