This paper presents a heuristic algorithm for the flexible job shop scheduling problem with preventive maintenance constraints, aiming to minimize makespan, total workload of machines, and the maximal machine workload. The algorithm is evaluated on benchmark instances demonstrating its computational efficiency and practicality in real-world applications. Key contributions include a novel approach to schedule operations considering maintenance periods and a structured methodology for generating efficient schedules quickly.