SlideShare a Scribd company logo
2
Most read
4
Most read
8
Most read
MULTIMODAL TRANSIT HUB AT
ANAND VIHAR, NEW DELHI
ANALYSIS
SUBMITTED BY:
SAMRIDHI
M.ARCH.
SUSAP
BUS STAND 1. ENTRY FOR INTER & INTRA BUS
STAND IS SAME.
2. ONE EXIT FOR BOTH TERMINALS
CREATE JAM’S & CONGESTION.
3. NO PROPER PEDESTRIAN MOVEMENT.
CONFLICTS AT VARIOUS POINTS FOR
PEDESTRAINS.
4. NO SEGGREGATION OF INTER &
INTRA TERMINALS.
5. VERY CONGESTED AREA BETWEEN
TWO PLATFORMS.
6. BUSES ARE STANDING AT THEIR
PLACES AND ALSO IN-BETWEEN
AISLES.
7. NO PLACE FOR PEOPLE TO MOVE.8. NO DROP-OFF POINT.
9. NO PROPER SITTING PLACES ON PLATFORM.
10. NO. OF BUSES ARE MORE THAN THE SPACE AVAILABLE.
METRO STATION 1. NO SEPEARATE ENTRY FOR METRO STATION.
ENTRY FOR METRO-STATION IS FROM THE
ENTRY FOR BUS TERMINAL.
2. NO PROPER PEDESTRIAN CONNECTIVITY WITH
BUS-TERMINAL.
3. CONNECTIVITY WITH RAILWAY STATION IS
THROUGH FOOT OVER BRIDGE. WHICH HIDDEN
BEHIND THE RAILWAY STATION.
4. LONG QUEUE FOR TICKETING – LESS SPACE.
5. TO REACH ON PLATFORM AFTER BUYING A
TICKET, A LONG PATH HAS TO BE COVERED.
6. FEW SHOPS ARE ON GROUND FLOOR, FIRST
FLOOR IS EMPTY.
7. VERTICAL CORES ARE NOT VISIBLE WHEN
ENTER FROM THE GROUND FLOOR.
8. SERVICES ARE HIDDEN.
9. LIFTS ARE NOT NEAR TO STAIRCASE AND
ESCALATORS.
10. DAY LIGHTING IS LESS.
11. VERY CONGESTED AREA.
RAILWAY STATION
1. SEPARATE ENTRY/EXIT.
2. NO DIRECT LINK WITH THE BUS
TERMINAL & METRO STATION.LONG
WALKWAYS.
3. PASSENGERS COMMUTE THROUGH
PUNCTURES IN BOUNDARY WALL –
INFORMAL ACCESS.
4. SPACE IS LESS FOR WAITING &
TICKETING. LONG QUEUES.
5. IN FRONT OF RAILWAY STATION WIDE
ROAD IS FULLOF HAVING CARS, BUSES,
RICKHAWS, AUTO RICKSHAWS.
1. CONGESTIONON ROAD NO. 56 (ONLY
APPROACH ROAD TO RAILWAY STATION) DUE
TO SINGLE ENTRY/EXIT TO COMPLEX,
PEDESTRIAN DISPERSAL, HAWKERS AND
STATION BOUND TRAFFIC.
2. LONGER WALKING DISTANCES FOR
PASSENGERS TO INTERCHANGE / DISPERSAL.
3. PASSENGERS COMMUTE THROUGH
PUNCTURES IN BOUNDARY WALL –INFORMAL
ACCESS.
4. ENCROACHMENT-HAWKERS, GRAMINSEWA,
AUTOS.
5. FOOT OVER BRIDGE TO CROSS ROAD NO. 56
OVERCROWDED.
6. OPEN TO SKY.
7. ESCALATOR FOR ASCENDING ONLY.
8. MANY LEVEL CHANGES FROM ORIGIN TO
DESTINATION.
9. MIXING UP AT VARIOUS LOCATIONS WITH
PEDESTRIANS CAUSING CONFLICT POINTS.
10. USERS COMPLAINED THAT FOOT OVER BRIDGE IS
TOO NARROW OF PEDESTRIANS MOVING ON IT IN
BOTH DIRECTIONS, AND MOST FEEL THAT IT DOES NOT
TAKE THEM NEAR THEIR DESTINATION.
Ananad vihar
Ananad vihar
INCREASE THE LENGTH
OF FOOT OVER BRIDGE.
PROPOSED
IPT
INCREASE
ROAD WIDTH
PROPOSED
PEDESTRIAN
MOVEMENT

More Related Content

PDF
Transportation analysis at anand vihar
PDF
Kashmere gate isbt
PPT
Isbt kashmere gate 2
PPT
Anand Vihar Integrated Circulation Plan
PPTX
case study of netaji metro station
PPT
karunamoyee metro station thesis B.Arch
PPTX
CHENNAI MOFUSSIL BUS TERMINUS_a case study
PPTX
Isbt, kashmiri gate, delhi_a case study
Transportation analysis at anand vihar
Kashmere gate isbt
Isbt kashmere gate 2
Anand Vihar Integrated Circulation Plan
case study of netaji metro station
karunamoyee metro station thesis B.Arch
CHENNAI MOFUSSIL BUS TERMINUS_a case study
Isbt, kashmiri gate, delhi_a case study

What's hot (20)

PPTX
Inter state bus terminal - Library Study & Case Study
PPSX
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
PDF
Mumbai metro - Planning
PPTX
Literature study
PPTX
Ved tranzcube plaza, Vadodara
PDF
Berlin hauptbanhof central railway
PDF
Central Bus Station, Vadodara
PPTX
Transit Oriented Development.
PPTX
Transit hub
PPTX
Chennai mofussil bus terminal case study
PPTX
TEMPLE TOWN - Madurai and Omkareswar, India
PPTX
Chennai Mofussil Bus Terminal
PDF
FINAL PROJECT TRAIN STATION
PPT
Shanghai Long Distance Bus Station
PPSX
Site analysis - Transit hub
PDF
PANDIT NEHRU BUS STATION (PNBS) , VIJAYAWADA ,ANDHRA PRADESH
PPTX
CASE STUDY NEHRU PLACE,DELHI
PPTX
CHANDNI CHOWK REDEVELOPMENT
PDF
Bus Terminal-Bachelor thesis project 2006
PDF
Bus Terminal Pre Design Study.pdf
Inter state bus terminal - Library Study & Case Study
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Mumbai metro - Planning
Literature study
Ved tranzcube plaza, Vadodara
Berlin hauptbanhof central railway
Central Bus Station, Vadodara
Transit Oriented Development.
Transit hub
Chennai mofussil bus terminal case study
TEMPLE TOWN - Madurai and Omkareswar, India
Chennai Mofussil Bus Terminal
FINAL PROJECT TRAIN STATION
Shanghai Long Distance Bus Station
Site analysis - Transit hub
PANDIT NEHRU BUS STATION (PNBS) , VIJAYAWADA ,ANDHRA PRADESH
CASE STUDY NEHRU PLACE,DELHI
CHANDNI CHOWK REDEVELOPMENT
Bus Terminal-Bachelor thesis project 2006
Bus Terminal Pre Design Study.pdf
Ad

Viewers also liked (20)

PDF
BUS TERMINAL LIBRARY STUDY
PPS
Bus terminal+commercial complex+isbt+india ppt show
PDF
ASCE OC Geo-Institute Luncheon - ARTIC: Anaheim Regional Transportation Inter...
PPTX
Apresentação Oficial do Plano de Negócio Voo TxT App VOOTXT
PPTX
Ifreex Apresentação do Plano Oficial de Marketing
PPTX
Gender and development planning
PDF
Raleigh Multi-Modal Mobility Hub
PPTX
Libertagia Mondial Apresentação Oficial Novo Plano de Marketing
PPT
BigBônus - Ganhe dinheiro divulgando cartão de crédito
PDF
Apresentação Oficial Goobets Pre-Lançamento Português
PDF
bus terminal
PPSX
Literature case study - ARTIC
PDF
Bus Terminal-Bachelor thesis project 2006
PDF
Terminal Design
PPTX
Delhi.ppt
PPTX
PDF
What Makes Great Infographics
PDF
Masters of SlideShare
PDF
STOP! VIEW THIS! 10-Step Checklist When Uploading to Slideshare
PDF
You Suck At PowerPoint!
BUS TERMINAL LIBRARY STUDY
Bus terminal+commercial complex+isbt+india ppt show
ASCE OC Geo-Institute Luncheon - ARTIC: Anaheim Regional Transportation Inter...
Apresentação Oficial do Plano de Negócio Voo TxT App VOOTXT
Ifreex Apresentação do Plano Oficial de Marketing
Gender and development planning
Raleigh Multi-Modal Mobility Hub
Libertagia Mondial Apresentação Oficial Novo Plano de Marketing
BigBônus - Ganhe dinheiro divulgando cartão de crédito
Apresentação Oficial Goobets Pre-Lançamento Português
bus terminal
Literature case study - ARTIC
Bus Terminal-Bachelor thesis project 2006
Terminal Design
Delhi.ppt
What Makes Great Infographics
Masters of SlideShare
STOP! VIEW THIS! 10-Step Checklist When Uploading to Slideshare
You Suck At PowerPoint!
Ad

Recently uploaded (20)

PPTX
Presentation.pptx anemia in pregnancy in
PDF
Chalkpiece Annual Report from 2019 To 2025
PDF
The Complete Guide to Buying Verified Stripe Accounts 2025.pdf
PPTX
8086.pptx microprocessor and microcontroller
PDF
SOUND-NOTE-ARCHITECT-MOHIUDDIN AKHAND SMUCT
PDF
analisis snsistem etnga ahrfahfffffffffffffffffffff
PPTX
SOBALAJE WORK.pptxe4544556y8878998yy6555y5
PDF
GSH-Vicky1-Complete-Plans on Housing.pdf
PPTX
2. Competency Based Interviewing - September'16.pptx
PPTX
PROPOSAL tentang PLN di metode pelaksanaan.pptx
PDF
Govind singh Corporate office interior Portfolio
PPTX
Drawing as Communication for interior design
PDF
Timeless Interiors by PEE VEE INTERIORS
PPTX
ENG4-Q2-W5-PPT (1).pptx nhdedhhehejjedheh
PPTX
Bitcoin predictor project presentation
PPT
Unit I Preparatory process of dyeing in textiles
PPTX
WHY UPLOADING IS IMPORTANT TO DOWNLOAD SLIDES.pptx
PDF
Architecture Design Portfolio- VICTOR OKUTU
PDF
Test slideshare presentation for blog post
PDF
321 LIBRARY DESIGN.pdf43354445t6556t5656
Presentation.pptx anemia in pregnancy in
Chalkpiece Annual Report from 2019 To 2025
The Complete Guide to Buying Verified Stripe Accounts 2025.pdf
8086.pptx microprocessor and microcontroller
SOUND-NOTE-ARCHITECT-MOHIUDDIN AKHAND SMUCT
analisis snsistem etnga ahrfahfffffffffffffffffffff
SOBALAJE WORK.pptxe4544556y8878998yy6555y5
GSH-Vicky1-Complete-Plans on Housing.pdf
2. Competency Based Interviewing - September'16.pptx
PROPOSAL tentang PLN di metode pelaksanaan.pptx
Govind singh Corporate office interior Portfolio
Drawing as Communication for interior design
Timeless Interiors by PEE VEE INTERIORS
ENG4-Q2-W5-PPT (1).pptx nhdedhhehejjedheh
Bitcoin predictor project presentation
Unit I Preparatory process of dyeing in textiles
WHY UPLOADING IS IMPORTANT TO DOWNLOAD SLIDES.pptx
Architecture Design Portfolio- VICTOR OKUTU
Test slideshare presentation for blog post
321 LIBRARY DESIGN.pdf43354445t6556t5656

Ananad vihar

  • 1. MULTIMODAL TRANSIT HUB AT ANAND VIHAR, NEW DELHI ANALYSIS SUBMITTED BY: SAMRIDHI M.ARCH. SUSAP
  • 2. BUS STAND 1. ENTRY FOR INTER & INTRA BUS STAND IS SAME. 2. ONE EXIT FOR BOTH TERMINALS CREATE JAM’S & CONGESTION. 3. NO PROPER PEDESTRIAN MOVEMENT. CONFLICTS AT VARIOUS POINTS FOR PEDESTRAINS. 4. NO SEGGREGATION OF INTER & INTRA TERMINALS. 5. VERY CONGESTED AREA BETWEEN TWO PLATFORMS. 6. BUSES ARE STANDING AT THEIR PLACES AND ALSO IN-BETWEEN AISLES. 7. NO PLACE FOR PEOPLE TO MOVE.8. NO DROP-OFF POINT. 9. NO PROPER SITTING PLACES ON PLATFORM. 10. NO. OF BUSES ARE MORE THAN THE SPACE AVAILABLE.
  • 3. METRO STATION 1. NO SEPEARATE ENTRY FOR METRO STATION. ENTRY FOR METRO-STATION IS FROM THE ENTRY FOR BUS TERMINAL. 2. NO PROPER PEDESTRIAN CONNECTIVITY WITH BUS-TERMINAL. 3. CONNECTIVITY WITH RAILWAY STATION IS THROUGH FOOT OVER BRIDGE. WHICH HIDDEN BEHIND THE RAILWAY STATION. 4. LONG QUEUE FOR TICKETING – LESS SPACE. 5. TO REACH ON PLATFORM AFTER BUYING A TICKET, A LONG PATH HAS TO BE COVERED. 6. FEW SHOPS ARE ON GROUND FLOOR, FIRST FLOOR IS EMPTY. 7. VERTICAL CORES ARE NOT VISIBLE WHEN ENTER FROM THE GROUND FLOOR. 8. SERVICES ARE HIDDEN. 9. LIFTS ARE NOT NEAR TO STAIRCASE AND ESCALATORS. 10. DAY LIGHTING IS LESS. 11. VERY CONGESTED AREA.
  • 4. RAILWAY STATION 1. SEPARATE ENTRY/EXIT. 2. NO DIRECT LINK WITH THE BUS TERMINAL & METRO STATION.LONG WALKWAYS. 3. PASSENGERS COMMUTE THROUGH PUNCTURES IN BOUNDARY WALL – INFORMAL ACCESS. 4. SPACE IS LESS FOR WAITING & TICKETING. LONG QUEUES. 5. IN FRONT OF RAILWAY STATION WIDE ROAD IS FULLOF HAVING CARS, BUSES, RICKHAWS, AUTO RICKSHAWS.
  • 5. 1. CONGESTIONON ROAD NO. 56 (ONLY APPROACH ROAD TO RAILWAY STATION) DUE TO SINGLE ENTRY/EXIT TO COMPLEX, PEDESTRIAN DISPERSAL, HAWKERS AND STATION BOUND TRAFFIC. 2. LONGER WALKING DISTANCES FOR PASSENGERS TO INTERCHANGE / DISPERSAL. 3. PASSENGERS COMMUTE THROUGH PUNCTURES IN BOUNDARY WALL –INFORMAL ACCESS. 4. ENCROACHMENT-HAWKERS, GRAMINSEWA, AUTOS. 5. FOOT OVER BRIDGE TO CROSS ROAD NO. 56 OVERCROWDED. 6. OPEN TO SKY. 7. ESCALATOR FOR ASCENDING ONLY. 8. MANY LEVEL CHANGES FROM ORIGIN TO DESTINATION. 9. MIXING UP AT VARIOUS LOCATIONS WITH PEDESTRIANS CAUSING CONFLICT POINTS. 10. USERS COMPLAINED THAT FOOT OVER BRIDGE IS TOO NARROW OF PEDESTRIANS MOVING ON IT IN BOTH DIRECTIONS, AND MOST FEEL THAT IT DOES NOT TAKE THEM NEAR THEIR DESTINATION.
  • 8. INCREASE THE LENGTH OF FOOT OVER BRIDGE. PROPOSED IPT INCREASE ROAD WIDTH PROPOSED PEDESTRIAN MOVEMENT