SlideShare a Scribd company logo
Development of Forced Pulse Water Strip of
        HVOF Coatings and Chrome Plating on
     Aircraft, Landing Gear, Engine and Propeller
                     Components
                                                       Fred Laguines
                                                          ES3
                                                    (478) 258-2889
                                              Fred.Laguines@es3inc.com

                                                     Jay Randolph
                                                           ES3
                                                     (478) 957-1278
                                               Jay.Randolph@es3inc.com

                                                       Andrew Tieu
                                                           VLN
                                                      (613) 747-0107
                                                  andrewt@vln-tech.com

       ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY.
       REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.




ASETSDefense 2011, New Orleans, LA                                                                     8-10 Feb, 2011
Objective
Objective           The objective of Phase II SBIR is to validate the crack
Project Status
                    detectibility and fatigue characteristics of the substrates
                    after pulse waterstrip application
                                            application.
Other Coatings
                    FRC-East and Southeast: Focus is Engine
Contact                Inconel 718 & Titanium substrates
Information
                       HVOF coatings are Cr-C and T-800
                                 ti       C C d T 800
Questions              Abradable/Bond Coatings are Metco 450/101B & 312

                    Hill AFB: Focus is Landing Gear
                         300M High Strength Steel substrates, 280-300 KSI
                         HVOF coating is WC-Co
                         Chrome plating

                    Robins AFB: Focus is Aircraft and Propeller
                       4340 Low Strength Steel substrates
                       HVOF coating is WC-Co-Cr
                       Chrome Plating

              ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY.
              REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
Project Status
Objective              Phase II SBIR underway:
Project Status                Parameter Development Testing
                                  • HVOF and Cr strip testing concluded in Dec09
                                            d C t i t ti          l d d i D 09
Other Coatings                    • Abradable/Ceramics testing concluded Jul10
                              DemVal Testing
Contact                           • HVOF and Cr testing concluded in Dec09
Information                       • Ab d bl /C
                                    Abradable/Ceramics testing concluded Jul10
                                                    i t ti         l d d J l10
Questions
                              Crack Detection Testing
                                  • Concluded in Jun10
                              Fatigue Testing
                                  • HVOF stripped Inc718 coupons - On-going (ECD Apr 2011)
                                  • HVOF & Cr stripped 4340 coupons - On-going (ECD Apr 2011)
                                  • HVOF & Cr stripped 300M coupons - On-going (ECD Jun 2011)

                       Phase III SBIR Commercialization efforts underway for
                                       Commerciali ation          nder a
                        technology insertion at NAVAIR. Plans to insert into
                        production in POC depots.
                       OEM s
                        OEM’s being coordinated with, for complimentary test
                                                 with
                        programs.
              ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY.
              REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
Project Status
                                        Crack Detection Testing
                                        C   k D t ti    T ti
Objective

Project Status

Other Coatings

Contact
Information

Questions




                      View of Inc718 Crack Detection Coupon With Crack Prior to FPWJ
                            (View Typical for 4340 and 300M Crack Detection Coupons)



              ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY.
              REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
Project Status
                                        Crack Detection Testing
                                        C   k D t ti    T ti
Objective

Project Status

Other Coatings

Contact
Information

Questions




                                  Typical View of Crack During FPI Prior to FPWJ




              ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY.
              REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
Project Status
                                        Crack Detection Testing
                                        C   k D t ti    T ti
Objective
                                                     Crack Detectability Test Matrix
Project Status

Other Coatings

Contact
Information

Questions




                                           View of FPWJ Orientation Relative to Crack
                                           Vi    f      O i t ti    R l ti t C k


              ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY.
              REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
Project Status
                                        Crack Detection Testing
                                        C   k D t ti    T ti
Objective

Project Status

Other Coatings

Contact
Information

Questions




                       View of INC718 Coupon at 200X Mag (Run w/ T-800 Parameters).


                   View also typical for 4340 and 300M coupons. The FPWJ actually
                   enhanced the crack detectability by cleaning/removing any
                   contaminates or material that may hide the cracks. The crack length
                   measured pre- and post- FPWJ were consistent. All coupons passed
                                                        consistent
                   the detectability testing.

              ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY.
              REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
Project Status
                                                 Fatigue Testing
                                                 F ti    T ti
Objective

Project Status

Other Coatings

Contact
Information

Questions
                                 Typical View of Fatigue coupon in FPWJ booth at VLN.




                                Typical View of the fatigue coupon inspection sequence
                                 yp                     g      p      p         q
                                           conducted before and after FPWJ

              ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY.
              REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
Project Status
                                                 Fatigue Testing
                                                 F ti    T ti
Objective

Project Status

Other Coatings

Contact
Information

Questions




                   Left: Shows Typical View of .013-.015” T-800 HVOF Coated Inconel
                   718 Fatigue coupon prior to FPWJ.
                   Right: View of the coupon after complete coating removal by FPWJ.
                                f             f
                   View also typical for 4340 and 300M HVOF coated and Chrome plated
                   fatigue specimens. There were no visual or dimensional damage to
                   the b t t
                   th substrate.

              ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY.
              REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
Project Status
                                  INC718 F ti
                                         Fatigue Test Results
                                                 T tR     lt
Objective

Project Status

Other Coatings

Contact
Information

Questions




                                             Note: Curve reflects test results completed to date.

              ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY.
              REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
Project Status
                                                   4340 Fatigue Test Results
                                                        F ti    T tR     lt
Objective
                                                                    4340 Fatigue Data
                                       160
Project Status

Other Coatings                         150


Contact                                140
Information
                                  i)
                   Stress level(ksi




Questions                              130



                                       120



                                       110



                                       100
                                             100                   1000                             10000                    100000
                                                                                 Cycles

                                                                    Bare, Unpeened   Bare, Peened


                                                      Note: Curve reflects test results completed to date.

              ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY.
              REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
Project Status
                                                     300M Fatigue Test Results
                                                          F ti    T tR     lt
Objective
                                                                               300M Fatigue Data
                                     230
Project Status
                                     220
Other Coatings

Contact                              210

Information
                                     200
Questions
                  Stress Lev (KSI)




                                     190
                           vel




                                     180


                                     170


                                     160
                                           100                              1,000                              10,000                              100,000
                                                                                               Cycles


                                           Bare Upeended   Bare Peened   Chrome thin (Chem)   Chrome thick (Chem)   HVOF thin (Chem)   HVOF thick (Chem)


                                                             Note: Curve reflects test results completed to date.

              ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY.
              REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
Project Status
 Abradable/Ceramic C t d P
 Ab d bl /C     i Coated Parameter Development Testing
                               t   D   l     t T ti
Objective

Project Status

Other Coatings

Contact
Information

Questions
                             View of Metco 450/312 coated coupon in FPWJ @10 Ksi




                         View of the Metco 450/312 coupon inspection process after FPJW


              ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY.
              REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
Project Status
 Abradable/Ceramic C t d P
 Ab d bl /C     i Coated Parameter Development Testing
                               t   D   l     t T ti
Objective

Project Status

Other Coatings

Contact
Information

Questions


                   Left: View of Metco 450/312 coated coupon prior to FPWJ.
                   Right: View of the coupon after complete coating removal by FPWJ
                   @ 10 Ksi.
                   View also typical for Metco 450/101B coating. Process time was
                   approximately 9 minutes to remove 0.055 inch thick Metco 450/312
                   coating along the length of a 1 inch diameter, eight inch long
                   coupon. Th
                            There is no visual or dimensional damage to the Ti-6Al-4V
                                   i      i   l   di      i  ld          t th Ti 6Al 4V
                   substrate.
              ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY.
              REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
Project Status
 Abradable/Ceramic C t d P
 Ab d bl /C     i Coated Parameter Development Testing
                               t   D   l     t T ti
Objective

Project Status

Other Coatings

Contact
Information
                   Surfaces were visually
Questions
                   inspected under 20X
                   magnification to
                   observe surface texture
                   characteristics.




              ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY.
              REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
Project Status
                 Abradable/Ceramic C t d Dem/Val Testing
                 Ab d bl /C     i Coated D  /V l T ti
Objective

Project Status
                     TF34 HPC Fwd Stator Case,
Other Coatings
                     P/N 6037T10G04
Contact              M/F Ti-6Al-4V, Annealed and
Information
                     Coated with Metco 450/312
Questions




                                View FPWJ Test Set-up with 0.054” nozzle orifice
                                          @10Ksi and 2.25” Standoff
              ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY.
              REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
Project Status
                 Abradable/Ceramic C t d Dem/Val Testing
                 Ab d bl /C     i Coated D  /V l T ti
Objective

Project Status

Other Coatings

Contact
Information

Questions




                              View of Case Prior to FPWJ                               View of Case After FPWJ


                      FPWJ successfully removed the Metco 405/312 from case using a
                      single 0.054” diameter nozzle orifice and a pump pressure of 10 Ksi.



              ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY.
              REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
Project Status
                 Abradable/Ceramic C t d Dem/Val Testing
                 Ab d bl /C     i Coated D  /V l T ti
Objective

Project Status
                     F404 LPT Fwd Seal, P/N
Other Coatings
                     6049T70P03
Contact              M/F Inconel 718 and
Information
                     Coated with Metco 450/101B
Questions




                              View FPWJ Test Set upwith 0.054 nozzle orifice
                                             Set-upwith 0 054”
                                        @10Ksi and 2.5” Standoff

              ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY.
              REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
Project Status
                 Abradable/Ceramic C t d Dem/Val Testing
                 Ab d bl /C     i Coated D  /V l T ti
Objective

Project Status

Other Coatings

Contact
Information

Questions




                        Typical View of Knife Edge Surface (at 50X Mag) after FPWJ @ 10Ksi


                      FPWJ successfully removed the Metco 405/101B from seal using a
                      single 0.054” diameter nozzle orifice and a pump pressure of 10 Ksi.



              ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY.
              REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
Other Coatings
              Phase II SBIR F ll
              Ph            Follow-On P
                                   O Parameter Development
                                           t   D   l     t
Objective
                   Pulse Waterstrip Process has the capability of removing
Project Status     all of these coatings, and many more:
                            WC-Co from INC-718, and other substrates.
Other Coatings
                            Other TBCs, Abradable and Build-up coatings
Contact                     such as:
Information
                                    Metco 204 Metco 443, Metco 601,
                                    M t 204, M t 443 M t 601
Questions                           Rubber, etc…
                            Paint and Primers
                            Chrome and other platings.
                                               platings

                   Parameter development needs to be completed for
                   processing each coating properly.




              ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY.
              REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
Contact Information
Objective           ES3
                    Jay Randolph                                                Fred Laguines
Project Status
                    (478) 922-1460                                              (478) 922-1460
Other Coatings      jay.randolph@es3inc.com                                     fred.laguines@es3inc.com

Contact             Craig Pessetto                                               Don Crawford
Information
                    (801) 926-1150                                               (478) 922-1460
Questions           craig.pessetto@es3inc.com                                    don.crawford@es3inc.com


                   VLN – Advanced Technologies
                   Mohan Vijay                                                  Willie Bloom
                   (613) 749-2244                                               (613) 747-0107
                   mvijay@vln-tech.com
                      j y                                                       wbloom@vln-tech.com




              ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY.
              REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
Objective

Project Status

Other Coatings

Contact
Information

Questions                                                 Questions?




              ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY.
              REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.

More Related Content

PDF
Untitled document (1)
PPT
Merix Def Aero Oct08 A
PDF
Posted afms job annoucments (as of 31 jan 2014)
DOCX
2017 JAN - Aviation - Mark Koppa Personal Resume
PDF
Piping sample report
PPT
美國聯邦採購法之Rfp法規 cisanet-f1
DOCX
Resume_07Jan2016
DOCX
JAMES AJIBOYE RESUME-2016
Untitled document (1)
Merix Def Aero Oct08 A
Posted afms job annoucments (as of 31 jan 2014)
2017 JAN - Aviation - Mark Koppa Personal Resume
Piping sample report
美國聯邦採購法之Rfp法規 cisanet-f1
Resume_07Jan2016
JAMES AJIBOYE RESUME-2016

Similar to Asets Defense Presentation Fpwj 07 Feb2011 (20)

PDF
Frequency-Hopping Spread Spectrum FHSS from G
DOCX
Jeffrey Rachuba resume (Autosaved)
PDF
BuseResumeBinder
DOCX
Chris Blakey API Resume
DOCX
WILLIAMS IDORO CV 2.2
DOCX
Resume 8-29-16
PDF
TORQ General_5335_MY20_Diverge_Fender_Bracket_Change Insert to Thinh Phat_END...
PDF
Estudio de la física de la teletransportacin
PDF
Teleportación -teleportation-physics-study
DOCX
02Resume updated
PDF
0995186 - SLG - West LRT - Sunalta Sta. - Guideway Shoring (Complete Package)
DOCX
Brandon Hauhe Resume
DOCX
PED - Controls Engineer
PDF
Bcar 1278 1 - lamco 6-5-09 grade 18 f 20f and 24f
PDF
Commercial CalGreen - Building Enery Analysis Report
DOCX
Veerasekar api inspectorresume
DOCX
Veerasekar api inspectorresume
PDF
John P DeArmas
DOCX
Resume December 2012
PPTX
04-Fiber-Optic-Test-Enhancement-Project-Update-Meeting-08-10-2022.pptx
Frequency-Hopping Spread Spectrum FHSS from G
Jeffrey Rachuba resume (Autosaved)
BuseResumeBinder
Chris Blakey API Resume
WILLIAMS IDORO CV 2.2
Resume 8-29-16
TORQ General_5335_MY20_Diverge_Fender_Bracket_Change Insert to Thinh Phat_END...
Estudio de la física de la teletransportacin
Teleportación -teleportation-physics-study
02Resume updated
0995186 - SLG - West LRT - Sunalta Sta. - Guideway Shoring (Complete Package)
Brandon Hauhe Resume
PED - Controls Engineer
Bcar 1278 1 - lamco 6-5-09 grade 18 f 20f and 24f
Commercial CalGreen - Building Enery Analysis Report
Veerasekar api inspectorresume
Veerasekar api inspectorresume
John P DeArmas
Resume December 2012
04-Fiber-Optic-Test-Enhancement-Project-Update-Meeting-08-10-2022.pptx
Ad

More from williebloom (12)

PDF
Edc Nov.7.12
PDF
Wjta Paper 2011
PDF
Navy Sample Tests
PDF
Landmines Norma Report
PPT
How Pulse Jet Works(3)
PDF
Vijay Hard Road Circ
PDF
Paper Bhr England 2008
PDF
Benefit Concrete
PDF
Do D Policy Memo 8 April 2009
PDF
Bonnell Apwss Bhr 2010
PDF
Navy Sample Tests
PDF
Edc Nov.7.12
Wjta Paper 2011
Navy Sample Tests
Landmines Norma Report
How Pulse Jet Works(3)
Vijay Hard Road Circ
Paper Bhr England 2008
Benefit Concrete
Do D Policy Memo 8 April 2009
Bonnell Apwss Bhr 2010
Navy Sample Tests
Ad

Asets Defense Presentation Fpwj 07 Feb2011

  • 1. Development of Forced Pulse Water Strip of HVOF Coatings and Chrome Plating on Aircraft, Landing Gear, Engine and Propeller Components Fred Laguines ES3 (478) 258-2889 Fred.Laguines@es3inc.com Jay Randolph ES3 (478) 957-1278 Jay.Randolph@es3inc.com Andrew Tieu VLN (613) 747-0107 andrewt@vln-tech.com ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY. REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098. ASETSDefense 2011, New Orleans, LA 8-10 Feb, 2011
  • 2. Objective Objective The objective of Phase II SBIR is to validate the crack Project Status detectibility and fatigue characteristics of the substrates after pulse waterstrip application application. Other Coatings FRC-East and Southeast: Focus is Engine Contact Inconel 718 & Titanium substrates Information HVOF coatings are Cr-C and T-800 ti C C d T 800 Questions Abradable/Bond Coatings are Metco 450/101B & 312 Hill AFB: Focus is Landing Gear 300M High Strength Steel substrates, 280-300 KSI HVOF coating is WC-Co Chrome plating Robins AFB: Focus is Aircraft and Propeller 4340 Low Strength Steel substrates HVOF coating is WC-Co-Cr Chrome Plating ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY. REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
  • 3. Project Status Objective  Phase II SBIR underway: Project Status  Parameter Development Testing • HVOF and Cr strip testing concluded in Dec09 d C t i t ti l d d i D 09 Other Coatings • Abradable/Ceramics testing concluded Jul10  DemVal Testing Contact • HVOF and Cr testing concluded in Dec09 Information • Ab d bl /C Abradable/Ceramics testing concluded Jul10 i t ti l d d J l10 Questions  Crack Detection Testing • Concluded in Jun10  Fatigue Testing • HVOF stripped Inc718 coupons - On-going (ECD Apr 2011) • HVOF & Cr stripped 4340 coupons - On-going (ECD Apr 2011) • HVOF & Cr stripped 300M coupons - On-going (ECD Jun 2011)  Phase III SBIR Commercialization efforts underway for Commerciali ation nder a technology insertion at NAVAIR. Plans to insert into production in POC depots.  OEM s OEM’s being coordinated with, for complimentary test with programs. ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY. REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
  • 4. Project Status Crack Detection Testing C k D t ti T ti Objective Project Status Other Coatings Contact Information Questions View of Inc718 Crack Detection Coupon With Crack Prior to FPWJ (View Typical for 4340 and 300M Crack Detection Coupons) ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY. REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
  • 5. Project Status Crack Detection Testing C k D t ti T ti Objective Project Status Other Coatings Contact Information Questions Typical View of Crack During FPI Prior to FPWJ ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY. REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
  • 6. Project Status Crack Detection Testing C k D t ti T ti Objective Crack Detectability Test Matrix Project Status Other Coatings Contact Information Questions View of FPWJ Orientation Relative to Crack Vi f O i t ti R l ti t C k ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY. REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
  • 7. Project Status Crack Detection Testing C k D t ti T ti Objective Project Status Other Coatings Contact Information Questions View of INC718 Coupon at 200X Mag (Run w/ T-800 Parameters). View also typical for 4340 and 300M coupons. The FPWJ actually enhanced the crack detectability by cleaning/removing any contaminates or material that may hide the cracks. The crack length measured pre- and post- FPWJ were consistent. All coupons passed consistent the detectability testing. ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY. REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
  • 8. Project Status Fatigue Testing F ti T ti Objective Project Status Other Coatings Contact Information Questions Typical View of Fatigue coupon in FPWJ booth at VLN. Typical View of the fatigue coupon inspection sequence yp g p p q conducted before and after FPWJ ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY. REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
  • 9. Project Status Fatigue Testing F ti T ti Objective Project Status Other Coatings Contact Information Questions Left: Shows Typical View of .013-.015” T-800 HVOF Coated Inconel 718 Fatigue coupon prior to FPWJ. Right: View of the coupon after complete coating removal by FPWJ. f f View also typical for 4340 and 300M HVOF coated and Chrome plated fatigue specimens. There were no visual or dimensional damage to the b t t th substrate. ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY. REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
  • 10. Project Status INC718 F ti Fatigue Test Results T tR lt Objective Project Status Other Coatings Contact Information Questions Note: Curve reflects test results completed to date. ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY. REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
  • 11. Project Status 4340 Fatigue Test Results F ti T tR lt Objective 4340 Fatigue Data 160 Project Status Other Coatings 150 Contact 140 Information i) Stress level(ksi Questions 130 120 110 100 100 1000 10000 100000 Cycles Bare, Unpeened Bare, Peened Note: Curve reflects test results completed to date. ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY. REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
  • 12. Project Status 300M Fatigue Test Results F ti T tR lt Objective 300M Fatigue Data 230 Project Status 220 Other Coatings Contact 210 Information 200 Questions Stress Lev (KSI) 190 vel 180 170 160 100 1,000 10,000 100,000 Cycles Bare Upeended Bare Peened Chrome thin (Chem) Chrome thick (Chem) HVOF thin (Chem) HVOF thick (Chem) Note: Curve reflects test results completed to date. ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY. REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
  • 13. Project Status Abradable/Ceramic C t d P Ab d bl /C i Coated Parameter Development Testing t D l t T ti Objective Project Status Other Coatings Contact Information Questions View of Metco 450/312 coated coupon in FPWJ @10 Ksi View of the Metco 450/312 coupon inspection process after FPJW ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY. REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
  • 14. Project Status Abradable/Ceramic C t d P Ab d bl /C i Coated Parameter Development Testing t D l t T ti Objective Project Status Other Coatings Contact Information Questions Left: View of Metco 450/312 coated coupon prior to FPWJ. Right: View of the coupon after complete coating removal by FPWJ @ 10 Ksi. View also typical for Metco 450/101B coating. Process time was approximately 9 minutes to remove 0.055 inch thick Metco 450/312 coating along the length of a 1 inch diameter, eight inch long coupon. Th There is no visual or dimensional damage to the Ti-6Al-4V i i l di i ld t th Ti 6Al 4V substrate. ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY. REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
  • 15. Project Status Abradable/Ceramic C t d P Ab d bl /C i Coated Parameter Development Testing t D l t T ti Objective Project Status Other Coatings Contact Information Surfaces were visually Questions inspected under 20X magnification to observe surface texture characteristics. ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY. REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
  • 16. Project Status Abradable/Ceramic C t d Dem/Val Testing Ab d bl /C i Coated D /V l T ti Objective Project Status TF34 HPC Fwd Stator Case, Other Coatings P/N 6037T10G04 Contact M/F Ti-6Al-4V, Annealed and Information Coated with Metco 450/312 Questions View FPWJ Test Set-up with 0.054” nozzle orifice @10Ksi and 2.25” Standoff ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY. REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
  • 17. Project Status Abradable/Ceramic C t d Dem/Val Testing Ab d bl /C i Coated D /V l T ti Objective Project Status Other Coatings Contact Information Questions View of Case Prior to FPWJ View of Case After FPWJ FPWJ successfully removed the Metco 405/312 from case using a single 0.054” diameter nozzle orifice and a pump pressure of 10 Ksi. ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY. REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
  • 18. Project Status Abradable/Ceramic C t d Dem/Val Testing Ab d bl /C i Coated D /V l T ti Objective Project Status F404 LPT Fwd Seal, P/N Other Coatings 6049T70P03 Contact M/F Inconel 718 and Information Coated with Metco 450/101B Questions View FPWJ Test Set upwith 0.054 nozzle orifice Set-upwith 0 054” @10Ksi and 2.5” Standoff ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY. REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
  • 19. Project Status Abradable/Ceramic C t d Dem/Val Testing Ab d bl /C i Coated D /V l T ti Objective Project Status Other Coatings Contact Information Questions Typical View of Knife Edge Surface (at 50X Mag) after FPWJ @ 10Ksi FPWJ successfully removed the Metco 405/101B from seal using a single 0.054” diameter nozzle orifice and a pump pressure of 10 Ksi. ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY. REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
  • 20. Other Coatings Phase II SBIR F ll Ph Follow-On P O Parameter Development t D l t Objective Pulse Waterstrip Process has the capability of removing Project Status all of these coatings, and many more: WC-Co from INC-718, and other substrates. Other Coatings Other TBCs, Abradable and Build-up coatings Contact such as: Information Metco 204 Metco 443, Metco 601, M t 204, M t 443 M t 601 Questions Rubber, etc… Paint and Primers Chrome and other platings. platings Parameter development needs to be completed for processing each coating properly. ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY. REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
  • 21. Contact Information Objective ES3 Jay Randolph Fred Laguines Project Status (478) 922-1460 (478) 922-1460 Other Coatings jay.randolph@es3inc.com fred.laguines@es3inc.com Contact Craig Pessetto Don Crawford Information (801) 926-1150 (478) 922-1460 Questions craig.pessetto@es3inc.com don.crawford@es3inc.com VLN – Advanced Technologies Mohan Vijay Willie Bloom (613) 749-2244 (613) 747-0107 mvijay@vln-tech.com j y wbloom@vln-tech.com ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY. REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.
  • 22. Objective Project Status Other Coatings Contact Information Questions Questions? ES3 PROPRIEATARY INFORMATION. DISTRIBUTION AUTHORIZED TO DEPARTMENT OFDEFENSE ONLY; CRITICAL TECHNOLOGY. REFER OTHER REQUESTS FOR THIS DOCUMENT TO WR-ALC/ENFM TECHNOLOGY & RELIABILITY BRANCH, ROBINS AFB, GA 31098.