REPORT ASSIGNMENT (Group Project)
PROFESSIONAL PRACTICE 1 (QSB60604104837)
SCHOOL OF ARCHITECTURE. BUILDING. DESIGN
BACHELOR OF QUANTITY SURVEYING (HONOURS)
NAME: STUDENT ID:
CHUA JIA CHENG 0315260
HJ MUHD SYAFIQ BIN HJ ABD
ZARIFUL
0314702
LECTURER : Ramar Subramaniam
1 Tendering
Tendering is a process made by contractor to client, usually in competition, which if
accepted by the employer, will form a binding contract. Different types of tendering
leads to different benefits and limitations
1.1 Open Tendering
Under open tendering the employer advertises his proposed project, giving notice
that the contract is being tendered, offering an equal opportunity to any organisation
where the employer permits as many contractors as are interested to apply for tender
documents.
On larger projects, there may then be a pre-qualification process that produces a
short-list of suitable suppliers from the respondents expressing interest in the contract.
This short list will then be invited to prepare tenders. The selection of a short list can
include pre-qualification questionnaires and interviews. This sort of pre-qualification
process is not the same as selective tendering. Selective tendering only allows
suppliers invited from a pre-selected list to take part in the tender process.
Open Tendering can be said to be wasteful of contractors’ resources since many may
spend time preparing tenders to no effect. Also, knowing their chances of gaining
the contract are small, contractors may not study the contract in detail to work out
their minimum price, but simply quote a price that will be certain to bring them a
profit if they win the contract.
As a result it can waste a great deal of time, effort and money. However, open
tendering offers the greatest competition and has the advantage of allowing new or
emerging suppliers to try to secure work and so can facilitates greater
innovation.
1.1.1 Main Advantages:
 All contractors can tender for work: It gives opportunity for an unknown
contractor to compete for the work. Allowing the tender list to be made
without bias. Client will obtain the bargain possible. No favouritism in
selecting contractors. Promotes fairness.
 Difficult to reject lowest bid: Client does not bind to accept the lowest or any
offer but public accountability may be questioned if the lowest offer is not
accepted.
 Familiar with the system: Traditional method of tendering, familiar to all
sector of the engineering and construction industry.
1.1.2 Main Disadvantages:
 The tender list can be long as too many contractors tendering for one job:
This does not attract established contractor unless they are forced to, due to
lack of work.
 Risk of selecting new/unknown contractor: The project will be at risk if it
happens to be a contractor with poor workmanship, poor organisation and
especially no experience on the type of works being tendered.
 Longer tender process: with too many contractors to deal with it might take
longer to finish the tender process which includes the pre-qualification
process.
1.2 Selective Tendering
Certain Contractors are invited to tender. These Contractors are selected on their
integrity, ability and characteristics before they are invited to tender. It follows those
only firms of sufficient standing and experience in that particular type of work will be
approached. The lowest tender will generally have to be accepted since
contractors have all pre-qualified where it is difficult to reject the lowest bid,
evenif it appears dubiously low, unless that is due to some obvious mistake.
Consultants or experienced clients may maintain ‘approved’ lists of prospective
suppliers appropriate for particular types of contract and then regularly review
performance to assess whether they should remain on the list.
The advantage to the employer is that he can select only those contractors, who have
adequate experience, are financially sound, and have the resources and skills to
do the work. Selective tendering will tend to be faster than open tendering, and can
be seen as less wasteful, as there is no pre-qualification process as part of the
tender procedure itself. It can also give clients greater confidence that their
requirements will be satisfied.
Whilst often seen to be more efficient, selective tendering can exclude potential
suppliers, it can be seento introduce bias into the process, and it can result in
prospective suppliers continually contacting clients and consultants to check that they
are on the appropriate lists.
1.2.1 Main Advantages:
 Only properly qualified tenderers will be tendering: This reduces the
availability of work for other contractor especially new contractors.
 It reduced the cost of tendering: Reduces the cost of economic use of
resources, reduced tender documentation, shorter tender periods, better
management of the tender process.
 Less wasteful: No pre-qualification process which saves time for the project
and can be considered less wasteful
1.2.2 Main Disadvantages:
 Longer tendering period: It involved two distinct stages (Two Stage
Selective Tender)
 Higher price: Tender Price may invariably higher than would have been in
open tendering.
 Preparation of lists: This may undergo more resources by the employer.
1.3 Negotiated Tendering
Negotiated tenders are obtained by the employer inviting a contractor of his choice
to submit prices for a project. Negotiating with a single supplier may be appropriate
for highly specialist contracts (where there may be a limited number of potential
suppliers), or for extending the scope of an existing contract. It can give the client the
confidence of working with a supplier they already know, can reduce the
duration and costs of tendering and can allow early supplier involvement. Often
the services of a Quantity Surveyor is used to advise on rates and prices during
negotiations.
When invited to tender the contractor submits his prices, and if there are any queries
these are discussed and usually settled without difficulty. Thus mistakes in pricing
can be reduced, so that both the engineer advising the employer and the contractor
are confident that the job should be completed to budget if no unforeseen troubles
arise.
Most of the reasons for applying negotiated tender are when there is a very tight
deadline, emergency works are necessary, the employer's resources are either limited
or constrained thereby making the use of the other tendering impractical,
technicalities around the design and development of details can require the specialist
knowledge of the Contractor, or where the final cost requires to be estalished at an
early stage of development and the design will be controlled by the costs. A
negotiated tender has a good chance of being satisfactory because, more often than
not, the employer and the contractor base it on previous satisfactory working together.
Negotiated tendering can be seen as anti-competitive and exclusive, with the potential
for ‘cozy’ relationships to develop between the client and the supplier. Negotiated
tendering may not be permitted by some organisations due to the perceived lack
of accountability. Negotiated tenders for public works are rare because the standing
rules of public authorities do not normally permit them. But a private employer or
company not subject to restraints such as those mentioned in the next section can
always negotiate a contract, and many do so, particularly for small jobs.
1.3.1 Main Advantages:
 Only reputable contractor are invited for negotiation: With proven
experience, the employer does not have to worry about the risks of the project
being in danger because of the high quality of workmanship that can normally
be expected.
 Higher buildability: The contractor can contribute his expertise during design
stage
 Early commencement of work on site: It shortens the period involved in
appointing the contractor.
1.3.2 Main Disadvantages:
 Opposite effect (Backfired): Should the negotiations prove unsuccessful, this
causes wastage of valuable resources on both sides and loss of time for the
employer, which delays the overall selection of the contractor.
 Cost of Work: Generally resulting in higher prices than other methods of
tendering.
 Public matters: Lack of accountability and integrity may be in question.
2 Procurement
Procurement is define as the action of obtaining or procuring something. It also means
acquiring military equipment and supplies. In construction the term procurement
refers to a system which includes determining the condition of the project, setting the
contractual framework, setting tender, tender selection and evaluation and also
awarding of contract to contractor. Procurement is the primary steps of the
construction, a correct procurement system will lead to a success projects and
different procurement system allows different benefits and different restriction. The
four method that we learned in professional practice 1 is conventional procurement
system, design and build, managing contracting and, construction management.
2.1 Traditional/ Conventional Procurement
Construction process is separated from design process. The procurement system starts
with the employers approaching the design consultants to generate a full detail set of
tender documents with BQ, drawings, specifications & addendum specifications, form
of contract and many more. Then the employers will call for tender by using one of
the various method of tendering. The selected tenderers will be assigned will a Letter
of acceptance and the main contractor will have full responsibility on the construction
based on the drawings and specifications. Through this procurement system the
employer will have direct contractual relationships with 2 parties which are the
consultant for design and advices, and contractor to carry out the construction work.
2.1.1 Advantage of Traditional Procurement
 Familiar with its working: Since it is the traditional method, this
procurement system started a few decades before alternative procurement
system was even born. Therefore, all the parties like QS, Architects,
Engineers, and even contractors are familiar with the system and understand
how to work with each another understanding each other needs and motives. It
also smooths the procurement process due to the experience of all party in this
procurement method.
 Better Control of Work: The construction work is restricted and the
contractor that is awarded need to construct the building base on the
consultant design and specification which ensure the quality of the
construction because the works are pre-calculated and determined to be safe
and higher workability. The employer can also have a greater involvement in
the project.
2.1.2 Disadvantages of Traditional Procurement
 Creates “Them and Us” attitude: When a bad situation happens, the
employer will have trouble in putting the blame because he has two direct
contractual relationship with two main parties which are the consultants and
the main contractor. The main contractor will have their finger pointed on the
consultant to blame them on their bad design which creates the accident while
the consultant will blame the contractor on cutting corners to safe cost and
budgets, thus the employers will need to bring the disputes to the court.
 Less flexible: The contractor assigned may not use to the construction method
use by the consultant in their drawing. Even though the contractor is not
experience with the listed method but he still need to follows the outline and
brief set by the consultant. Thus creating much more chances for the
construction to be delay or collapsing which means the risk of accident is
higher.
 Slow and long duration: Traditional procurement system are slow, this is
because the employers needs advice from the consultant and participate to
produce the full outlined set for the contractor to construct. The design and
planning has comes before the construction phase and the construction phase
will start after the award of tender where the full design is completed with
certain specification. Hence the design and construction phases are
consequential and resulting a slower completion of the project.
2.2 Designand Build Procurement
Unlike traditional procurement system where the employer can choose to outsource
the design process by appointing the consultants for designs and advice on the project
during design stage and after the need statement create by architect is done then the
employers will call for tender where tenderers offer tenders for the project. Design
and Build procurement system can have both the design and build parallel, the full
design will be complete as the construction completes. In Design and Build
procurement system, the employer would 1st hire an architect to come out with
preliminaries design. This design is just a rough design where the tenderers will
complete to detail during the tendering process. After the preliminaries design is
done, the employers will call for tender. Tender evaluation will take much time
because there will be different prices as usual but also different design with different
specification. So as a consultant QS this will be the most crucial part to evaluate the
best tender but the final decision is still belongs to the employer. When the tender is
awarded the contractor will employed an architect or the employer’s architect will
change the contractual relationship from the employer to the contractor, this process is
call novation.
2.2.1 Advantages of Design and Build
 Fast completion of construction: As construction period is able to overlap
with the design phase therefore it allow much time saved compare to the
conventional method. This is because the main contractor himself is in full
control of the construction, nobody is more familiar to oneself. As an example
the main contractor design team may generate the design for only 1st floor and
the main contractor can coordinate the subcontractor to come to perform their
works based on the available drawing and on the mean time the design team
will prepare design for the next part of the building.
 Eliminate “Them and Us” attitude: Due to the main contractor single point
of contractual relationship with the employer. Employer can always search for
contractor when the construction does not go well. The main contractor which
has full responsible in both quality, cost, and schedule adherence will have to
bare the mistake and unable to point finger to another party. Main contractor
has full responsibility over the project, he is in charge of the design, the
engineering works, subcontractor’s works, M&E works, and many more.
Therefore the contractor will be more familiar with the design and concept of
the building which result in a better buildability of the project.
 Improve risk management: All the cost, construction schedule and quality of
construction and responsibilities are appropriately balanced and all the fault is
on the Main contractor which greatly reduce the risk of the employer.
Changing in plans and0 orders due to “errors and omissions” are totally
eliminated, because the main contractor had full responsibility for developing
drawings and specifications as well as constructing a fully-functioning facility.
2.2.2 Disadvantages of Designand Build
 Higher contract price: Peter parker says greater power required greater
responsibility, Mr Ramar says greater risks required greater pay. As the main
contractor bare all of the responsibility in the construction, the contractor will
have a higher tender price and higher budget as they include all the elements
to complete the total construction. The price is the total construction cost
instead of total building cost. It is also an uneconomic use of resources
because of the relatively high price of the contract.
 Difficulty in evaluation of tender: Evaluation is no longer just numbers, but
also includes design, specification, time, qualities and many more factor. This
is very important as the tenderers has full responsibility in the total
construction so they have the power to manage and design the whole building
which the employer need to carefully evaluate to avoid lost and bad qualities
of products.
Before any tendering process can be done, professional team and employer must
make sure all necessary tender documents have been prepared, checked and approved.
RECCOMENDATION
What types of tendering that employer want to choose depends on the nature of
contract, complexity of the construction, expertise needed and several reasons. But
usually for the government project all over the world tends to make open tender to
ensure the procurement and works to be done in fairly manner without prejudice.
However, Taylor's University is considering building a multi-storey car park building
in the vicinity of the campus to overcome the seious shortage of car park space, which
is one of the reasons why we prefer to use selective tendering because of the needs for
high quality to avoid any dangers/risks towards the students.
They're many reasons why we reccomend choosing selective tendering other than
open tendering and negotiated tendering.
-
-
-
-
A problem with both open and selective tendering is that a contractor’s circumstances
can change after he has submitted his tender. He can make losses on other contracts
which affect his financial stability; or may be so successful at tendering that he does
not have enough skilled staff or men to deal with all the work he wins. Neither
method of tendering nor any other means of procuring works can therefore guarantee
avoidance of troubles.
Reference
1) AWARD-WINNING. (2010). Retrieved October 12, 2015.
2) Natasa, T., Mladen, R., & Diana, C. (2007). "DESIGN AND BUILD" IN
COMPARISON WITH THE TRADITIONAL PROCUREMENT
METHOD AND THE POSSIBILITY OF ITS APPLICATION IN THE
CROATIAN CONSTRUCTION INDUSTRY. RetrievedOctober 12,
2015.

More Related Content

PDF
Professional Practice 1
PDF
Professional Practice 1 Group Assignment
DOCX
PP1 assignment
PDF
Professional practice 1 report
PDF
Professional practice 1 (QS)
DOCX
Pp group assignment
PPTX
A Case Study based on FIDIC and PAM Form 2006
PDF
Assignmenr for pp2 final account
Professional Practice 1
Professional Practice 1 Group Assignment
PP1 assignment
Professional practice 1 report
Professional practice 1 (QS)
Pp group assignment
A Case Study based on FIDIC and PAM Form 2006
Assignmenr for pp2 final account

What's hot (20)

DOCX
Professional Practice 1 Assignment
PDF
Assignment - Management Contracting
PPTX
Ppt on fidic claims
PPTX
PPTX
Tendering Bidding & Award of Contract Final Draft
PPT
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
DOCX
Professional Practice 2: Group Assignment
PPSX
Tendering Document for the Procurement of Works
PPTX
Types of contracts
PDF
Pp2 p5
PPTX
Tender procedure slide
PPTX
Site possession
PPT
Construction contracts docuements_08092008
PDF
design bid build or Traditional contract shortcomings and alternative method,...
PDF
Engineering, Procurement and Construction Contracts for Infrastructure Projec...
PPTX
Fidic Form of Contract.
PPTX
Chapter_2-Procurement and Contract management.pptx
PPTX
Time management in fidic red book 2017(prmg080 project)
DOCX
CL Final Report
PDF
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Professional Practice 1 Assignment
Assignment - Management Contracting
Ppt on fidic claims
Tendering Bidding & Award of Contract Final Draft
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
Professional Practice 2: Group Assignment
Tendering Document for the Procurement of Works
Types of contracts
Pp2 p5
Tender procedure slide
Site possession
Construction contracts docuements_08092008
design bid build or Traditional contract shortcomings and alternative method,...
Engineering, Procurement and Construction Contracts for Infrastructure Projec...
Fidic Form of Contract.
Chapter_2-Procurement and Contract management.pptx
Time management in fidic red book 2017(prmg080 project)
CL Final Report
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Ad

Similar to Professional practce assignment report (20)

DOCX
Pp1 group assignment
DOCX
Professional Practice 1 Proposal Report
PPTX
Mesurement presentation pavaruban
PPTX
Professional practce
PPTX
TENDERS.pptx
PDF
PP1 Tutorial 3 Presentation
PDF
Pp1 assignment group 8
PDF
PPTX
Unit 5 Tendering
PPTX
Tendering & Pre Construction Operations in Construction
PDF
72240273-3E74-4267-8F7B-E1FBB64A7A4C.pdf
PPT
Chapter 4 - developing a contract mangement plan gui sv.ppt
PPTX
Tendering
PDF
Professional Practice I Assignment
PDF
Tendering documentation
PPTX
Unit V - Contracts.pptx
PPTX
eeec ppt001.pptx
PPTX
Tender & its process.pptx
PPTX
WHAT IS E-TENDERING
Pp1 group assignment
Professional Practice 1 Proposal Report
Mesurement presentation pavaruban
Professional practce
TENDERS.pptx
PP1 Tutorial 3 Presentation
Pp1 assignment group 8
Unit 5 Tendering
Tendering & Pre Construction Operations in Construction
72240273-3E74-4267-8F7B-E1FBB64A7A4C.pdf
Chapter 4 - developing a contract mangement plan gui sv.ppt
Tendering
Professional Practice I Assignment
Tendering documentation
Unit V - Contracts.pptx
eeec ppt001.pptx
Tender & its process.pptx
WHAT IS E-TENDERING
Ad

More from Syafiq Zariful (20)

DOC
Conference paper-11-9-2017
DOCX
De assignment compile
DOCX
Pm group-compileddd
DOCX
Finalized dissertation (print 80 gram hardcover)
DOCX
07 cl-assignment-syafiq-qy-macy-huiyong-deric
DOCX
Vm report-most-updated-2
PPTX
Pp2 seminar
DOCX
Research proposal final draft
DOCX
Software assignment
PPTX
Software applications-presentation
DOCX
Community service-report-syafiq-2
DOCX
1,2 & 3,4 ratio analysis updated
DOCX
Financial management assignment (f) summarized 4
PPTX
Building economics presentation 3 2
PPTX
Fm presentation final
DOCX
Compiled fm assignment (complete)
PPTX
Estimating presentation
DOCX
Software application finalized group report
PPTX
Presentation measurement part 2
PPTX
Bs 2 assignment presentation1
Conference paper-11-9-2017
De assignment compile
Pm group-compileddd
Finalized dissertation (print 80 gram hardcover)
07 cl-assignment-syafiq-qy-macy-huiyong-deric
Vm report-most-updated-2
Pp2 seminar
Research proposal final draft
Software assignment
Software applications-presentation
Community service-report-syafiq-2
1,2 & 3,4 ratio analysis updated
Financial management assignment (f) summarized 4
Building economics presentation 3 2
Fm presentation final
Compiled fm assignment (complete)
Estimating presentation
Software application finalized group report
Presentation measurement part 2
Bs 2 assignment presentation1

Recently uploaded (20)

PPTX
ICG2025_ICG 6th steering committee 30-8-24.pptx
DOCX
Euro SEO Services 1st 3 General Updates.docx
PDF
Dr. Enrique Segura Ense Group - A Self-Made Entrepreneur And Executive
DOCX
unit 1 COST ACCOUNTING AND COST SHEET
PDF
20250805_A. Stotz All Weather Strategy - Performance review July 2025.pdf
PDF
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
PDF
Laughter Yoga Basic Learning Workshop Manual
PPTX
HR Introduction Slide (1).pptx on hr intro
PDF
Business model innovation report 2022.pdf
PDF
Types of control:Qualitative vs Quantitative
PPTX
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
DOCX
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
PDF
MSPs in 10 Words - Created by US MSP Network
PDF
IFRS Notes in your pocket for study all the time
PDF
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
PDF
Deliverable file - Regulatory guideline analysis.pdf
PPTX
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
PDF
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
PPTX
Dragon_Fruit_Cultivation_in Nepal ppt.pptx
PPTX
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
ICG2025_ICG 6th steering committee 30-8-24.pptx
Euro SEO Services 1st 3 General Updates.docx
Dr. Enrique Segura Ense Group - A Self-Made Entrepreneur And Executive
unit 1 COST ACCOUNTING AND COST SHEET
20250805_A. Stotz All Weather Strategy - Performance review July 2025.pdf
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
Laughter Yoga Basic Learning Workshop Manual
HR Introduction Slide (1).pptx on hr intro
Business model innovation report 2022.pdf
Types of control:Qualitative vs Quantitative
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
MSPs in 10 Words - Created by US MSP Network
IFRS Notes in your pocket for study all the time
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
Deliverable file - Regulatory guideline analysis.pdf
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
Dragon_Fruit_Cultivation_in Nepal ppt.pptx
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh

Professional practce assignment report

  • 1. REPORT ASSIGNMENT (Group Project) PROFESSIONAL PRACTICE 1 (QSB60604104837) SCHOOL OF ARCHITECTURE. BUILDING. DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) NAME: STUDENT ID: CHUA JIA CHENG 0315260 HJ MUHD SYAFIQ BIN HJ ABD ZARIFUL 0314702 LECTURER : Ramar Subramaniam
  • 2. 1 Tendering Tendering is a process made by contractor to client, usually in competition, which if accepted by the employer, will form a binding contract. Different types of tendering leads to different benefits and limitations 1.1 Open Tendering Under open tendering the employer advertises his proposed project, giving notice that the contract is being tendered, offering an equal opportunity to any organisation where the employer permits as many contractors as are interested to apply for tender documents. On larger projects, there may then be a pre-qualification process that produces a short-list of suitable suppliers from the respondents expressing interest in the contract. This short list will then be invited to prepare tenders. The selection of a short list can include pre-qualification questionnaires and interviews. This sort of pre-qualification process is not the same as selective tendering. Selective tendering only allows suppliers invited from a pre-selected list to take part in the tender process. Open Tendering can be said to be wasteful of contractors’ resources since many may spend time preparing tenders to no effect. Also, knowing their chances of gaining the contract are small, contractors may not study the contract in detail to work out their minimum price, but simply quote a price that will be certain to bring them a profit if they win the contract. As a result it can waste a great deal of time, effort and money. However, open tendering offers the greatest competition and has the advantage of allowing new or emerging suppliers to try to secure work and so can facilitates greater innovation. 1.1.1 Main Advantages:  All contractors can tender for work: It gives opportunity for an unknown contractor to compete for the work. Allowing the tender list to be made without bias. Client will obtain the bargain possible. No favouritism in selecting contractors. Promotes fairness.  Difficult to reject lowest bid: Client does not bind to accept the lowest or any offer but public accountability may be questioned if the lowest offer is not accepted.  Familiar with the system: Traditional method of tendering, familiar to all sector of the engineering and construction industry. 1.1.2 Main Disadvantages:  The tender list can be long as too many contractors tendering for one job: This does not attract established contractor unless they are forced to, due to lack of work.  Risk of selecting new/unknown contractor: The project will be at risk if it happens to be a contractor with poor workmanship, poor organisation and especially no experience on the type of works being tendered.  Longer tender process: with too many contractors to deal with it might take longer to finish the tender process which includes the pre-qualification process.
  • 3. 1.2 Selective Tendering Certain Contractors are invited to tender. These Contractors are selected on their integrity, ability and characteristics before they are invited to tender. It follows those only firms of sufficient standing and experience in that particular type of work will be approached. The lowest tender will generally have to be accepted since contractors have all pre-qualified where it is difficult to reject the lowest bid, evenif it appears dubiously low, unless that is due to some obvious mistake. Consultants or experienced clients may maintain ‘approved’ lists of prospective suppliers appropriate for particular types of contract and then regularly review performance to assess whether they should remain on the list. The advantage to the employer is that he can select only those contractors, who have adequate experience, are financially sound, and have the resources and skills to do the work. Selective tendering will tend to be faster than open tendering, and can be seen as less wasteful, as there is no pre-qualification process as part of the tender procedure itself. It can also give clients greater confidence that their requirements will be satisfied. Whilst often seen to be more efficient, selective tendering can exclude potential suppliers, it can be seento introduce bias into the process, and it can result in prospective suppliers continually contacting clients and consultants to check that they are on the appropriate lists. 1.2.1 Main Advantages:  Only properly qualified tenderers will be tendering: This reduces the availability of work for other contractor especially new contractors.  It reduced the cost of tendering: Reduces the cost of economic use of resources, reduced tender documentation, shorter tender periods, better management of the tender process.  Less wasteful: No pre-qualification process which saves time for the project and can be considered less wasteful 1.2.2 Main Disadvantages:  Longer tendering period: It involved two distinct stages (Two Stage Selective Tender)  Higher price: Tender Price may invariably higher than would have been in open tendering.  Preparation of lists: This may undergo more resources by the employer.
  • 4. 1.3 Negotiated Tendering Negotiated tenders are obtained by the employer inviting a contractor of his choice to submit prices for a project. Negotiating with a single supplier may be appropriate for highly specialist contracts (where there may be a limited number of potential suppliers), or for extending the scope of an existing contract. It can give the client the confidence of working with a supplier they already know, can reduce the duration and costs of tendering and can allow early supplier involvement. Often the services of a Quantity Surveyor is used to advise on rates and prices during negotiations. When invited to tender the contractor submits his prices, and if there are any queries these are discussed and usually settled without difficulty. Thus mistakes in pricing can be reduced, so that both the engineer advising the employer and the contractor are confident that the job should be completed to budget if no unforeseen troubles arise. Most of the reasons for applying negotiated tender are when there is a very tight deadline, emergency works are necessary, the employer's resources are either limited or constrained thereby making the use of the other tendering impractical, technicalities around the design and development of details can require the specialist knowledge of the Contractor, or where the final cost requires to be estalished at an early stage of development and the design will be controlled by the costs. A negotiated tender has a good chance of being satisfactory because, more often than not, the employer and the contractor base it on previous satisfactory working together. Negotiated tendering can be seen as anti-competitive and exclusive, with the potential for ‘cozy’ relationships to develop between the client and the supplier. Negotiated tendering may not be permitted by some organisations due to the perceived lack of accountability. Negotiated tenders for public works are rare because the standing rules of public authorities do not normally permit them. But a private employer or company not subject to restraints such as those mentioned in the next section can always negotiate a contract, and many do so, particularly for small jobs. 1.3.1 Main Advantages:  Only reputable contractor are invited for negotiation: With proven experience, the employer does not have to worry about the risks of the project being in danger because of the high quality of workmanship that can normally be expected.  Higher buildability: The contractor can contribute his expertise during design stage  Early commencement of work on site: It shortens the period involved in appointing the contractor. 1.3.2 Main Disadvantages:  Opposite effect (Backfired): Should the negotiations prove unsuccessful, this causes wastage of valuable resources on both sides and loss of time for the employer, which delays the overall selection of the contractor.  Cost of Work: Generally resulting in higher prices than other methods of tendering.  Public matters: Lack of accountability and integrity may be in question.
  • 5. 2 Procurement Procurement is define as the action of obtaining or procuring something. It also means acquiring military equipment and supplies. In construction the term procurement refers to a system which includes determining the condition of the project, setting the contractual framework, setting tender, tender selection and evaluation and also awarding of contract to contractor. Procurement is the primary steps of the construction, a correct procurement system will lead to a success projects and different procurement system allows different benefits and different restriction. The four method that we learned in professional practice 1 is conventional procurement system, design and build, managing contracting and, construction management. 2.1 Traditional/ Conventional Procurement Construction process is separated from design process. The procurement system starts with the employers approaching the design consultants to generate a full detail set of tender documents with BQ, drawings, specifications & addendum specifications, form of contract and many more. Then the employers will call for tender by using one of the various method of tendering. The selected tenderers will be assigned will a Letter of acceptance and the main contractor will have full responsibility on the construction based on the drawings and specifications. Through this procurement system the employer will have direct contractual relationships with 2 parties which are the consultant for design and advices, and contractor to carry out the construction work. 2.1.1 Advantage of Traditional Procurement  Familiar with its working: Since it is the traditional method, this procurement system started a few decades before alternative procurement system was even born. Therefore, all the parties like QS, Architects, Engineers, and even contractors are familiar with the system and understand how to work with each another understanding each other needs and motives. It also smooths the procurement process due to the experience of all party in this procurement method.  Better Control of Work: The construction work is restricted and the contractor that is awarded need to construct the building base on the consultant design and specification which ensure the quality of the construction because the works are pre-calculated and determined to be safe and higher workability. The employer can also have a greater involvement in the project. 2.1.2 Disadvantages of Traditional Procurement  Creates “Them and Us” attitude: When a bad situation happens, the employer will have trouble in putting the blame because he has two direct contractual relationship with two main parties which are the consultants and the main contractor. The main contractor will have their finger pointed on the consultant to blame them on their bad design which creates the accident while the consultant will blame the contractor on cutting corners to safe cost and budgets, thus the employers will need to bring the disputes to the court.
  • 6.  Less flexible: The contractor assigned may not use to the construction method use by the consultant in their drawing. Even though the contractor is not experience with the listed method but he still need to follows the outline and brief set by the consultant. Thus creating much more chances for the construction to be delay or collapsing which means the risk of accident is higher.  Slow and long duration: Traditional procurement system are slow, this is because the employers needs advice from the consultant and participate to produce the full outlined set for the contractor to construct. The design and planning has comes before the construction phase and the construction phase will start after the award of tender where the full design is completed with certain specification. Hence the design and construction phases are consequential and resulting a slower completion of the project.
  • 7. 2.2 Designand Build Procurement Unlike traditional procurement system where the employer can choose to outsource the design process by appointing the consultants for designs and advice on the project during design stage and after the need statement create by architect is done then the employers will call for tender where tenderers offer tenders for the project. Design and Build procurement system can have both the design and build parallel, the full design will be complete as the construction completes. In Design and Build procurement system, the employer would 1st hire an architect to come out with preliminaries design. This design is just a rough design where the tenderers will complete to detail during the tendering process. After the preliminaries design is done, the employers will call for tender. Tender evaluation will take much time because there will be different prices as usual but also different design with different specification. So as a consultant QS this will be the most crucial part to evaluate the best tender but the final decision is still belongs to the employer. When the tender is awarded the contractor will employed an architect or the employer’s architect will change the contractual relationship from the employer to the contractor, this process is call novation. 2.2.1 Advantages of Design and Build  Fast completion of construction: As construction period is able to overlap with the design phase therefore it allow much time saved compare to the conventional method. This is because the main contractor himself is in full control of the construction, nobody is more familiar to oneself. As an example the main contractor design team may generate the design for only 1st floor and the main contractor can coordinate the subcontractor to come to perform their works based on the available drawing and on the mean time the design team will prepare design for the next part of the building.  Eliminate “Them and Us” attitude: Due to the main contractor single point of contractual relationship with the employer. Employer can always search for contractor when the construction does not go well. The main contractor which has full responsible in both quality, cost, and schedule adherence will have to bare the mistake and unable to point finger to another party. Main contractor has full responsibility over the project, he is in charge of the design, the engineering works, subcontractor’s works, M&E works, and many more. Therefore the contractor will be more familiar with the design and concept of the building which result in a better buildability of the project.  Improve risk management: All the cost, construction schedule and quality of construction and responsibilities are appropriately balanced and all the fault is on the Main contractor which greatly reduce the risk of the employer. Changing in plans and0 orders due to “errors and omissions” are totally eliminated, because the main contractor had full responsibility for developing drawings and specifications as well as constructing a fully-functioning facility.
  • 8. 2.2.2 Disadvantages of Designand Build  Higher contract price: Peter parker says greater power required greater responsibility, Mr Ramar says greater risks required greater pay. As the main contractor bare all of the responsibility in the construction, the contractor will have a higher tender price and higher budget as they include all the elements to complete the total construction. The price is the total construction cost instead of total building cost. It is also an uneconomic use of resources because of the relatively high price of the contract.  Difficulty in evaluation of tender: Evaluation is no longer just numbers, but also includes design, specification, time, qualities and many more factor. This is very important as the tenderers has full responsibility in the total construction so they have the power to manage and design the whole building which the employer need to carefully evaluate to avoid lost and bad qualities of products.
  • 9. Before any tendering process can be done, professional team and employer must make sure all necessary tender documents have been prepared, checked and approved. RECCOMENDATION What types of tendering that employer want to choose depends on the nature of contract, complexity of the construction, expertise needed and several reasons. But usually for the government project all over the world tends to make open tender to ensure the procurement and works to be done in fairly manner without prejudice. However, Taylor's University is considering building a multi-storey car park building in the vicinity of the campus to overcome the seious shortage of car park space, which is one of the reasons why we prefer to use selective tendering because of the needs for high quality to avoid any dangers/risks towards the students. They're many reasons why we reccomend choosing selective tendering other than open tendering and negotiated tendering. - - - - A problem with both open and selective tendering is that a contractor’s circumstances can change after he has submitted his tender. He can make losses on other contracts which affect his financial stability; or may be so successful at tendering that he does not have enough skilled staff or men to deal with all the work he wins. Neither method of tendering nor any other means of procuring works can therefore guarantee avoidance of troubles.
  • 10. Reference 1) AWARD-WINNING. (2010). Retrieved October 12, 2015. 2) Natasa, T., Mladen, R., & Diana, C. (2007). "DESIGN AND BUILD" IN COMPARISON WITH THE TRADITIONAL PROCUREMENT METHOD AND THE POSSIBILITY OF ITS APPLICATION IN THE CROATIAN CONSTRUCTION INDUSTRY. RetrievedOctober 12, 2015.