Need
The former Casper, Wyoming refinery was one of the oldest refineries in the Western
United States. It operated from 1908 until 1991. As a result of common management
practices during the 80 years of operation, much of the site is underlain with residual
hydrocarbons. It has been estimated that 114,000 m3
of hydrocarbons (oil) had
leaked into the shallow alluvial aquifer adjacent to the North Platte River.
Solution
BP and the City of Casper agreed to convert the former refinery site into a golf
course and office park, with a trail system along the North Platte River. The
presence of a large amount of contaminants below the water table created a major
challenge. The remediation treatment system needed to handle up to 11,350 m3
per day of gasoline-contaminated groundwater, blend it into the middle of a
premier golf course and operate for more than 100 years. Knowing that petroleum
hydrocarbons are biodegradable and keeping in mind the cost of pumping
groundwater for decades, BP chose a wetland treatment technology as the most
appropriate solution. The full-scale wetland had to be capable of operating at
6,000 m3
per day and deal with potential fouling of the wetland media. A cascade
aeration system for iron oxidation and a surface flow wetland for iron precipitation
were added to the system. To address flow distribution, an innovative radial-
flow wetland configuration was adopted This innovative system is the largest
remediation wetland in North America.
Benefits
By using new “green” technology, the old refinery site has been transformed from
what once seemed destined to remain an unused brownfield, to a community
landmark. There is now a beautiful green space adjacent to the City, with
amenities including walking trails, a river park, a whitewater kayak course, and
an 18 hole golf course. The wetlands are integrated into the golf course water
features. When compared to a conventional mechanical plant, construction of an
engineered wetland system saved BP $12.5 million. Over the first 50 years of the
site remediation, the lower operating costs associated with constructed wetlands is
anticipated to save an additional $15.7 million.
British Petroleum, Casper
Aerated horizontal subsurface flow:
Contaminated groundwater
Project
British Petroleum, Casper
Location
Casper, Wyoming
Project type
Groundwater remediation
Wastewater type
Hydrocarbon contaminated
groundwater
Completion date
2003
Treatment
Subsurface flow wetland with
forced bed aeration
CASE
STUDY

More Related Content

PDF
Abg basal drainage_and_slope_veneer_retention_pozidrain_and_erosaweb_shetland...
PPTX
GWI 2009 Brookside Storage LLC
PPTX
Jea presentation july 2014
PPTX
Bee Creek Sewer Line
PPTX
July 29-210-Keegan Kult
PPTX
Short summary of PH4b Projects
PPTX
Marcopper Boac River Update
PPTX
Amarillo MLT_Canadian River Municipal Water Authority_Kent Satterwhite
Abg basal drainage_and_slope_veneer_retention_pozidrain_and_erosaweb_shetland...
GWI 2009 Brookside Storage LLC
Jea presentation july 2014
Bee Creek Sewer Line
July 29-210-Keegan Kult
Short summary of PH4b Projects
Marcopper Boac River Update
Amarillo MLT_Canadian River Municipal Water Authority_Kent Satterwhite

What's hot (12)

PDF
BC - Kitsault Mine - APPROVED by AKM - October 30 2015
PPTX
Lid Stormwater Approach: Overcoming Barriers to Implementation
PDF
News Release: Lomiko Metals
PDF
Revitalization of Old Fields by Leta Smith
PPTX
Solving Victoria BC's Sewage Problem - Clover point
PPTX
Cotswolds AONB Farm Forum March 2016
PDF
ReGen-erating Aged Binder
PDF
PROGRESS PHOTOGRAPHS
PDF
Advancements in ASR Well Design and Operations - City of Phoenix Case Study
PDF
SLC RAC Sports Complex 2013
PDF
The Trajectories of Large Scale Landfills and their International Counterparts
PPTX
410 Fitch Parkway Rezoning
BC - Kitsault Mine - APPROVED by AKM - October 30 2015
Lid Stormwater Approach: Overcoming Barriers to Implementation
News Release: Lomiko Metals
Revitalization of Old Fields by Leta Smith
Solving Victoria BC's Sewage Problem - Clover point
Cotswolds AONB Farm Forum March 2016
ReGen-erating Aged Binder
PROGRESS PHOTOGRAPHS
Advancements in ASR Well Design and Operations - City of Phoenix Case Study
SLC RAC Sports Complex 2013
The Trajectories of Large Scale Landfills and their International Counterparts
410 Fitch Parkway Rezoning
Ad

Viewers also liked (8)

DOCX
Google
PPS
Madrid
PPSX
PPS
Se tu misma
PPTX
www.reforcoescolarapoio.com.br - Geografia – Clima
PPT
G 2010 Eafety Sair[1]
PDF
Presentación4
PPTX
Exposicion de quimica
Google
Madrid
Se tu misma
www.reforcoescolarapoio.com.br - Geografia – Clima
G 2010 Eafety Sair[1]
Presentación4
Exposicion de quimica
Ad

Similar to ARM Casper case study-LR (20)

PDF
ES&E Magazine - Dawson Creek
PDF
DesalinationPresentation
PDF
NI_Water_Dunmurry_2012
DOCX
PClayton_accomplishments
PDF
Hydraulic Fracturing: Importance to the Industry
PDF
Compressor
PDF
Breath of fresh
PDF
City of Winter Springs Capital Improvement Projects 2025-2026
PPT
Oil Sands Water Management Initiative Notes
PDF
Eor the co2 challenge nov2014 gasworld article
PDF
Port lavaca desalination study
PDF
California; Harvesting Rain: Addressing Water Needs of the Monterey Peninsu...
 
PDF
Marange Resources Water Supply System Design-Odzi to Concession Pipeline
PDF
SPE-15101-PA
PDF
Beneficialuses produced-water
PDF
H063771
PDF
Fossil Bay Energy - Investment Opportunity CIM - September 2016 - BMM v3
DOCX
Business Plan
PDF
British Airportss Authority BAA Mayfield Aerated Subsurface Horizontal Airpor...
PPTX
Wac ncc091511 ascent,unconventional oil,northamerica
ES&E Magazine - Dawson Creek
DesalinationPresentation
NI_Water_Dunmurry_2012
PClayton_accomplishments
Hydraulic Fracturing: Importance to the Industry
Compressor
Breath of fresh
City of Winter Springs Capital Improvement Projects 2025-2026
Oil Sands Water Management Initiative Notes
Eor the co2 challenge nov2014 gasworld article
Port lavaca desalination study
California; Harvesting Rain: Addressing Water Needs of the Monterey Peninsu...
 
Marange Resources Water Supply System Design-Odzi to Concession Pipeline
SPE-15101-PA
Beneficialuses produced-water
H063771
Fossil Bay Energy - Investment Opportunity CIM - September 2016 - BMM v3
Business Plan
British Airportss Authority BAA Mayfield Aerated Subsurface Horizontal Airpor...
Wac ncc091511 ascent,unconventional oil,northamerica

More from Neil McCarthy (9)

PDF
Wetland Treatment Systems and Cold Weather
PDF
Buffalo Airport De-Icing
PDF
ARM Armthwaite case study-HQP
PDF
ARM Wolseley case study-LR
PDF
ARM Torver case study-LR
PDF
ARM Heathrow case study-LR
PDF
FBA Technology specific-LR
PDF
ARM AASP brochure-LR
PDF
ARM about NEW LR
Wetland Treatment Systems and Cold Weather
Buffalo Airport De-Icing
ARM Armthwaite case study-HQP
ARM Wolseley case study-LR
ARM Torver case study-LR
ARM Heathrow case study-LR
FBA Technology specific-LR
ARM AASP brochure-LR
ARM about NEW LR

ARM Casper case study-LR

  • 1. www.armgroupltd.co.uk t. +44 (0) 1889 583811 naturalwastewatertreatment www.armgroupltd.co.uk t. +44 (0) 1889 583811 Need The former Casper, Wyoming refinery was one of the oldest refineries in the Western United States. It operated from 1908 until 1991. As a result of common management practices during the 80 years of operation, much of the site is underlain with residual hydrocarbons. It has been estimated that 114,000 m3 of hydrocarbons (oil) had leaked into the shallow alluvial aquifer adjacent to the North Platte River. Solution BP and the City of Casper agreed to convert the former refinery site into a golf course and office park, with a trail system along the North Platte River. The presence of a large amount of contaminants below the water table created a major challenge. The remediation treatment system needed to handle up to 11,350 m3 per day of gasoline-contaminated groundwater, blend it into the middle of a premier golf course and operate for more than 100 years. Knowing that petroleum hydrocarbons are biodegradable and keeping in mind the cost of pumping groundwater for decades, BP chose a wetland treatment technology as the most appropriate solution. The full-scale wetland had to be capable of operating at 6,000 m3 per day and deal with potential fouling of the wetland media. A cascade aeration system for iron oxidation and a surface flow wetland for iron precipitation were added to the system. To address flow distribution, an innovative radial- flow wetland configuration was adopted This innovative system is the largest remediation wetland in North America. Benefits By using new “green” technology, the old refinery site has been transformed from what once seemed destined to remain an unused brownfield, to a community landmark. There is now a beautiful green space adjacent to the City, with amenities including walking trails, a river park, a whitewater kayak course, and an 18 hole golf course. The wetlands are integrated into the golf course water features. When compared to a conventional mechanical plant, construction of an engineered wetland system saved BP $12.5 million. Over the first 50 years of the site remediation, the lower operating costs associated with constructed wetlands is anticipated to save an additional $15.7 million. British Petroleum, Casper Aerated horizontal subsurface flow: Contaminated groundwater Project British Petroleum, Casper Location Casper, Wyoming Project type Groundwater remediation Wastewater type Hydrocarbon contaminated groundwater Completion date 2003 Treatment Subsurface flow wetland with forced bed aeration CASE STUDY