Situation
Our client, a global information technology services group, required an organization that could design and implement an integrated
supply chain model to support a major North American information technology upgrade project. The supply chain needed to
incorporate secure, time sensitive transportation planning and execution, inventory management, warehouse management, software
and hardware configuration, production scheduling and reverse logistics. The delivery of the configured products to the site was
a critical component of the overall process.
Challenges
With a supply chain model of this complexity and scale, we needed to collaborate extensively with the client and stakeholders to
successfully execute all of the equipment upgrades throughout North America. The project plan and implementation had a very tight
timeline, requiring us to be flexible and adapt to a series of changes - including revised delivery dates and changes to a software
protocol in the configuration services - without compromising our client’s project budget, on time performance expectations and
commitment to quality.
Actions
We worked collaboratively with the client and created a multi-organization program management team to lead the development and
execution of the plan. This team also implemented change control measures to ensure quality and consistency when delivering the
project throughout all organizations.
The client used the multi-disciplinary Apple Express Configuration Centre to minimize on-site installation time by pre-staging and
packaging equipment. This state-of-the-art centre is staffed with trained information technology professionals and equipped with
industry-leading infrastructure, providing scalable configuration services to meet all of our clients’ business requirements.
The logistics model we developed and executed accommodated all our client’s requirements, including maintaining and orchestrating
a suite of economical transportation options.
Results
The investment in dedicated, professional staff combined with the rigorous management process, measurements and technology,
ensured that the client project was successful.
Key Performance Actions and Statistics
• Over 70,000 components processed with an end-to-end accuracy of 99.8% during the six-month project.
• Logistics management of more than 200 tons of equipment.
• Lowest cost transportation mode selected 83.0% of the time while exceeding the project’s 98.0% on time SLA.
• Custom critical logistics management conducted with 99.8% on time performance.
case study
C O N F I G U R AT I O N
1715 N.W. 84th Avenue, Miami, FL 33126
Tel: 305.599.0291 Toll Free 1.888.672.7753
Email: sales.usa@appleexpress.com
5300 Satellite Drive, Mississauga, ON L4W 5J2
Tel: 905.602.9499 Toll Free 1.888.641.2142
Email: info@appleexpress.com www.appleexpress.com

More Related Content

DOCX
Mohamed Resume
DOC
KFRes_0916
DOCX
Mary In
DOCX
Annette Siverling Resume
DOCX
Resume 2.1
DOC
Resume 150927
DOCX
Kathy R Brown Resume Nov2016
DOCX
ResumeBenjaminBaron
Mohamed Resume
KFRes_0916
Mary In
Annette Siverling Resume
Resume 2.1
Resume 150927
Kathy R Brown Resume Nov2016
ResumeBenjaminBaron

What's hot (19)

DOC
Michael f mckinleyresume2
DOCX
nettie-whitehead
DOC
Pradeep kumar12 mar16 cv_updated
DOC
Martin Bryan LinkedIn FINAL
DOCX
PDF
ADP Payroll Project
DOC
Resumepmlatest
PPTX
Lean activities - April 2014 update
DOC
Ayman Zedan CV
PPT
Setup best practices
PDF
Powering performance through a tailor-made solution.
PDF
16.07.15_dallas_fox_resume (2)
DOC
Resume -UD
DOCX
james-love-resume-2015
PDF
ECSS-Q-ST-20C Supplier Responsibilities
DOC
Rahul V Kundyekar
DOCX
Wayne Hamilton Resume 5.9.16
DOC
Kevin Resume 11-2-2015
Michael f mckinleyresume2
nettie-whitehead
Pradeep kumar12 mar16 cv_updated
Martin Bryan LinkedIn FINAL
ADP Payroll Project
Resumepmlatest
Lean activities - April 2014 update
Ayman Zedan CV
Setup best practices
Powering performance through a tailor-made solution.
16.07.15_dallas_fox_resume (2)
Resume -UD
james-love-resume-2015
ECSS-Q-ST-20C Supplier Responsibilities
Rahul V Kundyekar
Wayne Hamilton Resume 5.9.16
Kevin Resume 11-2-2015
Ad

Similar to Apple Express Configuration and Staging (20)

DOC
Andrew taylor cv march 2016.doc
DOCX
TaylorMelissa
DOC
Gopi Krishna Resume_Cards
PDF
Sapple systems capability document
PDF
Sapple systems capability document
DOC
Introducing Robert Driskell
DOC
Lumi Noah resume FY2018
DOC
Kenneth M. Fischler
PDF
Sapple Systems Corporate Profile
DOC
paul_jubb cv 16May15
PPTX
Software Testing and Quality Assurance (QA) Services - Codetru
DOC
nitesh_rajpurkar_2016
PPTX
Best Test Automation Services Company - Codetru
DOC
Marc Cadden IT PM 3
DOC
Andrew Battisti Senior Project Manager Resume May 2015
DOC
AnakpalSandhuMaster1
PDF
Sci comm capabilities dec 2014
PDF
Success Story - Healthcare Insurance Testing Services
PDF
InfosysPublicServices - Healthcare SOA | Program Management Framework
PDF
DShapiroresume5doc (1)
Andrew taylor cv march 2016.doc
TaylorMelissa
Gopi Krishna Resume_Cards
Sapple systems capability document
Sapple systems capability document
Introducing Robert Driskell
Lumi Noah resume FY2018
Kenneth M. Fischler
Sapple Systems Corporate Profile
paul_jubb cv 16May15
Software Testing and Quality Assurance (QA) Services - Codetru
nitesh_rajpurkar_2016
Best Test Automation Services Company - Codetru
Marc Cadden IT PM 3
Andrew Battisti Senior Project Manager Resume May 2015
AnakpalSandhuMaster1
Sci comm capabilities dec 2014
Success Story - Healthcare Insurance Testing Services
InfosysPublicServices - Healthcare SOA | Program Management Framework
DShapiroresume5doc (1)
Ad

Apple Express Configuration and Staging

  • 1. Situation Our client, a global information technology services group, required an organization that could design and implement an integrated supply chain model to support a major North American information technology upgrade project. The supply chain needed to incorporate secure, time sensitive transportation planning and execution, inventory management, warehouse management, software and hardware configuration, production scheduling and reverse logistics. The delivery of the configured products to the site was a critical component of the overall process. Challenges With a supply chain model of this complexity and scale, we needed to collaborate extensively with the client and stakeholders to successfully execute all of the equipment upgrades throughout North America. The project plan and implementation had a very tight timeline, requiring us to be flexible and adapt to a series of changes - including revised delivery dates and changes to a software protocol in the configuration services - without compromising our client’s project budget, on time performance expectations and commitment to quality. Actions We worked collaboratively with the client and created a multi-organization program management team to lead the development and execution of the plan. This team also implemented change control measures to ensure quality and consistency when delivering the project throughout all organizations. The client used the multi-disciplinary Apple Express Configuration Centre to minimize on-site installation time by pre-staging and packaging equipment. This state-of-the-art centre is staffed with trained information technology professionals and equipped with industry-leading infrastructure, providing scalable configuration services to meet all of our clients’ business requirements. The logistics model we developed and executed accommodated all our client’s requirements, including maintaining and orchestrating a suite of economical transportation options. Results The investment in dedicated, professional staff combined with the rigorous management process, measurements and technology, ensured that the client project was successful. Key Performance Actions and Statistics • Over 70,000 components processed with an end-to-end accuracy of 99.8% during the six-month project. • Logistics management of more than 200 tons of equipment. • Lowest cost transportation mode selected 83.0% of the time while exceeding the project’s 98.0% on time SLA. • Custom critical logistics management conducted with 99.8% on time performance. case study C O N F I G U R AT I O N 1715 N.W. 84th Avenue, Miami, FL 33126 Tel: 305.599.0291 Toll Free 1.888.672.7753 Email: sales.usa@appleexpress.com 5300 Satellite Drive, Mississauga, ON L4W 5J2 Tel: 905.602.9499 Toll Free 1.888.641.2142 Email: info@appleexpress.com www.appleexpress.com