Let’s work to be the best-
in class
Mehdi Bouazza
128-11-2016Mehdi Bouazza
The Six Sigma Methodology
Define
Measure
Analyze
Improve
Control
228-11-2016Mehdi Bouazza
Project Problem and Goal Statement
Problem Statement:
Poorly coordinated music releases and slow improvement cycles. There’s also an
engagement rate of 40% which is very low measured compared to the average in our
industry. We are also having a bad heritage of the previous executive and processes are
poorly adapted to one another. Slow recruitment process.
Goal Statement:
Implement music 2.0 company wide, releasing better music in a simple less time-
consuming way. Reducing improvement cycles by stopping costly overhead and stop time-
consuming and useless meetings. From 40 meetings in a month, to 1 useful meeting in a
quarter (Quarterly meeting) and use a skype meeting 1 time a week.
Hiring new employees to fill the gap: Visual Designer and a Developer. Finally connect
processes by the extent of the other process. This will lead in a simple, dynamic and LEAN
work environment. Provide good content and make SOCIAL IMPACT on our fan base this
will increase the engagement rate to 90%. Invest more in attracting and retaining top
talents, by optimizing our HCM and focusing on Human Resource Development (HRD)
28-11-2016 3Mehdi Bouazza
Expected Results – Business Case
28-11-2016Mehdi Bouazza 4
Relevant Metrics:
Response Time (minutes, hours, days …) Cycle Time (minutes, hours, days …)
Downtime (minutes, hours, days …)
Correctness (of information or data) or Error Rate (%)
Efficiency (%)
Document Error Rate (%)
Availability (of systems) (%, Mean Time Between Failure, Mean Time to Repair)
Cost of Poor Quality ($)
Rework ($)
Improvement Targets:
100% reduction in cycle time
Increase System Availability from 95% to 100%
100% reduction on the improvement cycle
Increase engagement in the workforce from 90% to 100%
Operational/Strategic Impact:
Good music released faster, which means more releases in a quarter
An engaged, capable and effective workforce
Expected Results – Business Case
28-11-2016Mehdi Bouazza 5
Operational and Strategic Impact:
Hard Benefits: 1.82 FTE can be delivered. Wasted labor time spent on useless
tasks can be reduced by 100%.
Soft Benefits:
Improve customer satisfaction.
Improved service performance through less time loss in tickets including wait
time.
Project Plan
28-11-2016Mehdi Bouazza 6
27-nov 28-nov 29-nov 30-nov 1-dec 2-dec 3-dec 7-dec 8-dec 9-dec 10-dec 11-dec
Define 27-nov
Measure 27-nov
Analyze 28-nov
Improve 29-nov
Control 11-dec
Define
Measure
Analyze
Improve
Control
28-11-2016Mehdi Bouazza 7
Measure Baseline Performance
CURRENT
CIET or TICET: 200
Sigma Level: 3,5
GOAL
CIET or TICET : 5
Sigma Level: 6,0
Define
Measure
Analyze
Improve
Control
28-11-2016Mehdi Bouazza 9
Workflow Scheme
28-11-2016Mehdi Bouazza 10
Define
Measure
Analyze
Improve
Control
28-11-2016Mehdi Bouazza 11
Evaluation using Pugh Concept Matrix
28-11-2016Mehdi Bouazza 12
Pugh Concept Selection Matix
Alternative Concepts
Criteria Rating (1-10)
Extended
Contracts
PI Support
Material
Optimize
Process
On
Salesman
MBP
Link
Excel
Forms
Training
Timely Price Increase (CTQ) 10 + + + + + S
Contract Adherence (CTQ) 10 S + + + S +
Cost of Price Increase (Admin) 7 + - + S S -
Resources Required 4 + - S S S -
Rework Reduction 7 + S + S + +
Standardization/Automation of Process 7 S + + + + +
Customer Satisfaction 10 + + + S S +
Profitability 10 - + + + + +
Sum of Positives 5 5 7 4 4 5
Sum of Negatives 1 2 0 0 0 2
Sum of Sames 2 1 1 4 4 1
Weighted Sum of Positives 38 47 61 37 34 44
Weighted Sum of Negatives 10 11 0 0 0 11
Weighted Score 28 36 61 37 34 33
Optimized Workflow/Process
28-11-2016Mehdi Bouazza 13
Define
Measure
Analyze
Improve
Control
28-11-2016Mehdi Bouazza 14
Control Plan
28-11-2016Mehdi Bouazza 15
Process Name: Processing of fast and good music Date: 28-11-16
Control
Subject
Subject
Goals
Unit of
Meas.
Sensor
Frequency of
Measurement
Recording of
Measurement/
Tool Used
Measured
by Whom
Less Meetings 1 meeting in 4
months
Elapsed Time
- Calculate weekly P-Chart
Sorter/
Supervisor
Fast In time
delivery
No late deliveries
N/A Sorter 1 time a week N/A Superv
isor
Adequate Fax
Machine Toner
level to print
faxes
No late orders
due to fax
machine out of
toner.
N/A Sorter 4 Times per day N/A Sorter
Distribution of
faxed expedite
orders to
XCC's
Sort and
distribute all
submitted
Expedites
every 30 min
before
10:30AM.
Every 15 min.
10:30 to 12:00
Elapsed Time Clock/Watch
1 Delivery per
30 min, 1
Delivery per 15
min.
Sorter stamps
date/time of
distribution on
orders
XCC's
Usage of
Message
Board when
XCC is not
available
Return time of
XCC indicated
on message
board for every
absence >15
min.
Message
board used per
absence
Sorter
Check every fax
distribution
cycle
N/A Sorter
Elapsed Time
to Enter Order
XCC/Keyer
enters with-in
30 minutes of
receipt
(delivery by
Sorter)
Elapsed Time
Stamped time
and Computer Entry
Time
Whenever
performance
level drops
below 90% on a
given day
Data Collection
Form
Supervisor
Results Tracking Performance
0
200
400
600
800
1000
1200
1400
1600
AUG-16 SEP-16 OCT-16 NOV-16 DEC-16 JAN-17
PERFORMANCE
Errors Improvement DSO
28-11-2016
Mehdi Bouazza
16
RECAP
 1 big meeting at the end of the quarter
 1 meeting a month
 Teambuilding regularly a month
28-11-2016Mehdi Bouazza 17

More Related Content

PPT
Lean Six Sigma How To Conduct A Lean Event
PPTX
Bob Richards Keynote American Manufacturing Strategies Summit 2015
PDF
SUCCESS STORY: Streamlining the Architectural, Engineering and Professional (...
PDF
SUCCESS STORY: How Lean Six Sigma Reduced Travel Expense Approval Time by 94%
PPT
Bpm teaser
PDF
SUCCESS STORY: Improving the Capital Design Review Process at Wastewater Trea...
PPTX
SDC Case Study: NBC Universal, Toby Leaver
PPTX
Becoming world class, Lyssa Edwards, CGI
Lean Six Sigma How To Conduct A Lean Event
Bob Richards Keynote American Manufacturing Strategies Summit 2015
SUCCESS STORY: Streamlining the Architectural, Engineering and Professional (...
SUCCESS STORY: How Lean Six Sigma Reduced Travel Expense Approval Time by 94%
Bpm teaser
SUCCESS STORY: Improving the Capital Design Review Process at Wastewater Trea...
SDC Case Study: NBC Universal, Toby Leaver
Becoming world class, Lyssa Edwards, CGI

What's hot (20)

PDF
Value Stream Mapping: What to Do Before You Dive In
PPTX
Lean six sigma foundations
PPTX
Lean Tools and resulting ROI 2015
PPT
Core Lean Tools
PDF
Mapping the End to End Process
PPTX
GE Home Depot Black Belt Project
PPTX
LSS-OVMC
PPTX
Improving productivity through Lean and Total Productive Maintenance
PPTX
Lean Concepts In The Service Industry
PDF
Value Stream Mapping in Office & Service Setttings
PPTX
Lean A3 Report for Planning Downtime Elimination
PDF
SUCCESS STORY: Reducing Lead Time for Fuel Reconciliation From 10 Hours to 30...
PDF
Six sigma-black-belt-project-sample
PDF
SUCCESS STORY: Reducing Training Preparation Time by 72%
DOC
Sachin_Kumar
PPTX
SIC (Short Interval Control) Methodology
PPTX
Black Belt Project Storyboard Template Example
PDF
Value Stream Mapping: From Tool to Management Practice
PPTX
Effective quality improvement paths for manufacturing
PDF
PROJECT STORYBOARD: Reducing Learning Curve Ramp for Temp Employees by 2 Weeks
Value Stream Mapping: What to Do Before You Dive In
Lean six sigma foundations
Lean Tools and resulting ROI 2015
Core Lean Tools
Mapping the End to End Process
GE Home Depot Black Belt Project
LSS-OVMC
Improving productivity through Lean and Total Productive Maintenance
Lean Concepts In The Service Industry
Value Stream Mapping in Office & Service Setttings
Lean A3 Report for Planning Downtime Elimination
SUCCESS STORY: Reducing Lead Time for Fuel Reconciliation From 10 Hours to 30...
Six sigma-black-belt-project-sample
SUCCESS STORY: Reducing Training Preparation Time by 72%
Sachin_Kumar
SIC (Short Interval Control) Methodology
Black Belt Project Storyboard Template Example
Value Stream Mapping: From Tool to Management Practice
Effective quality improvement paths for manufacturing
PROJECT STORYBOARD: Reducing Learning Curve Ramp for Temp Employees by 2 Weeks
Ad

Viewers also liked (17)

PDF
50 efectos visuales
DOCX
1617 consistoriinfantil final
PDF
H2020 wp1617-health en
PPT
6086451
DOC
London Colder than Antarctica" unusual Trends of Global Cooling- Swechha Shukla
DOC
Resume Bodhi
DOCX
Horari cinquè 2015-16
PPTX
Estruturadoartigo
PDF
After the Vawe-Journal of Humanitarian Assistance
PDF
ใบความรู้ การดึงการผลัก ป.1+214+dltvscip1+55t2sci p01 f31-1page
PPTX
TECNOLOGÍA Y GESTIÓN DE LA INFORMACIÓN
DOCX
불면증 - 스틸녹스 졸피뎀 "EVO.OW.TO" 카톡:DDF11 졸피뎀 처방전,졸피뎀 20mg정품구입,졸피뎀 추천,졸피뎀 약모양,졸피뎀 약...
PPTX
Κίνα
PDF
ใบความรู้+พลังงานหมุนเวียน+3+ป.3+245+dltvscip3+55t2sci p03 f06-4page
PDF
Lição 8 - Israel no Plano da Redenção
PPTX
SC 2015: Thinking Fast and Slow with Software Development
50 efectos visuales
1617 consistoriinfantil final
H2020 wp1617-health en
6086451
London Colder than Antarctica" unusual Trends of Global Cooling- Swechha Shukla
Resume Bodhi
Horari cinquè 2015-16
Estruturadoartigo
After the Vawe-Journal of Humanitarian Assistance
ใบความรู้ การดึงการผลัก ป.1+214+dltvscip1+55t2sci p01 f31-1page
TECNOLOGÍA Y GESTIÓN DE LA INFORMACIÓN
불면증 - 스틸녹스 졸피뎀 "EVO.OW.TO" 카톡:DDF11 졸피뎀 처방전,졸피뎀 20mg정품구입,졸피뎀 추천,졸피뎀 약모양,졸피뎀 약...
Κίνα
ใบความรู้+พลังงานหมุนเวียน+3+ป.3+245+dltvscip3+55t2sci p03 f06-4page
Lição 8 - Israel no Plano da Redenção
SC 2015: Thinking Fast and Slow with Software Development
Ad

Similar to A LEAN Six Sixgma Implementation plan (20)

PPT
Medical Services Client Vsm 10 10 11
PPT
Medical Services Client Vsm 10 10 11
PPT
Improving SMT Equipment Utilization
PPT
Lean Mfg Takeawayssharing
PPTX
Final presentation (1)
PDF
Senthil S
PPT
Déployer le Lean lors d’un rachat d’entreprise
PPTX
Analysis of food and drinks manufacturing companies
PPTX
business review
PPT
Workharderand Harder
PPT
Work Harder and Harder
PPT
Lss pharma presentation2-2006
PPTX
Project charter for Six Sigma Project
PPTX
Six Sigma Overview for business process improvement
PPT
lean-simple-solutions
PPT
37022309 lean-simple-solutions
PPT
Lean 6 Sigma On Line Training From Searchtec
DOC
Naveen Pabba_CV
PPTX
Analyzed operations of Groundwork Buffalo to identify Non-Value Add activitie...
PPTX
CBAP Business analysis planning and monitoring
Medical Services Client Vsm 10 10 11
Medical Services Client Vsm 10 10 11
Improving SMT Equipment Utilization
Lean Mfg Takeawayssharing
Final presentation (1)
Senthil S
Déployer le Lean lors d’un rachat d’entreprise
Analysis of food and drinks manufacturing companies
business review
Workharderand Harder
Work Harder and Harder
Lss pharma presentation2-2006
Project charter for Six Sigma Project
Six Sigma Overview for business process improvement
lean-simple-solutions
37022309 lean-simple-solutions
Lean 6 Sigma On Line Training From Searchtec
Naveen Pabba_CV
Analyzed operations of Groundwork Buffalo to identify Non-Value Add activitie...
CBAP Business analysis planning and monitoring

Recently uploaded (20)

PPTX
IITM - FINAL Option - 01 - 12.08.25.pptx
PDF
income tax laws notes important pakistan
PDF
Satish NS: Fostering Innovation and Sustainability: Haier India’s Customer-Ce...
PPTX
df0ee68f89e1a869be4bff9b80a7 business 79f0.pptx
PPTX
Astra-Investor- business Presentation (1).pptx
PDF
THE COMPLETE GUIDE TO BUILDING PASSIVE INCOME ONLINE
PDF
Chapter 2 - AI chatbots and prompt engineering.pdf
PPTX
interschool scomp.pptxzdkjhdjvdjvdjdhjhieij
PDF
Highest-Paid CEO in 2025_ You Won’t Believe Who Tops the List.pdf
PDF
#1 Safe and Secure Verified Cash App Accounts for Purchase.pdf
PDF
Middle East's Most Impactful Business Leaders to Follow in 2025
PDF
Tortilla Mexican Grill 发射点犯得上发射点发生发射点犯得上发生
PDF
Immigration Law and Communication: Challenges and Solutions {www.kiu.ac.ug)
PPTX
IMM marketing mix of four ps give fjcb jjb
PDF
Second Hand Fashion Call to Action March 2025
PDF
Engaging Stakeholders in Policy Discussions: A Legal Framework (www.kiu.ac.ug)
PDF
Comments on Clouds that Assimilate Parts I&II.pdf
PDF
Kishore Vora - Best CFO in India to watch in 2025.pdf
DOCX
Center Enamel Powering Innovation and Resilience in the Italian Chemical Indu...
PPTX
TRAINNING, DEVELOPMENT AND APPRAISAL.pptx
IITM - FINAL Option - 01 - 12.08.25.pptx
income tax laws notes important pakistan
Satish NS: Fostering Innovation and Sustainability: Haier India’s Customer-Ce...
df0ee68f89e1a869be4bff9b80a7 business 79f0.pptx
Astra-Investor- business Presentation (1).pptx
THE COMPLETE GUIDE TO BUILDING PASSIVE INCOME ONLINE
Chapter 2 - AI chatbots and prompt engineering.pdf
interschool scomp.pptxzdkjhdjvdjvdjdhjhieij
Highest-Paid CEO in 2025_ You Won’t Believe Who Tops the List.pdf
#1 Safe and Secure Verified Cash App Accounts for Purchase.pdf
Middle East's Most Impactful Business Leaders to Follow in 2025
Tortilla Mexican Grill 发射点犯得上发射点发生发射点犯得上发生
Immigration Law and Communication: Challenges and Solutions {www.kiu.ac.ug)
IMM marketing mix of four ps give fjcb jjb
Second Hand Fashion Call to Action March 2025
Engaging Stakeholders in Policy Discussions: A Legal Framework (www.kiu.ac.ug)
Comments on Clouds that Assimilate Parts I&II.pdf
Kishore Vora - Best CFO in India to watch in 2025.pdf
Center Enamel Powering Innovation and Resilience in the Italian Chemical Indu...
TRAINNING, DEVELOPMENT AND APPRAISAL.pptx

A LEAN Six Sixgma Implementation plan

  • 1. Let’s work to be the best- in class Mehdi Bouazza 128-11-2016Mehdi Bouazza
  • 2. The Six Sigma Methodology Define Measure Analyze Improve Control 228-11-2016Mehdi Bouazza
  • 3. Project Problem and Goal Statement Problem Statement: Poorly coordinated music releases and slow improvement cycles. There’s also an engagement rate of 40% which is very low measured compared to the average in our industry. We are also having a bad heritage of the previous executive and processes are poorly adapted to one another. Slow recruitment process. Goal Statement: Implement music 2.0 company wide, releasing better music in a simple less time- consuming way. Reducing improvement cycles by stopping costly overhead and stop time- consuming and useless meetings. From 40 meetings in a month, to 1 useful meeting in a quarter (Quarterly meeting) and use a skype meeting 1 time a week. Hiring new employees to fill the gap: Visual Designer and a Developer. Finally connect processes by the extent of the other process. This will lead in a simple, dynamic and LEAN work environment. Provide good content and make SOCIAL IMPACT on our fan base this will increase the engagement rate to 90%. Invest more in attracting and retaining top talents, by optimizing our HCM and focusing on Human Resource Development (HRD) 28-11-2016 3Mehdi Bouazza
  • 4. Expected Results – Business Case 28-11-2016Mehdi Bouazza 4 Relevant Metrics: Response Time (minutes, hours, days …) Cycle Time (minutes, hours, days …) Downtime (minutes, hours, days …) Correctness (of information or data) or Error Rate (%) Efficiency (%) Document Error Rate (%) Availability (of systems) (%, Mean Time Between Failure, Mean Time to Repair) Cost of Poor Quality ($) Rework ($) Improvement Targets: 100% reduction in cycle time Increase System Availability from 95% to 100% 100% reduction on the improvement cycle Increase engagement in the workforce from 90% to 100% Operational/Strategic Impact: Good music released faster, which means more releases in a quarter An engaged, capable and effective workforce
  • 5. Expected Results – Business Case 28-11-2016Mehdi Bouazza 5 Operational and Strategic Impact: Hard Benefits: 1.82 FTE can be delivered. Wasted labor time spent on useless tasks can be reduced by 100%. Soft Benefits: Improve customer satisfaction. Improved service performance through less time loss in tickets including wait time.
  • 6. Project Plan 28-11-2016Mehdi Bouazza 6 27-nov 28-nov 29-nov 30-nov 1-dec 2-dec 3-dec 7-dec 8-dec 9-dec 10-dec 11-dec Define 27-nov Measure 27-nov Analyze 28-nov Improve 29-nov Control 11-dec
  • 8. Measure Baseline Performance CURRENT CIET or TICET: 200 Sigma Level: 3,5 GOAL CIET or TICET : 5 Sigma Level: 6,0
  • 12. Evaluation using Pugh Concept Matrix 28-11-2016Mehdi Bouazza 12 Pugh Concept Selection Matix Alternative Concepts Criteria Rating (1-10) Extended Contracts PI Support Material Optimize Process On Salesman MBP Link Excel Forms Training Timely Price Increase (CTQ) 10 + + + + + S Contract Adherence (CTQ) 10 S + + + S + Cost of Price Increase (Admin) 7 + - + S S - Resources Required 4 + - S S S - Rework Reduction 7 + S + S + + Standardization/Automation of Process 7 S + + + + + Customer Satisfaction 10 + + + S S + Profitability 10 - + + + + + Sum of Positives 5 5 7 4 4 5 Sum of Negatives 1 2 0 0 0 2 Sum of Sames 2 1 1 4 4 1 Weighted Sum of Positives 38 47 61 37 34 44 Weighted Sum of Negatives 10 11 0 0 0 11 Weighted Score 28 36 61 37 34 33
  • 15. Control Plan 28-11-2016Mehdi Bouazza 15 Process Name: Processing of fast and good music Date: 28-11-16 Control Subject Subject Goals Unit of Meas. Sensor Frequency of Measurement Recording of Measurement/ Tool Used Measured by Whom Less Meetings 1 meeting in 4 months Elapsed Time - Calculate weekly P-Chart Sorter/ Supervisor Fast In time delivery No late deliveries N/A Sorter 1 time a week N/A Superv isor Adequate Fax Machine Toner level to print faxes No late orders due to fax machine out of toner. N/A Sorter 4 Times per day N/A Sorter Distribution of faxed expedite orders to XCC's Sort and distribute all submitted Expedites every 30 min before 10:30AM. Every 15 min. 10:30 to 12:00 Elapsed Time Clock/Watch 1 Delivery per 30 min, 1 Delivery per 15 min. Sorter stamps date/time of distribution on orders XCC's Usage of Message Board when XCC is not available Return time of XCC indicated on message board for every absence >15 min. Message board used per absence Sorter Check every fax distribution cycle N/A Sorter Elapsed Time to Enter Order XCC/Keyer enters with-in 30 minutes of receipt (delivery by Sorter) Elapsed Time Stamped time and Computer Entry Time Whenever performance level drops below 90% on a given day Data Collection Form Supervisor
  • 16. Results Tracking Performance 0 200 400 600 800 1000 1200 1400 1600 AUG-16 SEP-16 OCT-16 NOV-16 DEC-16 JAN-17 PERFORMANCE Errors Improvement DSO 28-11-2016 Mehdi Bouazza 16
  • 17. RECAP  1 big meeting at the end of the quarter  1 meeting a month  Teambuilding regularly a month 28-11-2016Mehdi Bouazza 17