Contract Documents Parts of Construction Documents The Bidding Process & Requirements Construction Contracts- AIA Family of Documents
Part 1 Parts of Construction Documents
Professor Brandi R. Shepard© ACH 216-Construction Management
The basic building blocks of the contract documents are --  Professor Brandi R. Shepard© ACH 216-Construction Management
Drawings are the graphic representation of the work  They show material quantity and location; relationship of spaces to one another: Measurements/dimensions Footprint configuration/layout Siting (location on site) Details of materials & methods Building systems Schedules of Information
What’s included in the  DRAWINGS : Provide graphic representation of all the work to be completed.   Measurements/dimensions Footprint configuration Siting (location on site) Details of Materials & Methods Schedules of Information Building systems Structural, Enclosure, Mechanical/Electrical They show material quantity and location; relationship of spaces to one another BIDDING DOCUMENTS CONSTRUCTION DOCS
Specifications define the qualitative requirements  Verbally describe requirements Presents quality of material & installation Product data Considered the “meat” of the project    manual Testing Standards that must be met Information is organized using CSI 48  Division MasterFormat Introduced in 1963 Standard practice in US and Canada Current Edition: 2004
What’s included in the  SPECIFICATIONS : Technical information about materials indicated on the drawings Information is not easily communicated graphically Written requirements for project  Material Equipment Construction systems & standards Workmanship Specs represent the “quality” of the project PROJECT  MANUAL BIDDING DOCUMENTS CONSTRUCTION DOCS
PROJECT MANUAL Collection of written construction documents and project requirements Focuses on the administrative issues surrounding the project Typically bounded in book format Due to their format, the  Drawings  will always be considered separate from the  Project Manual  and should  NOT  be included in the  Project Manual
What’s included in the  CONTRACT FORMS : Agreement Form Contract required exhibits Bonds Performance Labor and material payment Warranty Maintenance Certificates Insurance Compliance (with stated requirements) Power of Attorney: agent that acts on behalf of the principal  PROJECT  MANUAL BIDDING DOCUMENTS CONSTRUCTION DOCS
 
What’s included in the  CONTRACT CONDITIONS : General Conditions Outlines the legal and regulatory rights, responsibilities and duties of Owner and Contractor (and others (A/E) involved in Project) Supplementary Conditions Modify or extend the standard general conditions Includes provisions relating to payments, retainage and insurance  Special Conditions Used when standard set of Supplementary Conditions need to be further complemented PROJECT  MANUAL BIDDING DOCUMENTS CONSTRUCTION DOCS
Assembled, these building block can be augmented (before bidding) by adding -- Written or graphic documents issued to clarify, revise, add to, or delete information in the original Bidding Documents
What’s included in the  ADDENDA : Written or graphic changes to the contract documents Interpretations of issues brought up by other parties (contractor, owner, A/E) Items to be clarified, corrected or explained Sometimes if many items are brought forward result in new issuance of construction docs Each addendum is to supersede and supplement all portions of bidding docs with which it conflicts Changes are usually bubbled or clouded and include an Addendum # listed in a triangle Should be organized and formatted for easy reference BIDDING DOCUMENTS CONSTRUCTION DOCS
What’s included in the  ADDENDA : Issued  BEFORE  the agreement is signed between owner and contractor Most times issued before bid is submitted Contractor is responsible to call out addenda in bid form  Addenda issued after bid are only given to selected bidder May result in changes to the contract price Addenda become apart of the contract documents Needs to be called out in the bid & agreement Verifies that bidder has reviewed addenda and it’s work is included in bid BIDDING DOCUMENTS CONSTRUCTION DOCS
Because the  Agreement  is expandable, it is still possible to add one element, the  Modifications .  Contract signed between Owner and Contractor stating the contractual and legal obligations to be performed by each party; includes type of contract and required exhibits such as bond and certificates.  AIA A101 or A111 Owner-Contractor Agreement
Because the  Agreement  is expandable, it is still possible to add one element, the  Modifications .
Because the  Agreement  is expandable, it is still possible to add one element, the  Modifications .  After the agreement is signed; changes to the agreement are made by contract modifications
What’s included in the  CONTRACT MODIFICATIONS : Written or graphic changes to the contract documents   AFTER   the agreement has been signed Becomes a  CHANGE ORDER Construction Change Directive Used when the work must be completed and Owner and Contractor can not agree on cost Puts responsibility on architect for determining costs of implementing change order Orders contractor to proceed immediately on work regardless of cost It gets resolved once work is completed CONSTRUCTION DOCS
Before pricing the work, the assembly looks like this -- The  Bidding Requirements , such as the  Instructions to Bidders  and  Bid Form  temporarily bind everything together as a package.
What’s included in the  BIDDING REQUIREMENTS : Invitation to Bid Instructions to Bidders Supplementary Instructions to Bidders Information available to Bidders Preliminary construction schedule Geotechnical data (borings, pit test & reports) Existing conditions (dwgs, specs, descriptions & property survey) Bid Forms and attachments PROJECT  MANUAL BIDDING DOCUMENTS CONSTRUCTION DOCS
What’s included in the  BIDDING REQUIREMENTS : Supplements to Bid Form  (not all are included) Bid Security Forms (if required) Bidder qualifications forms (if required) Substitution Lists (if permitted) Subcontractor Lists/Equipment Suppliers Lists List of Alternates List of estimated quantities (often used with allowances & unit prices) Affidavits  PROJECT  MANUAL BIDDING DOCUMENTS CONSTRUCTION DOCS
The resulting, tightly bound package is call the Contract Documents
NEXT LECTURE-PART 2 The Bidding Process & Requirements

More Related Content

PPTX
Types of Contract in Construction Management
PPT
Construction contracts docuements_08092008
PPTX
Construction disputes
PPTX
Stages In Construction
PDF
Construction Project Management Powerpoint Presentation Slides
PPTX
What is construction management & its Benefits?
DOCX
Bills of quantities
PPTX
Construction claims, disputes and project closure
Types of Contract in Construction Management
Construction contracts docuements_08092008
Construction disputes
Stages In Construction
Construction Project Management Powerpoint Presentation Slides
What is construction management & its Benefits?
Bills of quantities
Construction claims, disputes and project closure

What's hot (20)

PPT
contract procedure
PDF
Project management
PPTX
Construction project delivery methods
PDF
Construction Project Management
PPTX
Types of contract
PPT
Lecture 1 introduction to construction procurement process.
PDF
Project organization_Construction Management (2180611) (Semester-8), Civil En...
DOCX
Traditional procurement method
PPTX
Contracts and-tenders
PPTX
Construction contract
PDF
50451783 taking-off-quantity
PPTX
Construction Project Management
PPTX
CONTRACTS AND ITS TYPES
PDF
Construction Contract in Malaysia
DOCX
Professional practce assignment report
PPTX
Building bye laws
PDF
Fidic contract
PPTX
Construction difficulties
PPTX
QUANTITY SURVEYING
PPTX
Stakeholder’s Involvement in Construction Industry
contract procedure
Project management
Construction project delivery methods
Construction Project Management
Types of contract
Lecture 1 introduction to construction procurement process.
Project organization_Construction Management (2180611) (Semester-8), Civil En...
Traditional procurement method
Contracts and-tenders
Construction contract
50451783 taking-off-quantity
Construction Project Management
CONTRACTS AND ITS TYPES
Construction Contract in Malaysia
Professional practce assignment report
Building bye laws
Fidic contract
Construction difficulties
QUANTITY SURVEYING
Stakeholder’s Involvement in Construction Industry
Ad

Viewers also liked (20)

PPTX
Construction Futures Wales - Collaborative Bidding 1 - EST
PPT
ACH 231 Lecture 07 (Contract Documents) Part 2
PPT
ACH 231 Lecture 07 (Contract Documents) Part 3
PPT
Construction Futures Wales - Collaborative Bidding 2 - Value Wales
PDF
0 list of drawings
PDF
Balai Seni Negeri Drawings
DOCX
keliew CV
PDF
Martin taylor cv 3a
DOCX
MY CV (1)
DOC
PPTX
Welcome to Accommodation
PPT
Post-Tension Concrete - Info session for Contractors
PDF
Quantity Surveyor presentation
PDF
Architectural Working Drawings - الرسومات التنفيذية المعمارية
PPT
Presentación Sherrill Mane
PPTX
2011-11 UW Foster School of Business - Community Development
PPTX
Ur-Energy 2015 2Q Webcast and Teleconference Presentation
PDF
Getting rid of plastic bags in Singapore
PPT
20110329 ure corporate presentation (march 2011)
Construction Futures Wales - Collaborative Bidding 1 - EST
ACH 231 Lecture 07 (Contract Documents) Part 2
ACH 231 Lecture 07 (Contract Documents) Part 3
Construction Futures Wales - Collaborative Bidding 2 - Value Wales
0 list of drawings
Balai Seni Negeri Drawings
keliew CV
Martin taylor cv 3a
MY CV (1)
Welcome to Accommodation
Post-Tension Concrete - Info session for Contractors
Quantity Surveyor presentation
Architectural Working Drawings - الرسومات التنفيذية المعمارية
Presentación Sherrill Mane
2011-11 UW Foster School of Business - Community Development
Ur-Energy 2015 2Q Webcast and Teleconference Presentation
Getting rid of plastic bags in Singapore
20110329 ure corporate presentation (march 2011)
Ad

Similar to ACH 231 Lecture 07 (Contract Documents) Part 1 (20)

PPT
ACH 216 Lecture 04b (Bidding) Part 1
PPT
Architectural Professional Practice - Construction Documents
PPTX
Construction Documents
PDF
UAP Doc. 301BBBBBBBBBBBBBBBBBBBBBBBBB.pdf
PPT
Renovate Repair Legal Issues Owner View
PPT
Procurement and Contract Managgement.ppt
PDF
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
PPTX
Chapter two.pptx
PPT
Tutor construction activity documents ppt4
PPT
ACH 216 Lecture 04b (Bidding) Part 2
PDF
contract Management cchapter 1-6 of fourth year
PPT
construction technology and management
PPTX
Professional practices (lec 03) by k.iqbal
PPT
Fidic flow charts final
PPTX
BID Document.pptxnnnnnnnnnnnnnnnnnnnnnnn
PPT
construction management Tenderin ecg.ppt
PDF
Contract and Types of Contract
DOCX
1. What two major components make up the contract documents 2. .docx
PDF
002-Types of Tender Documents and Specifications.pdf
PPT
contract_management.ppt
ACH 216 Lecture 04b (Bidding) Part 1
Architectural Professional Practice - Construction Documents
Construction Documents
UAP Doc. 301BBBBBBBBBBBBBBBBBBBBBBBBB.pdf
Renovate Repair Legal Issues Owner View
Procurement and Contract Managgement.ppt
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Chapter two.pptx
Tutor construction activity documents ppt4
ACH 216 Lecture 04b (Bidding) Part 2
contract Management cchapter 1-6 of fourth year
construction technology and management
Professional practices (lec 03) by k.iqbal
Fidic flow charts final
BID Document.pptxnnnnnnnnnnnnnnnnnnnnnnn
construction management Tenderin ecg.ppt
Contract and Types of Contract
1. What two major components make up the contract documents 2. .docx
002-Types of Tender Documents and Specifications.pdf
contract_management.ppt

More from Anne Arundel Community College (20)

PPTX
Green team iceland presentation with audio
PPTX
ACH 122 Lecture 05a (Brick Masonry)
PPTX
ACH 122 Lecture 02 (Sustainability Leed)
PPT
ACH 122 Lecture 04a (Excavation & Foundations P1)
PPT
ACH 218 Lecture 04 (Marketing In Construction) Part 2
PPT
ACH 218 Lecture 04 (Marketing In Construction) Part 1
PPT
ACH 218 Lecture 03 (Organizational Structure) Part1
PPT
ACH 218 Lecture 03 (Organizational Structure) Part1
PPT
ACH 122 Lecture 01 (Bldg Codes)
PPT
ACH 122 Lecture 01 (Bldg Codes)
PPT
ACH 122 Lecture 01 (Bldg Codes)
PPT
ACH 245 Lecture 02 (Intro To Cad 2010)
PPT
ACH 245 Lecture 03 (Drawing 2010)
PPT
Ach 245 Lecture 01 (Fundamentals) Vista
PPT
ACH 216 Lecture 12 (Closeut & Turnover)
PPT
ACH 121 Lecture 14 (Finishes)
PPT
ACH 121 Lecture 13 (Special Construction)
PPT
ACH 216 Lecture 11 (Safety)
PPT
ACH 216 Lecture 08 (Scheduling)
PPT
ACH 216 Lecture 09 (Issues During Project)
Green team iceland presentation with audio
ACH 122 Lecture 05a (Brick Masonry)
ACH 122 Lecture 02 (Sustainability Leed)
ACH 122 Lecture 04a (Excavation & Foundations P1)
ACH 218 Lecture 04 (Marketing In Construction) Part 2
ACH 218 Lecture 04 (Marketing In Construction) Part 1
ACH 218 Lecture 03 (Organizational Structure) Part1
ACH 218 Lecture 03 (Organizational Structure) Part1
ACH 122 Lecture 01 (Bldg Codes)
ACH 122 Lecture 01 (Bldg Codes)
ACH 122 Lecture 01 (Bldg Codes)
ACH 245 Lecture 02 (Intro To Cad 2010)
ACH 245 Lecture 03 (Drawing 2010)
Ach 245 Lecture 01 (Fundamentals) Vista
ACH 216 Lecture 12 (Closeut & Turnover)
ACH 121 Lecture 14 (Finishes)
ACH 121 Lecture 13 (Special Construction)
ACH 216 Lecture 11 (Safety)
ACH 216 Lecture 08 (Scheduling)
ACH 216 Lecture 09 (Issues During Project)

Recently uploaded (20)

PDF
Trusted Executive Protection Services in Ontario — Discreet & Professional.pdf
PPTX
Fundamental Principles of Visual Graphic Design.pptx
PDF
The Advantages of Working With a Design-Build Studio
PPTX
Entrepreneur intro, origin, process, method
PPTX
Media And Information Literacy for Grade 12
PPTX
Wisp Textiles: Where Comfort Meets Everyday Style
PDF
GREEN BUILDING MATERIALS FOR SUISTAINABLE ARCHITECTURE AND BUILDING STUDY
PDF
Emailing DDDX-MBCaEiB.pdf DDD_Europe_2022_Intro_to_Context_Mapping_pdf-165590...
PDF
YOW2022-BNE-MinimalViableArchitecture.pdf
PDF
UNIT 1 Introduction fnfbbfhfhfbdhdbdto Java.pptx.pdf
PDF
Integrated-2D-and-3D-Animation-Bridging-Dimensions-for-Impactful-Storytelling...
PPTX
building Planning Overview for step wise design.pptx
PDF
Facade & Landscape Lighting Techniques and Trends.pptx.pdf
PPTX
AC-Unit1.pptx CRYPTOGRAPHIC NNNNFOR ALL
PPT
pump pump is a mechanism that is used to transfer a liquid from one place to ...
PPTX
Special finishes, classification and types, explanation
PPTX
CLASS_11_BUSINESS_STUDIES_PPT_CHAPTER_1_Business_Trade_Commerce.pptx
PPTX
HPE Aruba-master-icon-library_052722.pptx
PPT
EGWHermeneuticsffgggggggggggggggggggggggggggggggg.ppt
PPT
UNIT I- Yarn, types, explanation, process
Trusted Executive Protection Services in Ontario — Discreet & Professional.pdf
Fundamental Principles of Visual Graphic Design.pptx
The Advantages of Working With a Design-Build Studio
Entrepreneur intro, origin, process, method
Media And Information Literacy for Grade 12
Wisp Textiles: Where Comfort Meets Everyday Style
GREEN BUILDING MATERIALS FOR SUISTAINABLE ARCHITECTURE AND BUILDING STUDY
Emailing DDDX-MBCaEiB.pdf DDD_Europe_2022_Intro_to_Context_Mapping_pdf-165590...
YOW2022-BNE-MinimalViableArchitecture.pdf
UNIT 1 Introduction fnfbbfhfhfbdhdbdto Java.pptx.pdf
Integrated-2D-and-3D-Animation-Bridging-Dimensions-for-Impactful-Storytelling...
building Planning Overview for step wise design.pptx
Facade & Landscape Lighting Techniques and Trends.pptx.pdf
AC-Unit1.pptx CRYPTOGRAPHIC NNNNFOR ALL
pump pump is a mechanism that is used to transfer a liquid from one place to ...
Special finishes, classification and types, explanation
CLASS_11_BUSINESS_STUDIES_PPT_CHAPTER_1_Business_Trade_Commerce.pptx
HPE Aruba-master-icon-library_052722.pptx
EGWHermeneuticsffgggggggggggggggggggggggggggggggg.ppt
UNIT I- Yarn, types, explanation, process

ACH 231 Lecture 07 (Contract Documents) Part 1

  • 1. Contract Documents Parts of Construction Documents The Bidding Process & Requirements Construction Contracts- AIA Family of Documents
  • 2. Part 1 Parts of Construction Documents
  • 3. Professor Brandi R. Shepard© ACH 216-Construction Management
  • 4. The basic building blocks of the contract documents are -- Professor Brandi R. Shepard© ACH 216-Construction Management
  • 5. Drawings are the graphic representation of the work They show material quantity and location; relationship of spaces to one another: Measurements/dimensions Footprint configuration/layout Siting (location on site) Details of materials & methods Building systems Schedules of Information
  • 6. What’s included in the DRAWINGS : Provide graphic representation of all the work to be completed. Measurements/dimensions Footprint configuration Siting (location on site) Details of Materials & Methods Schedules of Information Building systems Structural, Enclosure, Mechanical/Electrical They show material quantity and location; relationship of spaces to one another BIDDING DOCUMENTS CONSTRUCTION DOCS
  • 7. Specifications define the qualitative requirements Verbally describe requirements Presents quality of material & installation Product data Considered the “meat” of the project manual Testing Standards that must be met Information is organized using CSI 48 Division MasterFormat Introduced in 1963 Standard practice in US and Canada Current Edition: 2004
  • 8. What’s included in the SPECIFICATIONS : Technical information about materials indicated on the drawings Information is not easily communicated graphically Written requirements for project Material Equipment Construction systems & standards Workmanship Specs represent the “quality” of the project PROJECT MANUAL BIDDING DOCUMENTS CONSTRUCTION DOCS
  • 9. PROJECT MANUAL Collection of written construction documents and project requirements Focuses on the administrative issues surrounding the project Typically bounded in book format Due to their format, the Drawings will always be considered separate from the Project Manual and should NOT be included in the Project Manual
  • 10. What’s included in the CONTRACT FORMS : Agreement Form Contract required exhibits Bonds Performance Labor and material payment Warranty Maintenance Certificates Insurance Compliance (with stated requirements) Power of Attorney: agent that acts on behalf of the principal PROJECT MANUAL BIDDING DOCUMENTS CONSTRUCTION DOCS
  • 11.  
  • 12. What’s included in the CONTRACT CONDITIONS : General Conditions Outlines the legal and regulatory rights, responsibilities and duties of Owner and Contractor (and others (A/E) involved in Project) Supplementary Conditions Modify or extend the standard general conditions Includes provisions relating to payments, retainage and insurance Special Conditions Used when standard set of Supplementary Conditions need to be further complemented PROJECT MANUAL BIDDING DOCUMENTS CONSTRUCTION DOCS
  • 13. Assembled, these building block can be augmented (before bidding) by adding -- Written or graphic documents issued to clarify, revise, add to, or delete information in the original Bidding Documents
  • 14. What’s included in the ADDENDA : Written or graphic changes to the contract documents Interpretations of issues brought up by other parties (contractor, owner, A/E) Items to be clarified, corrected or explained Sometimes if many items are brought forward result in new issuance of construction docs Each addendum is to supersede and supplement all portions of bidding docs with which it conflicts Changes are usually bubbled or clouded and include an Addendum # listed in a triangle Should be organized and formatted for easy reference BIDDING DOCUMENTS CONSTRUCTION DOCS
  • 15. What’s included in the ADDENDA : Issued BEFORE the agreement is signed between owner and contractor Most times issued before bid is submitted Contractor is responsible to call out addenda in bid form Addenda issued after bid are only given to selected bidder May result in changes to the contract price Addenda become apart of the contract documents Needs to be called out in the bid & agreement Verifies that bidder has reviewed addenda and it’s work is included in bid BIDDING DOCUMENTS CONSTRUCTION DOCS
  • 16. Because the Agreement is expandable, it is still possible to add one element, the Modifications . Contract signed between Owner and Contractor stating the contractual and legal obligations to be performed by each party; includes type of contract and required exhibits such as bond and certificates. AIA A101 or A111 Owner-Contractor Agreement
  • 17. Because the Agreement is expandable, it is still possible to add one element, the Modifications .
  • 18. Because the Agreement is expandable, it is still possible to add one element, the Modifications . After the agreement is signed; changes to the agreement are made by contract modifications
  • 19. What’s included in the CONTRACT MODIFICATIONS : Written or graphic changes to the contract documents AFTER the agreement has been signed Becomes a CHANGE ORDER Construction Change Directive Used when the work must be completed and Owner and Contractor can not agree on cost Puts responsibility on architect for determining costs of implementing change order Orders contractor to proceed immediately on work regardless of cost It gets resolved once work is completed CONSTRUCTION DOCS
  • 20. Before pricing the work, the assembly looks like this -- The Bidding Requirements , such as the Instructions to Bidders and Bid Form temporarily bind everything together as a package.
  • 21. What’s included in the BIDDING REQUIREMENTS : Invitation to Bid Instructions to Bidders Supplementary Instructions to Bidders Information available to Bidders Preliminary construction schedule Geotechnical data (borings, pit test & reports) Existing conditions (dwgs, specs, descriptions & property survey) Bid Forms and attachments PROJECT MANUAL BIDDING DOCUMENTS CONSTRUCTION DOCS
  • 22. What’s included in the BIDDING REQUIREMENTS : Supplements to Bid Form (not all are included) Bid Security Forms (if required) Bidder qualifications forms (if required) Substitution Lists (if permitted) Subcontractor Lists/Equipment Suppliers Lists List of Alternates List of estimated quantities (often used with allowances & unit prices) Affidavits PROJECT MANUAL BIDDING DOCUMENTS CONSTRUCTION DOCS
  • 23. The resulting, tightly bound package is call the Contract Documents
  • 24. NEXT LECTURE-PART 2 The Bidding Process & Requirements