AGILE &
SCRUM
In a Nutshell
Why Agile?
Traditional (Waterfall) Development
Requirements
Design
Implementation
Verification
Maintenance
Agile / Agile Methodology
Agile: able to move quickly and easily
In Development: An umbrella term for any
of a number of iterative, incremental
development processes or frameworks
Iterative development: incremental
development of smaller features with frequent
revisions. Encourages rapid and flexible
response to change.
Agile Manifesto
Individuals and interactions over Process and tools
Working software over Comprehensive documentation
Customer Collaboration over Contract negotiation
Responding to change over Following a plan
While there is value on the right, we value the items on the left more
Agile
Scrum KanbanXP FDD
Agile vs. Waterfall
Build a House: Waterfall Style
Imagine:
• Meet Client. Discuss full house requirements
• Design entire house
• Lay foundation for fully designed house
• Build frame
• Put in plumbing
• Wire electrical
• Complete exterior
• Complete interior
Build a House: Agile Style
Imagine:
• Meet Client. Discuss immediate need (shelter to sleep in)
• Design, build & test a bedroom (1 door to get in and out)
• Meet Client. Discuss next need (bathroom)
• Design, build & test a bathroom (attached to bedroom)
• Meet Client. Discuss next need (kitchen)
• Design, build & test a kitchen (attached to bathroom)
• Meet Client. Discuss next need (bedroom on 2nd floor)
• Ooops, need to teardown and rebuild - originally
designed for one level
Build a House: Notes
• Last slide poked fun at Agile, but that wasn’t the point
• Both Waterfall & Agile methodologies can result in waste
• Waterfall: May build the wrong thing, wrong time, not
fulfill a need
• Agile: May need to redo work due to lack of plan/
foresight. Can “spin wheels” doing work to get it right.
• With Agile, still helps to have a vision; helps to have some
idea where you are going to help further reduce waste
Benefits of Agile
• Greater ability to respond to change
• Greater transparency
• Greater predictability
• Reduced risk
• Constant Product and Process
Improvement
Scrum
Scrum
• First described by Hirotaka
Takeuchi & Ikujiro
Nonaka in 1986 in the New
Product Development Game
• Based on case studies from
automotive, photocopier
and print manufacturing
• Formalized as Scrum in
1995 by Ken Schwaber &
Jeff Sutherland
Product
Owner
Product Owner:
The one who decides what gets built. Represents
the stakeholders and is the voice of the customer.
Responsible for maximizing value.
Product
Owner
Backlog Item: Has attributes of description,
order, estimate and value.
User Story:

A description that captures the user’s need (‘who’,
‘what’, and ‘why’) in a simple, concise way.
Written in the form of:

“As a {role}, I want a {goal/desire} so that I can
{benefit}.”
Example:

“As a car driver, I want a means to turn the car, so
that I can go around a bend in the road.”
Backlog Item
Item 2Item 3Item 4Item 5Item 6Item 1
Product
Owner
Product

Backlog
Product Backlog:
Prioritized list of user stories and “technical debt”.
Technical Debt is technical work to be completed
but which the user is not likely to notice. For
example, better organizing code for maintainability.
Item 1
Item 2
Item 3
Item 4
Item 5
Item 6
Product
Owner
Development Team: Cross-functional team
with all the skills necessary to create product
features (complete backlog items). Responsible
for delivering potentially shippable increments of
the product.
Sprint: One development cycle. Typically 2 to 4
weeks in length. The development team
commits to completing select backlog items each
sprint.
Some Quick Definitions
Product

Backlog
Item 1
Item 2
Item 3
Item 4
Item 5
Item 6
Sprint
Planning
Product
Owner
Product

Backlog
Sprint

Backlog
Item 1
Item 2
Item 3
Item 4
Item 5
Item 6
Product
Owner
Scrum Master:
Servant leader for the team. Ensures the
team uses agreed-upon scrum processes.
Removes impediments to Development
Team progress.
Similar to Project/Program Manager
Sprint
24 hr
Product

Backlog
Sprint

Backlog
Item 1
Item 2
Item 3
Item 4
Item 5
Item 6
Daily
Stand-up
Product
Owner Daily Stand-up:
Meeting in which each
team member gives a
brief status update of
what they did, what
they will do, and what
is blocking them.
Sprint
24 hr
Product

Backlog
Sprint

Backlog
Item 1
Item 2
Item 3
Item 4
Item 5
Item 6
Product
Owner
Definition of Done (DoD):
Team defined criteria by which a backlog
item is considered complete. Can include
things such as having automated tests in
place and features passing all automated
tests.
Sprint
24 hr
Working
Increment
Product

Backlog
Sprint

Backlog
Item 4
Item 5
Item 6
Product
Owner
Working
Increment
Feedback
Sprint
Item 7
Item 8
24 hr
Product

Backlog
Sprint

Backlog
Recap of Scrum Roles
Product Owner: Decides what is to be built. The voice of
the stakeholders. Responsible for maximizing product and
Development Team value. Similar to a Product Manager.
Development Team: Cross-functional team with all the
skills necessary to create product features. Responsible for
delivering potentially shippable increments of product every
sprint.
Scrum Master: Meeting facilitator and coach. Ensures the
team uses agreed-upon scrum processes. Removes
impediments to Development Team progress.
Scrum Meetings
Sprint Planning: Meeting in which the team figures out which backlog
items it can commit to completing for the coming sprint.
Daily Stand-up: Short meeting held every day during a sprint. Each team
member briefly describes what (s)he worked on, what (s)he will work on, and
any thing that is blocking them from working.
Sprint Review & Retrospective: Meetings in which the team
demonstrates completed work to stakeholders. The team also discusses what
went well, not so well and what they want to work on improving in the next
sprint (much like a post mortem).
Backlog Grooming: A meeting used to make sure the backlog is still
properly prioritized, break down larger stories, or get clarification on stories.
Other Common Terms
Story Points: An estimated measure given to a user story to judge
how much work the story is.
Velocity: The capacity of a team to handle story points in a sprint.
Over time an average can be determined of how many story points a
team typically completes in a sprint.
Burn-down chart: Chart that is updated every day to show the “burn
down” of the amount of work left in a sprint, plotted against the ideal,
linear burn-down rate.
Spike: A time boxed period in a sprint used to perform research or
create a prototype. A spike is complete when the time period ends. The
goal may or may not have been achieved in a spike.
Resources
• “Scrum: The Art of Doing Twice the Work in Half the
Time” by Ken Schwaber and Jeff Sutherland
• http://agilemanifesto.org
• http://scrumtrainingseries.com
• http://www.scrumguides.org
• http://www.scrum.org
• http://www.scrumalliance.org
• “Kanban: Successful Evolutionary Change for Your
Technology Business” by David J. Anderson
Kanban
• Developed by Taiichi
Ohno of Toyota in the
1950’s.
• Adapted for software by
David J. Anderson
• Based on the Theory of
Constraints introduced in
1984 in the book The Goal
by Eliyahu M. Goldratt
Kanban Key Principles
• Start with existing process
• Agree to pursue incremental, evolutionary change
• Respect current process, roles, responsibilities and
titles
• Leadership at all levels
Kanban
Backlog Analysis Develop Test Deploy
3 5 3 5
Doing DoingDone Done
Kanban places upper limit on WIP inventory
Scrum vs. Kanban
Scrum Kanban
Cadence Fixed length Continuous flow
Roles
Product Owner, 

Scrum Master
Development Team
No prescribed roles
Key Metrics Velocity Cycle time
Change Philosophy
Change only 

between sprints
Change at any time
Level of Structure More structured Less structured
Thank You!

More Related Content

PDF
Guideline for retrospective & sprint planning
PPTX
MODULE 1 (PREVENTIVE MAINTENANCE OVERVIEW).pptx
PPTX
Estimación, Priorización y Seguimiento de un Proyecto Ágil Empleando el User ...
PPTX
What is the purpose of Sprint planning meeting in Agile?
ODP
AgileWarsaw: Spikes
PDF
An introduction to Agile & Scrum
PDF
Agile, not just for software
PPTX
Effective User Story Writing
Guideline for retrospective & sprint planning
MODULE 1 (PREVENTIVE MAINTENANCE OVERVIEW).pptx
Estimación, Priorización y Seguimiento de un Proyecto Ágil Empleando el User ...
What is the purpose of Sprint planning meeting in Agile?
AgileWarsaw: Spikes
An introduction to Agile & Scrum
Agile, not just for software
Effective User Story Writing

Similar to Agile And Scum In a Nutshell (20)

PPT
Technical writing in an agile development environment
PPTX
Scrum Overview
PDF
Introduction to Agile and Scrum
PDF
Agile_basics
PPT
KANBAN-13-2048allpages (24 files merged).ppt
PDF
Understanding-Agile for beginners in real
PDF
Understanding-Agile &Scrum.pdf
PDF
Agile Framework based on PMBOK 6th Edition.pdf
PDF
Perfect Backlogs - 3 July 2023
PPTX
Agile
PPTX
Agile Modeling & Scrum Development.pptx
PDF
Agile software development development explained
PPTX
Agile Software Development and DevOps 21092019
PPTX
Introduction To Scrum Presentation for beginners
PPTX
Standardization and strategy in agile
PPTX
Case Study on agile scrum methodology on shopping cart
PDF
Essentials of Scrum
PPTX
Understanding Agile Development with Scrum
PPT
Scrum-Agile : An Introduction
Technical writing in an agile development environment
Scrum Overview
Introduction to Agile and Scrum
Agile_basics
KANBAN-13-2048allpages (24 files merged).ppt
Understanding-Agile for beginners in real
Understanding-Agile &Scrum.pdf
Agile Framework based on PMBOK 6th Edition.pdf
Perfect Backlogs - 3 July 2023
Agile
Agile Modeling & Scrum Development.pptx
Agile software development development explained
Agile Software Development and DevOps 21092019
Introduction To Scrum Presentation for beginners
Standardization and strategy in agile
Case Study on agile scrum methodology on shopping cart
Essentials of Scrum
Understanding Agile Development with Scrum
Scrum-Agile : An Introduction
Ad

Agile And Scum In a Nutshell

  • 4. Agile / Agile Methodology Agile: able to move quickly and easily In Development: An umbrella term for any of a number of iterative, incremental development processes or frameworks Iterative development: incremental development of smaller features with frequent revisions. Encourages rapid and flexible response to change.
  • 5. Agile Manifesto Individuals and interactions over Process and tools Working software over Comprehensive documentation Customer Collaboration over Contract negotiation Responding to change over Following a plan While there is value on the right, we value the items on the left more
  • 8. Build a House: Waterfall Style Imagine: • Meet Client. Discuss full house requirements • Design entire house • Lay foundation for fully designed house • Build frame • Put in plumbing • Wire electrical • Complete exterior • Complete interior
  • 9. Build a House: Agile Style Imagine: • Meet Client. Discuss immediate need (shelter to sleep in) • Design, build & test a bedroom (1 door to get in and out) • Meet Client. Discuss next need (bathroom) • Design, build & test a bathroom (attached to bedroom) • Meet Client. Discuss next need (kitchen) • Design, build & test a kitchen (attached to bathroom) • Meet Client. Discuss next need (bedroom on 2nd floor) • Ooops, need to teardown and rebuild - originally designed for one level
  • 10. Build a House: Notes • Last slide poked fun at Agile, but that wasn’t the point • Both Waterfall & Agile methodologies can result in waste • Waterfall: May build the wrong thing, wrong time, not fulfill a need • Agile: May need to redo work due to lack of plan/ foresight. Can “spin wheels” doing work to get it right. • With Agile, still helps to have a vision; helps to have some idea where you are going to help further reduce waste
  • 11. Benefits of Agile • Greater ability to respond to change • Greater transparency • Greater predictability • Reduced risk • Constant Product and Process Improvement
  • 12. Scrum
  • 13. Scrum • First described by Hirotaka Takeuchi & Ikujiro Nonaka in 1986 in the New Product Development Game • Based on case studies from automotive, photocopier and print manufacturing • Formalized as Scrum in 1995 by Ken Schwaber & Jeff Sutherland
  • 14. Product Owner Product Owner: The one who decides what gets built. Represents the stakeholders and is the voice of the customer. Responsible for maximizing value.
  • 15. Product Owner Backlog Item: Has attributes of description, order, estimate and value. User Story:
 A description that captures the user’s need (‘who’, ‘what’, and ‘why’) in a simple, concise way. Written in the form of:
 “As a {role}, I want a {goal/desire} so that I can {benefit}.” Example:
 “As a car driver, I want a means to turn the car, so that I can go around a bend in the road.” Backlog Item
  • 16. Item 2Item 3Item 4Item 5Item 6Item 1 Product Owner Product
 Backlog Product Backlog: Prioritized list of user stories and “technical debt”. Technical Debt is technical work to be completed but which the user is not likely to notice. For example, better organizing code for maintainability.
  • 17. Item 1 Item 2 Item 3 Item 4 Item 5 Item 6 Product Owner Development Team: Cross-functional team with all the skills necessary to create product features (complete backlog items). Responsible for delivering potentially shippable increments of the product. Sprint: One development cycle. Typically 2 to 4 weeks in length. The development team commits to completing select backlog items each sprint. Some Quick Definitions Product
 Backlog
  • 18. Item 1 Item 2 Item 3 Item 4 Item 5 Item 6 Sprint Planning Product Owner Product
 Backlog Sprint
 Backlog
  • 19. Item 1 Item 2 Item 3 Item 4 Item 5 Item 6 Product Owner Scrum Master: Servant leader for the team. Ensures the team uses agreed-upon scrum processes. Removes impediments to Development Team progress. Similar to Project/Program Manager Sprint 24 hr Product
 Backlog Sprint
 Backlog
  • 20. Item 1 Item 2 Item 3 Item 4 Item 5 Item 6 Daily Stand-up Product Owner Daily Stand-up: Meeting in which each team member gives a brief status update of what they did, what they will do, and what is blocking them. Sprint 24 hr Product
 Backlog Sprint
 Backlog
  • 21. Item 1 Item 2 Item 3 Item 4 Item 5 Item 6 Product Owner Definition of Done (DoD): Team defined criteria by which a backlog item is considered complete. Can include things such as having automated tests in place and features passing all automated tests. Sprint 24 hr Working Increment Product
 Backlog Sprint
 Backlog
  • 22. Item 4 Item 5 Item 6 Product Owner Working Increment Feedback Sprint Item 7 Item 8 24 hr Product
 Backlog Sprint
 Backlog
  • 23. Recap of Scrum Roles Product Owner: Decides what is to be built. The voice of the stakeholders. Responsible for maximizing product and Development Team value. Similar to a Product Manager. Development Team: Cross-functional team with all the skills necessary to create product features. Responsible for delivering potentially shippable increments of product every sprint. Scrum Master: Meeting facilitator and coach. Ensures the team uses agreed-upon scrum processes. Removes impediments to Development Team progress.
  • 24. Scrum Meetings Sprint Planning: Meeting in which the team figures out which backlog items it can commit to completing for the coming sprint. Daily Stand-up: Short meeting held every day during a sprint. Each team member briefly describes what (s)he worked on, what (s)he will work on, and any thing that is blocking them from working. Sprint Review & Retrospective: Meetings in which the team demonstrates completed work to stakeholders. The team also discusses what went well, not so well and what they want to work on improving in the next sprint (much like a post mortem). Backlog Grooming: A meeting used to make sure the backlog is still properly prioritized, break down larger stories, or get clarification on stories.
  • 25. Other Common Terms Story Points: An estimated measure given to a user story to judge how much work the story is. Velocity: The capacity of a team to handle story points in a sprint. Over time an average can be determined of how many story points a team typically completes in a sprint. Burn-down chart: Chart that is updated every day to show the “burn down” of the amount of work left in a sprint, plotted against the ideal, linear burn-down rate. Spike: A time boxed period in a sprint used to perform research or create a prototype. A spike is complete when the time period ends. The goal may or may not have been achieved in a spike.
  • 26. Resources • “Scrum: The Art of Doing Twice the Work in Half the Time” by Ken Schwaber and Jeff Sutherland • http://agilemanifesto.org • http://scrumtrainingseries.com • http://www.scrumguides.org • http://www.scrum.org • http://www.scrumalliance.org • “Kanban: Successful Evolutionary Change for Your Technology Business” by David J. Anderson
  • 27. Kanban • Developed by Taiichi Ohno of Toyota in the 1950’s. • Adapted for software by David J. Anderson • Based on the Theory of Constraints introduced in 1984 in the book The Goal by Eliyahu M. Goldratt
  • 28. Kanban Key Principles • Start with existing process • Agree to pursue incremental, evolutionary change • Respect current process, roles, responsibilities and titles • Leadership at all levels
  • 29. Kanban Backlog Analysis Develop Test Deploy 3 5 3 5 Doing DoingDone Done Kanban places upper limit on WIP inventory
  • 30. Scrum vs. Kanban Scrum Kanban Cadence Fixed length Continuous flow Roles Product Owner, 
 Scrum Master Development Team No prescribed roles Key Metrics Velocity Cycle time Change Philosophy Change only 
 between sprints Change at any time Level of Structure More structured Less structured