On-Machine Probing effects on OEE AMTS 2008 Moise Cummings TechSolve, Inc.
Benét Laboratories “ Research was sponsored by the U.S. Army Benet Laboratories and was accomplished under Cooperative Agreement Number W15QKN-06-2-0100. The views and conclusions contained in this document are those of the authors and should not be interpreted as representing the official policies, either expressed or implied, of U.S. Army Benet Laboratories or the U.S. Government. The U.S. Government is authorized to reproduce and distribute reprints for Government purposes notwithstanding any copyright notation heron.”
Smart Machine Technology Thrust Areas  Intelligent  Machining Network Health &  Maintenance Machine Tool  Metrology Intelligent  Planning Tool Condition  Monitoring On-Machine Probing
Definition of On-Machine Probing American Machinist m agazine 2008 survey of benchmark companies Perceptions of On-Machine Probing What is OEE (Overall Equipment Effectiveness)? Definition of OEE Calculating OEE Six big losses in a plant Obstacles to OEE OEE and On-Machine Probing Test performed at TechSolve Success Stories Conclusions Outline
On-Machine Probing An inspection process within a machine tool that requires minimal use of peripheral inspection equipment or additional operators Data is used to make process adjustments to minimize non-conforming parts Benefits to Industry Work offset verification Detects maladjusted fixtures Collects SPC data Reduced material handling On-machine rework In-process correction On-Machine Probing U-TOL L-TOL UCL LCL
2008 Machine Shop Benchmark Survey Analysis From the July 2008 issue of  American Machinist “ This year, there was a noticeable increase in the uses of in-process measurement, coordinate measuring machines, barfeeders and prefixturing of workpieces, especially for shops in the benchmark shop categories.” Increasing the overall equipment effectiveness (OEE) is one of the hallmarks of the machine shops in the benchmark categories
Industrial Perceptions Probing diverts time from machining and increases cycle time Instead of focusing on cycle time, we should evaluate overall equipment effectiveness (OEE) Probing routines are difficult to write and use State-of-the-art software makes writing routines easier and more user-friendly Once written, routines can be used on repeat parts The probe is only as accurate as the machine itself
What is OEE? Best practice way to monitor and improve the effectiveness of a manufacturing process Organizes any productivity losses into three components to provide a gage for process improvement Availability, Performance, and Quality
How is OEE calculated? OEE  = Availability X Performance X Quality Availability  = Operating Time / Planned Production Time Performance  = Ideal Cycle Time / (Operating time / Total Pieces) Quality  = Good Piece / Total Pieces World-class performance OEE = 85% The OEE percentage by itself may not provide the right answer You must scrutinize its components
Six Big Losses OEE takes into account issues like: Machine breakdowns Setup time Line restraint Reduced speeds Start-up rejects Production rejects On-machine probing addresses three of the six big losses in OEE Is the sum of those losses worth a probing cycle?
Obstacles to OEE Availability  – Any event that effects planned production Changeover, setup , break downs, material shortages Performance  – Any event that causes the process to run at less than optimal speed Machine wear,  operator inefficiency , mis-feeds Quality  –  Parts that are not produced to specification and require rework Start-up scrap, production scrap Q:  What are the roadblocks to world class OEE? A:  Scrutinize the individual components.
Current State of Manufacturing Start-up scrap:   One of the biggest losses to a production  environment comes from the  setup procedure . This  may be because the setup process is very  dependent on the skill of the operator. There is also  a chance that the wrong rough stock can be loaded.  Production scrap:   Another major loss to a production environment  comes from the production process itself (such as  tool wear and features “drifting” out of tolerance). Time loss:   Time is lost in production due to waiting in (off-line)  inspection queues and conventional setup  procedure.
Benefits of On-Machine Probing Precise Setup:   With on-machine probing, setups can be located exactly to the rough stock to avoid air cuts or buried  cutters in a roughing process. Process verification:   Features can be inspected during the production  process and reported back to the operator. This will  reduce time at the CMM and allow for more uptime  at the CNC.  Time savings:   Routines can be written that will allow setup to be  performed in a fraction of the time of conventional  (manual) setup procedures. Local work coordinate  systems can also be used to eliminate positional  accuracy of the machine for a high-tolerance, local  set of features, such as bolt hole patterns.
For the sake of discussion, all of the comparisons will be done in reference to the SMPI demonstration part SMPI Demo Part
Process Steps 106.5  minutes   43.5  minutes Pre-Technology Time in minutes Tasks Why & Benefit Post-Technology Time in minutes 20.0 Set G54 Establish work coordinates 2.0 4.0 Validate rough stock Inspect for correct stock 2.0 4.0 Laser inspection face mill Accurate tool length - TCM 1.5 10.0 Face mill surface Optimized tool path - IM 5.0 4.0 Laser inspection end mill Accurate tool length - TCM 1.25 21.0 Roughing two pockets  Optimized tool path - IM 10.5 8.0 Finishing two pockets  Optimized tool path - IM 5.5 8.5 Set G55 & G56 Set local work coordinates 1.0 4.0 Laser inspection drill Accurate tool length -TCM 0.5 4.0 Drill holes in G55 & G56 Optimized tool path - IM 2.5 19.0 End mill roughing two bores Optimized tool path - IM 9.5 3.0 Laser inspection measure tool Accurate tool wear - TCM 1.25 1.0 Finish 50 mm holes Improved accuracy of holes - IM 1.0 varies Final inspection On-machine probing vs. CMM 3.0 Probing steps in blue
Setup Time Reduction and Quality To minimize linear inaccuracy, on-machine probing can establish a local WCS on localized datum This is more significant on longer parts with features that may be clustered in different sections of the workpiece Setting a local work coordinate system showed a 50% average improvement in the true position Time Savings: Conventional Method = 8.5 min  OMP = 1.0 min    = 7.5 minutes True position improvement of  50%  and more than  7 minutes  saved
Setup Time Reduction and Quality A reduction in time at the CMM and an improved part quality means that there is and increase in the  overall equipment effectiveness (OEE)  of the plant. Unknown Distance  G55 G56
Success Stories Successes from actual customers of TechSolve that have adopted the use of spindle probes
Effect on Availability One component of OEE is the lost of efficiency due to machine availability The availability is defined as: Availability = Operating Time / Planned Production Time Availability: Less trips to the CMM and less setups means that the customer is utilizing their machine tool to make more parts To achieve this the uncertainty of the process has to be addressed
Effect on Availability Scenario:  A company manufactures complex aircraft components during a three shift (24 hour) operation. The components must be inspected to a traceable standard before they can be signed-off. The queue at the CMM and the inspection process is one hour. The CNC must idle while the inspection is taking place or risk making scrap parts. Solution:  After tuning the machine and performing repeatability studies on the machine, the CNC can inspect the parts with a high level of certainty per ASME B5.54. The shop is able to move from lot inspections to first and last article inspection while sampling CTQ features on the CNC. The availability of the machine increases by 12%, which adds to the OEE due to the increase operating time. Availability = Operating Time / Planned Production Time
Effect on Quality & Availability Problem:  A customer has to machine a cast aluminum housing. The housing has two production locating pins that are used as datums that span 24 inches apart. Between those datums are a series of machine features, among those features are four bored holes surrounded by bolt hole patterns that have to maintain true positions of 0.040”. Solution:  The client is able to use a spindle probe to establish a local work coordinate system within the bore diameter. By using that local work coordinate system as the origin of the bolt hole pattern, the process is able  to easily hold a true position of 0.001” (previously 0.040”)  to the main bore without breaking the setup or making multiple trips to the CMM.
Effect on Quality and Availability Quality:  The customer realized a 60% increase in the part quality from the use of the spindle probe Availability:  Less trips to the CMM and less setups meant that the customer is utilizing their machine tool to make more parts
Effect on Quality Problem:  A manufacturer has an issue with bottlenecks at the inspection area due to the volume of work being produced on the CNC machining area. Goal:  To utilize on-machine probing to go from ongoing inspection to first article inspection, which would reduce the inspection time by 80%. This would lead to an increase in production due to less time spent waiting for inspection . Cell #1 Cell #2 Cell #3 Inspection
Effect on Quality Solution:  The biggest concerns from the quality department was being able to  Produce parts that were statistically within control for sampling Have a method in place to make sure that the machine tool was qualified The machine tool was first qualified and tuned to reduce metrology errors Repeatability studies were performed per the ASME B5.54 standards to ensure the quality of the probe itself The CNC machine was “foot-printed” using a diamond-circle-square test and the part was collaborated using a traceable CMM
Effect on Quality Result:  With a machine that is qualified, repeatable, and traceable the customer can now inspect parts on the machine within a relative certainty This will result in an a single daily inspection on the CMM and ongoing inspection key features on the machine This increase in part quality and throughput will have a direct impact on the plant’s OEE because of the reduction in the three of the six big losses: Start-up scrap Production scrap Waiting for the CMM’s approval throughout the day
Conclusion Spindle probes are meant to increase the productivity and the effectiveness of a process Probing offsets the time and cost of scrap and downtime that is currently in the machining process Reduction in scrap and reduced time spent performing offline inspections will increase the overall equipment effectiveness (OEE)   of the process
Questions? For more information see TechSolve at booth # 1022 Moise Cummings (513) 948-2048 [email_address] www.techsolve.org

More Related Content

PDF
A CASE STUDY ON RELIABLITY MAINTENANCE
DOC
Preventive Maintenance Process and Program
PPTX
Preventive Maintenance for Mechanized Poultry Operations - Knowledge Day 2016
PPT
Transition to online AMS reduces maintenance costs and improves operations
PPT
Equipment reliability l2
PPTX
Quality of maintenance
PDF
IRJET- Rejection Analysis in Fuel Equipment
DOC
Capability initial flow control
A CASE STUDY ON RELIABLITY MAINTENANCE
Preventive Maintenance Process and Program
Preventive Maintenance for Mechanized Poultry Operations - Knowledge Day 2016
Transition to online AMS reduces maintenance costs and improves operations
Equipment reliability l2
Quality of maintenance
IRJET- Rejection Analysis in Fuel Equipment
Capability initial flow control

What's hot (20)

PPTX
Terotechnology
DOCX
Maintenance cost
PPT
Unit 2
PPTX
Asset Managment
PDF
Overall equipment effectiveness of critical machines in manufacturing industries
PPTX
Maintenance
PDF
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
PPTX
Concept of URS,DQ,IQ,OQ,PQ
PPT
Maintenance engineering- Unit- 3
PPT
Ampule filling and_sealing_machine.ppt1
PPTX
Tero technology and Tribology - Maintenance Management
PPTX
Maintenance engineering
PPT
Aviation maintenance methods asci609 final presentation_gstamp
PDF
Proper Asset Maintenance Improves Safety, Reliability, and Profitability
PDF
Acculine product quality management procedure flowchart
PPTX
Equipment Qualification by- Deepak Kumar
PPT
Plant Maintenance
PDF
Maintenance and Asset Management
PPT
Medical OEMs can achieve commercial mfg efficiency
Terotechnology
Maintenance cost
Unit 2
Asset Managment
Overall equipment effectiveness of critical machines in manufacturing industries
Maintenance
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
Concept of URS,DQ,IQ,OQ,PQ
Maintenance engineering- Unit- 3
Ampule filling and_sealing_machine.ppt1
Tero technology and Tribology - Maintenance Management
Maintenance engineering
Aviation maintenance methods asci609 final presentation_gstamp
Proper Asset Maintenance Improves Safety, Reliability, and Profitability
Acculine product quality management procedure flowchart
Equipment Qualification by- Deepak Kumar
Plant Maintenance
Maintenance and Asset Management
Medical OEMs can achieve commercial mfg efficiency
Ad

Similar to Amts Presentation (20)

PDF
Bed Rail Report
PPTX
Presentation2.pptx
PPTX
Autonomous Maintenance (AM)
PPT
CMM_inspection_fundamentals_presentation.ppt
PPT
PPT
CMM_inspection_fundamentals_presentation.ppt
PDF
“Development of automatic feeder system in cellular manufacturing to improve ...
PDF
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
PPTX
Experimental investigation of ohns surface property and process parameter on ...
DOCX
Excel Lesson 5 Overview  Watch the Excel Lesson 5 Vid.docx
PDF
critique and summary on (1) high speed machining (2) additive manufacturing (...
PPTX
Chapter 24 (cost optionization)
PPTX
Performance Optimization Of Machining Process On Optimal Cutting Parameters B...
PPTX
Steam Turbine Alignment
PPTX
Sustainable Manufacturing: Optimization of single pass Turning machining oper...
PDF
171130 Progress Update WP2 (Bram Westerweel)
PPTX
ch3.ECONOMIC AND PRODUCT DESIGN CONSIDERATIONS IN MACHINING.pptx
PDF
I012536474
PDF
Systems & Software, Etc - Laser Focus World Article
PDF
Why OEE?
Bed Rail Report
Presentation2.pptx
Autonomous Maintenance (AM)
CMM_inspection_fundamentals_presentation.ppt
CMM_inspection_fundamentals_presentation.ppt
“Development of automatic feeder system in cellular manufacturing to improve ...
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
Experimental investigation of ohns surface property and process parameter on ...
Excel Lesson 5 Overview  Watch the Excel Lesson 5 Vid.docx
critique and summary on (1) high speed machining (2) additive manufacturing (...
Chapter 24 (cost optionization)
Performance Optimization Of Machining Process On Optimal Cutting Parameters B...
Steam Turbine Alignment
Sustainable Manufacturing: Optimization of single pass Turning machining oper...
171130 Progress Update WP2 (Bram Westerweel)
ch3.ECONOMIC AND PRODUCT DESIGN CONSIDERATIONS IN MACHINING.pptx
I012536474
Systems & Software, Etc - Laser Focus World Article
Why OEE?
Ad

Recently uploaded (20)

PPTX
33ABJFA6556B1ZP researhchzfrsdfasdfsadzd
PDF
Susan Semmelmann: Enriching the Lives of others through her Talents and Bless...
PDF
income tax laws notes important pakistan
PPTX
Project Management_ SMART Projects Class.pptx
PPTX
TRAINNING, DEVELOPMENT AND APPRAISAL.pptx
PPTX
interschool scomp.pptxzdkjhdjvdjvdjdhjhieij
PPTX
2 - Self & Personality 587689213yiuedhwejbmansbeakjrk
PPTX
Transportation in Logistics management.pptx
DOCX
Emerging Dubai Investment Opportunities in 2025.docx
PDF
Tortilla Mexican Grill 发射点犯得上发射点发生发射点犯得上发生
PPTX
BUSINESS CYCLE_INFLATION AND UNEMPLOYMENT.pptx
PDF
Robin Fischer: A Visionary Leader Making a Difference in Healthcare, One Day ...
PDF
533158074-Saudi-Arabia-Companies-List-Contact.pdf
PDF
Vinod Bhatt - Most Inspiring Supply Chain Leader in India 2025.pdf
PDF
Communication Tactics in Legal Contexts: Historical Case Studies (www.kiu.ac...
PDF
Stacey L Stevens - Canada's Most Influential Women Lawyers Revolutionizing Th...
PPTX
basic introduction to research chapter 1.pptx
PPTX
IITM - FINAL Option - 01 - 12.08.25.pptx
DOCX
Center Enamel A Strategic Partner for the Modernization of Georgia's Chemical...
PDF
Immigration Law and Communication: Challenges and Solutions {www.kiu.ac.ug)
33ABJFA6556B1ZP researhchzfrsdfasdfsadzd
Susan Semmelmann: Enriching the Lives of others through her Talents and Bless...
income tax laws notes important pakistan
Project Management_ SMART Projects Class.pptx
TRAINNING, DEVELOPMENT AND APPRAISAL.pptx
interschool scomp.pptxzdkjhdjvdjvdjdhjhieij
2 - Self & Personality 587689213yiuedhwejbmansbeakjrk
Transportation in Logistics management.pptx
Emerging Dubai Investment Opportunities in 2025.docx
Tortilla Mexican Grill 发射点犯得上发射点发生发射点犯得上发生
BUSINESS CYCLE_INFLATION AND UNEMPLOYMENT.pptx
Robin Fischer: A Visionary Leader Making a Difference in Healthcare, One Day ...
533158074-Saudi-Arabia-Companies-List-Contact.pdf
Vinod Bhatt - Most Inspiring Supply Chain Leader in India 2025.pdf
Communication Tactics in Legal Contexts: Historical Case Studies (www.kiu.ac...
Stacey L Stevens - Canada's Most Influential Women Lawyers Revolutionizing Th...
basic introduction to research chapter 1.pptx
IITM - FINAL Option - 01 - 12.08.25.pptx
Center Enamel A Strategic Partner for the Modernization of Georgia's Chemical...
Immigration Law and Communication: Challenges and Solutions {www.kiu.ac.ug)

Amts Presentation

  • 1. On-Machine Probing effects on OEE AMTS 2008 Moise Cummings TechSolve, Inc.
  • 2. Benét Laboratories “ Research was sponsored by the U.S. Army Benet Laboratories and was accomplished under Cooperative Agreement Number W15QKN-06-2-0100. The views and conclusions contained in this document are those of the authors and should not be interpreted as representing the official policies, either expressed or implied, of U.S. Army Benet Laboratories or the U.S. Government. The U.S. Government is authorized to reproduce and distribute reprints for Government purposes notwithstanding any copyright notation heron.”
  • 3. Smart Machine Technology Thrust Areas Intelligent Machining Network Health & Maintenance Machine Tool Metrology Intelligent Planning Tool Condition Monitoring On-Machine Probing
  • 4. Definition of On-Machine Probing American Machinist m agazine 2008 survey of benchmark companies Perceptions of On-Machine Probing What is OEE (Overall Equipment Effectiveness)? Definition of OEE Calculating OEE Six big losses in a plant Obstacles to OEE OEE and On-Machine Probing Test performed at TechSolve Success Stories Conclusions Outline
  • 5. On-Machine Probing An inspection process within a machine tool that requires minimal use of peripheral inspection equipment or additional operators Data is used to make process adjustments to minimize non-conforming parts Benefits to Industry Work offset verification Detects maladjusted fixtures Collects SPC data Reduced material handling On-machine rework In-process correction On-Machine Probing U-TOL L-TOL UCL LCL
  • 6. 2008 Machine Shop Benchmark Survey Analysis From the July 2008 issue of American Machinist “ This year, there was a noticeable increase in the uses of in-process measurement, coordinate measuring machines, barfeeders and prefixturing of workpieces, especially for shops in the benchmark shop categories.” Increasing the overall equipment effectiveness (OEE) is one of the hallmarks of the machine shops in the benchmark categories
  • 7. Industrial Perceptions Probing diverts time from machining and increases cycle time Instead of focusing on cycle time, we should evaluate overall equipment effectiveness (OEE) Probing routines are difficult to write and use State-of-the-art software makes writing routines easier and more user-friendly Once written, routines can be used on repeat parts The probe is only as accurate as the machine itself
  • 8. What is OEE? Best practice way to monitor and improve the effectiveness of a manufacturing process Organizes any productivity losses into three components to provide a gage for process improvement Availability, Performance, and Quality
  • 9. How is OEE calculated? OEE = Availability X Performance X Quality Availability = Operating Time / Planned Production Time Performance = Ideal Cycle Time / (Operating time / Total Pieces) Quality = Good Piece / Total Pieces World-class performance OEE = 85% The OEE percentage by itself may not provide the right answer You must scrutinize its components
  • 10. Six Big Losses OEE takes into account issues like: Machine breakdowns Setup time Line restraint Reduced speeds Start-up rejects Production rejects On-machine probing addresses three of the six big losses in OEE Is the sum of those losses worth a probing cycle?
  • 11. Obstacles to OEE Availability – Any event that effects planned production Changeover, setup , break downs, material shortages Performance – Any event that causes the process to run at less than optimal speed Machine wear, operator inefficiency , mis-feeds Quality – Parts that are not produced to specification and require rework Start-up scrap, production scrap Q: What are the roadblocks to world class OEE? A: Scrutinize the individual components.
  • 12. Current State of Manufacturing Start-up scrap: One of the biggest losses to a production environment comes from the setup procedure . This may be because the setup process is very dependent on the skill of the operator. There is also a chance that the wrong rough stock can be loaded. Production scrap: Another major loss to a production environment comes from the production process itself (such as tool wear and features “drifting” out of tolerance). Time loss: Time is lost in production due to waiting in (off-line) inspection queues and conventional setup procedure.
  • 13. Benefits of On-Machine Probing Precise Setup: With on-machine probing, setups can be located exactly to the rough stock to avoid air cuts or buried cutters in a roughing process. Process verification: Features can be inspected during the production process and reported back to the operator. This will reduce time at the CMM and allow for more uptime at the CNC. Time savings: Routines can be written that will allow setup to be performed in a fraction of the time of conventional (manual) setup procedures. Local work coordinate systems can also be used to eliminate positional accuracy of the machine for a high-tolerance, local set of features, such as bolt hole patterns.
  • 14. For the sake of discussion, all of the comparisons will be done in reference to the SMPI demonstration part SMPI Demo Part
  • 15. Process Steps 106.5 minutes 43.5 minutes Pre-Technology Time in minutes Tasks Why & Benefit Post-Technology Time in minutes 20.0 Set G54 Establish work coordinates 2.0 4.0 Validate rough stock Inspect for correct stock 2.0 4.0 Laser inspection face mill Accurate tool length - TCM 1.5 10.0 Face mill surface Optimized tool path - IM 5.0 4.0 Laser inspection end mill Accurate tool length - TCM 1.25 21.0 Roughing two pockets Optimized tool path - IM 10.5 8.0 Finishing two pockets Optimized tool path - IM 5.5 8.5 Set G55 & G56 Set local work coordinates 1.0 4.0 Laser inspection drill Accurate tool length -TCM 0.5 4.0 Drill holes in G55 & G56 Optimized tool path - IM 2.5 19.0 End mill roughing two bores Optimized tool path - IM 9.5 3.0 Laser inspection measure tool Accurate tool wear - TCM 1.25 1.0 Finish 50 mm holes Improved accuracy of holes - IM 1.0 varies Final inspection On-machine probing vs. CMM 3.0 Probing steps in blue
  • 16. Setup Time Reduction and Quality To minimize linear inaccuracy, on-machine probing can establish a local WCS on localized datum This is more significant on longer parts with features that may be clustered in different sections of the workpiece Setting a local work coordinate system showed a 50% average improvement in the true position Time Savings: Conventional Method = 8.5 min OMP = 1.0 min  = 7.5 minutes True position improvement of 50% and more than 7 minutes saved
  • 17. Setup Time Reduction and Quality A reduction in time at the CMM and an improved part quality means that there is and increase in the overall equipment effectiveness (OEE) of the plant. Unknown Distance G55 G56
  • 18. Success Stories Successes from actual customers of TechSolve that have adopted the use of spindle probes
  • 19. Effect on Availability One component of OEE is the lost of efficiency due to machine availability The availability is defined as: Availability = Operating Time / Planned Production Time Availability: Less trips to the CMM and less setups means that the customer is utilizing their machine tool to make more parts To achieve this the uncertainty of the process has to be addressed
  • 20. Effect on Availability Scenario: A company manufactures complex aircraft components during a three shift (24 hour) operation. The components must be inspected to a traceable standard before they can be signed-off. The queue at the CMM and the inspection process is one hour. The CNC must idle while the inspection is taking place or risk making scrap parts. Solution: After tuning the machine and performing repeatability studies on the machine, the CNC can inspect the parts with a high level of certainty per ASME B5.54. The shop is able to move from lot inspections to first and last article inspection while sampling CTQ features on the CNC. The availability of the machine increases by 12%, which adds to the OEE due to the increase operating time. Availability = Operating Time / Planned Production Time
  • 21. Effect on Quality & Availability Problem: A customer has to machine a cast aluminum housing. The housing has two production locating pins that are used as datums that span 24 inches apart. Between those datums are a series of machine features, among those features are four bored holes surrounded by bolt hole patterns that have to maintain true positions of 0.040”. Solution: The client is able to use a spindle probe to establish a local work coordinate system within the bore diameter. By using that local work coordinate system as the origin of the bolt hole pattern, the process is able to easily hold a true position of 0.001” (previously 0.040”) to the main bore without breaking the setup or making multiple trips to the CMM.
  • 22. Effect on Quality and Availability Quality: The customer realized a 60% increase in the part quality from the use of the spindle probe Availability: Less trips to the CMM and less setups meant that the customer is utilizing their machine tool to make more parts
  • 23. Effect on Quality Problem: A manufacturer has an issue with bottlenecks at the inspection area due to the volume of work being produced on the CNC machining area. Goal: To utilize on-machine probing to go from ongoing inspection to first article inspection, which would reduce the inspection time by 80%. This would lead to an increase in production due to less time spent waiting for inspection . Cell #1 Cell #2 Cell #3 Inspection
  • 24. Effect on Quality Solution: The biggest concerns from the quality department was being able to Produce parts that were statistically within control for sampling Have a method in place to make sure that the machine tool was qualified The machine tool was first qualified and tuned to reduce metrology errors Repeatability studies were performed per the ASME B5.54 standards to ensure the quality of the probe itself The CNC machine was “foot-printed” using a diamond-circle-square test and the part was collaborated using a traceable CMM
  • 25. Effect on Quality Result: With a machine that is qualified, repeatable, and traceable the customer can now inspect parts on the machine within a relative certainty This will result in an a single daily inspection on the CMM and ongoing inspection key features on the machine This increase in part quality and throughput will have a direct impact on the plant’s OEE because of the reduction in the three of the six big losses: Start-up scrap Production scrap Waiting for the CMM’s approval throughout the day
  • 26. Conclusion Spindle probes are meant to increase the productivity and the effectiveness of a process Probing offsets the time and cost of scrap and downtime that is currently in the machining process Reduction in scrap and reduced time spent performing offline inspections will increase the overall equipment effectiveness (OEE) of the process
  • 27. Questions? For more information see TechSolve at booth # 1022 Moise Cummings (513) 948-2048 [email_address] www.techsolve.org