ALIGNMENT OF TUNNEL
1) Preliminary setting of tunnel on topographical survey of Indian
maps
2) Marking tunnel obligatory points
3) Driving lines between obligatory points
4) Marking points with concrete pillars
Note : Rotary or rotary percussion methods used for investigating loose soil while
rotary drilling method used for rocky soil
INVESTIGATION AT TIME OF CONSTRUCTION
1)Heading : It is part of tunnel c/s excavated for small length.It may be top ,
bottom and side
2)Driving Drift :Excavated for entire length of tunnel
Heading give information at time of construction while drift give complete
information prior to construction of tunnel
When length of tunnel is small ,centre line located by means of theodolite
When length of tunnel is sufficient , triangulation is used for locating centre lines.
TUNNEL ALIGNMENT AND GRADE
 0.2% grade for proper drainage
 Straight alignment sold be provided
 Side drain have slope of 1 in 500
 Ventilation more effective if grade is in one direction
 In underground compound levelling BS & FS must be made same
 Grade in tunnel should be less then surface grade
 For tunnel greater than 300m length grade provided below 75% of ruling
gradient
 In order to maintain desire shape off tunnel c/s is check @interval at 2m to
3m

More Related Content

PPTX
Case studies of surveys involved in Railway Tunnel constructed under sea.
PPTX
Tunnel example for road project by Malyar Talash
PPT
Subsidence
PDF
Geological investigations for highways
PPTX
Tunnel engineering
PPTX
Highway Alignment
PDF
Travis_Smith_Work_Term_Report_F2016
PPT
Effect of underground tunnelling by (TBM) on foundations of existing structures
Case studies of surveys involved in Railway Tunnel constructed under sea.
Tunnel example for road project by Malyar Talash
Subsidence
Geological investigations for highways
Tunnel engineering
Highway Alignment
Travis_Smith_Work_Term_Report_F2016
Effect of underground tunnelling by (TBM) on foundations of existing structures

What's hot (20)

PPTX
DOC
Prediction of Surface Subsidence and Its Monitoring
PPTX
Advanced tunnel borring machine.ppt
PDF
Gyromat in tunnelling practice
PDF
Ug mine planning
PPTX
Setting out work
PPTX
DOCX
Preliminary design for natm tunnel support in soil
PPTX
New Trends In Exploration For Natural Resources
PPTX
Tunnel’s
PPTX
PPT on execution of 680 m long tunnel ensuring safety of the adjoining rail t...
PDF
Edge Detectionand Depth Estimation from Magnetic DataofWadi Araba,Eastern Des...
PPTX
Setting out construction works 01
PDF
Transportation engineering 2
PPTX
Tunneling
PDF
Study of Dynamic Analysis for Immersed Tube Tunnel
PPTX
Tunnel making methods and tunnel boring machine
PDF
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Prediction of Surface Subsidence and Its Monitoring
Advanced tunnel borring machine.ppt
Gyromat in tunnelling practice
Ug mine planning
Setting out work
Preliminary design for natm tunnel support in soil
New Trends In Exploration For Natural Resources
Tunnel’s
PPT on execution of 680 m long tunnel ensuring safety of the adjoining rail t...
Edge Detectionand Depth Estimation from Magnetic DataofWadi Araba,Eastern Des...
Setting out construction works 01
Transportation engineering 2
Tunneling
Study of Dynamic Analysis for Immersed Tube Tunnel
Tunnel making methods and tunnel boring machine
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Ad

Similar to Alignment of tunnel useful for engineering exams (8)

PPTX
ALEEM MALIK
PPTX
CONVENTIONAL TUNNELLING.pptx
PPT
unit-vi-tunnels-alignments-tunneling-methods-highway-tunnels-r-bhagat-2020.ppt
PPT
tunnelling scope, construction techniques and necessity
PPTX
Tunnel _______________amit.pptx
PPTX
Tunneling exploration
PDF
Tunnels, types & importance
ALEEM MALIK
CONVENTIONAL TUNNELLING.pptx
unit-vi-tunnels-alignments-tunneling-methods-highway-tunnels-r-bhagat-2020.ppt
tunnelling scope, construction techniques and necessity
Tunnel _______________amit.pptx
Tunneling exploration
Tunnels, types & importance
Ad

Recently uploaded (20)

PDF
August -2025_Top10 Read_Articles_ijait.pdf
PDF
Abrasive, erosive and cavitation wear.pdf
PPTX
A Brief Introduction to IoT- Smart Objects: The "Things" in IoT
PPTX
Chemical Technological Processes, Feasibility Study and Chemical Process Indu...
PPTX
Amdahl’s law is explained in the above power point presentations
PPTX
ASME PCC-02 TRAINING -DESKTOP-NLE5HNP.pptx
PDF
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
PDF
Applications of Equal_Area_Criterion.pdf
PPTX
Module 8- Technological and Communication Skills.pptx
PPTX
Measurement Uncertainty and Measurement System analysis
PDF
UEFA_Carbon_Footprint_Calculator_Methology_2.0.pdf
PPTX
Chapter 2 -Technology and Enginerring Materials + Composites.pptx
PDF
Prof. Dr. KAYIHURA A. SILAS MUNYANEZA, PhD..pdf
PDF
Exploratory_Data_Analysis_Fundamentals.pdf
PDF
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
PPT
Chapter 1 - Introduction to Manufacturing Technology_2.ppt
PPTX
CN_Unite_1 AI&DS ENGGERING SPPU PUNE UNIVERSITY
PPTX
"Array and Linked List in Data Structures with Types, Operations, Implementat...
PDF
August 2025 - Top 10 Read Articles in Network Security & Its Applications
PPTX
Principal presentation for NAAC (1).pptx
August -2025_Top10 Read_Articles_ijait.pdf
Abrasive, erosive and cavitation wear.pdf
A Brief Introduction to IoT- Smart Objects: The "Things" in IoT
Chemical Technological Processes, Feasibility Study and Chemical Process Indu...
Amdahl’s law is explained in the above power point presentations
ASME PCC-02 TRAINING -DESKTOP-NLE5HNP.pptx
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
Applications of Equal_Area_Criterion.pdf
Module 8- Technological and Communication Skills.pptx
Measurement Uncertainty and Measurement System analysis
UEFA_Carbon_Footprint_Calculator_Methology_2.0.pdf
Chapter 2 -Technology and Enginerring Materials + Composites.pptx
Prof. Dr. KAYIHURA A. SILAS MUNYANEZA, PhD..pdf
Exploratory_Data_Analysis_Fundamentals.pdf
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
Chapter 1 - Introduction to Manufacturing Technology_2.ppt
CN_Unite_1 AI&DS ENGGERING SPPU PUNE UNIVERSITY
"Array and Linked List in Data Structures with Types, Operations, Implementat...
August 2025 - Top 10 Read Articles in Network Security & Its Applications
Principal presentation for NAAC (1).pptx

Alignment of tunnel useful for engineering exams

  • 1. ALIGNMENT OF TUNNEL 1) Preliminary setting of tunnel on topographical survey of Indian maps 2) Marking tunnel obligatory points 3) Driving lines between obligatory points 4) Marking points with concrete pillars Note : Rotary or rotary percussion methods used for investigating loose soil while rotary drilling method used for rocky soil
  • 2. INVESTIGATION AT TIME OF CONSTRUCTION 1)Heading : It is part of tunnel c/s excavated for small length.It may be top , bottom and side 2)Driving Drift :Excavated for entire length of tunnel Heading give information at time of construction while drift give complete information prior to construction of tunnel When length of tunnel is small ,centre line located by means of theodolite When length of tunnel is sufficient , triangulation is used for locating centre lines.
  • 3. TUNNEL ALIGNMENT AND GRADE  0.2% grade for proper drainage  Straight alignment sold be provided  Side drain have slope of 1 in 500  Ventilation more effective if grade is in one direction  In underground compound levelling BS & FS must be made same  Grade in tunnel should be less then surface grade  For tunnel greater than 300m length grade provided below 75% of ruling gradient  In order to maintain desire shape off tunnel c/s is check @interval at 2m to 3m