Created by ejlp12@gmail.com, June 20105 - Project Scope ManagementProject Management Training
Project Scope ManagementMonitoring &Controlling ProcessesPlanningProcessesEnter phase/Start projectExit phase/End projectInitiatingProcessesClosingProcessesExecutingProcesses
Project Scope ManagementProcess to ensure that the project includes all-and-only the work required, to complete the project successfullyScope can refer to Product Scope &  Project ScopeScope Management Plan (part of Develop Project Mgmt Plan)How will I do the scope?Provides guidance on how project scope will be defines, documented, verified, managed, and controlled by project management teamDon’t assume that requirements were determined before project began (not part of the project)
Attitude to say no to unnecessary scope. It should go to project approval process5.1 Collect RequirementsThe process of  defining and documenting stakeholders’ needs to meet the project objectiveBalance stakeholder’s requirement: prioritizing requirement & resolve conflicts
Collect Requirement Techniques (1)INTERVIEWS: Directly talk with stakeholdersFOCUS GROUPS: Interactive discussion with qualified Stakeholders & Subject matter expertsFACILITATED WORKSHOPS: Focused cross functional stakeholders.JAD Joint application design, QFD Quality function developmentHelps determine critical characteristic of new product developmentStart by collecting customer need - VOC: Voice of the Customers
Collect Requirement Techniques (2)GROUP CREATIVITY TECHNIQUES: Brainstorming, Nominal group technique: enhance brainstorming with voting and rankingDelphi Technique: some expert answer questionnaire and give anonimity feedback Idea/mind mapping, Affinity Diagram: sort idea into groupsGROUP DECISION MAKING TECHNIQUES: Unanimity, Majority (>50%), Plurality, Dictatorship
Affinity DiagramRequirement sorted into groups by similaritiesEasier to see additional scope (risk) that have not been identifiedImage Source: PMP Exam Preparation 6th Edition, Rita Mulcahy
Collect Requirement Techniques (3)QUESTIONNAIRE AND SURVEYS: wide number of respondentsOBSERVATION/JOB SHADOWING: viewing individual in their environmentPROTOTYPES: early feedback by providing a working model
Balance Stakeholder’s RequirementThere is a need to balance stakeholder’s requirement Some issue are so complex they cannot be resolved by PM aloneFacilitate the resolution of competing requirement, consider: business case, project charter, project scope statement, project constraintsWhat you can do:
Conflict resolution, team building, meeting, problem solving skills, escalation, approval from stakeholderStakeholder request to do or add something that is not related to the reason of project created should be rejected!
Requirement DocumentOutput of the Collect Requirement processHelps make sure the requirements clear and unambiguous.How will we know if the work we do will acceptability meet this requirement?Rule of thumbSpecific (Unambiguous)Measurable (How will we know we have finished?)Achievable (Can we do it?)Relevant (Is it the right thing to do?)Timed (When will we do it?)
5.2 Define ScopeProcess of developing a detailed description of the project and productProject scope statement may includes product scope, deliverables, product acceptance criteria, out of scope, additional risk, constraints & assumptions
Define ScopeConcern with what is and is not included in the project and its deliverablesYou should maintain a realistic schedule and budget that can achieve the project’s scopeIteration process should be done to maintain itLooking for options to adjust the projectAnalyze the objective and description of the product stated by the customer/sponsor and turn them into tangible deliverables.Project lifecycle termProduct Analysis
Project Scope StatementThe primary result of the Define Scope processAlong with the WBS and WBS dictionary, comprise the scope baseline is part of project management plan.May includes:Product scopeDeliverablesProduct acceptance criteriaWhat is not part of the project (out of scope)Additional risksConstraints and assumptions :Constraints: factors that limit the team’s optionsAssumptions: Things that assumed to be true (may not be true)
5.3 Create WBSProcess of subdividing project deliverables and project work into smaller, more manageable components.WBS does not show dependencies
Dividing work package into activities is part of the time management process (Define Activities)Create WBSWBS includes the project management works.Work package: lowest level WBS component which can be scheduled, cost estimated, monitored and controlled.WBS Structure can be organized byPhasesMajor deliverablesSubprojects e.g. contracted workBeware of excessive decomposition. It can lead to non-productive management effort, inefficient use of resources (performing work)Control account: management control point for performance measurement (one or more work packages)WBS dictionary provides more detailed components, e.g. description of work, responsible organization, acceptance criteriaAgreed Scope baseline includes project scope statement, WBS, WBS dictionary
WBS SampleImage Source: Practice Standard for WBS 2nd Edition. PMI © 2006
WBS100% rule: WBS includes 100% of the work defined by project scope and capture ALL deliverables (external, internal, interim) in term of work to be completed including project management.WBS creation method:Top-DownBottom upWBS StandardWBS TemplatesDon’t mind with WBS viewOutline ViewTabular ViewTree structure view (vertical, horizontal, centralized)
WBS Dictionary SampleIncludes (but not limited to):Code of account identifierDescription of workResponsible organizationList of schedule milestoneAssociated schedule activitiesResource requiredCost estimatesQuality requirementsAcceptance criteriaTechnical referencesContract InformationImage Source: Practice Standard for WBS 2nd Edition. PMI © 2006
WBS Dictionary Sample (2)Source: http://www.brighthub.com/office/project-management/articles/52388.aspx
5.4 Verify ScopeProcess of formalizing acceptance of the completed project deliverables.
Verify ScopeDifferent with quality control which concerned with correctness of deliverables. Can be performed before or parallel
NOT making sure you have the right scope during project planning
But, to gain formal acceptance of deliverables during monitoring and control.Inspection = review, product reviews, audits, walkthroughsMeasuring, examining, verifying to determine work and deliverables are meet requirement & product acceptance criteria

More Related Content

PPTX
Creating the project charter
PPTX
Project management
PDF
PMP Lecture 4: Project Integration Management
PPTX
Project scope management
PDF
PMP Chap 10 - Project Communication Management Details
PPT
Project scope management
PPTX
Project Scope Management - PMBOK6
PDF
Project Charter Guide
Creating the project charter
Project management
PMP Lecture 4: Project Integration Management
Project scope management
PMP Chap 10 - Project Communication Management Details
Project scope management
Project Scope Management - PMBOK6
Project Charter Guide

What's hot (20)

PPTX
Lec 03 project life cycle
PPTX
Project management
PDF
Project Management Professional (PMP)
PPT
Project Control- Overview Presentation Tafseer
PDF
2. project scope management
PPTX
Pmp chapter(5) Scope Management
PPTX
Project Stakeholder Management - PMBOK6
PPTX
Project Management Steps
PPTX
Project scheduling
PPTX
Project Management Life Cycle
PPTX
Project Management
PPT
Introduce Project Management
PDF
Chap 5.2 Collect requirements
PDF
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PPTX
Project execution and implementation
PPT
05 project scope management
PPTX
Smart project management - Best Practices to Manage Project effectively
PDF
Project Integration Management
PPTX
Project Management Principles and Process
PPTX
PMP Training - 01 introduction to framework
Lec 03 project life cycle
Project management
Project Management Professional (PMP)
Project Control- Overview Presentation Tafseer
2. project scope management
Pmp chapter(5) Scope Management
Project Stakeholder Management - PMBOK6
Project Management Steps
Project scheduling
Project Management Life Cycle
Project Management
Introduce Project Management
Chap 5.2 Collect requirements
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
Project execution and implementation
05 project scope management
Smart project management - Best Practices to Manage Project effectively
Project Integration Management
Project Management Principles and Process
PMP Training - 01 introduction to framework
Ad

Viewers also liked (20)

PPTX
Path to PMP
PPTX
6- PMP Training - Cost Management
PDF
PPTX
11- PMP Training - Procurement Management
PPTX
10- PMP Training - Risk Management
PPTX
Introduction to PMP
PPTX
7- PMP Training - Quality Management
PPTX
9- PMP Training - Communication Management
PPT
Learning pmp formulas the easy way
PPTX
PMP Training - 07 project cost management
PPTX
8- PMP Training - Human Resource Management
PPTX
PMP Training - 10 project communication management
PPTX
5 phases of project management
PPTX
Seo goals & objectives 2 quarter 2012
PDF
02 project scope management
PPTX
Defining clear project goals
PDF
Pmbok 4th edition chapter 5 - Project Scope Management
KEY
Project ATOM Goals And Objectives
PPTX
Objectives of Project evaluation
PPTX
Managing Virtual Project Teams
Path to PMP
6- PMP Training - Cost Management
11- PMP Training - Procurement Management
10- PMP Training - Risk Management
Introduction to PMP
7- PMP Training - Quality Management
9- PMP Training - Communication Management
Learning pmp formulas the easy way
PMP Training - 07 project cost management
8- PMP Training - Human Resource Management
PMP Training - 10 project communication management
5 phases of project management
Seo goals & objectives 2 quarter 2012
02 project scope management
Defining clear project goals
Pmbok 4th edition chapter 5 - Project Scope Management
Project ATOM Goals And Objectives
Objectives of Project evaluation
Managing Virtual Project Teams
Ad

Similar to PMP Training - 05 project scope management (20)

PPTX
04 projectintegrationmanagement
PDF
PPTX
3 how to scope a project to achieve the quality
PPTX
2.05 scope management 1
PPT
Chapter 2 Work Break down Structure (1).ppt
PPT
Chapter 2 Work Break down Structure1.ppt
PPT
Project management ALL ABOUT PROJECTS AND HIS
PPTX
CAPM Week 2 Chapter 5
PPT
3&4. project scope management at project.ppt
DOCX
MBA 6941, Managing Project Teams 1 Course Learning Ou.docx
PPTX
Scope and Time Management
PPT
2. Project Scope Management.ppt
PPTX
Lec 08 project scope_management
PDF
Pmp scope chapter 5
PPT
Ch05
PPT
ICB Competence, Project Standards
PPTX
2.1 integration management
PPTX
Project Scope Management Knowledge Area
PPT
Project management lecture 11 slide 11
PPTX
Online PMP Training Material for PMP Exam - Scope Management Knowledge Area
04 projectintegrationmanagement
3 how to scope a project to achieve the quality
2.05 scope management 1
Chapter 2 Work Break down Structure (1).ppt
Chapter 2 Work Break down Structure1.ppt
Project management ALL ABOUT PROJECTS AND HIS
CAPM Week 2 Chapter 5
3&4. project scope management at project.ppt
MBA 6941, Managing Project Teams 1 Course Learning Ou.docx
Scope and Time Management
2. Project Scope Management.ppt
Lec 08 project scope_management
Pmp scope chapter 5
Ch05
ICB Competence, Project Standards
2.1 integration management
Project Scope Management Knowledge Area
Project management lecture 11 slide 11
Online PMP Training Material for PMP Exam - Scope Management Knowledge Area

More from ejlp12 (20)

PDF
Introduction to Docker storage, volume and image
PDF
Java troubleshooting thread dump
PDF
RESTful web service with JBoss Fuse
PPTX
WebSphere Application Server Information Resources
PPTX
WebSphere Application Server Family (Editions Comparison)
PDF
Linux container & docker
PPTX
BPEL, BPEL vs ESB (Integration)
PPTX
BPMN Introduction
PPTX
JBoss Data Virtualization (JDV) Sample Physical Deployment Architecture
PPTX
WebSphere Application Server Topology Options
PPTX
IBM WebSphere Application Server version to version comparison
PPTX
IBM WebSphere Application Server (Clustering) Concept
PPT
IBM WebSphere MQ Introduction
PPT
Java EE Introduction
PPTX
Introduction to Apache Cordova (Phonegap)
PPTX
Introduction to jQuery Mobile
PPTX
Introduction to JPA (JPA version 2.0)
PPTX
Introduction to JavaBeans Activation Framework v1.1
PPT
Arah pengembangan core network architecture (Indonesia)
PPTX
GSM/UMTS network architecture tutorial (Indonesia)
Introduction to Docker storage, volume and image
Java troubleshooting thread dump
RESTful web service with JBoss Fuse
WebSphere Application Server Information Resources
WebSphere Application Server Family (Editions Comparison)
Linux container & docker
BPEL, BPEL vs ESB (Integration)
BPMN Introduction
JBoss Data Virtualization (JDV) Sample Physical Deployment Architecture
WebSphere Application Server Topology Options
IBM WebSphere Application Server version to version comparison
IBM WebSphere Application Server (Clustering) Concept
IBM WebSphere MQ Introduction
Java EE Introduction
Introduction to Apache Cordova (Phonegap)
Introduction to jQuery Mobile
Introduction to JPA (JPA version 2.0)
Introduction to JavaBeans Activation Framework v1.1
Arah pengembangan core network architecture (Indonesia)
GSM/UMTS network architecture tutorial (Indonesia)

Recently uploaded (20)

PPTX
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
PDF
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
PDF
Business model innovation report 2022.pdf
PPTX
5 Stages of group development guide.pptx
PPTX
New Microsoft PowerPoint Presentation - Copy.pptx
PDF
Chapter 5_Foreign Exchange Market in .pdf
PPTX
Probability Distribution, binomial distribution, poisson distribution
PPTX
HR Introduction Slide (1).pptx on hr intro
PPT
340036916-American-Literature-Literary-Period-Overview.ppt
PDF
COST SHEET- Tender and Quotation unit 2.pdf
PDF
20250805_A. Stotz All Weather Strategy - Performance review July 2025.pdf
PDF
Nidhal Samdaie CV - International Business Consultant
PDF
Reconciliation AND MEMORANDUM RECONCILATION
PDF
DOC-20250806-WA0002._20250806_112011_0000.pdf
PDF
Types of control:Qualitative vs Quantitative
DOCX
Euro SEO Services 1st 3 General Updates.docx
PPTX
Dragon_Fruit_Cultivation_in Nepal ppt.pptx
PDF
MSPs in 10 Words - Created by US MSP Network
PDF
Dr. Enrique Segura Ense Group - A Self-Made Entrepreneur And Executive
DOCX
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
Business model innovation report 2022.pdf
5 Stages of group development guide.pptx
New Microsoft PowerPoint Presentation - Copy.pptx
Chapter 5_Foreign Exchange Market in .pdf
Probability Distribution, binomial distribution, poisson distribution
HR Introduction Slide (1).pptx on hr intro
340036916-American-Literature-Literary-Period-Overview.ppt
COST SHEET- Tender and Quotation unit 2.pdf
20250805_A. Stotz All Weather Strategy - Performance review July 2025.pdf
Nidhal Samdaie CV - International Business Consultant
Reconciliation AND MEMORANDUM RECONCILATION
DOC-20250806-WA0002._20250806_112011_0000.pdf
Types of control:Qualitative vs Quantitative
Euro SEO Services 1st 3 General Updates.docx
Dragon_Fruit_Cultivation_in Nepal ppt.pptx
MSPs in 10 Words - Created by US MSP Network
Dr. Enrique Segura Ense Group - A Self-Made Entrepreneur And Executive
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement

PMP Training - 05 project scope management

  • 1. Created by ejlp12@gmail.com, June 20105 - Project Scope ManagementProject Management Training
  • 2. Project Scope ManagementMonitoring &Controlling ProcessesPlanningProcessesEnter phase/Start projectExit phase/End projectInitiatingProcessesClosingProcessesExecutingProcesses
  • 3. Project Scope ManagementProcess to ensure that the project includes all-and-only the work required, to complete the project successfullyScope can refer to Product Scope & Project ScopeScope Management Plan (part of Develop Project Mgmt Plan)How will I do the scope?Provides guidance on how project scope will be defines, documented, verified, managed, and controlled by project management teamDon’t assume that requirements were determined before project began (not part of the project)
  • 4. Attitude to say no to unnecessary scope. It should go to project approval process5.1 Collect RequirementsThe process of defining and documenting stakeholders’ needs to meet the project objectiveBalance stakeholder’s requirement: prioritizing requirement & resolve conflicts
  • 5. Collect Requirement Techniques (1)INTERVIEWS: Directly talk with stakeholdersFOCUS GROUPS: Interactive discussion with qualified Stakeholders & Subject matter expertsFACILITATED WORKSHOPS: Focused cross functional stakeholders.JAD Joint application design, QFD Quality function developmentHelps determine critical characteristic of new product developmentStart by collecting customer need - VOC: Voice of the Customers
  • 6. Collect Requirement Techniques (2)GROUP CREATIVITY TECHNIQUES: Brainstorming, Nominal group technique: enhance brainstorming with voting and rankingDelphi Technique: some expert answer questionnaire and give anonimity feedback Idea/mind mapping, Affinity Diagram: sort idea into groupsGROUP DECISION MAKING TECHNIQUES: Unanimity, Majority (>50%), Plurality, Dictatorship
  • 7. Affinity DiagramRequirement sorted into groups by similaritiesEasier to see additional scope (risk) that have not been identifiedImage Source: PMP Exam Preparation 6th Edition, Rita Mulcahy
  • 8. Collect Requirement Techniques (3)QUESTIONNAIRE AND SURVEYS: wide number of respondentsOBSERVATION/JOB SHADOWING: viewing individual in their environmentPROTOTYPES: early feedback by providing a working model
  • 9. Balance Stakeholder’s RequirementThere is a need to balance stakeholder’s requirement Some issue are so complex they cannot be resolved by PM aloneFacilitate the resolution of competing requirement, consider: business case, project charter, project scope statement, project constraintsWhat you can do:
  • 10. Conflict resolution, team building, meeting, problem solving skills, escalation, approval from stakeholderStakeholder request to do or add something that is not related to the reason of project created should be rejected!
  • 11. Requirement DocumentOutput of the Collect Requirement processHelps make sure the requirements clear and unambiguous.How will we know if the work we do will acceptability meet this requirement?Rule of thumbSpecific (Unambiguous)Measurable (How will we know we have finished?)Achievable (Can we do it?)Relevant (Is it the right thing to do?)Timed (When will we do it?)
  • 12. 5.2 Define ScopeProcess of developing a detailed description of the project and productProject scope statement may includes product scope, deliverables, product acceptance criteria, out of scope, additional risk, constraints & assumptions
  • 13. Define ScopeConcern with what is and is not included in the project and its deliverablesYou should maintain a realistic schedule and budget that can achieve the project’s scopeIteration process should be done to maintain itLooking for options to adjust the projectAnalyze the objective and description of the product stated by the customer/sponsor and turn them into tangible deliverables.Project lifecycle termProduct Analysis
  • 14. Project Scope StatementThe primary result of the Define Scope processAlong with the WBS and WBS dictionary, comprise the scope baseline is part of project management plan.May includes:Product scopeDeliverablesProduct acceptance criteriaWhat is not part of the project (out of scope)Additional risksConstraints and assumptions :Constraints: factors that limit the team’s optionsAssumptions: Things that assumed to be true (may not be true)
  • 15. 5.3 Create WBSProcess of subdividing project deliverables and project work into smaller, more manageable components.WBS does not show dependencies
  • 16. Dividing work package into activities is part of the time management process (Define Activities)Create WBSWBS includes the project management works.Work package: lowest level WBS component which can be scheduled, cost estimated, monitored and controlled.WBS Structure can be organized byPhasesMajor deliverablesSubprojects e.g. contracted workBeware of excessive decomposition. It can lead to non-productive management effort, inefficient use of resources (performing work)Control account: management control point for performance measurement (one or more work packages)WBS dictionary provides more detailed components, e.g. description of work, responsible organization, acceptance criteriaAgreed Scope baseline includes project scope statement, WBS, WBS dictionary
  • 17. WBS SampleImage Source: Practice Standard for WBS 2nd Edition. PMI © 2006
  • 18. WBS100% rule: WBS includes 100% of the work defined by project scope and capture ALL deliverables (external, internal, interim) in term of work to be completed including project management.WBS creation method:Top-DownBottom upWBS StandardWBS TemplatesDon’t mind with WBS viewOutline ViewTabular ViewTree structure view (vertical, horizontal, centralized)
  • 19. WBS Dictionary SampleIncludes (but not limited to):Code of account identifierDescription of workResponsible organizationList of schedule milestoneAssociated schedule activitiesResource requiredCost estimatesQuality requirementsAcceptance criteriaTechnical referencesContract InformationImage Source: Practice Standard for WBS 2nd Edition. PMI © 2006
  • 20. WBS Dictionary Sample (2)Source: http://www.brighthub.com/office/project-management/articles/52388.aspx
  • 21. 5.4 Verify ScopeProcess of formalizing acceptance of the completed project deliverables.
  • 22. Verify ScopeDifferent with quality control which concerned with correctness of deliverables. Can be performed before or parallel
  • 23. NOT making sure you have the right scope during project planning
  • 24. But, to gain formal acceptance of deliverables during monitoring and control.Inspection = review, product reviews, audits, walkthroughsMeasuring, examining, verifying to determine work and deliverables are meet requirement & product acceptance criteria
  • 25. Control ScopeProcess of monitoring the status of the project and product scope and managing changes to the scope baselineThe cause and degree of variance relative to the scope baselineDecide corrective/preventive action required
  • 26. Control ScopeRelation with Perform Integrated Change Control ProcessNeed for scope change during Control ScopePotential impact to scope found in Control Cost, Control Schedule, etc.Perform Integrated Change Control* Accept or reject the change? *Return to Control Scope to process the approved changeImage redrawn from: PMP Exam Preparation 6th Edition, Rita Mulcahy
  • 27. Next topic: Project Time ManagementThank You